CN201627207U - Supporting structure of pine pile of foundation pit of elevator shaft - Google Patents
Supporting structure of pine pile of foundation pit of elevator shaft Download PDFInfo
- Publication number
- CN201627207U CN201627207U CN2010201293755U CN201020129375U CN201627207U CN 201627207 U CN201627207 U CN 201627207U CN 2010201293755 U CN2010201293755 U CN 2010201293755U CN 201020129375 U CN201020129375 U CN 201020129375U CN 201627207 U CN201627207 U CN 201627207U
- Authority
- CN
- China
- Prior art keywords
- elevator shaft
- foundation ditch
- pine
- foundation pit
- shaft foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model belongs to the technical field of a foundation pit of an elevator shaft, relating to a supporting structure of a pine pile of a foundation pit of an elevator shaft. Pine pile guard rails are vertically arranged on the peripheral wall of the foundation pit of the elevator shaft at intervals; the bottom of the foundation pit of the elevator shaft in the pine pile guard rails is paved with a stone cushion layer; the stone cushion layer is poured with a concrete cushion layer; the inner wall which is formed along the pine pile guard rails in the foundation pit of the elevator shaft is built with a brick wall fence; the place of a half height of the brick wall fence is provided with a concrete ring beam; the gaps between the brick wall fence and the pine pile guard rails are filled with filling materials; and the upper ends of the brick wall fence and the pine pile guard rails as well as the upper periphery of the foundation pit of the elevator shaft are poured with top pressing concrete. The structure has the advantages of low cost, short work period, good safety performance and environment protection, and is suitable for the elevator shaft, the depth of which is within 2-4m.
Description
Technical field
The utility model belongs to elevator shaft foundation ditch technical field, refers in particular to a kind of elevator shaft foundation ditch supporting pine pile structure.
Background technology
Development along with the foundation pit construction technology, going along with sb. to guard him of basement foundation ditch correspondingly is tending towards safe and perfect, domestic and international existing elevator shaft foundation pit supporting construction generally all adopts the soil nailing wall type structure, utilize the frictional force and the cohesion of the soil nailing and the surrounding soil of oblique setting, soil mass consolidation forms assembly, makes soil structuresization, at the domatic steel mesh reinforcement of establishing of supporting, spray microlith and mix earth, making the local soil body at excavation face place and deep layer Stabilized Soil sports association is one, constitutes the supporting wall; This supporting and protection structure cost height, long in time limit, poor safety performance, influential to environment.
Summary of the invention
The purpose of this utility model provides that a kind of cost is low, the duration is short, security performance is good, environment is not had the elevator shaft foundation ditch supporting pine pile structure of influence.
The purpose of this utility model is achieved in that
Elevator shaft foundation ditch supporting pine pile structure, vertical and be arranged at intervals with pine stake guardrail at elevator shaft foundation ditch perisporium, the bottom of the elevator shaft foundation ditch in pine stake guardrail is equipped with the stone bed course, on the stone bed course, built the concrete bed course, the inwall that forms along pine stake guardrail in the elevator shaft foundation ditch is built brick wall fence, half place at the brick wall fence height is provided with the concrete collar tie beam, be filled with filling material in the gap between brick wall fence and the pine stake guardrail, built the concrete that bears down on one in the upper end of brick wall fence and pine stake guardrail and the upper periphery of elevator shaft foundation ditch.
The length of above-mentioned pine stake is 5.5~6.5m, and the degree of depth of elevator shaft foundation ditch is 1.5~3m.
The length of above-mentioned pine stake is 6m, and the degree of depth of elevator shaft foundation ditch is 2m.
Above-mentioned filling material is sand or rubble.
The outstanding compared to existing technology advantage of the utility model is:
1, the utility model is vertical and be arranged at intervals with pine stake guardrail at elevator shaft foundation ditch perisporium, reduced the influence of the long side effect of large-area foundation ditch, be filled with resistance to deformation, migration-resistant ability that yellow sand has improved elevator shaft foundation ditch wall in the gap between brick wall fence and pine stake, thereby having guaranteed that the elevator shaft foundation ditch re-uses in the process does not deform, and has improved the security performance of elevator shaft foundation ditch greatly.
2, the utility model adopts pine stake guardrail to go along with sb. to guard him, and cost is low, can directly with excavator the pine stake be pressed into elevator shaft foundation ditch bottom surface, and easy to use, the duration lacks, environment is not influenced.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is a structural representation of the present utility model.
The specific embodiment
The utility model is further described with specific embodiment below in conjunction with accompanying drawing, referring to Fig. 1-2:
Be provided with elevator shaft foundation ditch 10 in the bottom of basement 1, elevator shaft foundation ditch supporting pine pile structure at basement 1 is: vertical and be arranged at intervals with pine stake 13 guardrails at elevator shaft foundation ditch 10 perisporiums, the bottom of the elevator shaft foundation ditch 10 in pine stake 13 guardrails is equipped with stone bed course 11, on stone bed course 11, built concrete bed course 12, the inwall that forms along pine stake 13 guardrails in elevator shaft foundation ditch 10 is built brick wall fence 14, half place at brick wall fence 14 height is provided with concrete collar tie beam 141, be filled with filling material 15 in the gap between brick wall fence 14 and pine stake 13 guardrails, built the concrete 16 that bears down on one in the upper end of brick wall fence 14 and pine stake 13 guardrails and the upper periphery of elevator shaft foundation ditch 10.
The length D of above-mentioned pine stake 13 is 5.5~6.5m, and the depth d of elevator shaft foundation ditch 10 is 1.5~3m.
The length D of above-mentioned pine stake 13 is 6m, and the depth d of elevator shaft foundation ditch 10 is 2m.
Above-mentioned filling material 15 is sand or rubble.
The foregoing description only is one of preferred embodiment of the present utility model; be not to limit protection domain of the present utility model according to this; so: all equivalences of doing according to structure of the present utility model, shape, principle change, and all should be covered by within the protection domain of the present utility model.
Claims (4)
1. elevator shaft foundation ditch supporting pine pile structure, it is characterized in that: vertical and be arranged at intervals with pine stake guardrail at elevator shaft foundation ditch perisporium, the bottom of the elevator shaft foundation ditch in pine stake guardrail is equipped with the stone bed course, on the stone bed course, built the concrete bed course, the inwall that forms along pine stake guardrail in the elevator shaft foundation ditch is built brick wall fence, half place at the brick wall fence height is provided with the concrete collar tie beam, be filled with filling material in the gap between brick wall fence and the pine stake guardrail, built the concrete that bears down on one in the upper end of brick wall fence and pine stake guardrail and the upper periphery of elevator shaft foundation ditch.
2. elevator shaft foundation ditch supporting pine pile structure according to claim 1, it is characterized in that: the length of described pine stake is 5.5~6.5m, the degree of depth of elevator shaft foundation ditch is 1.5~3m.
3. elevator shaft foundation ditch supporting pine pile structure according to claim 1, it is characterized in that: the length of described pine stake is 6m, the degree of depth of elevator shaft foundation ditch is 2m.
4. elevator shaft foundation ditch supporting pine pile structure according to claim 1, it is characterized in that: described filling material is sand or rubble.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201293755U CN201627207U (en) | 2010-03-10 | 2010-03-10 | Supporting structure of pine pile of foundation pit of elevator shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201293755U CN201627207U (en) | 2010-03-10 | 2010-03-10 | Supporting structure of pine pile of foundation pit of elevator shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201627207U true CN201627207U (en) | 2010-11-10 |
Family
ID=43058598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201293755U Expired - Fee Related CN201627207U (en) | 2010-03-10 | 2010-03-10 | Supporting structure of pine pile of foundation pit of elevator shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201627207U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839663A (en) * | 2015-01-13 | 2016-08-10 | 中天建设集团有限公司 | Method for reinforcing soft soil foundation pit by combination of upturning cushion layer ring beams (concealed beam) and vertical anchor pipes |
CN108978680A (en) * | 2018-08-22 | 2018-12-11 | 中天建设集团有限公司 | A kind of muck soil elevator foundation pit supporting construction device and method |
CN109322313A (en) * | 2018-11-12 | 2019-02-12 | 上海建工集团股份有限公司 | Foundation pit enclosure structure system and its construction method |
CN116289967A (en) * | 2023-01-28 | 2023-06-23 | 中国十七冶集团有限公司 | Over-excavation collapse-prevention elevator foundation pit slope construction process |
-
2010
- 2010-03-10 CN CN2010201293755U patent/CN201627207U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839663A (en) * | 2015-01-13 | 2016-08-10 | 中天建设集团有限公司 | Method for reinforcing soft soil foundation pit by combination of upturning cushion layer ring beams (concealed beam) and vertical anchor pipes |
CN108978680A (en) * | 2018-08-22 | 2018-12-11 | 中天建设集团有限公司 | A kind of muck soil elevator foundation pit supporting construction device and method |
CN108978680B (en) * | 2018-08-22 | 2020-11-27 | 中天建设集团有限公司 | Mucky soil elevator foundation pit supporting construction device and method |
CN109322313A (en) * | 2018-11-12 | 2019-02-12 | 上海建工集团股份有限公司 | Foundation pit enclosure structure system and its construction method |
CN116289967A (en) * | 2023-01-28 | 2023-06-23 | 中国十七冶集团有限公司 | Over-excavation collapse-prevention elevator foundation pit slope construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105239586B (en) | Method for supporting foundation pit by adopting support structure | |
CN103233473B (en) | Many ribs of high polymer stake grouting method | |
CN102653945B (en) | Foundation reinforcing and replacing structure and construction method thereof | |
CN101250886B (en) | Method for reinforcing masonry structure building base | |
CN203361033U (en) | Protective device for intercepting falling rocks of through cut | |
JP2015183364A (en) | Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means | |
CN201627207U (en) | Supporting structure of pine pile of foundation pit of elevator shaft | |
CN104532714B (en) | Roadbed structure for treating deep soft soil karst foundation | |
CN106012971A (en) | Vegetation concrete protection slope and construction method thereof | |
CN206385548U (en) | A kind of tandem anchor slab foundation pit support system with Recyclable anchor rope | |
CN108824097A (en) | Prefabricated GFRP pipe concrete stake and armoured concrete slab overhead type roadbed pile slab structure | |
CN203905044U (en) | Overhead deep foundation pit crossing construction elevator beam plate type base structure | |
CN110939142A (en) | Roadbed structure for side slope | |
CN207512768U (en) | A kind of Gravity Retaining Wall | |
CN205088687U (en) | Supporting structure of strut foundation ditch | |
CN202672161U (en) | Cement-soil mixing drum sheet-pile united slope structure with soil nails | |
CN211773563U (en) | Pile foundation structure | |
CN201567579U (en) | Foundation pit supporting structure of gantry pine pile anchored rod | |
CN201991015U (en) | Foundation underpinning structure | |
CN212316951U (en) | Roadbed structure for side slope | |
CN208803305U (en) | Prefabricated GFRP pipe concrete stake and concrete slab overhead type roadbed pile slab structure | |
CN207331754U (en) | Municipal administration inspection shaft | |
CN203924106U (en) | A kind of reinforced soil retaining wall is used from embedded dust block | |
CN206706778U (en) | A kind of supporting construction of deep basal pit | |
CN207228130U (en) | A kind of city integrated piping lane foundation pit backfill processing combined system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101110 Termination date: 20130310 |