CN206706778U - A kind of supporting construction of deep basal pit - Google Patents

A kind of supporting construction of deep basal pit Download PDF

Info

Publication number
CN206706778U
CN206706778U CN201720466693.2U CN201720466693U CN206706778U CN 206706778 U CN206706778 U CN 206706778U CN 201720466693 U CN201720466693 U CN 201720466693U CN 206706778 U CN206706778 U CN 206706778U
Authority
CN
China
Prior art keywords
foundation ditch
composite filling
pile
supporting construction
deep basal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720466693.2U
Other languages
Chinese (zh)
Inventor
曹功皓
魏学天
邢小燕
贾雨
王成伟
刘坤
李慧
汤青喜
王静
陈俭勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaochuang Industrial Co ltd
Original Assignee
Hi Tech Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hi Tech Construction Ltd By Share Ltd filed Critical Hi Tech Construction Ltd By Share Ltd
Priority to CN201720466693.2U priority Critical patent/CN206706778U/en
Application granted granted Critical
Publication of CN206706778U publication Critical patent/CN206706778U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of supporting construction of deep basal pit, including foundation ditch, foundation ditch plane is divided into south, north, east, Xisi side, the foundation ditch west side is using multiple composite filling piles according to determining deviation arrangement as support, composite filling pile include pouring by the cylindrical concrete stake core that forms of perfusion and with stake core together with rubble pile protection, a circle steel reinforcement cage is with the outside of multiple composite filling piles, its excess-three side of foundation ditch is using multiple minor diameter cast-in-place concrete piles according to determining deviation arrangement as support.The beneficial effects of the utility model are:The foundation ditch for closing on skyscraper side uses composite filling pile as support, and being with a circle steel reinforcement cage on the outside of composite filling pile further reinforces, it can be ensured that the safety and stability of pattern foundation pit supporting structure, increases the security of construction, improves construction quality.

Description

A kind of supporting construction of deep basal pit
Technical field
The utility model belongs to building field, espespecially a kind of supporting construction of deep basal pit.
Background technology
Present urban architecture density is increasing, and in face of land resource scarcity, excavation of foundation pit depth is more and more deeper, works as foundation ditch When excavation closes on skyscraper, it can cause surrounding building that additional deformation occurs, structure can be caused when additional deformation is excessive Cracking and destruction, so as to influence the normal use of surrounding building, larger potential safety hazard can be produced using bored concrete pile supporting merely.
The content of the invention
To solve the above problems, the utility model provides a kind of supporting construction of deep basal pit, it can be ensured that pattern foundation pit supporting structure Safety and stability, increase the security of construction, improve construction quality.
The utility model uses following technical scheme:A kind of supporting construction of deep basal pit, including foundation ditch, foundation ditch plane are divided into South, north, east, Xisi side, the foundation ditch west side is using multiple composite filling piles according to determining deviation arrangement as support, compounding and pouring Stake include pouring by the cylindrical concrete stake core that forms of perfusion and with stake core together with rubble pile protection, multiple composite filling piles Outside is with a circle steel reinforcement cage, and its excess-three side of foundation ditch is using multiple minor diameter cast-in-place concrete piles according to determining deviation arrangement as branch Support.
Centre-to-centre spacing between adjacent composite filling pile is equal with the centre-to-centre spacing between adjacent minor diameter cast-in-place concrete pile.
The height of the steel reinforcement cage is identical with the height of composite filling pile.
A diameter of 800mm of the minor diameter cast-in-place concrete pile.
The beneficial effects of the utility model are:The foundation ditch for closing on skyscraper side uses composite filling pile as support, multiple A circle steel reinforcement cage is with the outside of conjunction bored concrete pile further to reinforce, it can be ensured that the safety and stability of pattern foundation pit supporting structure, increase the peace of construction Quan Xing, improve construction quality.
Brief description of the drawings
Fig. 1 is plan of the present utility model.
Fig. 2 is compounding and pouring pile-supported structure schematic diagram.
Embodiment
Orientation in the utility model is defined according to the rule of up north and down south left west and right east.
As depicted in figs. 1 and 2, a kind of supporting construction of deep basal pit, including foundation ditch 1, foundation ditch plane are divided into south, north, east, west Skyscraper is closed in four sides, the west side of foundation ditch 1, and the west side of foundation ditch 1 is with multiple composite filling piles 2 according to determining deviation arrangement Support, composite filling pile 2 include pouring by the cylindrical concrete stake core 6 that forms of perfusion and with stake core 6 together with broken stone pile Set 5, concrete pile body have the function that carrying and limit lateral deformation, and the rubble pile protection 5 in outside has the work of carrying and draining With multiple outsides of composite filling pile 2 are with a circle steel reinforcement cage 3, and the height of steel reinforcement cage 3 is identical with the height of composite filling pile 2, base 1 its excess-three side is cheated with multiple minor diameter cast-in-place concrete piles 4 according to determining deviation arrangement as support, minor diameter filling concrete A diameter of 800mm of stake.In between centre-to-centre spacing and adjacent minor diameter cast-in-place concrete pile 4 between adjacent composite filling pile 2 The heart is away from equal, centre-to-centre spacing 1.5m.

Claims (4)

1. a kind of supporting construction of deep basal pit, including foundation ditch, foundation ditch plane is divided into south, north, east, Xisi side, it is characterised in that:Institute Foundation ditch west side is stated using multiple composite filling piles according to determining deviation arrangement as support, composite filling pile is included by cylindrical concrete The soil stake core that forms of perfusion and the rubble pile protection together with being poured with stake core, a circle reinforcing bar is with the outside of multiple composite filling piles Cage, its excess-three side of foundation ditch is using multiple minor diameter cast-in-place concrete piles according to determining deviation arrangement as support.
2. the supporting construction of deep basal pit according to claim 1, it is characterised in that:Center between adjacent composite filling pile It is equal away from the centre-to-centre spacing between adjacent minor diameter cast-in-place concrete pile.
3. the supporting construction of deep basal pit according to claim 1, it is characterised in that:The height of the steel reinforcement cage and compound filling The height for noting stake is identical.
4. the supporting construction of deep basal pit according to claim 1, it is characterised in that:The minor diameter cast-in-place concrete pile A diameter of 800mm.
CN201720466693.2U 2017-04-28 2017-04-28 A kind of supporting construction of deep basal pit Expired - Fee Related CN206706778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720466693.2U CN206706778U (en) 2017-04-28 2017-04-28 A kind of supporting construction of deep basal pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720466693.2U CN206706778U (en) 2017-04-28 2017-04-28 A kind of supporting construction of deep basal pit

Publications (1)

Publication Number Publication Date
CN206706778U true CN206706778U (en) 2017-12-05

Family

ID=60457715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720466693.2U Expired - Fee Related CN206706778U (en) 2017-04-28 2017-04-28 A kind of supporting construction of deep basal pit

Country Status (1)

Country Link
CN (1) CN206706778U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439011A (en) * 2022-03-25 2022-05-06 刘俊男 Construction device for environment-friendly cast-in-place pile of constructional engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439011A (en) * 2022-03-25 2022-05-06 刘俊男 Construction device for environment-friendly cast-in-place pile of constructional engineering
CN114439011B (en) * 2022-03-25 2023-09-01 明达海洋工程有限公司 Construction device for environment-friendly filling pile for constructional engineering

Similar Documents

Publication Publication Date Title
CN204401385U (en) A kind of road structure processing Deep Thick Soft Ground karst foundation
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN205742175U (en) A kind of steel construction protection wall of bored pile
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN107237343A (en) A kind of many wall type nodular diaphragm walls as bridge foundation for soft soil foundation
CN206706778U (en) A kind of supporting construction of deep basal pit
CN102767187A (en) Reverse construction method for pebble foundation swirling well
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN210049631U (en) Basement increases a layer and drags to trade construction structures
CN205576990U (en) Cross section and wear bridge pier tunnel slip casting supporting construction
CN201627207U (en) Supporting structure of pine pile of foundation pit of elevator shaft
CN203905044U (en) Overhead deep foundation pit crossing construction elevator beam plate type base structure
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN206477351U (en) Element earth pile for the high collapsible loess foundation of big thickness
CN203049588U (en) Pit-in-pit cylindrical mould
CN206486886U (en) A kind of equipment for reinforcing Line for Passenger Transportation Extra-fine sand ground
CN206220100U (en) A kind of deep foundation pit supporting structure for closing on protection building
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure
CN209323552U (en) A kind of ground base enforcement device
CN104328794B (en) A kind of narrow base tower four lower limb associating well foundation
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support
CN208251078U (en) A kind of bottom-expanding sinking-pipe pilework
CN207959245U (en) A kind of load-bearing pile foundation structure
CN102926389B (en) Grouped pile structure for preventing and treating landslide and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee after: Gaochuang Industrial Co.,Ltd.

Address before: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee before: GAOCHUANG CONSTRUCTION Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205