CN106640134A - Secondary lining window-chasing mould-entering system - Google Patents

Secondary lining window-chasing mould-entering system Download PDF

Info

Publication number
CN106640134A
CN106640134A CN201611123277.9A CN201611123277A CN106640134A CN 106640134 A CN106640134 A CN 106640134A CN 201611123277 A CN201611123277 A CN 201611123277A CN 106640134 A CN106640134 A CN 106640134A
Authority
CN
China
Prior art keywords
chute
window
shunt cylinder
shunting
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611123277.9A
Other languages
Chinese (zh)
Other versions
CN106640134B (en
Inventor
熊鹏
李亚方
张刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611123277.9A priority Critical patent/CN106640134B/en
Publication of CN106640134A publication Critical patent/CN106640134A/en
Application granted granted Critical
Publication of CN106640134B publication Critical patent/CN106640134B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Abstract

The invention discloses a secondary lining window-chasing mould-entering system. The system comprises at least two groups of main ingredient hoppers and T-shaped frames, wherein one sides of the upper end openings of the main ingredient hoppers are fixedly arranged at two ends of the T-shaped frames, the lower end faces of the main ingredient hoppers are supported through parallel frames, the main ingredient hoppers are provided with lambdoidal sliding grooves in a sleeved mode through first through holes on the two sides of the lower ends of the main ingredient hoppers, the lower end openings of the lambdoidal sliding grooves are provided with three-joint flow dividing grooves, the lower end openings of the three-joint flow dividing grooves are provided with flow dividing tumbling barrels, and the lower end openings of the flow dividing tumbling barrels are provided with first sliding grooves. According to the secondary lining window-chasing mould-entering system, through the method of the combination of the main ingredient hoppers, the lambdoidal sliding grooves, the three-joint flow dividing grooves, the flow dividing tumbling barrels and window entering chutes, a corresponding valve is simply operated so that concretes can flow into each work window, and thus window-chasing material-entering of the secondary lining arch wall concretes is achieved.

Description

Secondary lining enters modular system by window
Technical field
The invention belongs to Construction of Civil Engineering field, is related to concreting servicing unit, and in particular to a kind of secondary lining Block enters modular system by window.
Background technology
One of secondary lining concreting most common method is poured using pumping flexible pipe, and this kind of scheme is maximum to be lacked Point:Pipe is frequently changed in concreting process, line operator's working strength is excessive, pipe process is being changed in plenty of time consumption In, transition duct at least needs 4 people to operate, and wastes time and energy.Concreting is less efficient, and it cannot be guaranteed that concrete is by window Charging.
The two of secondary lining concreting common method are easy chute devices, and this scheme is it cannot be guaranteed that concrete Into each window, cause to produce " people " word slope after concreting, affect concrete quality.The arrangement and method for construction concrete drop Greatly, rubble can be easily separated with mortar in dropping process, it is impossible to ensure concrete quality.
The content of the invention
The present invention solves the deficiencies in the prior art, there is provided a kind of secondary lining enters modular system by window, successively installs shunting Groove so that each layer splitter box can reach each operation window, while adding job platform in corresponding the window's position, realize coagulation Soil is successively poured by window.
The technical solution adopted in the present invention is:A kind of secondary lining enters modular system by window, including at least two groups main hoppers And T-shaped frame, the main hopper upper port side is fixedly arranged on T-shaped frame two ends, and its main hopper lower surface is supported by parallel shelf, institute State main hopper and inverted vee slip is arranged with by the first through hole of its lower end both sides, the inverted vee slip lower port is provided with threeway Splitter box, the distributing T-pipe groove lower port is provided with shunting tumbling barrel, and the shunting tumbling barrel lower port is provided with the first chute.
In a kind of preferred embodiment of the invention, the distributing T-pipe groove has square hopper, the square hopper two-phase Second through hole is provided with to side lower end, thereafter side upper end is provided with third through-hole, the square hopper is arranged by the second through hole Have at herringbone shunting chute, and its third through-hole and be provided with acclivitous shunting chute, the shunting chute is slided with herringbone The flexible connection of groove.
In a kind of preferred embodiment of the invention, the herringbone shunting chute lower port is movably equipped with the second chute, institute State the second chute to be placed in the truncated cone-shaped hopper upper port of shunting tumbling barrel, and the second chute keeps with herringbone shunting chute Vertically.
In a kind of preferred embodiment of the invention, the shunting tumbling barrel has truncated cone-shaped hopper, truncated cone-shaped hopper lower port Main shunt cylinder is provided with, main shunt cylinder side is provided with time shunt cylinder, and the main shunt cylinder and secondary shunt cylinder lower port are placed in first On chute.
In a kind of preferred embodiment of the invention, the shunting tumbling barrel also has on plate, main shunt cylinder and secondary shunt cylinder It is equipped with jack, plate is inserted into main shunt cylinder and secondary shunt cylinder by the jack activity, and plate is inserted by integrally formed Plate and be placed in fork strap upper end draw ring composition.
In a kind of preferred embodiment of the invention, the main shunt cylinder and secondary shunt cylinder are L-type tube structure, and main Shunt cylinder and secondary shunt cylinder are vertically arranged.
In a kind of preferred embodiment of the invention, first chute is with the second chute towards consistent its keeping parallelism.
In a kind of preferred embodiment of the invention, the inverted vee slip, the first chute, herringbone shunting chute and second Chute longitudinal cross-section is V-arrangement or circular arc.
Compared to prior art, the device have the advantages that:
1st, main hopper, inverted vee slip, distributing T-pipe groove, shunt tumbling barrel and enter by way of window chute combines, letter The corresponding valve of single operation, makes concrete flow to each operation window, realizes feeding by window for two lining arch wall concrete.
2nd, shunting tumbling barrel overcomes original arrangement and method for construction concreting process and easily isolates, and produces the cold seam of " people " font Drawback.
3rd, the labour intensity of workman is alleviated.The each layer pipeline conversion of the system only needs to for retractable chute to be retractable to two lining platforms At vehicle window family, one just can complete conversion.And ensure that work progress conversion is continuous, will not be formed because pipe overlong time is changed Cold seam.
4th, tumbling barrel system is shunted in combination with two lining chassis operating platforms, make the work high above the ground on chassis be changed into platform work Industry, improves the operating environment of workman.
Description of the drawings
Fig. 1 is integral installation distribution structure schematic diagram of the present invention;
Fig. 2 is main hopper schematic front view of the present invention;
Fig. 3 is Fig. 2 schematic top plan views;
Fig. 4 is distributing T-pipe groove schematic front view of the present invention;
Fig. 5 is schematic side view of the present invention;
Fig. 6 is present invention shunting tumbling barrel schematic front view;
Fig. 7 is the schematic top plan view of Fig. 6;
Fig. 8 is board plug structure schematic diagram of the present invention.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is described in detail.
A kind of secondary lining enters modular system by window, structure as shown in Figure 1, Figure 2 and Figure 3, including at least two groups main hoppers 1 and T-shaped frame 2, the upper port side of the main hopper 1 is fixedly arranged on the two ends of T-shaped frame 2, and its lower surface of main hopper 1 passes through parallel shelf 3 Support, the main hopper 1 is arranged with inverted vee slip 4, the lower end of the inverted vee slip 4 by the first through hole 11 of its lower end both sides Mouth is provided with distributing T-pipe groove 5, and the lower port of distributing T-pipe groove 5 is provided with shunting tumbling barrel 6, and the shunting lower port of tumbling barrel 6 is provided with First chute 7.Shunting tumbling barrel 6 overcomes the problem that original arrangement and method for construction concreting process is easily isolated.
In embodiments of the present invention, as shown in Figures 4 and 5, the distributing T-pipe groove 5 has square hopper 51, the side The two relative side lower end of shape hopper 5 is provided with the second through hole 54, and thereafter side upper end is provided with third through-hole 55, the square hopper 5 It is arranged with herringbone shunting chute 52, and its third through-hole 55 by the second through hole 54 and is provided with acclivitous shunting chute 53, the shunting chute 53 is flexible with inverted vee slip 4 to be connected.Shunting chute 53 is flexible with inverted vee slip 4 to be connected, Ke Yiqi To the effect for adjusting shunting chute 53 and the length of inverted vee slip 4.
Preferably, as shown in figure 1, the herringbone shunting lower port of chute 7 is movably equipped with the second chute 8, second chute 8 It is placed in the upper port of truncated cone-shaped hopper 61 of shunting tumbling barrel 6, and the second chute 8 keeps vertical with herringbone shunting chute 7. During Tunnel Second Lining Construction, the one end of the second chute 8 is placed in the upper port of truncated cone-shaped hopper 61 of shunting tumbling barrel 6, separately One end is flexible with the square chute for being fixed on tunnel body of wall to be connected.Mixed mud flows to each working window of three-level by the second chute 8 Mouthful.(operation window number from tunnel outer wall down number consecutively one, two, three)
As shown in Figure 6, Figure 7, shunt tumbling barrel 6 and there is truncated cone-shaped hopper 61, the lower port of truncated cone-shaped hopper 61 is provided with main shunting Cylinder 62, the side of main shunt cylinder 62 is provided with time shunt cylinder 63, and the main shunt cylinder 62 and the lower port of secondary shunt cylinder 63 are placed in first On chute 7.Main shunt cylinder 61 and secondary shunt cylinder 62 are L-type tube structure, and main shunt cylinder 61 and secondary shunt cylinder 62 vertically set Put.During Tunnel Second Lining Construction, mixed mud flows to two grades of each working windows by time chute 7 of shunt cylinder 63 and first Mouthful.Mixed mud flows to each operation window of one-level by the chute 7 of main shunt cylinder 63 and first.
Shunting tumbling barrel 6 also has plate 64, and on main shunt cylinder 62 and secondary shunt cylinder 63 jack 65 is equipped with, and plate 64 passes through The jack 65 is inserted in main shunt cylinder 62 and secondary shunt cylinder 63, and plate 64 is by integrally formed fork strap 641 and is placed in fork strap The draw ring 642 of 641 upper surfaces is constituted.By main shunt cylinder 62 and the main shunt cylinder 62 of the activity insertion of secondary shunt cylinder 63 and secondary shunt cylinder 63 It is interior, prevent concrete from passing through, the concrete of plate 64 is extracted out by main shunt cylinder 62 and secondary shunt cylinder 63.
First chute 7 with the second chute 8 towards consistent its keeping parallelism, specifically, outside the first chute 7 and the second chute 8 Port is extended to on each operation window outer wall of tunnel volume from the both sides of main hopper 1.
Inverted vee slip 4, the longitudinal cross-section of 52 and second chute of the first chute 7, herringbone shunting chute 8 are V-arrangement or circular arc Shape, preferential, the inverted vee slip 4, the longitudinal cross-section of 52 and second chute of the first chute 7, herringbone shunting chute 8 are right angle Triangle.
It should be noted that the present invention implements the pipeline for also needing to lining trolley length and being connected with chassis, the discharging of pipeline Mouth is connected with the lower port of main hopper 1,12 meters of chassis length, and main hopper upper port size is 65*50cm, and lower port size is 47* 23cm, height 50cm, apart from chassis termination 3m.
Its operation principle is:The main hopper 1 of main platform is sequentially installed, inverted vee slip 4, distributing T-pipe groove 5 is installed and is divided Stream tumbling barrel 6, finally installs windows at different levels point chute, by the pump delivering concrete of chassis to main hopper 1, adjusts distributing T-pipe groove Second chute 8 of 5 lower ends so as to which the lower port of distributing T-pipe groove 5 is left in the port of the second chute 8, and by main shunt cylinder 62 Plate 64 is extracted out, flows backwards concrete to three-level operation window, after the plate 64 of main shunt cylinder 62 is inserted, extract time shunt cylinder 63 out Plate 64, flow backwards concrete to secondary work window, finally adjust the second chute 8 so as to which the port of the second chute 8 is placed in threeway The lower port of splitter box 5, flows backwards concrete to one-level operation window, changes pump line, carries out the construction of spray top.
The present invention successively installs splitter box according to the design drawing of chassis splitter box so that each layer splitter box can reach each Operation window;Simultaneously job platform is added in corresponding the window's position, be easy to operative.
Above-described embodiment, simply presently preferred embodiments of the present invention, not for limiting the practical range of the present invention, thus it is all with The equivalent variations that content described in the claims in the present invention is done, all should be included within scope of the invention as claimed.

Claims (8)

1. secondary lining enters modular system by window, it is characterised in that including at least two groups main hoppers (1) and T-shaped frame (2), the master Hopper (1) upper port side is fixedly arranged on T-shaped frame (2) two ends, and its main hopper (1) lower surface is supported by parallel shelf (3), described Main hopper (1) is arranged with inverted vee slip (4) by the first through hole (11) of its lower end both sides, under the inverted vee slip (4) Port is provided with distributing T-pipe groove (5), and distributing T-pipe groove (5) lower port is provided with shunting tumbling barrel (6), shunting tumbling barrel (6) Lower port is provided with the first chute (7).
2. secondary lining according to claim 1 enters modular system by window, it is characterised in that distributing T-pipe groove (5) tool There are square hopper (51), square hopper (5) the two relative side lower end to be provided with the second through hole (54), thereafter side upper end is provided with Third through-hole (55), the square hopper (5) by the second through hole (54) be arranged with herringbone shunt chute (52), and its 3rd Through hole (55) place is provided with acclivitous shunting chute (53), and shunting chute (53) is flexible with inverted vee slip (4) to be connected.
3. secondary lining according to claim 2 enters modular system by window, it is characterised in that the herringbone shunts chute (7) lower port is movably equipped with the second chute (8), and second chute (8) is placed on the truncated cone-shaped hopper (61) of shunting tumbling barrel (6) On port, and the second chute (8) is vertical with herringbone shunting chute (7) holding.
4. secondary lining according to claim 3 enters modular system by window, it is characterised in that the shunting tumbling barrel (6) has Truncated cone-shaped hopper (61), truncated cone-shaped hopper (61) lower port is provided with main shunt cylinder (62), and main shunt cylinder (62) side is provided with secondary Shunt cylinder (63), the main shunt cylinder (62) and secondary shunt cylinder (63) lower port are placed on the first chute (7).
5. secondary lining according to claim 3 enters modular system by window, it is characterised in that the shunting tumbling barrel (6) also has There is plate (64), on main shunt cylinder (62) and secondary shunt cylinder (63) jack (65) is equipped with, plate (64) is by the jack (65) Activity is inserted into main shunt cylinder (62) and secondary shunt cylinder (63), and plate (64) is by integrally formed fork strap (641) and puts Draw ring (642) in fork strap (641) upper end is constituted.
6. secondary lining according to claim 5 enters modular system by window, it is characterised in that the main shunt cylinder (61) and secondary Shunt cylinder (62) is L-type tube structure, and main shunt cylinder (61) and secondary shunt cylinder (62) are vertically arranged.
7. secondary lining according to claim 6 enters modular system by window, it is characterised in that first chute (7) and the Two chutes (8) are towards consistent its keeping parallelism.
8. secondary lining according to claim 7 enters modular system by window, it is characterised in that the inverted vee slip (4), One chute (7), herringbone shunting chute (52) and the second chute (8) longitudinal cross-section are V-arrangement or circular arc.
CN201611123277.9A 2016-12-08 2016-12-08 Secondary lining enters modular system by window Active CN106640134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611123277.9A CN106640134B (en) 2016-12-08 2016-12-08 Secondary lining enters modular system by window

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611123277.9A CN106640134B (en) 2016-12-08 2016-12-08 Secondary lining enters modular system by window

Publications (2)

Publication Number Publication Date
CN106640134A true CN106640134A (en) 2017-05-10
CN106640134B CN106640134B (en) 2019-09-24

Family

ID=58820159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611123277.9A Active CN106640134B (en) 2016-12-08 2016-12-08 Secondary lining enters modular system by window

Country Status (1)

Country Link
CN (1) CN106640134B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013232A (en) * 2017-05-18 2017-08-04 中铁隧道集团二处有限公司 A kind of concrete feeding-distribution device
CN107060830A (en) * 2017-06-09 2017-08-18 中铁十七局集团第五工程有限公司 Single-track tunnel secondary lining concrete pours device and its construction method by window
CN108316951A (en) * 2018-04-13 2018-07-24 兰州理工大学 Enter the equipment and application method that mould pours by window for tunnel double-lining concrete
CN109826650A (en) * 2019-01-30 2019-05-31 中铁隧道集团二处有限公司 A kind of single-track tunnel lining trolley automation cloth system and construction method
CN110043289A (en) * 2019-05-29 2019-07-23 中国水利水电第三工程局有限公司 Jacked piles with small section secondary lining side wall concrete pours the system of putting in storage
CN110924988A (en) * 2019-12-20 2020-03-27 浙江正方交通建设有限公司 Tunnel secondary lining concrete chute pouring system and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002070498A (en) * 2000-08-28 2002-03-08 Gifu Kogyo Co Ltd Method and device for placing concrete for tunnel
CN201232553Y (en) * 2008-07-31 2009-05-06 中铁一局集团有限公司 Buffer for deep-well injection of concrete
CN202417520U (en) * 2011-11-27 2012-09-05 中铁十二局集团第一工程有限公司 Concrete pumping distribution device used in construction of secondary linings of tunnel
CN202628120U (en) * 2012-07-10 2012-12-26 中铁十二局集团第七工程有限公司 Tunnel two-lining concrete construction trolley based material distributing device
CN204662990U (en) * 2015-05-11 2015-09-23 中国铁建大桥工程局集团有限公司 A kind of tandem barrel device preventing concrete disintegration
CN204960329U (en) * 2015-07-13 2016-01-13 中交路桥华南工程有限公司 A tumbling barrel for concreting structure
CN205112078U (en) * 2015-07-30 2016-03-30 中建七局安装工程有限公司 Isolating -proof device for concrete
CN205532626U (en) * 2016-01-19 2016-08-31 中国水利水电第五工程局有限公司 A divide silo device for pour
CN206246134U (en) * 2016-12-08 2017-06-13 熊鹏 Secondary lining enters modular system by window

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002070498A (en) * 2000-08-28 2002-03-08 Gifu Kogyo Co Ltd Method and device for placing concrete for tunnel
CN201232553Y (en) * 2008-07-31 2009-05-06 中铁一局集团有限公司 Buffer for deep-well injection of concrete
CN202417520U (en) * 2011-11-27 2012-09-05 中铁十二局集团第一工程有限公司 Concrete pumping distribution device used in construction of secondary linings of tunnel
CN202628120U (en) * 2012-07-10 2012-12-26 中铁十二局集团第七工程有限公司 Tunnel two-lining concrete construction trolley based material distributing device
CN204662990U (en) * 2015-05-11 2015-09-23 中国铁建大桥工程局集团有限公司 A kind of tandem barrel device preventing concrete disintegration
CN204960329U (en) * 2015-07-13 2016-01-13 中交路桥华南工程有限公司 A tumbling barrel for concreting structure
CN205112078U (en) * 2015-07-30 2016-03-30 中建七局安装工程有限公司 Isolating -proof device for concrete
CN205532626U (en) * 2016-01-19 2016-08-31 中国水利水电第五工程局有限公司 A divide silo device for pour
CN206246134U (en) * 2016-12-08 2017-06-13 熊鹏 Secondary lining enters modular system by window

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013232A (en) * 2017-05-18 2017-08-04 中铁隧道集团二处有限公司 A kind of concrete feeding-distribution device
CN107060830A (en) * 2017-06-09 2017-08-18 中铁十七局集团第五工程有限公司 Single-track tunnel secondary lining concrete pours device and its construction method by window
CN108316951A (en) * 2018-04-13 2018-07-24 兰州理工大学 Enter the equipment and application method that mould pours by window for tunnel double-lining concrete
CN108316951B (en) * 2018-04-13 2024-04-26 兰州理工大学 Device for pouring tunnel secondary lining concrete window by window in mold and use method
CN109826650A (en) * 2019-01-30 2019-05-31 中铁隧道集团二处有限公司 A kind of single-track tunnel lining trolley automation cloth system and construction method
CN110043289A (en) * 2019-05-29 2019-07-23 中国水利水电第三工程局有限公司 Jacked piles with small section secondary lining side wall concrete pours the system of putting in storage
CN110924988A (en) * 2019-12-20 2020-03-27 浙江正方交通建设有限公司 Tunnel secondary lining concrete chute pouring system and construction method
CN110924988B (en) * 2019-12-20 2021-03-23 浙江正方交通建设有限公司 Tunnel secondary lining concrete chute pouring system and construction method

Also Published As

Publication number Publication date
CN106640134B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN106640134A (en) Secondary lining window-chasing mould-entering system
CN205421952U (en) Steel bar traction device
CN107130978A (en) Combined type working jumbo for tunnel lining
CN204197695U (en) A kind of packaged type automatic conveying bucket
CN206769918U (en) Tunnel lining trolley concrete pours chute by window
CN202560243U (en) Automatic guniting feeding machine
CN206246134U (en) Secondary lining enters modular system by window
CN201786031U (en) Slip-formed concrete distributing bin device
CN202745385U (en) Concrete pouring chute
CN201457199U (en) Rail type concrete mixer truck
CN203429540U (en) Vehicle special for road construction
CN204278238U (en) A kind of mine concrete special agitator truck
CN208201580U (en) A kind of asphalt paving device
CN207959846U (en) A kind of Multifunctional coating machine
CN202510133U (en) Uniform dropping type blanking device
CN106761827B (en) A kind of tunnel-liner closure mould bases
CN210916957U (en) Road setting-out device for road construction
CN204238219U (en) Concreting distributing machine
CN209602884U (en) The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track
CN209649136U (en) A kind of small-sized mortar transfer car(buggy)
CN203666662U (en) Mine car bottom cleaning device
CN208473310U (en) A kind of removable, highly adjustable, folding concrete distributing device
CN207377075U (en) A kind of floor tile flapping device
CN206972263U (en) The anti-collapse device in the horizontal hole in tunnel
CN105058569A (en) Pouring head capable of achieving uniform feeding

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant