CN206667743U - New sunk type floor hoisting die structure - Google Patents

New sunk type floor hoisting die structure Download PDF

Info

Publication number
CN206667743U
CN206667743U CN201720301182.5U CN201720301182U CN206667743U CN 206667743 U CN206667743 U CN 206667743U CN 201720301182 U CN201720301182 U CN 201720301182U CN 206667743 U CN206667743 U CN 206667743U
Authority
CN
China
Prior art keywords
bolt
square steel
water
steel
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720301182.5U
Other languages
Chinese (zh)
Inventor
曾星巨
经永清
陈章剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN LIUJIAN GROUP Co Ltd
Original Assignee
FUJIAN LIUJIAN GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN LIUJIAN GROUP Co Ltd filed Critical FUJIAN LIUJIAN GROUP Co Ltd
Priority to CN201720301182.5U priority Critical patent/CN206667743U/en
Application granted granted Critical
Publication of CN206667743U publication Critical patent/CN206667743U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of new sunk type floor hoisting die structure, including square steel, angle steel and water-proof bolt;Its feature is welded for one end of angle steel with second of square steel one end, the section of stretching out portion bolt of the angle steel other end is connected with one end of the first square steel, the lower end of bolt connects after passing through one end of the first square steel through Plastic cap, screwed joint and water-proof bolt, and the bolt head of water-proof bolt withstands template;Tool-type is assembled into by square steel and angle steel and hangs mould mould.For water-proof bolt length depending on thickness of slab, template is withstood in water-proof bolt lower end, and square steel is fixed in upper end.So as to reach effectively control thickness of slab, sinking control height.Sinking Ban Chu corners are straight after form removal, corner is upright.Form removal simultaneously is simple, only need to screw out bolt, and piecemeal exits square steel, avoids destroying concrete structure during form removal, lifts concrete structure perception.Structural material is easy to get, simple structure, processing installation reliability height;Strong applicability, it is easy to operate;Mould reuses.

Description

New sunk type floor hoisting die structure
Technical field
The utility model belongs to building template construction field, more particularly to a kind of new sunk type floor hoisting die structure, fits Mould use is hung at sunk type floor for building.
Background technology
Building sunk type floor is widely used, but generally existing is sunk, height controls inequality, sinking plate effective depth of slab difficult The problems such as to control.When traditional lumps of wood is fixed as mould is hung with iron nail, when global displacement, especially casting and compacting of concrete easily occurs Hang mould often to be trampled by worker, cause thickness of slab, drop plate height to be not being met.Furthermore traditional lumps of wood is fixed with iron nail to be not easy Remove, worker can only be removed by force with spade during form removal, be easily destroyed concrete structure at drop plate.Not only influence mixed after form removal Native perception is coagulated, the later stage for more influenceing structure uses function, and at toilet drop plate, structure destruction is easily caused the quality such as leak and asked Topic.Traditional lumps of wood hangs mould, well damage during dismounting, and utilization rate is low.
To solve problem above, from the angle of live practice of construction, consider economy, practicality and be applicable Property, therefore take the new sunk type floor hoisting die structure.
The content of the invention
The purpose of this utility model is to provide a kind of new sunk type floor hoisting die knot easy to use, economical and practical Structure.
The purpose of this utility model is achieved in that described new sunk type floor hoisting die structure, new sunk type Floor hoisting die structure, including the first square steel that specification is 50mm × 50mm × 2600mm;Specification is 50 × 50mm × 1500mm Second of square steel and specification be 30mm × 30mm × 3mm × 150mm angle steel;It is characterized in that:One end of angle steel and second The welding of kind square steel one end, the section of stretching out portion bolt of the angle steel other end are connected with one end of the first square steel, and the lower end of bolt is worn Connected after crossing one end of the first square steel through Plastic cap, screwed joint and water-proof bolt, the bolt head of water-proof bolt withstands mould Plate.
Novel structure post described in the utility model pours funnel structure and advantages below be present:1. simple structure:Use angle steel Square steel is connected with water-proof bolt it is assembled into tool-type and hang mould mould, template is withstood in water-proof bolt lower end, and square steel is fixed in upper end, middle Connected with screwed joint;2. reliable in quality:Installation quality is easily controllable, checks;3. construction effect is good, can effectively control thickness of slab and Floor sinks highly, lifting member perception and quality;4. removing simply, bolt only need to be screwed out, piecemeal exits square steel;5. can Recycling, material and labour cost are saved, it is cost-effective.
Brief description of the drawings
Fig. 1 is the stereogram of new sunk type floor hoisting die structure of the present utility model.
Fig. 2 is the upward view that novel structure post of the present utility model pours funnel structure.
Fig. 3 is the right view that novel structure post of the present utility model pours funnel structure.
Embodiment
Below in conjunction with the accompanying drawings and example, structure of the present utility model and installation process are described in detail:
As shown in Figure 1, Figure 2 and Figure 3, novel structure post described in the utility model pours funnel structure, and its structure includes Specification 50mm × 50mm × 2600mm the first square steel 1;50 × 50mm × 1500mm second of square steel 2.30mm×30mm × 3mm × 150mm angle steel.Its feature is welded for one end of angle steel 3 with second of one end of square steel 2, the section of stretching out of the angle steel other end The 50mm length in portion, is connected with bolt 4 with one end of the first square steel 1.Similarly connected mode is, one end of another angle steel with it is another One second of square steel one end welding, the section of stretching out portion of another angle steel other end 50mm length, with bolt and another The other end connection of the first square steel, other two corners are also similarly connected using the same manner, and square is assembled into so as to reach Tool-type hangs mould mould, through one end of the first square steel 1 bolt 4 lower end through Plastic cap 5, screwed joint 6 and sealing Bolt 7 connects, and the bolt head of water-proof bolt 7 withstands template.During form removal, upper bolt only need to be screwed out, piecemeal exits square steel.
The way that novel structure post described in the utility model pours funnel structure is:Square steel passes through angle steel and water-proof bolt Connection is assembled into tool-type and hangs mould mould.
The application method that novel structure post described in the utility model pours funnel structure is:After connection assembly is good, only need It is fixed at sinking plate, casting and compacting of concrete is completed after reaching strength of mould stripping, only need to screw out bolt, and piecemeal exits square steel, only For timber bolt length depending on thickness of slab, template is withstood in water-proof bolt lower end, and square steel is fixed in upper end.So as to reach effectively control thickness of slab, Sinking control height.Sinking Ban Chu corners are straight after form removal, corner is upright.Form removal simultaneously is simple, only need to screw out bolt, piecemeal moves back Go out square steel, avoid destroying concrete structure during form removal, lift concrete structure perception.
On the premise of spirit and scope of the present utility model are not departed from, the utility model also has various improvement and change Change, these changes and improvements, which require, to be fallen into the scope of protection of the utility model.

Claims (1)

1. a kind of new sunk type floor hoisting die structure, including the first square steel that specification is 50mm × 50mm × 2600mm;Rule Lattice are 50 × 50mm × 1500mm second of square steel(2)With the angle steel that specification is 30mm × 30mm × 3mm × 150mm(3);Its It is characterised by:Angle steel(3)One end and second of square steel(2)One end is welded, the section of stretching out portion bolt of the angle steel other end(4)With The first square steel(1)One end connection, bolt(4)Lower end pass through the first square steel(1)One end after through Plastic cap(5)、 Screwed joint(6)With water-proof bolt(7)Connection, water-proof bolt(7)Bolt head withstand template.
CN201720301182.5U 2017-03-27 2017-03-27 New sunk type floor hoisting die structure Expired - Fee Related CN206667743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720301182.5U CN206667743U (en) 2017-03-27 2017-03-27 New sunk type floor hoisting die structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720301182.5U CN206667743U (en) 2017-03-27 2017-03-27 New sunk type floor hoisting die structure

Publications (1)

Publication Number Publication Date
CN206667743U true CN206667743U (en) 2017-11-24

Family

ID=60374314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720301182.5U Expired - Fee Related CN206667743U (en) 2017-03-27 2017-03-27 New sunk type floor hoisting die structure

Country Status (1)

Country Link
CN (1) CN206667743U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837405A (en) * 2022-03-05 2022-08-02 山西三建集团有限公司 Formwork supporting method for simple and universal stereotyped descending formwork system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837405A (en) * 2022-03-05 2022-08-02 山西三建集团有限公司 Formwork supporting method for simple and universal stereotyped descending formwork system

Similar Documents

Publication Publication Date Title
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN207512759U (en) A kind of steel plate water-stopping structure for reinforced concrete inner support lattice column column bottom
CN106498847B (en) A kind of connection structure and connection method of prefabricated bent cap and prefabricated stand column
CN206667743U (en) New sunk type floor hoisting die structure
CN105544469B (en) Face-plate of rockfill dam bed course and construction method
CN107227845A (en) One kind filling wall construction post mold method
CN207211427U (en) A kind of prefabricated assembled concrete shear wall
CN106284653A (en) The construction method that a kind of balcony construct capital interspaces in advance
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN206581282U (en) Diaphram wall Ω type milling joints
CN203583514U (en) Pre-buried structure of ultra-deep foundation bolt
CN205476491U (en) Outer wall post template bottom consolidates uses pre -cast screw
CN206001126U (en) A kind of floor sealing hole sizing gasifying device
CN203947419U (en) A kind of high-speed railway bridge pinner template
CN204920255U (en) Stairwell alternates to be under construction uses regularization antipriming
CN209798811U (en) Tower crane foundation structure in foundation ditch of reservation reinforcing bar
CN106759857A (en) Steel tube regeneration monolith assembling structure
CN208686070U (en) A kind of constructional column pours bell-mouth structure of air
CN207194462U (en) A kind of water burst concrete storehouse surface pouring structure
CN206512893U (en) A kind of prefabricated assembled board wall I-steel bolt joint construction
CN206828956U (en) A kind of bridge ponding funnel
CN206233570U (en) A kind of structure suspension column of pre- mortar leakage prevention pours mould
CN205917847U (en) Steel structural system
CN106437193B (en) Big height brick-concrete composite buildings ruggedized construction
CN205777520U (en) The whole lifting steel mold device that a kind of deformation joint position processes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124

Termination date: 20210327

CF01 Termination of patent right due to non-payment of annual fee