CN206667507U - A kind of warming plate with arrangement of reinforcement - Google Patents

A kind of warming plate with arrangement of reinforcement Download PDF

Info

Publication number
CN206667507U
CN206667507U CN201720152462.4U CN201720152462U CN206667507U CN 206667507 U CN206667507 U CN 206667507U CN 201720152462 U CN201720152462 U CN 201720152462U CN 206667507 U CN206667507 U CN 206667507U
Authority
CN
China
Prior art keywords
warming plate
reinforcement
arrangement
concrete
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720152462.4U
Other languages
Chinese (zh)
Inventor
徐铨彪
李本悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design and Research Institute of Zhejiang University Co Ltd
Original Assignee
Architectural Design and Research Institute of Zhejiang University Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Zhejiang University Co Ltd filed Critical Architectural Design and Research Institute of Zhejiang University Co Ltd
Priority to CN201720152462.4U priority Critical patent/CN206667507U/en
Application granted granted Critical
Publication of CN206667507U publication Critical patent/CN206667507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of warming plate with arrangement of reinforcement, the warming plate with arrangement of reinforcement includes warming plate and the reinforced mesh being laid in warming plate, and connection reinforcing bar is wherein thrown away at the node of several reinforced mesh.For warming plate with arrangement of reinforcement in the thermal insulation structure construction method of exterior wall concrete section position, it is balcony, at outdoor air conditioner dividing plate, at the window that floats, at parapet that the exterior wall concrete position, which includes beams of concrete, concrete shear force wall, external wall,.Connected in work progress between band arrangement of reinforcement warming plate using tongue and groove form, be aided with building sealant, it is ensured that junction is water-tight, not spillage.Warming plate with arrangement of reinforcement can significantly improve the intensity, crack resistance and toughness of warming plate itself so that warming plate is bearing that certain vertical load and horizontal loading can also be born outside self gravitation load.

Description

A kind of warming plate with arrangement of reinforcement
Technical field
The utility model belongs to construction material and external wall construction method field, more particularly to a kind of insulation with arrangement of reinforcement Plate.
Background technology
Between floors, the energy loss of peripheral structure is maximum, and the thermal and insulating performance of building enclosure is to influence building The principal element of energy consumption, and most weak part is exactly that peripheral protective is concrete position in peripheral structure, these positions often into For the cold-heat bridge position of wall, because the thermal conductivity factor of concrete is very big, the heat-insulating property of 200mm concrete does not support 2mm thickness Extruded sheet, so the Insulation for strengthening concrete position is the touchstone of examination and maintenance structural thermal insulation effect.
The thermal insulation structure processing of peripheral structure mainly has three kinds of inside holding, external thermal insulation and Self-thermal-insulation System, because coagulation The thermal conductivity factor of soil material is very big, is difficult to realize self-heat conserving, so the Insulation at concrete position mainly has inside holding and outer Two kinds of insulation.Inside holding system is exactly to do thermal insulation structure towards the side of indoor room in concrete component, is completed to building Insulation.In inside holding system, concrete component is directly exposed in outdoor, and integral heat insulation effect is bad, and in concrete section Position can produce dew condensation phenomenon, and the dipping of dew or freeze thawing easily cause that concrete wall surface is mouldy, cracking, have a strong impact on exterior wall Heat insulation effect, the construction way of inside holding system are located at Indoor environment, are easily destroyed by user in finishing, influence to be incubated Effect.Due to the irrationality of inside holding system technically, gradually substituted by external insulation system at present.External insulation system exists The insulation way at concrete position mainly has following several:
(1) thermal insulation mortar, thermal insulation mortar and concrete binding are directly smeared outside concrete, decorative cover is done outside thermal insulation mortar Layer.The advantages of the method is easy for construction, quick, and shortcoming is that the adhesion strength of thermal insulation mortar and concrete is limited, limits guarantor The thickness of warm mortar, the performance of heat insulation effect is also limit naturally.Thermal insulation mortar self-strength is not high, weatherability and impact resistance Property it is poor, experience summer is extremely hot and the multiple circulation of winter severe cold after, often cracking, hollowing, infiltration and face brick take off exterior wall Phenomena such as falling, particularly Tile falling, the lives and properties to the people bring great threat, and face brick is once come off, and maintenance is applied Work difficulty is big, and cost is also high.
(2) organic insulation materials such as EPS, XPS are directly bonded on concrete structure with glue, or nail is in concrete knot On structure, architectural surface, such as brushing water-repellent paint or dry-hang stone are done outside insulation material again, general recommendations is prevented using light-duty Water paint, if using cladding way, suspension member must pass through heat-insulation layer and directly be connected with concrete structure, it is impossible to be supported on insulation On material.Unsuitable binding face tile outside the insulation material handled by this construction method because for binding face tile cement mortar with Adhesion strength between organic insulation material is extremely low, and face brick easily comes off, and threatens the security of the lives and property of the people.The method Another drawback be that fire resistance is poor, external labeling type insulation material is mostly B level refractory materials, in work progress easily occur fire Calamity, the fire that several particularly occurred in recent years are triggered by heat insulating material for external, cause serious casualties and property damage Lose, more deepened various circles of society to the worry in terms of external insulation system fire safety.This thermal insulation structure method also has one to lack Point, it is exactly that the service life of insulation material and the service life of agent structure mismatch, the service life of organic insulation material is led to Often only 25 years, much smaller than the service life (be usually 50 years) and the property right in real estate time limit of agent structure, (house was generally 70 Year).The insulation material life-span must replace construction again after expiring, and replace the construction spent time and expense is also high, and The normal use of building can be influenceed.
(3) warming plate is glued outside, and warming plate is usually inorganic heat insulation material, there is steam pressure sand aerated insulation plate, foam concrete Warming plate, exterior insulation or glass bead insulation plate etc., inorganic heat-insulation board are identical with the agent structure life-span.Warming plate with The cement mortar smeared between concrete after is bonded, and architectural surface is then done outside warming plate.The method heat insulation effect is preferable, But construction procedure is more, situ wet operation amount is big, higher to construction technical requirement, is wanted once the adhesion strength of cement mortar does not reach Ask or hollowing occur, warming plate also easily comes off, in the future using bringing potential safety hazard.The tensile strength of warming plate itself compared with It is low, crack resistance is poor, toughness is weak, cracky, fracture during transport and construction, defect rate is high, in practical application When by summer several times is extremely hot and the circulation of winter severe cold is also easily ftractureed, thus cause water leakage through exterior wall, alien invasion breakage etc. Problem.
Either inside holding system or external insulation system, the advance pouring molding of concrete structure is required to, pours coagulation Construction timber shutterings are needed to use when native, a large amount of use of construction timber shutterings seriously consumes the limited forest reserves, do not meet China The fundamental state policy of " energy-conservation, consumption reduction, emission reduction, the environmental protection " of construction industry, does not meet the requirement of green building yet.
Utility model content
A kind of the drawbacks of existing thermal insulation structure way several for exterior wall concrete position, there is provided warming plate with arrangement of reinforcement.
In order to achieve the above object, technical scheme is as follows used by the utility model:A kind of warming plate with arrangement of reinforcement, bag Warming plate and the reinforced mesh being laid in warming plate are included, connection reinforcing bar is wherein thrown away at the node of several reinforced mesh.
Another technical scheme of the present utility model is a kind of warming plate with arrangement of reinforcement, including warming plate and is laid on insulation Connection steel wire is thrown away at the node of steel fabric sheet in plate, wherein several steel fabric sheets.
It can be calculated and determined according to the stressing conditions of warming plate with the arrangement of reinforcement in arrangement of reinforcement warming plate, warming plate is removed and born from heavy burden Load, earthquake load, wind load, exterior trim area load etc..With the arrangement of reinforcement in arrangement of reinforcement warming plate in addition to force request is met, it is also necessary to root Thin diameter reinforcing bar solid matter is preferably used according to detailing requiments, the bar-mat reinforcement such as cracking resistance and toughness requirement.
Further, the material of the warming plate is steam pressure sand aerated concrete, foam concrete, foamed ceramic or vitreous Microballon.
Further, the material of the connection reinforcing bar is stainless steel.
The beneficial effects of the utility model are as follows:Warming plate with arrangement of reinforcement can significantly improve the intensity of warming plate itself, resist Fragility and toughness so that warming plate is bearing that certain vertical load and level can also be born outside self gravitation load Load.During concrete construction, outboard template of the warming plate as concrete, plank sheathing dosage can be saved, reduce form removal workload. The Screw arbor with nut at both-ends of template, Saving steel amount can be doubled as in concreting by connecting reinforcing bar.During concreting, warming plate and mixed Solidifying soil is seamless bonding, and forms an entirety, and separately have dowel to be connected with concrete so that warming plate is durable in use, will not take off Fall, the thickness of warming plate is also no longer restricted, can be determined completely according to power conservation requirement.Meanwhile reinforced mesh also can be limited effectively The development of heat preservation plate material contraction fissure processed, avoid the cracking of thus caused finish coat.Connected between warming plate using tongue and groove form Connect, be aided with building sealant, it is ensured that junction not spillage in concreting, it is water-tight in normal use.
Warming plate material can be the aerating of steam pressure sand, foam concrete, foamed ceramic and glass bead etc., be inorganic heat preservation Material, the service life of insulation material is identical with major structure of construction, while insulation material is also A level refractory materials, and fire occurs It will not burn, will not produce thick smoke, toxic smoke during calamity, effectively improve the fire protecting performance of building.
Brief description of the drawings
Fig. 1 is axle geodesic structure schematic diagram of the utility model with arrangement of reinforcement warming plate;
Fig. 2 is sectional view of the utility model with arrangement of reinforcement warming plate;
Fig. 3-a are the construction method organigram at beams of concrete in the utility model embodiment 1, and Fig. 3-b are this reality With the architectural section in new embodiment 1 at beams of concrete;
Fig. 4-a are the construction method organigram at exterior wall concrete shear force wall in the utility model embodiment 2, Fig. 4- B is the architectural section at exterior wall concrete shear force wall in the utility model embodiment 2;
Fig. 5-a are the construction method organigram that external wall is balcony in the utility model embodiment 3, and Fig. 5-b are In the utility model embodiment 3-external wall be balcony architectural section;
Fig. 6-a are that the construction method organigram at outdoor air conditioner dividing plate, Fig. 6-b are in the utility model embodiment 4 Architectural section in the utility model embodiment 4 at outdoor air conditioner dividing plate;
Fig. 7-a are the construction method organigram at the window that floatd in the utility model embodiment 5, and Fig. 7-b are that this practicality is new The architectural section to be floatd in type embodiment 5 at window;
Fig. 8-a are the construction method organigram at parapet in the utility model embodiment 6, and Fig. 8-b are this practicality Architectural section in new embodiment 6 at parapet.
Specific implementation method
In order that the technical solution of the utility model and advantage are clearer, with reference to specific application to utility model Embodiment is further elaborated.
As shown in Figure 1-2, a kind of warming plate with arrangement of reinforcement, including warming plate and the bar-mat reinforcement that is laid in warming plate Connection reinforcing bar is thrown away at the node of piece, wherein several reinforced mesh.According to load condition, reinforced mesh can be changed into steel wire Piece, connection reinforcing bar change connection steel wire into.
It can be calculated and determined according to the stressing conditions of warming plate with the arrangement of reinforcement in arrangement of reinforcement warming plate, warming plate is removed and born from heavy burden Load, earthquake load, wind load, exterior trim area load etc..With the arrangement of reinforcement in arrangement of reinforcement warming plate in addition to force request is met, it is also necessary to root Thin diameter reinforcing bar solid matter is preferably used according to detailing requiments, the bar-mat reinforcement such as cracking resistance and toughness requirement.
There are following several situations at external wall concrete position according to building function and the difference of structural elements:Concrete Beam, concrete column, concrete shear force wall, balcony, the window that floats, air conditioner shelf and parapet etc..
Embodiment 1:Isothermal holding at beams of concrete, architectural construction is as shown in Fig. 3-b, at beams of concrete, from interior extremely Outdoor construction way is followed successively by:Interior finish coat, concrete layer, band arrangement of reinforcement warming plate, exterior trim surface layer.Exterior trim surface layer can be divided into painting Material, face brick and the class of stone material three, when for the heavy materials such as stone material when, need the indwelling built-in fitting in band arrangement of reinforcement warming plate in advance.Liang Shang Masonry can use self heat insulation wall combination exterior trim surface layer, can also use doing for ordinary masonry structure+heat-insulation layer+exterior trim surface layer Method, it is proposed that preferentially using the former way because self heat insulation wall is easy for construction, economy and durability, energy-conserving and environment-protective.Specific implementation step Reference picture 3-a is followed successively by:Scaffold is set up, sets up beams of concrete internal model and bed die, reinforcing bar in colligation beams of concrete, on bed die Fixing band arrangement of reinforcement warming plate simultaneously completes waterproof sealing processing;Wooden parting bead is set up on the outside of band arrangement of reinforcement warming plate, wooden parting bead is matched somebody with somebody with band The warming plate of muscle is connected, and wooden parting bead is firmly connected with outside scaffold.When deck-molding is higher, job specfication handbook is consulted, band is matched somebody with somebody Need to set Screw arbor with nut at both-ends between muscle warming plate and inner side template, Screw arbor with nut at both-ends is embedded in band arrangement of reinforcement warming plate in advance, with being connected Reinforcing bar, which merges, to be set, Saving steel amount, casting concrete, after concrete strength reaches requirement, the internal model of dismantling concrete beam And bed die, exterior wall, concrete beam side and bottom are built by laying bricks or stones on warming plate and beams of concrete by interior decoration requirement cleaning, rendering, it is complete Into interior finish coat.On the outside of warming plate stickup ceramic tile, brushing fireproof coating or dry-hang stone are carried out according to the detailing requiments of exterior finish.
Embodiment 2:Isothermal holding at exterior wall concrete shear wall, architectural construction is as shown in Fig. 4-b, from indoor to outdoor Construction way is followed successively by:Interior finish coat, concrete layer, band arrangement of reinforcement warming plate, exterior trim surface layer.The same coagulation of inside and outside coating ways Tu Liangchu.Specific implementation step reference picture 4-a is followed successively by:Colligation concrete reinforcing steel, the scaffold of concrete walls is set up, is set up Internal model, outside scaffold and wooden parting bead are set up, the band arrangement of reinforcement warming plate as outboard template is fixed on wooden parting bead, warming plate Tongue and groove is taken to connect between horizontal joint and vertical seam.For concrete shear force wall, needed between band arrangement of reinforcement warming plate and inner side template Screw arbor with nut at both-ends is set, and Screw arbor with nut at both-ends is embedded in band arrangement of reinforcement warming plate in advance, merges setting, Saving steel amount with being connected reinforcing bar. Shear wall concrete is poured, after concrete strength reaches requirement, completes inside and outside finish coat construction.Between band arrangement of reinforcement warming plate Connecting structure be construction in emphasis and difficult point, the utility model using tongue and groove connection, silicone and building adhesive are being looked forward to by pressure It is intraoral completely to fill out, it is ensured that not spillage during construction, it is impermeable during use, completed before concreting between band arrangement of reinforcement warming plate Connecting structure, be advantageous to the quality of live sight check connecting portion, seam crossing bears larger pressure during concreting, such as Fruit now not spillage, shows that the connection of warming plate is reliable, the possibility of later water leakage through exterior wall also very little;Spillage point is such as found, It should immediately treat to meet concreting, should additionally indicate to be quality weak spot herein, should be weighed before exterior trim surface construction Point concern.This construction method can expose the weak part of construction quality as early as possible, in order to timely processing, prevent trouble before it happens.Exterior wall Thermal insulation structure at concrete column is similar to concrete shear force wall, repeats no more.
Embodiment 3:Thermal insulation structure when external wall is balcony, need to be to sun to avoid producing cold-heat bridge as shown in Fig. 5-b The surrounding of platen does comprehensive isothermal holding, and the warming plate of balcony slab lower section and side is incubated using band arrangement of reinforcement of the present utility model Plate and bed die and side form when doubling as concreting, the warming plate above balcony slab can also use its other party without arrangement of reinforcement Method carries out thermal insulation structure.Specific implementation step reference picture 5-a is followed successively by:Scaffold is set up, indoor section laying plank sheathing is outdoor Insulating sections laying band arrangement of reinforcement warming plate is needed to be used as bed die and side form, the seam between bed die can use straight seam connection, side form Between connecting sewing connected using ribbet, institute's seam is both needed to building adhesive sealing, it is ensured that not spillage during construction, does not leak during use Water, colligation concrete reinforcing steel, casting concrete, concrete strength reach form removal after requirement, carry out in balcony plate face Warming plate is constructed, and finally carries out the construction of exterior trim surface layer, railing and erection of doors and windows.
Embodiment 4:Isothermal holding at outdoor air conditioner dividing plate, architectural construction as shown in Fig. 6-b, be similarly avoid producing it is cold Heat bridge, comprehensive isothermal holding need to be done to air conditioner dividing plate surrounding, when air conditioner shelf is few relative to structural beams drop plate, its It is similar with balcony to construct way, repeats no more.When drop plate is more, specific implementation step reference picture 6-a is followed successively by:Set up pin hand Frame, indoor section laying plank sheathing, outdoor need insulating sections laying band arrangement of reinforcement warming plate as bed die and side form, colligation concrete Interior reinforcing bar, lays the warming plate above air conditioner dividing plate, and the backform poured as partition plate coagulation soil is close between backform and side form Envelope processing, it is ensured that not spillage when pouring, it is water-tight during use.To ensure the quality of concreting, air conditioner shelf should be taken Certain oblique gradient, so that air is discharged during concreting, finally carry out the construction of exterior finish.Certainly, air conditioner every Plate secondary can also be poured, and step is similar with one-piece casting, but construction quality is poured without once whole.
Embodiment 5:Float thermal insulation structure processing at window, the window that floats is a kind of rectangular box of prominent wall face, and general three face is equal Also can be simultaneously window for window, two sides is blank wall in addition, and the window that floats adds exterior wall heat transfer area and room because it protrudes metope The Shape Coefficient in room, it is that building exchanges most violent position, and the keypoint part of building energy conservation construction with environment's heat.Adopt Floatd during with the warming plate of the present utility model with arrangement of reinforcement window architectural construction as shown in Fig. 7-b, in the outside of structural beams, float luffer boards Upper and lower side, it is required to set band arrangement of reinforcement warming plate, the formwork for placing with arrangement of reinforcement warming plate as the window concrete that floats.Specific implementation Step reference picture 7-a is followed successively by:Scaffold is set up, indoor section lays the reinforcing bar of plank sheathing, colligation beam and the luffer boards that float, and laying is outer Side band arrangement of reinforcement warming plate, and handles seam construction, it is ensured that not spillage during construction, water-tight, casting concrete during use, to improve Float the globality and water resistance of window, the window concrete that floats does not stay construction joint, when mixed with indoor floor coagulation local product primary concreting Coagulate native intensity and reach form removal after requirement, carry out the interior Decorative Construction at indoor position and the exterior trim surface construction at outdoor position.
Embodiment 6:Thermal insulation structure handles, architectural construction detail drawing similar with the thermal insulation structure at air conditioner dividing plate at parapet As shown in Fig. 8-b, it is with air conditioner shelf difference, the flanged plate of parapet is general higher, it is necessary to which concrete secondary pours Build, concrete pouring construction seam is formed typically at roof floor slab face, now the level with arrangement of reinforcement warming plate as exterior sheathing Connecting sewing need to avoid this position.Specific implementation step reference picture 8-a is followed successively by:Scaffold is set up, indoor section lays plank sheathing, Reinforcing bar in reinforcing bar and parapet, lays beams of concrete outer side band arrangement of reinforcement warming plate, pours roof concrete in colligation beams of concrete, After concrete strength reaches requirement after roof, with core band arrangement of reinforcement warming plate on the outside of laying parapet, warming plate seam structure is handled Make, it is ensured that not spillage during construction, it is water-tight during use, parapet concrete is poured, concrete strength removes mould after reaching requirement Plate, carry out the heat-insulation layer construction of the exterior trim surface construction and roof at outdoor position.
Embodiment 7:The isothermal holding on Stilt layer floor ground, when architectural establishment Stilt layer, the floor above Stilt layer Isothermal holding is generally also required to, the lower section of Stilt layer floor is placed in arrangement of reinforcement warming plate, bed die during as concreting, its The detail of construction and construction method are similar with the isothermal holding of outdoor balcony, and here is omitted.
Above only describes general principle of the present utility model and preferred embodiment, those skilled in the art can be according to above-mentioned Many changes and improvements are made in description, and these changes and improvements should belong to the scope of protection of the utility model.

Claims (4)

  1. A kind of 1. warming plate with arrangement of reinforcement, it is characterised in that including warming plate and the reinforced mesh being laid in warming plate, its In several reinforced mesh node at throw away connection reinforcing bar.
  2. 2. the warming plate according to claim 1 with arrangement of reinforcement, it is characterised in that the material of the connection reinforcing bar is stainless Steel.
  3. A kind of 3. warming plate with arrangement of reinforcement, it is characterised in that including warming plate and the steel fabric sheet being laid in warming plate, its In several steel fabric sheets node at throw away connection steel wire.
  4. 4. the warming plate with arrangement of reinforcement according to claim 1 or 3, it is characterised in that the material of the warming plate is steam pressure Sand aerated concrete, foam concrete, foamed ceramic or glass bead.
CN201720152462.4U 2017-02-20 2017-02-20 A kind of warming plate with arrangement of reinforcement Active CN206667507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720152462.4U CN206667507U (en) 2017-02-20 2017-02-20 A kind of warming plate with arrangement of reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720152462.4U CN206667507U (en) 2017-02-20 2017-02-20 A kind of warming plate with arrangement of reinforcement

Publications (1)

Publication Number Publication Date
CN206667507U true CN206667507U (en) 2017-11-24

Family

ID=60379497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720152462.4U Active CN206667507U (en) 2017-02-20 2017-02-20 A kind of warming plate with arrangement of reinforcement

Country Status (1)

Country Link
CN (1) CN206667507U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989209A (en) * 2017-12-20 2018-05-04 苏州市世好建材新技术工程有限公司 Half cast-in-situ thermal-insulated plate can be monitored
CN113276268A (en) * 2021-06-24 2021-08-20 丁艳妹 Heat preservation laying device is used in prefabricated wall brick processing
CN114482304A (en) * 2022-01-17 2022-05-13 中建八局第二建设有限公司 Construction method of composite insulation board of building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989209A (en) * 2017-12-20 2018-05-04 苏州市世好建材新技术工程有限公司 Half cast-in-situ thermal-insulated plate can be monitored
CN113276268A (en) * 2021-06-24 2021-08-20 丁艳妹 Heat preservation laying device is used in prefabricated wall brick processing
CN113276268B (en) * 2021-06-24 2022-06-07 广东省第十一建设有限公司 Heat preservation laying device is used in prefabricated wall brick processing
CN114482304A (en) * 2022-01-17 2022-05-13 中建八局第二建设有限公司 Construction method of composite insulation board of building

Similar Documents

Publication Publication Date Title
CN106013811B (en) A kind of installation method of assembled architecture
CN101307629B (en) Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method
CN106759994A (en) A kind of warming plate with arrangement of reinforcement and its thermal insulation structure construction method in exterior wall concrete section position
CN201826405U (en) Environment-friendly wall insulating structure for prefabricated buildings
WO2010105496A1 (en) External heat preservation composite wall of exterior wall with support
CN1936208A (en) Bound-type composite heat-insulation wall with support body
WO2007134517A1 (en) Composite concrete shear wall for heat insulation
WO2015120794A1 (en) Building component replacing plaster layer with prefabricated panel protection layer
CN206667507U (en) A kind of warming plate with arrangement of reinforcement
CN103835505A (en) Outer wall compound heat preservation board construction method
CN103669905A (en) Lightweight composite prefabricated panel combined type house and building method thereof
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN109356319A (en) A kind of one assembly concrete Side fascia of the six directions and its production method
CN108894367A (en) A kind of cast-in-place fair-faced concrete external wall system and its construction technology
CN209958534U (en) Low-energy-consumption energy-saving building system
CN100427708C (en) Energy saving composite self heat insulation wall for building
WO2024055622A1 (en) Prefabricated component formed by reverse laying and production process therefor
CN201459966U (en) Self-insulation wall structure for building
CN204919881U (en) Whole wall of assembly spouting lightweight concrete
RU2308576C2 (en) Exterior multistory building wall and wall erection method
CN204040459U (en) A kind of cast-in-situ concrete fireproof heat insulating non-dismantling formwork
CN207194226U (en) A kind of assembled integral shear wall connecting node
CN115977278A (en) Assembled light steel combined truss supported steel wire mesh frame mortar-perlite-polyphenyl composite shear wall and manufacturing method thereof
CN101492938A (en) Construction body with thermal insulation and construction method
CN212317251U (en) UHPC color finish coat outer-hanging wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant