CN206692979U - porous pavement - Google Patents

porous pavement Download PDF

Info

Publication number
CN206692979U
CN206692979U CN201720408413.2U CN201720408413U CN206692979U CN 206692979 U CN206692979 U CN 206692979U CN 201720408413 U CN201720408413 U CN 201720408413U CN 206692979 U CN206692979 U CN 206692979U
Authority
CN
China
Prior art keywords
groove
porous pavement
cushion
top layer
sealing block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720408413.2U
Other languages
Chinese (zh)
Inventor
夏明�
陆丽君
董秀奎
张耀洲
曹飞
李�权
付秀梅
杨赛娇
杜玉其
茅冲飞
周进民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Shilin Greening Co Ltd
Original Assignee
Kunshan Shilin Greening Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Shilin Greening Co Ltd filed Critical Kunshan Shilin Greening Co Ltd
Priority to CN201720408413.2U priority Critical patent/CN206692979U/en
Application granted granted Critical
Publication of CN206692979U publication Critical patent/CN206692979U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of porous pavement, including it is bottom-up lay successively and supply water through basic unit, pervious bed, drainage layer and top layer, the both sides on the top layer are provided with road tooth along its length direction, its length direction is provided with several equally distributed Drainage Divisions on the inside of the road tooth, the Drainage Division includes vertically penetrating the groove of road tooth, the sealing block of fitting groove madial wall is provided with the groove, the sealing block bottom, which is extended, support block, the support block both sides are extended the cushion having for supporting sealing block, the cushion is made up of hydro-expansive rubber, the bottom portion of groove is provided with below support block and the honeycomb duct for guiding rainwater.The utility model is by the characteristic of hydro-expansive rubber, and the cushion after water suction can become big, and the rainwater accumulated on road surface will leave along honeycomb duct, and sealing block will seal honeycomb duct again after drained water, achieve the beneficial effect for facilitating draining.

Description

Porous pavement
Technical field
A kind of road is the utility model is related to, more specifically, it relates to a kind of porous pavement.
Background technology
At present, what is used in the laying of road is that concrete is directly poured, and road surface does not have drain function, under Collection ponding is assembled on road surface when heavy rain or rainy day, when ponding reaches certain depth, not only result in road surface it is easily cracking, Threshing, the service life on road surface is reduced, add maintenance cost in the future, but also vehicle and the person can be caused to hinder Evil.
A kind of porous pavement is disclosed in the patent of Application No. " 201520396423.X ", it includes permeable brick layer, mixed Solidifying soil layer, metalling, gravel layer and vertical aqueduct, are additionally provided with underground storage area, the permeable brick layer is spread by some water-permeable bricks If forming, permeable brick layer, concrete layer, metalling and the gravel layer are sequentially distributed from top to bottom, and the vertical aqueduct is worn The concrete layer is crossed, its upper end tube nozzle stretches into the permeable brick layer, and the lower end mouth of pipe stretches into the metalling or gravel layer, described Underground storage area is located at roadside, and rubble or gravel are filled with the underground storage area.This ecological permeable road surface is by water guide Pipe and the cooperation of permeable brick layer, can reach preferable drainage effect, but because aqueduct top is directly exposed in gap, it is long After phase work, just easily blocked by the dust on road, lead to not proper drainage.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of porous pavement, it is convenient to have The effect of draining.
To realize above-mentioned technical purpose, the utility model provides following technical scheme:A kind of porous pavement, including under Lay successively upwards and supply water through basic unit, pervious bed, drainage layer and top layer, the both sides on the top layer are along its length direction Road tooth is provided with, the road tooth inner side is provided with several equally distributed Drainage Divisions, the Drainage Division bag along its length direction The groove for vertically penetrating road tooth is included, the sealing block of fitting groove madial wall, the sealing block are provided with the groove Bottom, which is extended, support block, and the support block both sides are extended the cushion having for supporting sealing block, the elasticity Pad is made up of hydro-expansive rubber, and the bottom portion of groove is provided with below support block and the honeycomb duct for guiding rainwater.
By using above-mentioned technical proposal, rainwater falls can be through top layer, drainage layer, pervious bed and base after porous pavement Layer, the cushion on the tooth of road will be bedewed without accumulating in top layer upper surface, when water is excessive, because hydro-expansive rubber has There is the characteristic of water-swellable, cushion will become big, and so as to prop up the sealing block of top, now the honeycomb duct of support block bottom is just It can expose, the rainwater accumulated on road surface will leave along honeycomb duct, achieve the beneficial effect for facilitating draining.When on road surface There is no ponding, the water in cushion is gradually lost in, and will narrow down to original size, and now support block will cover honeycomb duct, Avoid dust debris etc. from blocking honeycomb duct, achieve the auxiliary beneficial effect for improving reasonable structure.
Preferably, the side wall of the road tooth is provided with the limiting plate for sealing groove, penetrated among the limiting plate Be provided with support block width identical opening, gap be present between the limiting plate bottom and top layer, the gap is less than 2mm。
By using above-mentioned technical proposal, it can be expanded after cushion absorbs water to surrounding, groove is easily separated from, by spacing Plate blocks cushion, the cushion can only be expanded along its length, achieves the beneficial effect for improving structural soundness.
Preferably, insertion is provided with through hole in the cushion, top and sealing block bottom are provided with the through hole The fixed back-moving spring that end is fixed with groove bottom simultaneously, the back-moving spring are in contraction state.
, will be by the back-moving spring in contraction state after cushion gradually expands by using above-mentioned technical proposal Elongate, when the water in cushion is gradually lost in, cushion will retract script size, and now the elastic potential energy of back-moving spring will More than the potential energy of deformation of cushion, so as to accelerate the reset of cushion, avoid cushion from not setting back, achieve raising knot The beneficial effect of structure steadiness.
Preferably, the sealing block bottom is provided with the first guide housing being set in outside back-moving spring, the groove-bottom Portion is provided with the second guide housing that fitting is set in outside the first guide housing, the second guide housing lateral wall fitting through hole inner side Wall.
By using above-mentioned technical proposal, back-moving spring is played by the cooperation of the first guide housing and the second guide housing Guide effect, pressed home spring when avoiding the cushion from expanding, achieve the beneficial effect for improving structural soundness.
Preferably, the top layer is arranged to the middle slope shape reduced respectively to both sides in the width direction.
By using above-mentioned technical proposal, rainwater on road surface can along slope shape top layer upper table towards both sides road tooth Flow away, avoid accumulation of rainwater in top layer upper surface, achieve the beneficial effect for improving drainage efficiency.
Preferably, the basic unit by the plain local soil type after tamping into.
By using above-mentioned technical proposal, plain soil is that do not have the density for adulterating other impurities fine and smooth in crude sedimentation soil layer It is even, there is the soil of certain viscosity, will both there is preferable bearing capacity after rammed earth, while can also supply water through achieving Improve the beneficial effect of structural soundness.
Preferably, the pervious bed is made up of rubble.
By using above-mentioned technical proposal, rubble has the mechanical strength more stronger than plain soil, can effectively strengthen permeable road The mechanical strength in face, at the same supply water through, achieve further improve road surface bearing capacity beneficial effect.
Preferably, the drainage layer is made up of true qualities pervious concrete.
By using above-mentioned technical proposal, pervious concrete also keeps certain insertion while intensity requirement is met Hole meets the requirement of water penetration, therefore when preparing can also pass through mix-design in addition to selecting suitable raw material Reach the purpose of proof strength and porosity with preparation technology and additive, achieve and further improve structural soundness Beneficial effect.
Preferably, the top layer is made up of vermilion pervious concrete.
By using above-mentioned technical proposal, top layer is equally made of pervious concrete, and Zhu is added in pervious concrete Red pigment so that top layer is shown as vermilion, and convenient use person sees road clearly at night, achieves the beneficial effect for improving convenience Fruit.The relatively bigger material on road surface can not also pass through pervious concrete simultaneously, will not block porous pavement, achieve anticlogging auxiliary Beneficial effect.
Preferably, the groundwork thickness is 80mm, the pervious bed thickness is 200mm, and the drainage layer thickness is 80mm, the skin depth are 40mm.
By using above-mentioned technical proposal, each thickness degree of reasonable distribution, both ensured that porous pavement had stronger machinery strong Degree, while also possess preferable water penetration, achieve the beneficial effect for improving reasonable structure.
In summary, by the characteristic of hydro-expansive rubber, the cushion after water suction can become big, accumulate in the utility model Rainwater on road surface will leave along honeycomb duct, and sealing block will seal honeycomb duct again after drained water, achieve convenient row The beneficial effect of water.
Brief description of the drawings
Fig. 1 is the partial sectional view for being used to show porous pavement Rotating fields in the present embodiment;
Fig. 2 is to be used to show Drainage Division and the sectional view of porous pavement relation in the present embodiment;
Fig. 3 is to be used to show enlarged drawing at the A of Drainage Division concrete structure in Fig. 2;
Fig. 4 is the integrally-built side view for being used to show road tooth in the present embodiment.
In figure, 11, basic unit;12nd, pervious bed;13rd, drainage layer;14th, top layer;15th, road tooth;2nd, Drainage Division;21st, groove;22、 Sealing block;23rd, support block;24th, cushion;25th, honeycomb duct;26th, limiting plate;27th, it is open;31st, through hole;32nd, back-moving spring; 33rd, the first guide housing;34th, the second guide housing.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.
Embodiment:As shown in figure 1, a kind of porous pavement, including it is bottom-up lay successively and supply water through basic unit 11, Pervious bed 12, drainage layer 13 and top layer 14.
As shown in figure 1, basic unit 11 is that other are not adulterated in crude sedimentation soil layer is miscellaneous into, plain soil by the plain local soil type after tamping The density of matter is fine and smooth uniformly, has the soil of certain viscosity, will both have preferable bearing capacity after rammed earth.Pervious bed 12 by Rubble forms, and rubble has the mechanical strength more stronger than plain soil, can effectively strengthen the mechanical strength of porous pavement, supply water simultaneously Pass through, the present embodiment forms pervious bed 12 using graded broken stone.Drainage layer 13 is made up of true qualities pervious concrete, permeable coagulation Soil also keeps certain gap of through hole 31 to meet the requirement of water penetration, therefore when preparing while intensity requirement is met In addition to selecting suitable raw material, can also by mix-design and preparation technology and additive come reach proof strength and The purpose of porosity.Top layer 14 is made up of vermilion pervious concrete, and top layer 14 is equally made of pervious concrete, permeable Vermilion pigment is added in concrete so that top layer 14 is shown as vermilion, and convenient use person sees road clearly at night.Basic unit 11 is thick Spend for 80mm, the thickness of pervious bed 12 is 200mm, and the thickness of drainage layer 13 is 80mm, and the thickness of top layer 14 is 40mm, each layer of reasonable distribution Thickness, both ensured that porous pavement had stronger mechanical strength, while also possessed preferable water penetration.
As depicted in figs. 1 and 2, the both sides on top layer 14 are respectively arranged with square road tooth 15, road tooth along its length direction 15 inner side is provided with several equally distributed Drainage Divisions 2 along its length direction, and Drainage Division 2 includes vertically penetrating road The groove 21 of the inner side of tooth 15, the sealing block 22 of the fitting madial wall of groove 21, square sealing block are provided with square groove 21 Square support block 23 is extended downward among 22 bottoms, the bottom of groove 21 is provided with positioned at the lower section of support block 23 and is used for Guide the honeycomb duct 25 of rainwater.
As shown in Fig. 2 the both sides of support block 23 are provided with the cushion 24 for supporting sealing block 22, cushion 24 uses A kind of hydro-expansive rubber disclosed in the patent of Application No. " 201010107698.9 ", its preparation technology is easy, has and meets Hydroexpansivity, expansion rate is higher, and waterproof water-stagnating effect is good, and hydro-expansive rubber belongs to prior art, will not be described here.
As shown in Figures 2 and 3, insertion is provided with through hole 31 in cushion 24, and top and sealing block are provided with through hole 31 The back-moving spring 32 that end is fixed with the bottom of groove 21 simultaneously is fixed in 22 bottoms, and back-moving spring 32 is in contraction state.Sealing block 22 bottoms are provided with the first guide housing 33 being set in outside back-moving spring 32, and the bottom of groove 21, which is provided with fitting and is set in first, leads The second guide housing 34 to outside frame 33, the lateral wall of the second guide housing 34 fitting madial wall of through hole 31.By the first guide housing 33 with The cooperation of second guide housing 34 plays guide effect to back-moving spring 32, pressed home spring when avoiding the cushion 24 from expanding 32。
As shown in figure 4, the side wall of road tooth 15 is provided with the limiting plate 26 for sealing groove 21, penetrated among limiting plate 26 Be provided with the width identical opening 27 of support block 23, gap between the bottom of limiting plate 26 and top layer 14 be present, gap is less than 2mm.It can be expanded after cushion 24 absorbs water to surrounding, be easily separated from groove 21, block cushion 24 by limiting plate 26, make Cushion 24 can only expand along its length.Top layer 14 is arranged to the middle slope shape reduced respectively to both sides in the width direction. Rainwater on road surface can flow away along the upper table of top layer 14 of slope shape towards the road tooth 15 of both sides, avoid accumulation of rainwater on top layer 14 Upper surface.
The course of work:Rainwater falls through top layer 14, drainage layer 13, pervious bed 12 and basic unit 11 after porous pavement, and The upper surface of top layer 14 is not accumulated in, the cushion 24 on road tooth 15 will be bedewed when water is excessive, due to hydro-expansive rubber Characteristic with water-swellable, cushion 24 will become big, so as to prop up the sealing block 22 of top, the now bottom of support block 23 Honeycomb duct 25 will expose, and the rainwater accumulated on road surface will leave along honeycomb duct 25.
Because the top of back-moving spring 32 is fixedly connected with the bottom of sealing block 22, sealing block 22 can be drawn with back-moving spring 32 Stretch, while the first guide housing 33 can also be bonded the second guide housing 34 and slide, and make 32 flexible potential energy of back-moving spring.
When simultaneously there is no ponding, the water in cushion 24 is gradually lost in, and will narrow down to original size, reset on road surface Spring 32 can also recover contraction state, further help support block 23 to reset, now support block 23 will cover honeycomb duct 25, keep away Exempt from dust debris etc. and block honeycomb duct 25.

Claims (10)

1. a kind of porous pavement, including it is bottom-up lay successively and supply water through basic unit (11), pervious bed (12), drainage layer And top layer (14) (13), it is characterised in that:The both sides of the top layer (14) are provided with road tooth (15) along its length direction, described Its length direction is provided with several equally distributed Drainage Divisions (2) on the inside of road tooth (15), the Drainage Division (2) is included along perpendicular For Nogata to the groove (21) of insertion road tooth (15), the groove (21) is interior to be provided with the sealing block for being bonded groove (21) madial wall (22), sealing block (22) bottom, which is extended, support block (23), and support block (23) both sides, which are extended to have, to be used for The cushion (24) of sealing block (22) is supported, the cushion (24) is made up of hydro-expansive rubber, groove (21) bottom It is provided with below support block (23) and is used for the honeycomb duct (25) for guiding rainwater.
2. porous pavement according to claim 1, it is characterised in that:The side wall of the road tooth (15) is provided with for sealing The limiting plate (26) of groove (21), the middle insertion of the limiting plate (26) are provided with and support block (23) width identical opening (27), gap be present between limiting plate (26) bottom and top layer (14), the gap is less than 2mm.
3. porous pavement according to claim 2, it is characterised in that:Insertion is provided with through hole in the cushion (24) (31) top, is provided with the through hole (31) and fixes what end simultaneously was fixed with groove (21) bottom with sealing block (22) bottom Back-moving spring (32), the back-moving spring (32) are in contraction state.
4. porous pavement according to claim 3, it is characterised in that:Sealing block (22) bottom, which is provided with, to be set in again The first guide housing (33) of position spring (32) outside, groove (21) bottom is provided with fitting and is set in the first guide housing (33) outside The second guide housing (34), the second guide housing (34) lateral wall is bonded through hole (31) madial wall.
5. porous pavement according to claim 4, it is characterised in that:The top layer (14) is arranged to centre in the width direction The slope shape reduced respectively to both sides.
6. porous pavement according to claim 1, it is characterised in that:The basic unit (11) by the plain local soil type after tamping into.
7. porous pavement according to claim 6, it is characterised in that:The pervious bed (12) is made up of rubble.
8. porous pavement according to claim 7, it is characterised in that:The drainage layer (13) is by true qualities pervious concrete group Into.
9. porous pavement according to claim 8, it is characterised in that:The top layer (14) is by vermilion pervious concrete group Into.
10. porous pavement according to claim 9, it is characterised in that:Basic unit (11) thickness is 80mm, described permeable Layer (12) thickness is 200mm, and drainage layer (13) thickness is 80mm, and top layer (14) thickness is 40mm.
CN201720408413.2U 2017-04-18 2017-04-18 porous pavement Active CN206692979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720408413.2U CN206692979U (en) 2017-04-18 2017-04-18 porous pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720408413.2U CN206692979U (en) 2017-04-18 2017-04-18 porous pavement

Publications (1)

Publication Number Publication Date
CN206692979U true CN206692979U (en) 2017-12-01

Family

ID=60444461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720408413.2U Active CN206692979U (en) 2017-04-18 2017-04-18 porous pavement

Country Status (1)

Country Link
CN (1) CN206692979U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878140A (en) * 2021-01-14 2021-06-01 重庆弘力建设工程有限公司 Water-permeable municipal road and construction method thereof
CN113860805A (en) * 2021-10-11 2021-12-31 柳州北皓建材有限公司 Green pervious concrete and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878140A (en) * 2021-01-14 2021-06-01 重庆弘力建设工程有限公司 Water-permeable municipal road and construction method thereof
CN113860805A (en) * 2021-10-11 2021-12-31 柳州北皓建材有限公司 Green pervious concrete and preparation method thereof

Similar Documents

Publication Publication Date Title
CN105544336B (en) Gap water-permeable brick group and the ecological permeable road surface formed using brick group laying
CN209039905U (en) A kind of asphalt paving convenient for construction
CN204728165U (en) Ecological permeable road surface
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN213476523U (en) Infiltration road surface is used in gardens
CN206692979U (en) porous pavement
CN110219357A (en) Multifunctional sponge urban municipal road biological cleaning stranded belt and its construction technology
CN110607727B (en) Garden road structure capable of draining water quickly and construction method
CN208293343U (en) A kind of gardens porous pavement
CN103643689B (en) A kind of pipe type underground water drainage blind ditch and construction technology thereof and application
CN109629369A (en) A kind of permeable pavement structure and its method for paving based on building waste crushed material
CN206828908U (en) Asphalt paving structure
CN207714054U (en) A kind of novel water permeable road
CN206829337U (en) A kind of collection water assembly for gardens catchwork irrigation system
CN206692973U (en) Permanent seal cooling porous pavement
CN206457915U (en) A kind of high osmosis concave herbaceous field
CN214938891U (en) Stable roadbed structure
CN214362641U (en) Sponge city permeable pavement
CN210288015U (en) A pavement that permeates water for sponge city construction
CN209923727U (en) Plastic track with water seepage function
CN212865490U (en) Be applied to municipal road's ecological area of being detained
CN208152219U (en) A kind of dry depression for sponge city
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN210946875U (en) Supporting retaining wall convenient for drainage
CN212077508U (en) Semi-filling and semi-digging type roadbed structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant