- CN206689191U CN206689191U CN201720560711.3U CN201720560711U CN206689191U CN 206689191 U CN206689191 U CN 206689191U CN 201720560711 U CN201720560711 U CN 201720560711U CN 206689191 U CN206689191 U CN 206689191U
- Authority
- CN
- China
- Prior art keywords
- construction waste
- recovery
- retracting device
- channel
- passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/58—Construction or demolition [C&D] waste
Abstract
The utility model provides a kind of construction waste retracting device and construction waste recovery system, the construction waste recovery system includes pulverizer, recovery band and construction waste retracting device, the construction waste retracting device includes recovery tube, more mozzles, multiple cast hoppers and layered component, and recovery tube is used to be fixedly connected on the wall face of building and is obliquely installed.One end of each mozzle is connected with recovery tube, and multiple cast hoppers are connected with more mozzles correspondingly.Layered component is fixedly connected in recovery tube and recovery channel is divided into first passage and second channel, has multiple sieve apertures in layered component, so that construction waste is layered in recovery channel.Compared to prior art, a kind of construction waste retracting device provided by the utility model, conveniently and efficiently construction waste can be reclaimed, while preliminary layered shaping can be carried out to construction waste, enormously simplify follow-up reclaimer, improve organic efficiency.
Description
Technical field
Technical field of buildings is the utility model is related to, in particular to a kind of construction waste retracting device and building
Waste recovery systems.
Background technology
In building trade field, the yield of construction waste is quite huge, the current processing side of these construction wastes
Formula is that construction waste is packed, and then by manually carrying, or hanging device is allocated and transported to ground.
Investigate and find through inventor, for both common ways of recycling, artificial labor intensity of carrying is big, and efficiency
It is low;Hanging device allocation and transportation there is also the problem of packing, can not bulk cargo recovery, while need it is special start loop wheel machine, waste the energy.
In view of this, design and manufacture a kind of device that is simple and easy, facilitating construction waste to reclaim to be particularly important.
Utility model content
The purpose of this utility model is to provide a kind of construction waste retracting device, simple in construction, and can be useless by building
Material layering recovery, lifts organic efficiency.
Another object of the present utility model is to provide a kind of construction waste recovery system, can break bulk construction waste
Recycled after broken, avoid the waste of construction waste.
The utility model is realized using following technical scheme.
A kind of construction waste retracting device, for reclaiming caused construction waste in building, construction waste recovery dress
Put including recovery tube, more mozzles, multiple cast hoppers and layered component, recovery tube is used for the exterior wall for being fixedly connected on building
Face is simultaneously obliquely installed.One end of each mozzle connects with recovery tube, and the other end is used for the exterior wall for stretching into building.It is multiple to feed intake
Bucket is connected with more mozzles correspondingly.Layered component, which is fixedly connected in recovery tube and recovery channel is divided into first, leads to
Road and second channel, there are multiple sieve apertures in layered component, one end of multiple sieve apertures connects with first passage, the other end and second
Passage connects, so that construction waste is layered in recovery channel.
Further, layered component includes multiple through plates and multiple connecting plates, and multiple through plates are handed over multiple connecting plates
Fork is arranged at intervals, and each through plate is detachably connected with corresponding connecting plate.
Further, there is multiple sieve apertures, multiple through plates and multiple connecting plate clampings on through plate.
Further, cast hopper includes bucket body and ring baffle, and one end of bucket body has dog-house, and bucket body is away from dog-house
One end connected with mozzle so that the construction waste in bucket body slips into mozzle, the opening direction and dog-house of ring baffle
Opening direction it is consistent.
Further, cast hopper also includes dust cap and elastic rotation component, and dust cap lid is located at the top of ring baffle,
Elastic rotation component is arranged on one end of ring baffle and is connected with one end of dust cap, and dust cap can pass through elastic rotation component
Opposed annular flapper.
Further, elastic rotation component includes elastic component, rotating shaft and axle sleeve, and rotating shaft is fixedly connected with one end of dust cap
And be contained in axle sleeve, rotating shaft can be rotated relative to axle sleeve, and axle sleeve is fixedly connected on one end of ring baffle, and one end of elastic component is supported
The madial wall of ring baffle is connected to, the other end is connected to the bottom of dust cap.
Further, construction waste retracting device also includes transfer assembly, and transfer assembly includes the first conveyer belt and second
Conveyer belt, the position of the first conveyer belt is corresponding with the opening of first passage, for receiving the construction waste in first passage,
The position of second conveyer belt is corresponding with the opening of second channel, for receiving the construction waste in second channel.
Further, transfer assembly also includes a recycling bin, and recycling bin is arranged on the second conveyer belt away from second channel
One end of opening, for reclaiming the construction waste in second channel.
Further, recovery tube includes multiple straight lengths and multiple connection sections, and multiple straight lengths pass through multiple connection section strings
Connection forms recovery tube, and each straight length is detachably connected with being each connected section.
A kind of construction waste recovery system, for reclaiming construction waste, including pulverizer, recovery band and construction waste recovery
Device, the construction waste retracting device include recovery tube, more mozzles, multiple cast hoppers and layered component, recovery tube and are used for
It is fixedly connected on the wall face of building and is obliquely installed.One end of each mozzle connects with recovery tube, and the other end is used to stretch
Enter the exterior wall of building, multiple cast hoppers are connected with more mozzles correspondingly.Layered component is fixedly connected on recovery tube
It is interior and recovery channel is divided into first passage and second channel, there are multiple sieve apertures in layered component, one end of multiple sieve apertures with
First passage connects, and the other end connects with second channel, so that construction waste is layered in recovery channel.One end of recovery band is set
The opening in first passage is put, for receiving the construction waste in first passage, the other end for reclaiming band is arranged on pulverizer
Porch, for construction waste to be sent into pulverizer.
The utility model has the advantages that:
A kind of construction waste retracting device provided by the utility model, one end of each mozzle connect with recovery tube, separately
One end is used for the exterior wall for stretching into building, and multiple cast hoppers are connected with more mozzles correspondingly.Layered component, which is fixed, to be connected
It is connected in recovery tube and recovery channel is divided into first passage and second channel, there are multiple sieve apertures, multiple sieves in layered component
The one end in hole connects with first passage, and the other end connects with second channel, so that construction waste is layered in recovery channel.In reality
During the use of border, construction waste is poured into cast hopper, construction waste is moved to recovery by mozzle under gravity
In pipe.On the one hand construction waste in recovery tube moves along the bearing of trend of recovery tube under gravity, on the other hand exist
Bulk construction waste tumbles along first passage in the presence of layered component, and fritter construction waste and sand material fall into second by sieve aperture
Passage simultaneously tumbles along second channel, realizes the layering of construction waste.Compared to prior art, one kind provided by the utility model is built
Waste material recovery device is built, conveniently and efficiently construction waste can be reclaimed, while construction waste can tentatively be divided
Layer processing, enormously simplify follow-up reclaimer, improves organic efficiency.
A kind of construction waste recovery system provided by the utility model, the one end for reclaiming band is arranged on opening for first passage
At mouthful, for receiving the construction waste in first passage, the other end for reclaiming band is arranged on the porch of pulverizer, for that will build
Build waste material and be sent into pulverizer.Compared to prior art, a kind of construction waste recovery system provided by the utility model, will can lead to
The bulk construction waste crossed after the layering of construction waste retracting device carries out break process, so that construction waste is reclaimed,
The rate of recovery of construction waste is improved, construction waste is avoided and stacks caused environmental problem everywhere, it also avoid construction waste
Waste.
Brief description of the drawings
, below will be to required use in embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment
Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should not be by
Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also
To obtain other related accompanying drawings according to these accompanying drawings.
Fig. 1 is the Integral connection structure schematic diagram for the construction waste retracting device that the utility model first embodiment provides;
Fig. 2 is the attachment structure schematic diagram of layered component in Fig. 1;
Fig. 3 is the attachment structure schematic diagram of cast hopper in Fig. 1;
Fig. 4 is the structural representation of recovery tube in Fig. 1.
Icon:10- buildings;100- construction waste retracting devices;110- recovery tubes;111- straight lengths;113- connections save;
130- mozzles;150- cast hoppers;151- bucket bodies;153- ring baffles;155- dust caps;157- elastic rotation components;1571-
Elastic component;1573- rotating shafts;170- layered components;171- sieve apertures;173- through plates;175- connecting plates.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer
Accompanying drawing in type embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model part of the embodiment, rather than whole embodiments.Generally here described in accompanying drawing and
The component of the utility model embodiment shown can be configured to arrange and design with a variety of.
Therefore, the detailed description of the embodiment of the present utility model to providing in the accompanying drawings is not intended to limit requirement below
The scope of the utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in the utility model
Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all
Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.
, it is necessary to explanation in description of the present utility model, term " on ", " vertical ", " level ", " interior ", " outer " etc.
The orientation or position relationship of instruction be based on orientation shown in the drawings or position relationship, or the utility model product use when
The orientation or position relationship usually put, it is for only for ease of description the utility model and simplifies description, rather than instruction or dark
Show that the device of meaning or element there must be specific orientation, with specific azimuth configuration and operation, thus it is it is not intended that right
Limitation of the present utility model.In addition, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that instruction or dark
Show relative importance.
In description of the present utility model, it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set
Put ", " connected ", " installation ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected,
Or it is integrally connected;Can be mechanical connection or electrical connection;Can be joined directly together, intermediary can also be passed through
It is indirectly connected, can is the connection of two element internals.For the ordinary skill in the art, can be managed with concrete condition
Solve concrete meaning of the above-mentioned term in the utility model.
Below in conjunction with the accompanying drawings, some embodiments of the present utility model are elaborated.In the case where not conflicting, under
Feature in the embodiment stated can be mutually combined.
First embodiment
Reference picture 1, the present embodiment provide a kind of construction waste retracting device 100, caused by reclaiming in building 10
Construction waste, the construction waste retracting device 100 include recovery tube 110, more mozzles 130, multiple cast hoppers 150, layering
Component 170 and transfer assembly (not shown), recovery tube 110 are used to be fixedly connected on the wall face of building 10 and are obliquely installed.
One end of each mozzle 130 connects with recovery tube 110, and the other end is used for the exterior wall for stretching into building 10.Multiple cast hoppers 150
It is connected correspondingly with more mozzles 130.Layered component 170 is fixedly connected in recovery tube 110 and divides recovery tube 110
For first passage and second channel, there is multiple sieve apertures 171, one end of multiple sieve apertures 171 and first passage in layered component 170
Connection, the other end connects with second channel, so that construction waste is layered in recovery tube 110.Transfer assembly is arranged on recovery
The exit of pipe 110, for receiving construction waste.
In the present embodiment, recovery tube 110 is inclined on the wall face of building 10, the visual story height in angle of inclination
Depending on the contribution of degree and construction waste, it is obliquely installed the freely falling body for avoiding construction waste and leads to not showing for layering
As.
Transfer assembly includes the first conveyer belt, the second conveyer belt and recycling bin, the position of the first conveyer belt and first passage
Opening it is corresponding, for receiving the construction waste in first passage.The position of second conveyer belt and the opening of second channel
Locate it is corresponding, for receiving the construction waste in second channel.Recycling bin is arranged on the second conveyer belt opening away from second channel
One end at mouthful, for reclaiming the construction waste in second channel.
In the present embodiment, the bulk construction waste in first passage is transported to construction waste and stacked by the first conveyer belt
Place, cram packer or other transport vehicle transports are waited to elsewhere.Construction waste in recycling bin is then used as concrete
Raw material be added to mixer etc. machinery in, realize recycle.
Referring to Fig. 2, layered component 170 includes multiple through plates 173 and multiple connecting plates 175, multiple through plates 173 with it is more
The individual transpostion interval of connecting plate 175 is set, and each through plate 173 is detachably connected with corresponding connecting plate 175.
In the present embodiment, there is multiple sieve apertures 171, each through plate 173 and multiple connecting plates on each through plate 173
175 clampings.Specifically, the both ends of each through plate 173 are respectively arranged with the first recessed socket part and the first convex jointing part, similarly each
The both ends of connecting plate 175 are respectively arranged with the second recessed socket part and the second convex jointing part, and the first convex jointing part and the second recessed socket part are engaged,
Second convex jointing part and the first recessed socket part are engaged, so that each through plate 173 can clamping with each connecting plate 175.Need
Bright, in the present embodiment, the first convex jointing part is located at the upper end of connecting plate 175, and the first recessed socket part is located under connecting plate 175
End, the second convex jointing part are located at the upper end of through plate 173, and the second recessed socket part is located at the lower end of through plate 173, avoids construction waste big
Amount pours in the junction of connecting plate 175 and through plate 173.
Referring to Fig. 3, cast hopper 150 includes bucket body 151, ring baffle 153, dust cap 155 and elastic rotation component 157,
One end of bucket body 151 has dog-house, and the one end of bucket body 151 away from dog-house connects with mozzle 130, so that in bucket body 151
Construction waste slip into mozzle 130, the opening direction of ring baffle 153 is consistent with the opening direction of dog-house.Dust cap 155
Lid is located at the top of ring baffle 153, elastic rotation component 157 be arranged on one end of ring baffle 153 and with dust cap 155
One end is connected, and dust cap 155 can be rotated by the opposed annular baffle plate 153 of elastic rotation component 157.
Elastic rotation component 157 includes elastic component 1571, rotating shaft 1573 and axle sleeve (not shown), rotating shaft 1573 and dust cap
155 one end is fixedly connected and is contained in axle sleeve, and rotating shaft 1573 can rotate relative to axle sleeve, and axle sleeve is fixedly connected on ring baffle
153 one end, one end of elastic component 1571 are connected to the madial wall of ring baffle 153, and the other end is connected to the bottom of dust cap 155
Portion.When launching construction waste, dust cap 155 is depressed and enters dog-house by construction waste in the presence of own wt, so
Dust cap 155 returns to horizontal level in the presence of the restoring force of elastic component 1571 afterwards, so as to cover dog-house, prevents dog-house
In caused dust distribute everywhere.
In the present embodiment, elastic component 1571 is a compression spring, and dust cap 155 is under the elastic force effect of the compression spring
It is returned to horizontal level.Certainly, this is not restricted to, elastic component 1571 herein can also make elastoplast or elastic caoutchouc
Deng being not especially limited herein.
Referring to Fig. 4, recovery tube 110 includes multiple straight lengths 111 and multiple connection sections 113, and multiple straight lengths 111 are by more
The individual series connection of connection section 113 forms recovery tube 110, and each straight length 111 is detachably connected with each section 113 that is connected.
It should be noted that it is provided with a connecting plate 175 or through plate 173, each connecting plate in each straight length 111
175 or each through plates 173 are welded on the inner surface of each straight length 111.Each straight length 111 saves 113 with multiple connections
Standard component is made, is arranged at intervals through plate 173 and connecting plate 175 when multiple straight lengths 111 are connected, so that layering is imitated
Fruit is more preferable.In actual use, it can be connected and an appropriate number of straight length 111 and inclined according to the height of building 10 and floor height
Tiltedly it is arranged on building 10.
In summary, the present embodiment provide a kind of construction waste retracting device 100, one end of each mozzle 130 with
Recovery tube 110 connects, and the other end is used to stretching into the exterior wall of building 10, multiple cast hoppers 150 correspondingly with more water conservancy diversion
Pipe 130 connects.Dust cap 155 is additionally provided with cast hopper 150, prevents the airborne dust in cast hopper 150 from flying away everywhere.Connecting plate
175 are fixedly installed in recovery tube 110 with through plate 173 and recovery tube 110 are divided into first passage and second channel, even
There are multiple sieve apertures 171 on logical plate 173, one end of multiple sieve apertures 171 connects with first passage, and the other end connects with second channel
It is logical, so that construction waste is layered in recovery tube 110.In actual use, construction waste is poured into cast hopper 150,
Construction waste is moved in recovery tube 110 by mozzle 130 under gravity.Construction waste one in recovery tube 110
Aspect moves along the bearing of trend of recovery tube 110 under gravity, on the other hand in through plate 173 and connecting plate 175
The lower bulk construction waste of effect tumbles along first passage, and fritter construction waste and sand material fall into second channel simultaneously by sieve aperture 171
Tumbled along second channel, realize the layering of construction waste.First conveyer belt and the second conveyer belt are respectively by building in first passage
The construction waste built in waste material and second channel is transported.Compared to prior art, a kind of construction waste that the present embodiment provides returns
Receiving apparatus 100, conveniently and efficiently construction waste can be reclaimed, while construction waste can be carried out at preliminary layering
Reason, and construction waste is transported in recycling bin reclaimed in the opening of second channel, improve organic efficiency.
Second embodiment
The present embodiment provides a kind of construction waste recovery system, for reclaiming construction waste, including pulverizer, recovery band and
Construction waste retracting device 100, the wherein basic structure of construction waste retracting device 100 and principle and caused technique effect and
First embodiment is identical, and to briefly describe, the present embodiment part does not refer to part, refers to corresponding contents in first embodiment.
A kind of construction waste recovery system, for reclaiming construction waste, including pulverizer, recovery band and construction waste recovery
Device 100, the construction waste retracting device 100 include recovery tube 110, more mozzles 130, multiple cast hoppers 150 and layering
Component 170, recovery tube 110 are used to be fixedly connected on the wall face of building 10 and are obliquely installed.One end of each mozzle 130
Connected with recovery tube 110, the other end is used for the exterior wall for stretching into building 10, and multiple cast hoppers 150 are led with more correspondingly
Flow tube 130 connects.Layered component 170 is fixedly installed in recovery tube 110 and recovery tube 110 is divided into first passage and second
Passage, there are multiple sieve apertures 171 in layered component 170, one end of multiple sieve apertures 171 connects with first passage, the other end and
Two passages connect, so that construction waste is layered in recovery tube 110.One end of recovery band is arranged on the opening of first passage
Place, for receiving the construction waste in first passage, the other end for reclaiming band is arranged on the porch of pulverizer, for that will build
Waste material is sent into pulverizer.
A kind of construction waste recovery system that the present embodiment provides, recovery band is provided with the opening of first passage, and
The other end of recovery band is provided with pulverizer, the bulk construction waste in first passage is crushed.Compared to prior art, sheet
A kind of construction waste recovery system that embodiment provides, the bulk construction waste in first passage can be crushed returned again
Receive, improve the rate of recovery of construction waste.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this
For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model
Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.
Claims (10)
1. a kind of construction waste retracting device, for reclaiming caused construction waste in building, it is characterised in that including recovery
Pipe, more mozzles, multiple cast hoppers and layered component, the recovery tube are used for the wall face for being fixedly connected on the building
And be obliquely installed, one end of each mozzle connects with the recovery tube, and the other end is used to stretch into the outer of the building
Wall, multiple cast hoppers are connected with the more mozzles correspondingly;
The layered component is fixedly connected in the recovery tube and the recovery channel is divided into first passage and second channel,
There are multiple sieve apertures in the layered component, one end of multiple sieve apertures connects with the first passage, the other end with it is described
Second channel connects, so that the construction waste is layered in the recovery channel.
2. construction waste retracting device according to claim 1, it is characterised in that the layered component includes multiple connections
Plate and multiple connecting plates, multiple through plates are set with multiple connecting plate transpostion intervals, each through plate with it is right
The connecting plate answered is detachably connected.
3. construction waste retracting device according to claim 2, it is characterised in that have on the through plate multiple described
Sieve aperture, multiple through plates and multiple connecting plate clampings.
4. construction waste retracting device according to claim 1, it is characterised in that the cast hopper includes bucket body and annular
Baffle plate, one end of the bucket body have dog-house, and the one end of the bucket body away from the dog-house connects with the mozzle, with
The construction waste in the bucket body is set to slip into the mozzle, the opening direction of the ring baffle and the dog-house
Opening direction is consistent.
5. construction waste retracting device according to claim 4, it is characterised in that the cast hopper also include dust cap and
Elastic rotation component, the dust cap lid are located at the top of the ring baffle, and the elastic rotation component is arranged on the ring
One end of shape baffle plate is simultaneously connected with one end of the dust cap, and the dust cap can be relatively described by the elastic rotation component
Ring baffle rotates.
6. construction waste retracting device according to claim 5, it is characterised in that the elastic rotation component includes elasticity
Part, rotating shaft and axle sleeve, the rotating shaft are fixedly connected and are contained in the axle sleeve with one end of the dust cap, and the rotating shaft can
Rotated relative to the axle sleeve, the axle sleeve is fixedly connected on one end of the ring baffle, and one end of the elastic component is connected to
The madial wall of the ring baffle, the other end are connected to the bottom of the dust cap.
7. according to the construction waste retracting device described in claim any one of 1-6, it is characterised in that the construction waste recovery
Device also includes transfer assembly, and the transfer assembly includes the first conveyer belt and the second conveyer belt, the position of first conveyer belt
Put it is corresponding with the opening of the first passage, for receiving the construction waste in the first passage, described second
The position of conveyer belt is corresponding with the opening of the second channel, and the building for receiving in the second channel is given up
Material.
8. construction waste retracting device according to claim 7, it is characterised in that the transfer assembly also includes a recovery
Bucket, the recycling bin are arranged on one end of the opening of second conveyer belt away from the second channel, described for reclaiming
The construction waste in second channel.
9. construction waste retracting device according to claim 1, it is characterised in that the recovery tube includes multiple straight lengths
With multiple connection sections, multiple straight lengths form the recovery tube by multiple connection section series connection, each straight tube
Section is detachably connected with each connection section.
10. a kind of construction waste recovery system, for reclaiming construction waste, it is characterised in that including pulverizer, recovery band and such as
Any one of the claim 1-9 construction waste retracting devices, one end of the recovery band are arranged on opening for the first passage
At mouthful, for receiving the construction waste in the first passage, the other end of the recovery band is arranged on the pulverizer
Porch, for the construction waste to be sent into the pulverizer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720560711.3U CN206689191U (en) | 2017-05-18 | 2017-05-18 | A kind of construction waste retracting device and construction waste recovery system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720560711.3U CN206689191U (en) | 2017-05-18 | 2017-05-18 | A kind of construction waste retracting device and construction waste recovery system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206689191U true CN206689191U (en) | 2017-12-01 |
Family
ID=60450256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720560711.3U Expired - Fee Related CN206689191U (en) | 2017-05-18 | 2017-05-18 | A kind of construction waste retracting device and construction waste recovery system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206689191U (en) |
-
2017
- 2017-05-18 CN CN201720560711.3U patent/CN206689191U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106957156A (en) | A kind of building castoff recycling treatment system method | |
CN210097897U (en) | Building solid waste in-situ recycling treatment device | |
CN204294609U (en) | A kind of fixed building rubbish process for producing line | |
CN206689191U (en) | A kind of construction waste retracting device and construction waste recovery system | |
CN203830399U (en) | Extrusion type contaminated soil breaking and mixing remediation device | |
CN207726056U (en) | A kind of oscillatory type hopper discharger | |
CN110116916A (en) | It is a kind of for the fishing device of waste garrulous material to can be recycled | |
CN206763113U (en) | Fine sand reclaims tailing dry arranging device | |
CN109158162A (en) | A kind of stone screening machine and its method for sieving for soil remediation | |
CN206765104U (en) | Sunk type sandstone blending station | |
CN202877109U (en) | Vibration sieve capable of discharging dry slag | |
CN210474947U (en) | Production line for manufacturing recycled bricks by using decoration garbage | |
CN110434147B (en) | Resource treatment method for construction waste | |
CN204911720U (en) | Take dust collector's waste recycling assembly line | |
WO2017071151A1 (en) | Coal screening apparatus | |
CN207143134U (en) | A kind of kitchen garbage subregion packing apparatus | |
CN206778348U (en) | Emery dust grading adjusts machine | |
CN206457418U (en) | A kind of live building castoff recycling treatment system of mobile model | |
CN205926263U (en) | Fragment of brick and concrete piece separator | |
CN108745635A (en) | A kind of magnetic separation sorting equipment for after construction waste crushing | |
CN202105839U (en) | Road rubbish separating and processing device | |
CN209669041U (en) | A kind of sludge drying reutilization system | |
CN113954235A (en) | Production equipment and production process of ecological concrete | |
CN205201742U (en) | Timber powder recycle mechanism | |
CN109985711A (en) | A kind of mobile modularized building solid waste original position recycling treatment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171201 Termination date: 20190518 |