CN206667766U - One kind building civil construction pours harden structure - Google Patents

One kind building civil construction pours harden structure Download PDF

Info

Publication number
CN206667766U
CN206667766U CN201720314414.0U CN201720314414U CN206667766U CN 206667766 U CN206667766 U CN 206667766U CN 201720314414 U CN201720314414 U CN 201720314414U CN 206667766 U CN206667766 U CN 206667766U
Authority
CN
China
Prior art keywords
hole
cavity
chute
supporting plate
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720314414.0U
Other languages
Chinese (zh)
Inventor
陈竣
祝叶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Polytechnic University
Original Assignee
Wuhan Polytechnic University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Polytechnic University filed Critical Wuhan Polytechnic University
Priority to CN201720314414.0U priority Critical patent/CN206667766U/en
Application granted granted Critical
Publication of CN206667766U publication Critical patent/CN206667766U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses one kind building civil construction to pour harden structure, including bottom plate, the inside of the bottom plate offers the first cavity, first through hole is offered at axle center at the top of the bottom plate, and first through hole connects with the first cavity, both sides at the top of the bottom plate offer the first chute, and the first sliding block is slidably connected in first chute.The utility model is by setting bottom plate, reach the effect fixed to supporting plate, pass through first through hole, reach the effect for making concrete enter the first cavity, pass through the first cavity, reach the effect held to concrete, pass through the first sliding block and the first chute, reach the effect for driving supporting plate movement, by bolt, the first screwed hole and the second screwed hole, reach the effect fixed to supporting plate, pass through the second cavity, reach the effect for making concrete flow into the first cavity, it is convenient that two templates are docked, it is also convenient for the use of workmen.

Description

One kind building civil construction pours harden structure
Technical field
Building building technical field is the utility model is related to, is specially that a kind of building civil construction pours harden structure.
Background technology
Civil construction is to build the scientific and technical general designation of all kinds of job facilities, it both referred to applied material, equipment and The technical activities such as the exploration that is carried out, design, construction, maintenance;Also refer to the object of engineering construction, that is, build on the ground or ground Under, in land or water, be directly or indirectly human lives, production, military affairs, the various job facilities of Scientific Research Service, build building Needed to use in construction and pour plate and built, poured plate and poured into by concrete between two templates and be fabricated, and Existing two templates are inconvenient to dock, so as to the use of inconvenient workmen.
Utility model content
The purpose of this utility model is that providing a kind of building civil construction pours harden structure, and it is convenient to two templates to possess The advantages of being attached, solve the problems, such as that inconvenience is attached to two templates.
To achieve the above object, the utility model provides following technical scheme:One kind building civil construction pours harden structure, Including bottom plate, the inside of the bottom plate offers the first cavity, and first through hole, and are offered at the axle center at the top of the bottom plate One through hole connects with the first cavity, and the both sides at the top of the bottom plate offer the first chute, the interior company of slip of first chute The first sliding block is connected to, supporting plate is fixedly connected with the top of first sliding block, the inside of the supporting plate offers the second chamber Body, the bottom of the supporting plate side are communicated with discharge nozzle, and bottom of the supporting plate away from discharge nozzle side is fixedly connected with Fixed block, the surface of the fixed block offer the first screwed hole, and the first screwed hole internal thread is connected with bolt, the bottom The both sides at plate front top offer the second screwed hole, and the second screwed hole connects with the first chute, one end of the bolt The first screwed hole, the first chute and the second screwed hole and the inside for extending to the second screwed hole are sequentially passed through, the supporting plate is leaned on Connecting rod is provided with the top of nearly fixed block side, the supporting plate offers the second through hole at the top of fixed block side, And second through hole connected with the second cavity, the supporting plate opens up fluted, and groove and at the top of discharge nozzle side Two cavitys connect, and have been fixedly connected with spring at the top and bottom of the groove inner chamber, the spring away from groove inner wall one End is fixedly connected with sliding ball, and one end of the connecting rod sequentially passes through the second through hole, the second cavity and groove and extends to groove Inside, the top and bottom that the connecting rod is located at groove inner chamber one end offer second be used cooperatively with sliding ball and slided Groove, the described one end of sliding ball away from spring extend to the inside of the second chute and contacted with the inwall of the second chute.
Preferably, the bottom of second cavity is fixedly connected with swash plate, and the surface of the swash plate offers third through-hole.
Preferably, the first limited block has been fixedly connected with the top and bottom of second through hole, the connecting rod is located at The second limited block being used cooperatively with the first limited block is fixedly connected with the top and bottom of groove inner chamber.
Preferably, the quantity of second screwed hole is several, and is in be equally spaced.
Preferably, one end of the connecting rod is provided with pull bar, and the pull bar is fixedly connected with the connecting rod by fixture.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model reaches the effect fixed to supporting plate, by first through hole, reaching makes to mix by setting bottom plate Solidifying soil enters the effect of the first cavity, by the first cavity, reaches the effect held to concrete, passes through the first sliding block and first Chute, reach the effect for driving supporting plate movement, by bolt, the first screwed hole and the second screwed hole, reach and supporting plate is consolidated Fixed effect, by the second cavity, reach the effect for making concrete flow into the first cavity, it is convenient that two templates are docked, It is also convenient for the use of workmen.
2nd, the utility model facilitates concrete to be flowed out out of discharge nozzle, avoids concrete from occurring flowing out by swash plate Situation, by third through-hole, facilitate concrete to flow into the bottom of swash plate by third through-hole, avoid swash plate bottom from there is no coagulation Soil, the hardness of building panel is influenceed, by the first limited block and the second limited block, reach the effect spacing to connecting rod, the company of avoiding Extension bar is in the presence of slipping in movement, and by pull bar, convenient use person pulls connecting rod, avoids connecting rod from occurring moving Dynamic situation, by connecting rod, reach the effect to the sealing of the second cavity, avoid impurity from falling into the second cavity, influence template Use, by sliding ball and the second chute, connecting rod can be fixed, avoid connecting rod from being come off out of groove.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model A-A partial structurtes enlarged diagram.
In figure:1 bottom plate, 2 first cavitys, 3 first through hole, 4 first chutes, 5 first sliding blocks, 6 supporting plates, 7 second cavitys, 8 discharge nozzles, 9 fixed blocks, 10 first screwed holes, 11 bolts, 12 second screwed holes, 13 connecting rods, 14 second through holes, 15 grooves, Ball, 18 second chutes, 19 swash plates, 20 third through-holes, 21 first limited blocks, 22 second limited blocks, 23 pull bars are slided in 16 springs, 17.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-2, one kind building civil construction pours harden structure, including bottom plate 1, and the inside of bottom plate 1 offers the One cavity 2, first through hole 3 is offered at the axle center at the top of bottom plate 1, and first through hole 3 connects with the first cavity 2, at the top of bottom plate 1 Both sides offer the first chute 4, slidably connect the first sliding block 5 in the first chute 4, the top of the first sliding block 5, which is fixed, to be connected Supporting plate 6 is connected to, the inside of supporting plate 6 offers the second cavity 7, and the bottom of the second cavity 7 is fixedly connected with swash plate 19, passed through Swash plate 19, facilitate concrete to be flowed out out of discharge nozzle 8, avoid concrete from being in the presence of flowing out, the surface of swash plate 19 is opened Provided with third through-hole 20, by third through-hole 20, facilitate concrete to flow into the bottom of swash plate 19 by third through-hole 20, avoid tiltedly The bottom of plate 19 does not have concrete, influences the hardness of building panel, and the bottom of the side of supporting plate 6 is communicated with discharge nozzle 8, and supporting plate 6 is remote The bottom for separating out the side of expects pipe 8 is fixedly connected with fixed block 9, and the surface of fixed block 9 offers the first screwed hole 10, the first screw thread The internal thread of hole 10 is connected with bolt 11, and the both sides at the front of bottom plate 1 top offer the second screwed hole 12, the second screwed hole 12 Quantity is several, and is in be equally spaced, and the second screwed hole 12 connects with the first chute 4, and one end of bolt 11 sequentially passes through First screwed hole 10, the first chute 4 and the second screwed hole 12 and the inside for extending to the second screwed hole 12, supporting plate 6 is close to solid Determine to be provided with connecting rod 13 at the top of the side of block 9, by connecting rod 13, reach the effect to the sealing of the second cavity 7, avoid impurity Fall into the second cavity 7, influence the use of template, one end of connecting rod 13 is provided with pull bar 23, pull bar 23 by fixture with Connecting rod 13 is fixedly connected, and by pull bar 23, convenient use person pulls connecting rod 13, avoids connecting rod 13 from occurring irremovable Situation, supporting plate 6 offer the second through hole 14 at the top of the side of fixed block 9, and the top and bottom of the second through hole 14 are solid Surely be connected with the first limited block 21, connecting rod 13 be located at the top and bottom of the inner chamber of groove 15 be fixedly connected with it is first spacing The second limited block 22 that block 21 is used cooperatively, by the first limited block 21 and the second limited block 22, reach spacing to connecting rod 13 Effect, avoid connecting rod 13 from being in the presence of slipping when mobile, and the second through hole 14 connects with the second cavity 7, supporting plate 6 Fluted 15 are opened up at the top of the side of discharge nozzle 8, and groove 15 connects with the second cavity 7, the top of the inner chamber of groove 15 with Bottom has been fixedly connected with spring 16, and the one end of spring 16 away from the inwall of groove 15 is fixedly connected with sliding ball 17, connecting rod 13 One end sequentially passes through the second through hole 14, the second cavity 7 and groove 15 and the inside for extending to groove 15, and connecting rod 13 is located at groove The top and bottom of 15 inner chambers one end offer the second chute 18 being used cooperatively with sliding ball 17, are slided by sliding ball 17 and second Groove 18, connecting rod 13 can be fixed, avoid connecting rod 13 from being come off out of groove 15, the sliding one end of ball 17 away from spring 16 is prolonged Extend the inside of the second chute 18 and contacted with the inwall of the second chute 18, by setting bottom plate 1, reach and supporting plate 6 is fixed Effect, by first through hole 3, reach the effect for making concrete enter the first cavity 2, by the first cavity 2, reach to coagulation The effect that soil is held, by the first sliding block 5 and the first chute 4, reach the effect for driving supporting plate 6 to move, pass through bolt 11, the One screwed hole 10 and the second screwed hole 12, reach the effect fixed to supporting plate 6, by the second cavity 7, reaching makes concrete stream Enter the effect of the first cavity 2, it is convenient that two templates are docked, it is also convenient for the use of workmen.
In use, rotating bolt 11, bolt 11 is removed in the second screwed hole 12, the first sliding block 5 is slided, it is suitable to be moved to Bolt 11 is caught in the second screwed hole 12 behind position, supporting plate 6 is fixed, pulls pull bar 23, pull bar 23 drives connection Bar 13 is extracted out out of groove 15, concrete is poured into the second cavity 7, concrete is flowed out by discharge nozzle 8, passes through first through hole 3 flow into the first cavity 2.
In summary:The building civil construction pours harden structure, passes through bottom plate 1, the first cavity 2, the first chute 4, first The cooperation of sliding block 5, supporting plate 6, the second cavity 7, fixed block 9, bolt 11, the second screwed hole 12 and connecting rod 13, is solved not Convenient the problem of two templates are attached.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. one kind building civil construction pours harden structure, including bottom plate (1), it is characterised in that:The inside of the bottom plate (1) opens up There is the first cavity (2), first through hole (3), and first through hole (3) and the first chamber are offered at the axle center at the top of the bottom plate (1) Body (2) connects, and the both sides at the top of the bottom plate (1) offer the first chute (4), are slidably connected in first chute (4) There is the first sliding block (5), supporting plate (6) is fixedly connected with the top of first sliding block (5), the inside of the supporting plate (6) is opened Provided with the second cavity (7), the bottom of supporting plate (6) side is communicated with discharge nozzle (8), and the supporting plate (6) is away from discharging The bottom of pipe (8) side is fixedly connected with fixed block (9), and the surface of the fixed block (9) offers the first screwed hole (10), institute State the first screwed hole (10) internal thread and be connected with bolt (11), the both sides at bottom plate (1) front top offer the second spiral shell Pit (12), and the second screwed hole (12) connects with the first chute (4), one end of the bolt (11) sequentially passes through the first screw thread Hole (10), the first chute (4) and the second screwed hole (12) simultaneously extend to the inside of the second screwed hole (12), the supporting plate (6) Connecting rod (13) is provided with the top of fixed block (9) side, the supporting plate (6) is close to the top of fixed block (9) side The second through hole (14) is offered, and the second through hole (14) connects with the second cavity (7), the supporting plate (6) is close to discharge nozzle (8) Opened up at the top of side fluted (15), and groove (15) connects with the second cavity (7), the top of groove (15) inner chamber and Bottom has been fixedly connected with spring (16), and the one end of the spring (16) away from groove (15) inwall is fixedly connected with sliding ball (17), one end of the connecting rod (13) sequentially passes through the second through hole (14), the second cavity (7) and groove (15) and extended to recessed The inside of groove (15), the top and bottom that the connecting rod (13) is located at groove (15) inner chamber one end offer and sliding ball (17) The second chute (18) being used cooperatively, the one end of the sliding ball (17) away from spring (16) extend to the inside of the second chute (18) And contacted with the inwall of the second chute (18).
2. a kind of building civil construction according to claim 1 pours harden structure, it is characterised in that:Second cavity (7) bottom is fixedly connected with swash plate (19), and the surface of the swash plate (19) offers third through-hole (20).
3. a kind of building civil construction according to claim 1 pours harden structure, it is characterised in that:Second through hole (14) the first limited block (21) has been fixedly connected with the top and bottom of, the connecting rod (13) is located at the top of groove (15) inner chamber Portion and bottom are fixedly connected with the second limited block (22) being used cooperatively with the first limited block (21).
4. a kind of building civil construction according to claim 1 pours harden structure, it is characterised in that:Second screwed hole (12) quantity is several, and is in be equally spaced.
5. a kind of building civil construction according to claim 1 pours harden structure, it is characterised in that:The connecting rod (13) One end be provided with pull bar (23), the pull bar (23) is fixedly connected by fixture with connecting rod (13).
CN201720314414.0U 2017-03-29 2017-03-29 One kind building civil construction pours harden structure Expired - Fee Related CN206667766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720314414.0U CN206667766U (en) 2017-03-29 2017-03-29 One kind building civil construction pours harden structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720314414.0U CN206667766U (en) 2017-03-29 2017-03-29 One kind building civil construction pours harden structure

Publications (1)

Publication Number Publication Date
CN206667766U true CN206667766U (en) 2017-11-24

Family

ID=60373550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720314414.0U Expired - Fee Related CN206667766U (en) 2017-03-29 2017-03-29 One kind building civil construction pours harden structure

Country Status (1)

Country Link
CN (1) CN206667766U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115653307A (en) * 2022-12-02 2023-01-31 中国三冶集团有限公司 Concrete pouring reel structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115653307A (en) * 2022-12-02 2023-01-31 中国三冶集团有限公司 Concrete pouring reel structure

Similar Documents

Publication Publication Date Title
CN107009515B (en) A kind of bridge construction concrete mixing arrangement
CN107335498A (en) A kind of construction waste crushing screening plant
CN104874591A (en) Building remaining mud processing technology and system
CN206667766U (en) One kind building civil construction pours harden structure
CN106640134A (en) Secondary lining window-chasing mould-entering system
CN109203249A (en) A kind of temporary hopper of the multifunction environment-protection type of concrete production
CN208148172U (en) Dry-mixing mortar storage tank
CN207401768U (en) It builds a dam with stone screening plant
CN106984526A (en) A kind of civil engineering sand sifter
CN206527045U (en) It is a kind of with the building stone feeding-distribution device cleared up automatically
CN207144866U (en) A kind of high-order current divider box drawing mechanism
CN111744237B (en) Efficient center transmission tailing filling deep cone thickener
CN205713135U (en) Concrete defoaming device with auto-cleaning structure thereof
CN205329694U (en) Slip casting integrated equipment for foundation treatment
CN209424006U (en) A kind of sorting device of the concrete construction with screening function
CN207960164U (en) Prefabricated enclosure wall
CN204529696U (en) A kind of coating controlled-release fertilizer production equipment
CN105149281B (en) A kind of viscous aluminium cleaning device of hub mold
CN210032686U (en) Thickness control device for horizontal masonry mortar joint
CN206138761U (en) On -line spray cleaning device of spray dryer
CN105965681A (en) Vertical pouring and fast homogenizing device and method for pipe cores of PCCPs
CN206778905U (en) A kind of civil engineering sand sifter
CN206121946U (en) Casein sodium cyclone separator
CN206246134U (en) Secondary lining enters modular system by window
CN214682840U (en) Screening device of high-quality machine-made sand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124