CN206680871U - Boom device is transported on a kind of four rail beams - Google Patents

Boom device is transported on a kind of four rail beams Download PDF

Info

Publication number
CN206680871U
CN206680871U CN201720200698.0U CN201720200698U CN206680871U CN 206680871 U CN206680871 U CN 206680871U CN 201720200698 U CN201720200698 U CN 201720200698U CN 206680871 U CN206680871 U CN 206680871U
Authority
CN
China
Prior art keywords
rail
boom device
track
component car
bearing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720200698.0U
Other languages
Chinese (zh)
Inventor
闫启金
王少松
马宏宇
邢晓强
王素云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201720200698.0U priority Critical patent/CN206680871U/en
Application granted granted Critical
Publication of CN206680871U publication Critical patent/CN206680871U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model belongs to fortune boom device on a kind of four rail beams and is made up of force bearing plate, track and rail wheel.Four tracks are respectively on intermediate prefabricated beam and left and right side precast beam, left component car and right component car are located on left and right two tracks respectively by the wheel support and rail wheel of its lower end respectively, the side angle of lower end two of force bearing plate is provided with left and right support column, two left support posts are located at the longitudinal direction of left side 1/3rd of left component car face trisection, and two right support posts are located at the longitudinal direction of right side 1/3rd of right component car face trisection.The utility model can solve heavy weight box beam can not the problem that run on precast beam of the capacity value less than its weight or on car, have simple in construction, save labor, reduce construction cost, the advantages of safe and reliable and using effect is good.

Description

Boom device is transported on a kind of four rail beams
Technical field
The utility model, which belongs on a kind of four rail beams, transports boom device.
Background technology
Under regular situation, heavy weight box beam can not be run on precast beam of the capacity value less than its weight or on car, no Then, heavy weight box beam can be by the precast beam of its lower end or car compression failure.It is generally necessary to across pier straddle truck coordinative construction, but across pier dragon Gantry crane construction cost is higher, and work efficiency is relatively low.
Such as:1303 meters of Xi Xian new districts Jing He new cities county East Road Jing He grand bridges total length, totally 36 across wherein the 3rd(9~11 Across), the seven, the eight(26~33 across)Using 50m across footpath prefabricated PC box beams(Remaining uses 30m across footpaths), totally 132, Monolithic beam weight 260t, it is the box-beam structure of the new weight of domestic contrast.The prefabricated case beam scheme of architecture of design is across pier portal frame Construction, need to such as carry out the transport of other hole position prefabricated case beams by frame prefabricated case beam, and fortune beam load laterally must not only fall in list On piece prefabricated case beam, while vertically and horizontally it is both needed to take effective pressure to spread measure, avoids causing local and overall stress destruction.But It is higher using across pier straddle truck 50 rice bin beam construction costs of progress, and work efficiency is relatively low.In addition, when being related to the construction of cross a river road, gantry Hanger rail road can not be directly laid, it is necessary to solve this technical barrier by other method in river course.
The content of the invention
The purpose of this utility model is to transport boom device on a kind of four rail beams of design, and solving heavy weight box beam can not be in lotus Carrying capacity has simple in construction less than the problem run on the precast beam of its weight or on car, saves labor, reduces construction cost, The advantages of safe and reliable and using effect is good.
For this, the utility model is made up of force bearing plate, track and rail wheel.Four tracks respectively positioned at intermediate prefabricated beam and On left and right side precast beam, left component car and right component car are located at left and right two respectively by the wheel support and rail wheel of its lower end respectively On bar track, the side angle of lower end two of force bearing plate is provided with left and right support column, and two left support posts are located at left component car face trisection At the longitudinal direction of left side 1/3rd, two right support posts are located at the longitudinal direction of right side 1/3rd of right component car face trisection.
Track on described intermediate prefabricated beam is two, respectively on the both sides in intermediate prefabricated beam face.A described left side Track on the precast beam of side is one, on the right-hand end in left side precast beam face.Track on described right side precast beam is One, in the left-hand end in right side precast beam face.Described rail wheel is tended to act by motor of tending to act.The upper end two of described force bearing plate Side is provided with fixed ear.
Said structure has reached the purpose of this utility model.
The utility model, which solves heavy weight box beam, to be run on precast beam of the capacity value less than its weight or on car Problem, have simple in construction, save labor, reduce construction cost, the advantages of safe and reliable and using effect is good.
The utility model considerably reduces construction cost, is only 10% or so of across pier portal frame construction cost, shortens Traveling time 50%, securely and reliably, user's request can be met.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
As illustrated, transporting boom device on a kind of four rail beams, it is made up of force bearing plate 6, track 12 and rail wheel 9.Four rails Road is laid in spacing distance, and track longitudinal slope is consistent with highway route design longitudinal slope, and laterally four rail bases are on coplanar track.Four Bar track is respectively on intermediate prefabricated beam 13 and left side precast beam 10, right side precast beam 14.On described intermediate prefabricated beam Track is two, respectively on the both sides in intermediate prefabricated beam face.Track on described left side precast beam is one, positioned at a left side On the right-hand end in side precast beam face.Track on described right side precast beam is one, the left-hand end positioned at right side precast beam face On.
Left component car 8 and right component car 5 are located at left and right two rails respectively by the wheel support 16 and rail wheel of its lower end respectively On road.I.e.:The lower end corner of left component car and right component car respectively sets wheel support respectively, and the lower end of each wheel support passes through wheel shaft 15 Axle is integrated with wheel, and described rail wheel is tended to act by respective motor 11 of tending to act.Motor and brake apparatus use same controlling switch, Make the synchronous operation of two component cars and while brake, the heavy weight box beam edge that platform component car and force bearing plate thereon are carried two-by-two Track carries out feeding beam installation before running to Bridge Erector.
The side angle of lower end two of force bearing plate is provided with left and right support column, and two left support posts 7 are located at left component car face trisection At the longitudinal direction of left side 1/3rd.Two right support posts 4 are located at the longitudinal direction of right side 1/3rd of right component car face trisection.So as to The load of the heavy weight box beam 1 of force bearing plate acknowledgement of consignment is set to be evenly distributed on left component car and right component car and four tracks.
The side of upper end two of described force bearing plate is provided with fixed ear 3, passes through steel wire rope 2, fixed big weight during for carrying Box beam.
The utility model can be by 1 50 rice bin beam(Heavy weight box beam)Weight be laterally evenly distributed to 3 30 rice bins Beam(Intermediate prefabricated beam and left and right side precast beam)On, to meet maximum construction loads moment of flexure allowed to bear in 30 rice bin girder spans Allow the requirement of maximum construction loads moment of flexure with every meter of floorings.The input across pier straddle truck is avoided, saves cost, work efficiency shows Write.
In a word, the utility model can solve heavy weight box beam can not capacity value less than its weight precast beam on or car The advantages of problem of upper operation, has simple in construction, saves labor, reduces construction cost, and safe and reliable and using effect is good.

Claims (6)

1. transporting boom device on a kind of four rail beams, it is made up of force bearing plate, track and rail wheel, it is characterised in that:Four tracks point Not Wei Yu on intermediate prefabricated beam and left and right side precast beam, left component car and right component car respectively by the wheel support of its lower end and For rail wheel respectively on left and right two tracks, the side angle of lower end two of force bearing plate is provided with left and right support column, two left support post positions At the longitudinal direction of left side 1/3rd of left component car face trisection, two right support posts are located at the right side of right component car face trisection At 1/3rd longitudinal directions.
2. transport boom device on the rail beam of one kind four as described in claim 1, it is characterised in that:On described intermediate prefabricated beam Track is two, respectively on the both sides in intermediate prefabricated beam face.
3. transport boom device on the rail beam of one kind four as described in claim 1, it is characterised in that:On described left side precast beam Track is one, on the right-hand end in left side precast beam face.
4. transport boom device on the rail beam of one kind four as described in claim 1, it is characterised in that:On described right side precast beam Track is one, in the left-hand end in right side precast beam face.
5. transport boom device on the rail beam of one kind four as described in claim 1, it is characterised in that:Described rail wheel is by motor of tending to act Tend to act.
6. transport boom device on the rail beam of one kind four as described in claim 1, it is characterised in that:The upper end two of described force bearing plate Side is provided with fixed ear.
CN201720200698.0U 2017-03-03 2017-03-03 Boom device is transported on a kind of four rail beams Expired - Fee Related CN206680871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720200698.0U CN206680871U (en) 2017-03-03 2017-03-03 Boom device is transported on a kind of four rail beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720200698.0U CN206680871U (en) 2017-03-03 2017-03-03 Boom device is transported on a kind of four rail beams

Publications (1)

Publication Number Publication Date
CN206680871U true CN206680871U (en) 2017-11-28

Family

ID=60392152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720200698.0U Expired - Fee Related CN206680871U (en) 2017-03-03 2017-03-03 Boom device is transported on a kind of four rail beams

Country Status (1)

Country Link
CN (1) CN206680871U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267503A (en) * 2018-12-04 2019-01-25 中铁上海设计院集团有限公司 A kind of transversely strengthening structure of the double Pin single line beams current for beam car
CN109537461A (en) * 2018-12-04 2019-03-29 中铁上海设计院集团有限公司 A kind of construction method of island station horn mouth location beam transporting passage
CN110219242A (en) * 2019-05-21 2019-09-10 宁波市政工程建设集团股份有限公司 A kind of double-deck construction method of installation for synchronizing beam in beam
CN110725215A (en) * 2019-11-06 2020-01-24 郑州市市政工程总公司 Beam transporting structure of newly-built upper-layer bridge on existing bridge and beam transporting method using existing bridge
CN110804950A (en) * 2019-11-06 2020-02-18 郑州市市政工程总公司 Safe and energy-saving beam transporting method for building bridge on bridge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267503A (en) * 2018-12-04 2019-01-25 中铁上海设计院集团有限公司 A kind of transversely strengthening structure of the double Pin single line beams current for beam car
CN109537461A (en) * 2018-12-04 2019-03-29 中铁上海设计院集团有限公司 A kind of construction method of island station horn mouth location beam transporting passage
CN109537461B (en) * 2018-12-04 2022-09-02 中铁上海设计院集团有限公司 Construction method of island type station bell mouth section girder transportation channel
CN109267503B (en) * 2018-12-04 2023-12-08 中铁上海设计院集团有限公司 Transverse reinforcing structure for double single-beam used for beam transporting vehicle passing
CN110219242A (en) * 2019-05-21 2019-09-10 宁波市政工程建设集团股份有限公司 A kind of double-deck construction method of installation for synchronizing beam in beam
CN110725215A (en) * 2019-11-06 2020-01-24 郑州市市政工程总公司 Beam transporting structure of newly-built upper-layer bridge on existing bridge and beam transporting method using existing bridge
CN110804950A (en) * 2019-11-06 2020-02-18 郑州市市政工程总公司 Safe and energy-saving beam transporting method for building bridge on bridge
CN110804950B (en) * 2019-11-06 2022-01-25 郑州市市政工程总公司 Safe and energy-saving beam transporting method for building bridge on bridge

Similar Documents

Publication Publication Date Title
CN206680871U (en) Boom device is transported on a kind of four rail beams
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN102182147B (en) Steel box girder erection method
CN103215886B (en) Novel short segment steel box-concrete combined beam
CN104213477A (en) Straddle type single-track double-box rectangular steel-concrete composite track beam structure
CN103030070B (en) A kind of can the transfer crane of traveling and operation on ramp
CN103422441A (en) Perforating method for erecting long-span highway box girders by using DJ180 bridge erecting machine
CN201648969U (en) Railway T-girder bridge girder erection machine suitable for laying and erecting seamless lines for passenger and freight shared lines
CN203452009U (en) Self-walking device for mounting steel beam
CN105568786B (en) Overhanging combination box track roof beam suspension system of suspension type monorail transit bottom plate
CN108706302A (en) A kind of self-propelled is spatially steered track flat car for transport of sills device and its forward method
CN115058957A (en) Dual-purpose trestle supporting structure
CN208965416U (en) A kind of safeguard structure of large span frame bridge jack-in process existing railway
CN106677076A (en) Simple and rapid method and device for mounting box girder at the top of adjacent bent cap by using span pier gantry crane
CN101649603A (en) 50-meter T-shaped beam prefabricated assembling process
CN107642010A (en) Medium-and low-speed maglev traffic system straightway support rail beam
CN105586813B (en) Suspended monorail traffic bottom plate opening combined box type track beam suspension system
CN110565531A (en) Construction channel structure and installation method
CN206680872U (en) A kind of box beam adjusting apparatus
CN201891087U (en) Auxiliary girder feeding platform of transport rack integrated machine
CN212533553U (en) Rubber-tyred trolley car guide rail, rail and road
CN114438901A (en) Construction method for built-in magnetic suspension elevated line bridge girder erection machine
CN204589817U (en) A kind of reinforcing mat posture fence operation integrated apparatus
CN203048438U (en) Door type hoist capable of traveling and operating on slope
CN208055772U (en) Rail reinforcement device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

Termination date: 20180303