CN206246134U - Secondary lining enters modular system by window - Google Patents

Secondary lining enters modular system by window Download PDF

Info

Publication number
CN206246134U
CN206246134U CN201621342757.XU CN201621342757U CN206246134U CN 206246134 U CN206246134 U CN 206246134U CN 201621342757 U CN201621342757 U CN 201621342757U CN 206246134 U CN206246134 U CN 206246134U
Authority
CN
China
Prior art keywords
chute
window
shunting
shunt cylinder
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621342757.XU
Other languages
Chinese (zh)
Inventor
熊鹏
李亚方
张刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621342757.XU priority Critical patent/CN206246134U/en
Application granted granted Critical
Publication of CN206246134U publication Critical patent/CN206246134U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Enter modular system by window the utility model discloses a kind of secondary lining, including at least two groups main hoppers and T-shaped frame, the main hopper upper port side is fixedly arranged on T-shaped frame two ends, and its main hopper lower surface is supported by parallel shelf, the main hopper is arranged with inverted vee slip by the first through hole of its lower end both sides, the inverted vee slip lower port is provided with distributing T-pipe groove, and the distributing T-pipe groove lower port is provided with shunting tumbling barrel, and the shunting tumbling barrel lower port is provided with the first chute.The system main hopper, inverted vee slip, distributing T-pipe groove, shunt tumbling barrel and enter by way of window chute is combined, the corresponding valve of simple operations makes concrete flow to each operation window, realize two lining arch wall concrete by window charging.

Description

Secondary lining enters modular system by window
Technical field
The invention belongs to Construction of Civil Engineering field, it is related to concreting servicing unit, and in particular to a kind of secondary lining Block enters modular system by window.
Background technology
One of secondary lining concreting most common method is poured using pumping flexible pipe, and this kind of scheme is maximum to be lacked Point:Pipe frequently is changed in concreting process, line operator's working strength is excessive, pipe process is being changed in plenty of time consumption In, transition duct at least needs 4 people to operate, and wastes time and energy.Concreting is less efficient, and it cannot be guaranteed that concrete is by window Charging.
The two of secondary lining concreting common method are easy chute devices, and this scheme is it cannot be guaranteed that concrete Into each window, " people " word slope is produced after causing concreting, influence concrete quality.The arrangement and method for construction concrete drop Greatly, rubble can be easily separated with mortar in dropping process, it is impossible to ensure concrete quality.
The content of the invention
The present invention solves the deficiencies in the prior art, there is provided a kind of secondary lining enters modular system by window, successively installs shunting Groove so that each layer splitter box can reach each operation window, while adding job platform in corresponding the window's position, realize coagulation Soil is successively poured by window.
The technical solution adopted in the present invention is:A kind of secondary lining enters modular system, including at least two groups main hoppers by window And T-shaped frame, the main hopper upper port side is fixedly arranged on T-shaped frame two ends, and its main hopper lower surface is supported by parallel shelf, institute State main hopper and inverted vee slip is arranged with by the first through hole of its lower end both sides, the inverted vee slip lower port is provided with threeway Splitter box, the distributing T-pipe groove lower port is provided with shunting tumbling barrel, and the shunting tumbling barrel lower port is provided with the first chute.
In a kind of preferred embodiment of the invention, the distributing T-pipe groove has square hopper, the square hopper two-phase Second through hole is provided with to side lower end, side upper end is provided with third through-hole thereafter, the square hopper is arranged by the second through hole There is herringbone to shunt and acclivitous shunting chute is provided with chute, and its third through-hole, the shunting chute is slided with herringbone The flexible connection of groove.
In a kind of preferred embodiment of the invention, the herringbone shunting chute lower port is movably equipped with the second chute, institute The second chute is stated to be placed in the truncated cone-shaped hopper upper port of shunting tumbling barrel, and the second chute keeps with herringbone shunting chute Vertically.
In a kind of preferred embodiment of the invention, the shunting tumbling barrel has truncated cone-shaped hopper, truncated cone-shaped hopper lower port Main shunt cylinder is provided with, main shunt cylinder side is provided with time shunt cylinder, and the main shunt cylinder and secondary shunt cylinder lower port are placed in first On chute.
In a kind of preferred embodiment of the invention, the shunting tumbling barrel also has on plate, main shunt cylinder and secondary shunt cylinder It is equipped with jack, plate is inserted into main shunt cylinder and secondary shunt cylinder by the jack activity, and plate is inserted by integrally formed Plate and be placed in fork strap upper end draw ring composition.
In a kind of preferred embodiment of the invention, the main shunt cylinder and secondary shunt cylinder are L-type tube structure, and main Shunt cylinder and secondary shunt cylinder are vertically arranged.
In a kind of preferred embodiment of the invention, first chute and the second chute are towards consistent its keeping parallelism.
In a kind of preferred embodiment of the invention, the inverted vee slip, the first chute, herringbone shunting chute and second Chute longitudinal cross-section is V-arrangement or circular arc.
Compared to prior art, the device have the advantages that:
1st, main hopper, inverted vee slip, distributing T-pipe groove, shunt tumbling barrel and enter by way of window chute is combined, letter The corresponding valve of single operation, makes concrete flow to each operation window, realizes being fed by window for two lining arch wall concrete.
2nd, shunting tumbling barrel overcomes original arrangement and method for construction concreting process and easily isolates, and produces the cold seam of " people " font Drawback.
3rd, the labour intensity of workman is alleviated.Each layer pipeline conversion of the system only needs to for retractable chute to be retractable to two lining platforms At vehicle window family, one just can complete conversion.And ensure that work progress conversion is continuous, will not be formed because pipe overlong time is changed Cold seam.
4th, shunting tumbling barrel system is combined with two lining chassis operating platforms, the work high above the ground on chassis is changed into platform and makees Industry, improves the operating environment of workman.
Brief description of the drawings
Fig. 1 is integral installation distribution structure schematic diagram of the present invention;
Fig. 2 is main hopper schematic front view of the present invention;
Fig. 3 is Fig. 2 schematic top plan views;
Fig. 4 is distributing T-pipe groove schematic front view of the present invention;
Fig. 5 is schematic side view of the present invention;
Fig. 6 is present invention shunting tumbling barrel schematic front view;
Fig. 7 is the schematic top plan view of Fig. 6;
Fig. 8 is board plug structure schematic diagram of the present invention.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
A kind of secondary lining enters modular system by window, structure as shown in Figure 1, Figure 2 and Figure 3, including at least two groups main hoppers 1 and T-shaped frame 2, the upper port side of the main hopper 1 is fixedly arranged on the two ends of T-shaped frame 2, and its lower surface of main hopper 1 passes through parallel shelf 3 Support, the main hopper 1 is arranged with inverted vee slip 4, the lower end of the inverted vee slip 4 by the first through hole 11 of its lower end both sides Mouth is provided with distributing T-pipe groove 5, and the lower port of distributing T-pipe groove 5 is provided with shunting tumbling barrel 6, and the shunting lower port of tumbling barrel 6 is provided with First chute 7.Shunting tumbling barrel 6 overcomes the problem that original arrangement and method for construction concreting process is easily isolated.
In embodiments of the present invention, as shown in Figures 4 and 5, the distributing T-pipe groove 5 has square hopper 51, the side The two relative side lower end of shape hopper 5 is provided with the second through hole 54, and side upper end is provided with third through-hole 55, the square hopper 5 thereafter It is arranged with herringbone shunting chute 52, and its third through-hole 55 by the second through hole 54 and is provided with acclivitous shunting chute 53, the shunting chute 53 is flexible with inverted vee slip 4 to be connected.Shunting chute 53 is flexible with inverted vee slip 4 to be connected, Ke Yiqi To the effect of regulation shunting chute 53 and the length of inverted vee slip 4.
Preferably, as shown in figure 1, the herringbone shunting lower port of chute 7 is movably equipped with the second chute 8, second chute 8 It is placed in the upper port of truncated cone-shaped hopper 61 of shunting tumbling barrel 6, and the second chute 8 keeps vertical with herringbone shunting chute 7. During Tunnel Second Lining Construction, the one end of the second chute 8 is placed in the upper port of truncated cone-shaped hopper 61 of shunting tumbling barrel 6, separately One end is flexible with the square chute for being fixed on tunnel wall to be connected.Mixed mud flows to each working window of three-level by the second chute 8 Mouthful.(operation window number from tunnel outer wall down number consecutively one, two, three)
As shown in Figure 6, Figure 7, shunting tumbling barrel 6 has truncated cone-shaped hopper 61, and the lower port of truncated cone-shaped hopper 61 is provided with main shunting Cylinder 62, the side of main shunt cylinder 62 is provided with time shunt cylinder 63, and the main shunt cylinder 62 and the lower port of secondary shunt cylinder 63 are placed in first On chute 7.Main shunt cylinder 61 and secondary shunt cylinder 62 are L-type tube structure, and main shunt cylinder 61 and secondary shunt cylinder 62 vertically set Put.During Tunnel Second Lining Construction, mixed mud passes through time chute 7 of shunt cylinder 63 and first and flows to two grades of each working windows Mouthful.Mixed mud flows to each operation window of one-level by the chute 7 of main shunt cylinder 63 and first.
Shunting tumbling barrel 6 also has plate 64, and jack 65 is equipped with main shunt cylinder 62 and secondary shunt cylinder 63, and plate 64 passes through The jack 65 is inserted in main shunt cylinder 62 and secondary shunt cylinder 63, and plate 64 is by integrally formed fork strap 641 and is placed in fork strap The draw ring 642 of 641 upper surfaces is constituted.By main shunt cylinder 62 and the main shunt cylinder 62 of activity insertion of secondary shunt cylinder 63 and secondary shunt cylinder 63 It is interior, prevent concrete from passing through, extract the concrete of plate 64 out and pass through main shunt cylinder 62 and secondary shunt cylinder 63.
First chute 7 and the second chute 8 towards consistent its keeping parallelism, specifically, outside the first chute 7 and the second chute 8 Port is extended to on each operation window outer wall of tunnel volume from the both sides of main hopper 1.
Inverted vee slip 4, the longitudinal cross-section of 52 and second chute of the first chute 7, herringbone shunting chute 8 are V-arrangement or circular arc Shape, preferential, the inverted vee slip 4, the longitudinal cross-section of 52 and second chute of the first chute 7, herringbone shunting chute 8 are right angle Triangle.
It should be noted that the present invention implements to also need to, and lining trolley is long and pipeline that be connected with chassis, the discharging of pipeline Mouth is connected with the lower port of main hopper 1, and chassis is long 12 meters, and main hopper upper port size is 65*50cm, and lower port size is 47* 23cm, height 50cm, apart from chassis termination 3m.
Its operation principle is:The main hopper 1 of main platform is sequentially installed, inverted vee slip 4, distributing T-pipe groove 5 is installed and is divided Stream tumbling barrel 6, finally installs windows at different levels point chute, by the pump delivering concrete of chassis to main hopper 1, adjusts distributing T-pipe groove Second chute 8 of 5 lower ends, makes its port of the second chute 8 leave the lower port of distributing T-pipe groove 5, and by main shunt cylinder 62 Plate 64 is extracted out, flows backwards concrete to three-level operation window, after the plate 64 of main shunt cylinder 62 is inserted, extract time shunt cylinder 63 out Plate 64, flow backwards concrete to secondary work window, finally adjust the second chute 8, its port of the second chute 8 is placed in threeway The lower port of splitter box 5, flows backwards concrete to one-level operation window, changes pump line, carries out the construction of spray top.
The present invention successively installs splitter box according to the design drawing of chassis splitter box so that each layer splitter box can reach each Operation window;Job platform is added in corresponding the window's position simultaneously, is easy to operative.
Above-described embodiment, simply presently preferred embodiments of the present invention, not for limiting practical range of the invention, thus it is all with The equivalent variations that content described in the claims in the present invention is done, all should be included within scope of the invention as claimed.

Claims (8)

1. secondary lining enters modular system by window, it is characterised in that including at least two groups main hoppers (1) and T-shaped frame (2), the master Hopper (1) upper port side is fixedly arranged on T-shaped frame (2) two ends, and its main hopper (1) lower surface is supported by parallel shelf (3), described Main hopper (1) is arranged with inverted vee slip (4) by the first through hole (11) of its lower end both sides, under the inverted vee slip (4) Port is provided with distributing T-pipe groove (5), and distributing T-pipe groove (5) lower port is provided with shunting tumbling barrel (6), shunting tumbling barrel (6) Lower port is provided with the first chute (7).
2. secondary lining according to claim 1 enters modular system by window, it is characterised in that distributing T-pipe groove (5) tool There are square hopper (51), square hopper (5) the two relative side lower end to be provided with the second through hole (54), side upper end is provided with thereafter Third through-hole (55), the square hopper (5) by the second through hole (54) be arranged with herringbone shunt chute (52), and its 3rd Through hole (55) place is provided with acclivitous shunting chute (53), and shunting chute (53) is flexible with inverted vee slip (4) to be connected.
3. secondary lining according to claim 2 enters modular system by window, it is characterised in that the herringbone shunts chute (7) lower port is movably equipped with the second chute (8), and second chute (8) is placed on the truncated cone-shaped hopper (61) of shunting tumbling barrel (6) On port, and the second chute (8) is vertical with herringbone shunting chute (7) holding.
4. secondary lining according to claim 3 enters modular system by window, it is characterised in that the shunting tumbling barrel (6) has Truncated cone-shaped hopper (61), truncated cone-shaped hopper (61) lower port is provided with main shunt cylinder (62), and main shunt cylinder (62) side is provided with secondary Shunt cylinder (63), the main shunt cylinder (62) and secondary shunt cylinder (63) lower port are placed on the first chute (7).
5. secondary lining according to claim 3 enters modular system by window, it is characterised in that the shunting tumbling barrel (6) also has There is plate (64), jack (65) is equipped with main shunt cylinder (62) and secondary shunt cylinder (63), plate (64) is by the jack (65) Activity is inserted into main shunt cylinder (62) and secondary shunt cylinder (63), and plate (64) is by integrally formed fork strap (641) and puts Draw ring (642) in fork strap (641) upper end is constituted.
6. secondary lining according to claim 5 enters modular system by window, it is characterised in that the main shunt cylinder (61) and secondary Shunt cylinder (62) is L-type tube structure, and main shunt cylinder (61) and secondary shunt cylinder (62) are vertically arranged.
7. secondary lining according to claim 6 enters modular system by window, it is characterised in that first chute (7) and the Consistent its keeping parallelism of two chutes (8) direction.
8. secondary lining according to claim 7 enters modular system by window, it is characterised in that the inverted vee slip (4), One chute (7), herringbone shunting chute (52) and the second chute (8) longitudinal cross-section are V-arrangement or circular arc.
CN201621342757.XU 2016-12-08 2016-12-08 Secondary lining enters modular system by window Withdrawn - After Issue CN206246134U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621342757.XU CN206246134U (en) 2016-12-08 2016-12-08 Secondary lining enters modular system by window

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621342757.XU CN206246134U (en) 2016-12-08 2016-12-08 Secondary lining enters modular system by window

Publications (1)

Publication Number Publication Date
CN206246134U true CN206246134U (en) 2017-06-13

Family

ID=59006602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621342757.XU Withdrawn - After Issue CN206246134U (en) 2016-12-08 2016-12-08 Secondary lining enters modular system by window

Country Status (1)

Country Link
CN (1) CN206246134U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640134A (en) * 2016-12-08 2017-05-10 熊鹏 Secondary lining window-chasing mould-entering system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640134A (en) * 2016-12-08 2017-05-10 熊鹏 Secondary lining window-chasing mould-entering system
CN106640134B (en) * 2016-12-08 2019-09-24 熊鹏 Secondary lining enters modular system by window

Similar Documents

Publication Publication Date Title
CN106640134A (en) Secondary lining window-chasing mould-entering system
CN205421952U (en) Steel bar traction device
CN204197695U (en) A kind of packaged type automatic conveying bucket
CN210396153U (en) Height-adjustable movable concrete discharging device
CN206246134U (en) Secondary lining enters modular system by window
CN206874291U (en) One kind two serves as a contrast chute and enters modular system by window
CN210659228U (en) Movable single-side formwork system for subway construction
CN205421940U (en) Concrete spreader
CN201786031U (en) Slip-formed concrete distributing bin device
CN202745385U (en) Concrete pouring chute
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN202510133U (en) Uniform dropping type blanking device
CN202672156U (en) High-speed-railway roadbed-section road-shoulder concrete pouring machine
CN201762642U (en) Dragging lime soil block forming machine for construction lime soil
CN203796282U (en) Vehicular pulp shooting machine
CN204590623U (en) A kind of material transfer box for aluminum alloy mould plate system
CN203514751U (en) Convenient-to-move scaffold for building interior wall construction
CN106836807A (en) It is a kind of can quick-assembling and mobile modular rack application method
CN209602884U (en) The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track
CN106761827B (en) A kind of tunnel-liner closure mould bases
CN213925765U (en) Positioning mechanism is used in road bed construction
CN207377075U (en) A kind of floor tile flapping device
CN206972263U (en) The anti-collapse device in the horizontal hole in tunnel
CN205419266U (en) Reinforcing bar pulls carriage
CN206144161U (en) Equipment of pouring little component concrete is exclusively used in

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170613

Effective date of abandoning: 20190924

AV01 Patent right actively abandoned