CN212405979U - A whitewash device for building construction wall body - Google Patents

A whitewash device for building construction wall body Download PDF

Info

Publication number
CN212405979U
CN212405979U CN202020917184.9U CN202020917184U CN212405979U CN 212405979 U CN212405979 U CN 212405979U CN 202020917184 U CN202020917184 U CN 202020917184U CN 212405979 U CN212405979 U CN 212405979U
Authority
CN
China
Prior art keywords
plastering
wall
slide bar
pulley
support slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020917184.9U
Other languages
Chinese (zh)
Inventor
吉晓民
吴梦娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Technology
Original Assignee
Xian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Technology filed Critical Xian University of Technology
Priority to CN202020917184.9U priority Critical patent/CN212405979U/en
Application granted granted Critical
Publication of CN212405979U publication Critical patent/CN212405979U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a whitewash device for building house construction wall body, including the equipment base, the interval is provided with a pair of fore-and-aft support slide bar on the equipment base side by side, and every top of supporting the slide bar all is connected with the pulley through the pulley dead lever, and two lateral walls that support the slide bar and be close to each other all along vertically having seted up the spout, all cooperate in every spout to be provided with the slider, and the top of every slider all is connected with the balancing weight through the haulage rope of walking around the pulley, is connected with horizontally operation horizontal pole between two sliders, and one side of operation horizontal pole is connected with the unit of plastering. The utility model relates to a whitewash device for building construction wall body under construction dips in through the roller of plastering and gets the function and realize the wall body work of plastering, can guarantee through the support slide bar simultaneously to plaster the main part and plaster the action from top to bottom and not consume too much strength, very big reduction the use degree of difficulty.

Description

A whitewash device for building construction wall body
Technical Field
The utility model belongs to the technical field of wall body plastering unit, concretely relates to whitewash device for building house construction wall body.
Background
At present, with the rapid development of economy in China, the investment of infrastructure is increased, so that a large number of projects under construction are generated. In addition, with the improvement of living conditions of population in China and the increasing population number, the house demand is more and more. However, the wall body is plastered by manual painting, so that the problems of low working efficiency, high labor intensity, high manual risk, high labor cost, difficulty in obtaining fundamental guarantee of quality and the like generally exist. After many data are examined and found, foreign countries adopt a mortar spraying mode due to higher labor cost, namely, mortar is directly sprayed on the wall surface, but leveling is still manually leveled, so that the characteristic of high machine efficiency is not fully exerted.
In recent years, various plastering mechanisms are diversified, but due to various structural styles of walls and different adhesion forces of the wall surfaces to mortar, the situations of plastering falling and hollowing generally exist, so that the plastering mechanism is not suitable for the practicability of engineering sites.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a whitewash device for building house construction wall body can compromise and plaster quality and efficiency.
The utility model adopts the technical proposal that: the utility model provides a whitewash device for building construction wall body, including the equipment base, the interval is provided with a pair of fore-and-aft support slide bar on the equipment base side by side, every top of supporting the slide bar all is connected with the pulley through the pulley dead lever, two lateral walls that support the slide bar and be close to each other all vertically have seted up the spout along, all the cooperation is provided with the slider in every spout, the top of every slider all is connected with the balancing weight through the haulage rope of walking around the pulley, be connected with horizontally operation horizontal pole between two sliders, one side of operation horizontal pole is connected with the unit of plastering.
The utility model is also characterized in that,
the unit of plastering includes the main part of plastering of box structure, and the lateral wall of the main part of plastering is provided with and cup joints the solid fixed ring outside the operation horizontal pole, and the wall ash feed inlet has been seted up on the top of the main part of plastering, and the lateral wall that the operation horizontal pole was kept away from to the main part of plastering is provided with the equipment groove, and the equipment inslot is seted up the wall ash discharge gate that communicates to the main part of plastering, and the equipment inslot is connected with the roller of plastering that one side stretched into in the wall ash.
A gap is reserved between the outer side wall of the plastering roller and the wall plaster discharge port, and a leakage-proof dipping wadding strip is filled in the gap between the outer side wall of the plastering roller and the wall plaster discharge port.
The outer side wall of the plastering main body provided with the fixing ring is also provided with an operating handle.
The mass of the balancing weight is equal to half of the total mass of the two sliding blocks, the operation cross rod and the plastering unit.
The sliding groove is also arranged on the side wall of the two support sliding rods which are far away from each other along the longitudinal direction, and the balancing weight on the same support sliding rod is in sliding fit with the sliding groove on one side close to the outer side.
The equipment base has respectively seted up a standing groove corresponding to the position of two support slide bars, and two support slide bars are inserted respectively and are located two standing grooves.
And a roller assembly is arranged below the bottom end of the equipment base.
The utility model has the advantages that: the utility model relates to a whitewash device for building construction wall body under construction dips in through the roller of plastering and gets the function and realize the wall body work of plastering, can guarantee through the support slide bar simultaneously to plaster the main part and plaster the action from top to bottom and not consume too much strength, very big reduction the use degree of difficulty.
Drawings
FIG. 1 is a schematic structural view of a plastering device for a wall body in construction of a building under construction according to the present invention;
FIG. 2 is a schematic view showing the connection relationship of the placement grooves in the plastering device for the construction wall of a building under construction according to the present invention;
FIG. 3 is a schematic view showing the connection relationship of the sliding blocks in the plastering device for the construction wall of a building under construction according to the present invention;
FIG. 4 is a schematic view showing the connection relationship of the counterweight in the plastering device for the construction wall of a building under construction according to the present invention;
FIG. 5 is a schematic view showing the connection relationship of the pulley fixing rod in the plastering device for the construction wall of a building under construction according to the present invention;
FIG. 6 is a top view of a plastering unit of the plastering apparatus for a wall for construction of a building under construction according to the present invention;
fig. 7 is a partial enlarged view of a wall ash discharge port in a plastering device for a construction wall of a building under construction.
In the drawing, 1, an equipment base, 2, a supporting slide rod, 3, an operating cross rod, 4, a plastering main body, 5, a placing groove, 6, a sliding groove, 7, a sliding block, 8, a balancing weight, 9, a pulley fixing rod, 10, a pulley, 11, a traction rope, 12, a fixing ring, 13, an operating handle, 14, a wall ash feeding hole, 15, an equipment groove, 16, a plastering roller, 17, a main shaft, 18, a wall ash discharging hole, 19, a leakage-proof dipping floc strip and 20 roller components are arranged.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and specific embodiments.
The utility model provides a painting device for building construction wall, as shown in figures 1 to 7, comprising an equipment base 1, a supporting slide bar 2, an operation cross bar 3 and a plastering main body 4, wherein the equipment base 1 is horizontally arranged on the ground, the top of the equipment base 1 is symmetrically provided with a placing groove 5, one end of the supporting slide bar 2 is inserted in the placing groove 5, the supporting slide bar 2 is vertical to the equipment base 1, the supporting slide bar 2 is symmetrically arranged based on the equipment base 1, the side wall of the supporting slide bar 2 is symmetrically provided with a slide groove 6, the slide groove 6 is vertically arranged, the slide groove 6 at one side is slidably connected with a slide block 7, the slide block 6 at the other side is slidably connected with a balancing weight 8, the slide block 7 is far away from the slide groove 6 and is fixedly connected with one end of the operation cross bar 3, the operation cross bar 3 is vertical to the supporting slide bar 2, operation horizontal pole 3 is on a parallel with equipment base 1 and is used for the fixed main part 4 that plasters, support slide bar 2 and keep away from the vertical fixedly connected with pulley dead lever 9 of equipment base 1 end, pulley dead lever 9 is kept away from and is supported slide bar 2 end and be provided with pulley 10, it is provided with haulage rope 11 to slide in the spout of pulley 10, 11 both ends of haulage rope extend and haulage rope 11 one end fixed connection in slider 7 along the 6 departments of spout that the symmetry set up, 11 other one end fixed connection in haulage rope are in balancing weight 8, can keep balance rather than when not adding the wall ash mortar in plastering main part 4 for total mass of two balancing weights 8, 1 bottom of equipment base is.
The main part 4 lateral wall of plastering is provided with solid fixed ring 12, operating handle 13 and wall ash feed inlet 14, gu fixed ring 12 is located the same side of main part 4 of plastering and operating handle 13 quantity is two with operating handle 13, operating handle 13 arranges the symmetric position in based on solid fixed ring 12, gu fixed ring 12 cross-under is in operation horizontal pole 3, main part 4 of plastering is located between the support slide bar 2 that the symmetry set up, wall ash feed inlet 14 is seted up at main part 4 tops of plastering.
The side of the plastering main body 4 far away from the operating handle 13 is provided with an equipment groove 15, a plastering roller 16 is arranged in the equipment groove 15, the central line of the plastering roller 16 is connected with a main shaft 17 in a penetrating way, and two ends of the main shaft 17 are fixedly connected to the symmetrical wall of the equipment groove 15. Wall ash discharge gate 18 has been seted up to equipment groove 15 inner wall, 18 mouthfuls of walls ash discharge gate are provided with the leak protection and dip in and get the cotton wadding 19, the leak protection is dipped in and is got 19 quantity of cotton wadding and be a plurality of, 16 lateral walls of plastering roller are located 18 mouths of walls ash discharge gate, and 18 mouthfuls of walls ash discharge gate are close to and contactless with 16 lateral walls of plastering roller, the leak protection is dipped in and is got cotton wadding 19 and keep away from 18 end contacts 16 lateral walls of plastering roller of walls ash discharge gate, the gap is dipped in by the leak protection between 16 of plastering roller and the 18 mouth of walls ash discharge.
When the device works, firstly, water is sprayed on a wall to be constructed to enable the wall to fully absorb water, meanwhile, wall cement mortar is mixed according to a proportion and meets a standard state, and the device enters a field. When the device is used, firstly, the device is correctly assembled, one end of a support sliding rod 2 is inserted into a placing groove 5, so that the support sliding rod 2 is vertical to a device base 1, a fixing ring 12 is sleeved on an operation cross rod 3, a sliding block 7 and a balancing weight 8 are respectively connected onto a sliding groove 6 in a sliding mode, a traction rope 11 is arranged on a pulley 10, one end of the traction rope 11 is fixedly connected to the sliding block 7, the other end of the traction rope 11 is fixedly connected onto the balancing weight 8, the whole body between the two balancing weights 8 and the support sliding rod 2, namely the two sliding blocks 7, the operation cross rod 3 and a plastering unit are in a balanced state, mixed wall mortar can be poured into a plastering main body 4 after the steps are completed, the plastering main body 4 slides to the bottoms of the two support sliding rods 2, then the device base 1 is moved, one side of the device base 1 is close to the root, the plastering main body 4 is moved upwards to the top of the wall, at the moment, the sliding block 7 moves upwards along the sliding groove 6, and meanwhile, the counterweight block 8 moves downwards along the sliding groove 6 under the action of self weight and generates pulling force on the sliding block 7 through the traction rope 11 on the pulley 10, so that the labor consumption of supporting the plastering main body 4 is reduced; when plastering, the plastering roller 16 is contacted with a wall, because the integral gravity between the supporting slide rods 2 is larger than two balancing weights 8 after the plastering main body 4 is added with wall plaster mortar, the plastering main body 4 automatically and slowly moves down under the action of gravity difference, the process only needs to be kept stable by manual hand, the slide block 7 moves down along the sliding chute 6, meanwhile, the balancing weights 8 move up along the sliding chute 6 under the action of self weight to generate pulling force on the slide block 7 through the traction rope 11 on the pulley 10, so that the plastering main body 4 does not fall down quickly, the plastering of the plastering roller 16 is more uniform, wall plaster flows out from the wall plaster discharge port 18 to the plastering roller 16 in the process, the wall plaster is plastered on the wall along with the rolling of the plastering roller 16, the leak-proof flocculus 19 can seal a gap between the plastering roller 16 and the wall plaster discharge port 18, the wall plaster is ensured not to flow out to cause waste, if the integral moving position is needed, only need pushing away equipment base 1 and promote along the wall root, wheel components 20 will drive the equipment displacement, treat that the wall construction is accomplished, with this device split, and will plaster the inside sanitization of main part 4 and can leave the field.
In this way, the utility model relates to a whitewash device for building under construction wall body dips in through plastering roller 16 and gets the function and realize the wall body work of plastering, can guarantee through supporting slide bar 2 simultaneously that the action of plastering about main part 4 does not consume too much strength, very big reduction the use degree of difficulty.

Claims (8)

1. The utility model provides a whitewash device for building construction wall, a serial communication port, including equipment base (1), equipment base (1) is gone up and is provided with a pair of fore-and-aft support slide bar (2) by the interval side by side, the top of every support slide bar (2) all is connected with pulley (10) through pulley dead lever (9), spout (6) have all been seted up along vertically to two lateral walls that support slide bar (2) and be close to each other, every spout (6) interior all the cooperation is provided with slider (7), the top of every slider (7) all is connected with balancing weight (8) through haulage rope (11) of walking around pulley (10), be connected with horizontally operation horizontal pole (3) between two slider (7), one side of operation horizontal pole (3) is connected with the unit of plastering.
2. A plastering device for constructing a wall body in a house according to claim 1, wherein the plastering unit comprises a plastering body (4) with a box-type structure, the outer side wall of the plastering body (4) is provided with a fixing ring (12) sleeved outside the operating cross bar (3), the top end of the plastering body (4) is provided with a wall ash feeding hole (14), the outer side wall of the plastering body (4) far away from the operating cross bar (3) is provided with an equipment groove (15), a wall ash discharging hole (18) communicated to the plastering body (4) is formed in the equipment groove (15), and a plastering roller (16) with one side extending into the wall ash discharging hole (18) is rotatably connected in the equipment groove (15) through a horizontal main shaft (17).
3. A plastering device for a wall in building construction according to claim 2, wherein a gap is left between the outer side wall of the plastering roller (16) and the wall cement outlet (18), and the gap between the outer side wall of the plastering roller (16) and the wall cement outlet (18) is filled with the leak-proof dipping flocs (19).
4. A plastering device for a wall in building construction as claimed in claim 2, wherein an operating handle (13) is further provided on the outer side wall of the plastering main body (4) provided with the fixing ring (12).
5. A plastering device for constructing walls in housing as claimed in claim 1, wherein the mass of the weight block (8) is equivalent to half of the total mass of the two slide blocks (7), the operating beam (3) and the plastering unit.
6. A plastering device for a wall body in building construction according to claim 1, wherein the slide groove (6) is further formed in a side wall of the two support slide bars (2) which is away from each other in the longitudinal direction, and the weight block (8) on the same support slide bar (2) is slidably fitted with the slide groove (6) on the outer side.
7. The plastering device for building construction walls according to claim 1, wherein the equipment base (1) is provided with a placing groove (5) at a position corresponding to each of the two support slide bars (2), and the two support slide bars (2) are respectively inserted into the two placing grooves (5).
8. Painting device for walls in housing construction according to claim 1, characterised in that roller assemblies (20) are provided below the bottom end of the equipment base (1).
CN202020917184.9U 2020-05-27 2020-05-27 A whitewash device for building construction wall body Expired - Fee Related CN212405979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020917184.9U CN212405979U (en) 2020-05-27 2020-05-27 A whitewash device for building construction wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020917184.9U CN212405979U (en) 2020-05-27 2020-05-27 A whitewash device for building construction wall body

Publications (1)

Publication Number Publication Date
CN212405979U true CN212405979U (en) 2021-01-26

Family

ID=74403117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020917184.9U Expired - Fee Related CN212405979U (en) 2020-05-27 2020-05-27 A whitewash device for building construction wall body

Country Status (1)

Country Link
CN (1) CN212405979U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775153A (en) * 2021-08-25 2021-12-10 陈保磊 Wall plastering machine and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775153A (en) * 2021-08-25 2021-12-10 陈保磊 Wall plastering machine and using method thereof

Similar Documents

Publication Publication Date Title
CN211306702U (en) Cement brick manufacturing and forming equipment
CN212405979U (en) A whitewash device for building construction wall body
CN109339419A (en) A kind of working method of automatic tiling equipment
CN111604261A (en) Screen cloth self-interacting sieve separator is used in dry-mixed mortar production
CN113477155B (en) Quantitative proportioning device for concrete waterproofing agent production
CN111648562A (en) Plastering mechanism
CN203418636U (en) Even size rapidly distributing system with evenly distributing groove and stock stopping plate integrated
CN110388065B (en) Building wall building tool
CN205532629U (en) All -hydraulic central ditch die carrier
CN206810172U (en) A kind of architectural engineering stirs and evenly mixs process equipment with coating
CN206591794U (en) A kind of scaffold easy to use
CN206551217U (en) A kind of construction concrete central mix plant
CN205926103U (en) Power transmission line automatic spraying equipment
CN111744237B (en) Efficient center transmission tailing filling deep cone thickener
CN212223831U (en) Foundation leveling device for building construction
CN205238297U (en) Insulating brick raw material mixer constructs
CN209493945U (en) A kind of distribution device and connection structure of deep basal pit huge foundation underplate concrete
CN211815457U (en) Quick repair equipment of town road
CN206667766U (en) One kind building civil construction pours harden structure
CN114396101B (en) A booster pump station system for two-way moisturizing of municipal administration water supply network
CN109025194A (en) A kind of mechanical float for building
CN211081041U (en) Concrete placement equipment for construction
CN212440940U (en) Accelerate stirring building of stirring efficiency
CN208294018U (en) A kind of construction wall plastering machine
CN218894024U (en) Movable water retaining wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210126