CN206246134U - Secondary lining enters modular system by window - Google Patents
Secondary lining enters modular system by window Download PDFInfo
- Publication number
- CN206246134U CN206246134U CN201621342757.XU CN201621342757U CN206246134U CN 206246134 U CN206246134 U CN 206246134U CN 201621342757 U CN201621342757 U CN 201621342757U CN 206246134 U CN206246134 U CN 206246134U
- Authority
- CN
- China
- Prior art keywords
- chute
- window
- shunting
- shunt cylinder
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Enter modular system by window the utility model discloses a kind of secondary lining, including at least two groups main hoppers and T-shaped frame, the main hopper upper port side is fixedly arranged on T-shaped frame two ends, and its main hopper lower surface is supported by parallel shelf, the main hopper is arranged with inverted vee slip by the first through hole of its lower end both sides, the inverted vee slip lower port is provided with distributing T-pipe groove, and the distributing T-pipe groove lower port is provided with shunting tumbling barrel, and the shunting tumbling barrel lower port is provided with the first chute.The system main hopper, inverted vee slip, distributing T-pipe groove, shunt tumbling barrel and enter by way of window chute is combined, the corresponding valve of simple operations makes concrete flow to each operation window, realize two lining arch wall concrete by window charging.
Description
Technical field
The invention belongs to Construction of Civil Engineering field, it is related to concreting servicing unit, and in particular to a kind of secondary lining
Block enters modular system by window.
Background technology
One of secondary lining concreting most common method is poured using pumping flexible pipe, and this kind of scheme is maximum to be lacked
Point:Pipe frequently is changed in concreting process, line operator's working strength is excessive, pipe process is being changed in plenty of time consumption
In, transition duct at least needs 4 people to operate, and wastes time and energy.Concreting is less efficient, and it cannot be guaranteed that concrete is by window
Charging.
The two of secondary lining concreting common method are easy chute devices, and this scheme is it cannot be guaranteed that concrete
Into each window, " people " word slope is produced after causing concreting, influence concrete quality.The arrangement and method for construction concrete drop
Greatly, rubble can be easily separated with mortar in dropping process, it is impossible to ensure concrete quality.
The content of the invention
The present invention solves the deficiencies in the prior art, there is provided a kind of secondary lining enters modular system by window, successively installs shunting
Groove so that each layer splitter box can reach each operation window, while adding job platform in corresponding the window's position, realize coagulation
Soil is successively poured by window.
The technical solution adopted in the present invention is:A kind of secondary lining enters modular system, including at least two groups main hoppers by window
And T-shaped frame, the main hopper upper port side is fixedly arranged on T-shaped frame two ends, and its main hopper lower surface is supported by parallel shelf, institute
State main hopper and inverted vee slip is arranged with by the first through hole of its lower end both sides, the inverted vee slip lower port is provided with threeway
Splitter box, the distributing T-pipe groove lower port is provided with shunting tumbling barrel, and the shunting tumbling barrel lower port is provided with the first chute.
In a kind of preferred embodiment of the invention, the distributing T-pipe groove has square hopper, the square hopper two-phase
Second through hole is provided with to side lower end, side upper end is provided with third through-hole thereafter, the square hopper is arranged by the second through hole
There is herringbone to shunt and acclivitous shunting chute is provided with chute, and its third through-hole, the shunting chute is slided with herringbone
The flexible connection of groove.
In a kind of preferred embodiment of the invention, the herringbone shunting chute lower port is movably equipped with the second chute, institute
The second chute is stated to be placed in the truncated cone-shaped hopper upper port of shunting tumbling barrel, and the second chute keeps with herringbone shunting chute
Vertically.
In a kind of preferred embodiment of the invention, the shunting tumbling barrel has truncated cone-shaped hopper, truncated cone-shaped hopper lower port
Main shunt cylinder is provided with, main shunt cylinder side is provided with time shunt cylinder, and the main shunt cylinder and secondary shunt cylinder lower port are placed in first
On chute.
In a kind of preferred embodiment of the invention, the shunting tumbling barrel also has on plate, main shunt cylinder and secondary shunt cylinder
It is equipped with jack, plate is inserted into main shunt cylinder and secondary shunt cylinder by the jack activity, and plate is inserted by integrally formed
Plate and be placed in fork strap upper end draw ring composition.
In a kind of preferred embodiment of the invention, the main shunt cylinder and secondary shunt cylinder are L-type tube structure, and main
Shunt cylinder and secondary shunt cylinder are vertically arranged.
In a kind of preferred embodiment of the invention, first chute and the second chute are towards consistent its keeping parallelism.
In a kind of preferred embodiment of the invention, the inverted vee slip, the first chute, herringbone shunting chute and second
Chute longitudinal cross-section is V-arrangement or circular arc.
Compared to prior art, the device have the advantages that:
1st, main hopper, inverted vee slip, distributing T-pipe groove, shunt tumbling barrel and enter by way of window chute is combined, letter
The corresponding valve of single operation, makes concrete flow to each operation window, realizes being fed by window for two lining arch wall concrete.
2nd, shunting tumbling barrel overcomes original arrangement and method for construction concreting process and easily isolates, and produces the cold seam of " people " font
Drawback.
3rd, the labour intensity of workman is alleviated.Each layer pipeline conversion of the system only needs to for retractable chute to be retractable to two lining platforms
At vehicle window family, one just can complete conversion.And ensure that work progress conversion is continuous, will not be formed because pipe overlong time is changed
Cold seam.
4th, shunting tumbling barrel system is combined with two lining chassis operating platforms, the work high above the ground on chassis is changed into platform and makees
Industry, improves the operating environment of workman.
Brief description of the drawings
Fig. 1 is integral installation distribution structure schematic diagram of the present invention;
Fig. 2 is main hopper schematic front view of the present invention;
Fig. 3 is Fig. 2 schematic top plan views;
Fig. 4 is distributing T-pipe groove schematic front view of the present invention;
Fig. 5 is schematic side view of the present invention;
Fig. 6 is present invention shunting tumbling barrel schematic front view;
Fig. 7 is the schematic top plan view of Fig. 6;
Fig. 8 is board plug structure schematic diagram of the present invention.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
A kind of secondary lining enters modular system by window, structure as shown in Figure 1, Figure 2 and Figure 3, including at least two groups main hoppers 1 and
T-shaped frame 2, the upper port side of the main hopper 1 is fixedly arranged on the two ends of T-shaped frame 2, and its lower surface of main hopper 1 passes through parallel shelf 3
Support, the main hopper 1 is arranged with inverted vee slip 4, the lower end of the inverted vee slip 4 by the first through hole 11 of its lower end both sides
Mouth is provided with distributing T-pipe groove 5, and the lower port of distributing T-pipe groove 5 is provided with shunting tumbling barrel 6, and the shunting lower port of tumbling barrel 6 is provided with
First chute 7.Shunting tumbling barrel 6 overcomes the problem that original arrangement and method for construction concreting process is easily isolated.
In embodiments of the present invention, as shown in Figures 4 and 5, the distributing T-pipe groove 5 has square hopper 51, the side
The two relative side lower end of shape hopper 5 is provided with the second through hole 54, and side upper end is provided with third through-hole 55, the square hopper 5 thereafter
It is arranged with herringbone shunting chute 52, and its third through-hole 55 by the second through hole 54 and is provided with acclivitous shunting chute
53, the shunting chute 53 is flexible with inverted vee slip 4 to be connected.Shunting chute 53 is flexible with inverted vee slip 4 to be connected, Ke Yiqi
To the effect of regulation shunting chute 53 and the length of inverted vee slip 4.
Preferably, as shown in figure 1, the herringbone shunting lower port of chute 7 is movably equipped with the second chute 8, second chute 8
It is placed in the upper port of truncated cone-shaped hopper 61 of shunting tumbling barrel 6, and the second chute 8 keeps vertical with herringbone shunting chute 7.
During Tunnel Second Lining Construction, the one end of the second chute 8 is placed in the upper port of truncated cone-shaped hopper 61 of shunting tumbling barrel 6, separately
One end is flexible with the square chute for being fixed on tunnel wall to be connected.Mixed mud flows to each working window of three-level by the second chute 8
Mouthful.(operation window number from tunnel outer wall down number consecutively one, two, three)
As shown in Figure 6, Figure 7, shunting tumbling barrel 6 has truncated cone-shaped hopper 61, and the lower port of truncated cone-shaped hopper 61 is provided with main shunting
Cylinder 62, the side of main shunt cylinder 62 is provided with time shunt cylinder 63, and the main shunt cylinder 62 and the lower port of secondary shunt cylinder 63 are placed in first
On chute 7.Main shunt cylinder 61 and secondary shunt cylinder 62 are L-type tube structure, and main shunt cylinder 61 and secondary shunt cylinder 62 vertically set
Put.During Tunnel Second Lining Construction, mixed mud passes through time chute 7 of shunt cylinder 63 and first and flows to two grades of each working windows
Mouthful.Mixed mud flows to each operation window of one-level by the chute 7 of main shunt cylinder 63 and first.
Shunting tumbling barrel 6 also has plate 64, and jack 65 is equipped with main shunt cylinder 62 and secondary shunt cylinder 63, and plate 64 passes through
The jack 65 is inserted in main shunt cylinder 62 and secondary shunt cylinder 63, and plate 64 is by integrally formed fork strap 641 and is placed in fork strap
The draw ring 642 of 641 upper surfaces is constituted.By main shunt cylinder 62 and the main shunt cylinder 62 of activity insertion of secondary shunt cylinder 63 and secondary shunt cylinder 63
It is interior, prevent concrete from passing through, extract the concrete of plate 64 out and pass through main shunt cylinder 62 and secondary shunt cylinder 63.
First chute 7 and the second chute 8 towards consistent its keeping parallelism, specifically, outside the first chute 7 and the second chute 8
Port is extended to on each operation window outer wall of tunnel volume from the both sides of main hopper 1.
Inverted vee slip 4, the longitudinal cross-section of 52 and second chute of the first chute 7, herringbone shunting chute 8 are V-arrangement or circular arc
Shape, preferential, the inverted vee slip 4, the longitudinal cross-section of 52 and second chute of the first chute 7, herringbone shunting chute 8 are right angle
Triangle.
It should be noted that the present invention implements to also need to, and lining trolley is long and pipeline that be connected with chassis, the discharging of pipeline
Mouth is connected with the lower port of main hopper 1, and chassis is long 12 meters, and main hopper upper port size is 65*50cm, and lower port size is 47*
23cm, height 50cm, apart from chassis termination 3m.
Its operation principle is:The main hopper 1 of main platform is sequentially installed, inverted vee slip 4, distributing T-pipe groove 5 is installed and is divided
Stream tumbling barrel 6, finally installs windows at different levels point chute, by the pump delivering concrete of chassis to main hopper 1, adjusts distributing T-pipe groove
Second chute 8 of 5 lower ends, makes its port of the second chute 8 leave the lower port of distributing T-pipe groove 5, and by main shunt cylinder 62
Plate 64 is extracted out, flows backwards concrete to three-level operation window, after the plate 64 of main shunt cylinder 62 is inserted, extract time shunt cylinder 63 out
Plate 64, flow backwards concrete to secondary work window, finally adjust the second chute 8, its port of the second chute 8 is placed in threeway
The lower port of splitter box 5, flows backwards concrete to one-level operation window, changes pump line, carries out the construction of spray top.
The present invention successively installs splitter box according to the design drawing of chassis splitter box so that each layer splitter box can reach each
Operation window;Job platform is added in corresponding the window's position simultaneously, is easy to operative.
Above-described embodiment, simply presently preferred embodiments of the present invention, not for limiting practical range of the invention, thus it is all with
The equivalent variations that content described in the claims in the present invention is done, all should be included within scope of the invention as claimed.
Claims (8)
1. secondary lining enters modular system by window, it is characterised in that including at least two groups main hoppers (1) and T-shaped frame (2), the master
Hopper (1) upper port side is fixedly arranged on T-shaped frame (2) two ends, and its main hopper (1) lower surface is supported by parallel shelf (3), described
Main hopper (1) is arranged with inverted vee slip (4) by the first through hole (11) of its lower end both sides, under the inverted vee slip (4)
Port is provided with distributing T-pipe groove (5), and distributing T-pipe groove (5) lower port is provided with shunting tumbling barrel (6), shunting tumbling barrel (6)
Lower port is provided with the first chute (7).
2. secondary lining according to claim 1 enters modular system by window, it is characterised in that distributing T-pipe groove (5) tool
There are square hopper (51), square hopper (5) the two relative side lower end to be provided with the second through hole (54), side upper end is provided with thereafter
Third through-hole (55), the square hopper (5) by the second through hole (54) be arranged with herringbone shunt chute (52), and its 3rd
Through hole (55) place is provided with acclivitous shunting chute (53), and shunting chute (53) is flexible with inverted vee slip (4) to be connected.
3. secondary lining according to claim 2 enters modular system by window, it is characterised in that the herringbone shunts chute
(7) lower port is movably equipped with the second chute (8), and second chute (8) is placed on the truncated cone-shaped hopper (61) of shunting tumbling barrel (6)
On port, and the second chute (8) is vertical with herringbone shunting chute (7) holding.
4. secondary lining according to claim 3 enters modular system by window, it is characterised in that the shunting tumbling barrel (6) has
Truncated cone-shaped hopper (61), truncated cone-shaped hopper (61) lower port is provided with main shunt cylinder (62), and main shunt cylinder (62) side is provided with secondary
Shunt cylinder (63), the main shunt cylinder (62) and secondary shunt cylinder (63) lower port are placed on the first chute (7).
5. secondary lining according to claim 3 enters modular system by window, it is characterised in that the shunting tumbling barrel (6) also has
There is plate (64), jack (65) is equipped with main shunt cylinder (62) and secondary shunt cylinder (63), plate (64) is by the jack (65)
Activity is inserted into main shunt cylinder (62) and secondary shunt cylinder (63), and plate (64) is by integrally formed fork strap (641) and puts
Draw ring (642) in fork strap (641) upper end is constituted.
6. secondary lining according to claim 5 enters modular system by window, it is characterised in that the main shunt cylinder (61) and secondary
Shunt cylinder (62) is L-type tube structure, and main shunt cylinder (61) and secondary shunt cylinder (62) are vertically arranged.
7. secondary lining according to claim 6 enters modular system by window, it is characterised in that first chute (7) and the
Consistent its keeping parallelism of two chutes (8) direction.
8. secondary lining according to claim 7 enters modular system by window, it is characterised in that the inverted vee slip (4),
One chute (7), herringbone shunting chute (52) and the second chute (8) longitudinal cross-section are V-arrangement or circular arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621342757.XU CN206246134U (en) | 2016-12-08 | 2016-12-08 | Secondary lining enters modular system by window |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621342757.XU CN206246134U (en) | 2016-12-08 | 2016-12-08 | Secondary lining enters modular system by window |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206246134U true CN206246134U (en) | 2017-06-13 |
Family
ID=59006602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621342757.XU Withdrawn - After Issue CN206246134U (en) | 2016-12-08 | 2016-12-08 | Secondary lining enters modular system by window |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206246134U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106640134A (en) * | 2016-12-08 | 2017-05-10 | 熊鹏 | Secondary lining window-chasing mould-entering system |
-
2016
- 2016-12-08 CN CN201621342757.XU patent/CN206246134U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106640134A (en) * | 2016-12-08 | 2017-05-10 | 熊鹏 | Secondary lining window-chasing mould-entering system |
CN106640134B (en) * | 2016-12-08 | 2019-09-24 | 熊鹏 | Secondary lining enters modular system by window |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106640134A (en) | Secondary lining window-chasing mould-entering system | |
CN205421952U (en) | Steel bar traction device | |
CN204197695U (en) | A kind of packaged type automatic conveying bucket | |
CN210396153U (en) | Height-adjustable movable concrete discharging device | |
CN206246134U (en) | Secondary lining enters modular system by window | |
CN206874291U (en) | One kind two serves as a contrast chute and enters modular system by window | |
CN210659228U (en) | Movable single-side formwork system for subway construction | |
CN205421940U (en) | Concrete spreader | |
CN201786031U (en) | Slip-formed concrete distributing bin device | |
CN202745385U (en) | Concrete pouring chute | |
CN106284989B (en) | The sliding form bracing system of double track and complete construction method | |
CN202510133U (en) | Uniform dropping type blanking device | |
CN202672156U (en) | High-speed-railway roadbed-section road-shoulder concrete pouring machine | |
CN201762642U (en) | Dragging lime soil block forming machine for construction lime soil | |
CN203796282U (en) | Vehicular pulp shooting machine | |
CN204590623U (en) | A kind of material transfer box for aluminum alloy mould plate system | |
CN203514751U (en) | Convenient-to-move scaffold for building interior wall construction | |
CN106836807A (en) | It is a kind of can quick-assembling and mobile modular rack application method | |
CN209602884U (en) | The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track | |
CN106761827B (en) | A kind of tunnel-liner closure mould bases | |
CN213925765U (en) | Positioning mechanism is used in road bed construction | |
CN207377075U (en) | A kind of floor tile flapping device | |
CN206972263U (en) | The anti-collapse device in the horizontal hole in tunnel | |
CN205419266U (en) | Reinforcing bar pulls carriage | |
CN206144161U (en) | Equipment of pouring little component concrete is exclusively used in |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170613 Effective date of abandoning: 20190924 |
|
AV01 | Patent right actively abandoned |