CN206636585U - Grouting pipe and filling system - Google Patents
Grouting pipe and filling system Download PDFInfo
- Publication number
- CN206636585U CN206636585U CN201720424219.3U CN201720424219U CN206636585U CN 206636585 U CN206636585 U CN 206636585U CN 201720424219 U CN201720424219 U CN 201720424219U CN 206636585 U CN206636585 U CN 206636585U
- Authority
- CN
- China
- Prior art keywords
- pipe
- main body
- connection sleeve
- sleeve pipe
- seal ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The grouting pipe and filling system that the embodiment of the present application provides include:Pipe main body, connection sleeve pipe and seal ring, the pipe main body is hollow columnar structures, the pipe main body includes first end, the second end and body, the seal ring is sheathed on the surface of the body, and the seal ring is arranged between the first end and the second end, the internal diameter of the connection sleeve pipe is more than the external diameter of the pipe main body, and the connection sleeve pipe is sheathed on the second end of the pipe main body, and the connection sleeve pipe is fixedly connected with the pipe main body.Grouting operation can be performed into pipe main body by connection sleeve pipe, so as to fill caused gap between two lining structures and splash guard, improve the waterproof effect of splash guard.
Description
Technical field
The application is related to building field, in particular to a kind of grouting pipe and filling system.
Background technology
When carrying out construction, it is often necessary to carry out water-proofing treatment.The usual way of water-proofing treatment is in first branch structure
Surface one layer of splash guard is set, two lining structures then are set on surface of the splash guard away from first branch structure.
Because the surface of splash guard is oily material, so easily producing gap, shadow between two lining structures and splash guard
Ring the effect of water-proofing treatment.
Utility model content
In view of this, the embodiment of the present application provides a kind of grouting pipe and filling system, above-mentioned due to anti-to improve
The problem of there is gap between water plate and two lining structures and influence water-proofing treatment effect.
To achieve the above object, the embodiment of the present application provides a kind of grouting pipe, and the grouting pipe includes:Pipe master
Body, connection sleeve pipe and seal ring, the pipe main body are hollow columnar structures, the pipe main body include first end, the second end with
And body, the seal ring are sheathed on the surface of the body, and the seal ring be arranged on the first end and the second end it
Between, the internal diameter of the connection sleeve pipe is more than the external diameter of the pipe main body, and the connection sleeve pipe is sheathed on the second of the pipe main body
End, and the connection sleeve pipe is fixedly connected with the pipe main body.
Preferably, in above-mentioned grouting pipe, the pipe main body is hollow cylindrical structure.
Pipe main body is specifically as follows hollow cylindrical structure, because grouting pipe is embedded in two lining structures, cylindrical structure by
Pressure to two lining structures is more uniform, it is not easy to causes damaging for pipe main body because the pressure size being subject to is uneven.
Preferably, in above-mentioned grouting pipe, the seal ring is circular ring, the diameter of the inner ring of the seal ring
Equal to the diameter of the outer surface of the body, and the axis of the seal ring overlaps with the axis of the body.
Seal ring can be sheathed on the surface of body, and seal ring is circular ring, can to body it is easy by
The position of corrosion carries out sealing protection.
Preferably, in above-mentioned grouting pipe, the pipe main body is steel tube main body, and the connection sleeve pipe connects for steel
Sleeve pipe, the seal ring are steel seal ring.
Pipe main body is steel tube main body, it is not easy to when being deformed because of the pressure of two lining structures, and carrying out slip casting step,
Because pipe main body is made up of steel material, pressure caused by slip casting pressurization is not easy to impact pipe main body.
Preferably, in above-mentioned grouting pipe, the inner side of one end of the remote pipe main body of the connection sleeve pipe is set
There is screw thread.
One end of the remote pipe main body of connection sleeve pipe is provided with screw thread, connection sleeve pipe can by way of screw thread engagement with
Other pipe fittings are connected, can be by way of screw thread engagement using stifled preferably to complete slip casting step, and when not in use
Head blocks connection sleeve pipe together with body, avoids debris from entering the connectedness for carrying out grouting pipe.
The utility model embodiment additionally provides a kind of filling system, including above-mentioned grouting pipe and plug, described
Plug includes connecting portion and stop part, and the outer surface of the connecting portion is provided with to be meshed with the inside thread of the connection sleeve pipe
Screw thread, the plug can be detachably connected with the connection sleeve pipe by way of screw thread engages.
Preferably, in above-mentioned filling system, in addition to connecting tube, the connecting tube include the first connection end and second
Connection end, the outer surface of the first connection end of the connecting tube are provided with the spiral shell being meshed with the inside thread of the connection sleeve pipe
Line, the second connection end of the connecting tube are provided with the screw thread being meshed with the screw thread of the connecting portion of the plug, the connection
First connection end of pipe can be detachably connected with the connection sleeve pipe by way of screw thread engages, and the second of the connecting tube connects
End is connect to be detachably connected by way of screw thread engages with the plug.
When needing to use above-mentioned grouting pipe to carry out grouting operation, connection sleeve pipe can be arranged with grouting pipe
One end be connected with connecting tube by way of screw thread engagement, so as to by connecting tube preferably perform slip casting by grouting pipe
Step.
Preferably, in above-mentioned filling system, the system also includes first branch structure, splash guard and two lining structures, institute
The surface that splash guard is arranged at the just branch structure is stated, the first end of the grouting pipe is in contact with the splash guard, described
Grouting pipe is arranged in two lining structure.
The first end of grouting pipe can specifically be in contact with the one side of the remote first branch structure of splash guard, and grouting pipe
It can be arranged in two lining structures.Specifically, first grouting pipe can be fixed, then irrigates commerical ready-mixed concrete, commodity coagulation
Soil forms two lining structures.
Preferably, in above-mentioned filling system, the axis of the grouting pipe mutually hangs down with the plane where the splash guard
Directly.
Specifically, the axis of grouting pipe can be perpendicular with the plane where splash guard.Certainly, the axis of grouting pipe
There can also be other predetermined angles with splash guard, the specific angle value between the axis and splash guard of grouting pipe should not be managed
Solve to be to limitation of the present utility model.
Preferably, in above-mentioned filling system, the material of the just branch structure is gunite concrete, two lining structure
Material is commerical ready-mixed concrete.
Gunite concrete is the concrete constructed with gunite.It is that pulp-water mud, sand and maximum particle diameter are less than 25 millimeters
Stone loads spraying machine by a certain percentage after mix, with compressed air by dry mixture along Pipeline transport to shower nozzle at, mixed with water
Merge and sprayed with the high speed of 40~60 meter per seconds to being formed in the scope of operation.Commerical ready-mixed concrete, also known as ready-mixed concrete, referred to as
For " business's concrete ", ash or material are commonly called as:Be by the component such as cement, aggregate, water and the additive mixed as needed, mineral admixture by
According to certain proportion, sold in mixing plant after metering, mixing and use transport vehicle, moved to point-of-use at the appointed time
Concrete mix.
The grouting pipe of the embodiment of the present application offer and having the beneficial effect that for filling system:
The grouting pipe and filling system that the embodiment of the present application provides include:Pipe main body, connection sleeve pipe and seal ring, institute
It is hollow columnar structures to state pipe main body, and the pipe main body includes first end, the second end and body, and the seal ring is sheathed on institute
The surface of body is stated, and the seal ring is arranged between the first end and the second end, the internal diameter of the connection sleeve pipe is more than
The external diameter of the pipe main body, the connection sleeve pipe are sheathed on the second end of the pipe main body, and the connection sleeve pipe and the pipe
Main body is fixedly connected.Grouting operation can be performed into pipe main body by connection sleeve pipe, so as to fill two lining structures and splash guard
Between caused gap, improve the waterproof effect of splash guard.
Brief description of the drawings
, below will be to embodiment or existing for clearer explanation the embodiment of the present application or technical scheme of the prior art
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of application, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the grouting pipe that the embodiment of the present application provides;
Fig. 2 is the structural representation for the plug that the embodiment of the present application provides;
Fig. 3 is the structural representation for the connecting tube that the embodiment of the present application provides;
Fig. 4 is the structural representation for the filling system that the embodiment of the present application provides;
Fig. 5 is a kind of structural representation of the use state for the filling system that the embodiment of the present application provides.
Icon:100- grouting pipes;110- pipe main bodys;111- first ends;The ends of 112- second;113- bodys;120- connections
Sleeve pipe;130- seal rings;200- plugs;210- connecting portions;220- stop parts;300- connecting tubes;The connection ends of 310- first;320-
Second connection end;The first branch structures of 400-;500- splash guards;The lining structures of 600- bis-.
Embodiment
Details refer to Fig. 1, and Fig. 1 shows a kind of grouting pipe 100 that the utility model embodiment provides, and the slip casting is led
Pipe 100 includes pipe main body 110, connection sleeve pipe 120 and seal ring 130.Connection sleeve pipe 120 is connected with one end of pipe main body 110,
Seal ring 130 is sheathed on the surface of the pipe main body 110.
Pipe main body 110 is specifically as follows hollow columnar structures, and pipe main body 110 include first end 111, the second end 112 with
And body 113.Pipe main body 110 is specifically as follows hollow cylindrical structure, then as viewed from the visual angle at first end 111, the second end 112,
It is circular ring.It is more uniform to bear pressure when being under pressure for the pipe main body 110 of cylindrical structure.Pipe main body 110 is specific
It can be steel tube main body 110, because grouting pipe 100 is needed after fixing, be filled out to the position where the grouting pipe 100
Fill commerical ready-mixed concrete, if therefore pipe main body 110 is soft structures, commerical ready-mixed concrete easily bends grouting pipe 100, is unfavorable for noting
Starch the transport of fluid in conduit 100.
It is made it is appreciated that pipe main body 110 is specifically as follows steel material, or other hard materials, for example (,) it is poly-
Tetrafluoro material is made, and it is to limitation of the present utility model that the specific material of pipe main body 110, which should not be construed,.
The internal diameter of connection sleeve pipe 120 is more than the external diameter of pipe main body 110, and connection sleeve pipe 120 is connected to the one of pipe main body 110
End.Specifically, connection sleeve pipe 120 can be fixedly connected with the second end 112 of pipe main body 110.The remote pipe master of connection sleeve pipe 120
The inner side of one end of body 110 can specifically be provided with screw thread, and connection sleeve pipe 120 can be by way of screw thread engagement and tube
Or block piece is detachably connected.
Connection sleeve pipe 120 is specifically as follows steel connection sleeve pipe, it will be understood that connection sleeve pipe 120 can also be specifically it
The connection sleeve pipe 120 of his material, as long as can play a part of connecting pipe main body 110 and other connectors, connection sleeve pipe
It is to limitation of the present utility model that 120 specific material, which should not be construed,.
Seal ring 130 can be set in the surface of body 113, specifically, seal ring 130 be arranged on first end 111 and
Between second end 112.The shape of seal ring 130 matches with body 113, if body 113 is shaped as hollow cylindrical knot
Structure, then seal ring 130 is circular ring;If body 113 is shaped as prismatic structure, seal ring 130 is and prism-shaped
Body 113 corresponding to hollow polygonized structure.Illustrated below so that seal ring 130 is circular ring as an example:
The diameter of the internal diameter of circular seal ring 130 can be equal to the diameter of the outer surface of body 113, and seal ring
130 axis can overlap with the axis of body 113.
Seal ring 130 is directed to through works construction joint and the reinforcing bar in crack, pipeline etc. easily by the ironware corroded
And the product specially developed.Seal ring 130 can specifically be made up of water-swellable material.Water-swellable material is specifically as follows rubber
Glue material, this kind of quality of rubber materials can produce 2 to 3 times of dilatancy after water is met, so as to full of where construction joint or crack
Space, seepage can be prevented.
Seal ring 130 can also be steel seal ring 130, and steel seal ring 130 can easily produce crack in pipeline
Position plays a part of reinforcing the pipeline position, is avoided as much as the generation in the crack at the pipeline position.
The utility model embodiment additionally provides a kind of filling system, and details refer to Fig. 4 and Fig. 5, the filling system bag
Include above-mentioned grouting pipe 100, plug 200, connecting tube 300, first branch structure 400, the lining structure 600 of splash guard 500 and two.
The side of first branch structure 400 is provided with splash guard 500, and details refer to Fig. 4, splash guard 500 it is remote it is described at the beginning of
The side of branch structure 400 is in contact with grouting pipe 100, and grouting pipe 100 is arranged at the inner side of two lining structure 600.Plug 200
It can be detachably connected with connection sleeve pipe 120 by way of screw thread engages, connecting tube 300 can also lead to connection sleeve pipe 120
The mode for crossing screw thread engagement is detachably connected.
Plug 200 includes connecting portion 210 and stop part 220, and details refer to Fig. 2, and the outer surface of connecting portion 210 can be set
It is equipped with the screw thread being meshed with the inside thread of the connection sleeve pipe of grouting pipe 100 120.Stop part 220 and the one of connecting portion 210
Side is fixedly connected.
Plug 200 can be connected with connection sleeve pipe 120 by way of screw thread engages, and can also pass through groove coupling phase
The mode of engaging is detachably connected, for example, the outer surface of plug 200 is provided with projection, the inner side of connection sleeve pipe 120 be provided with
The groove that projection matches, then plug 200 can detachably connect by way of projection engages with groove with connection sleeve pipe 120
Connect.It is appreciated that it is to limit of the present utility model that the specific connected mode of plug 200 and connection sleeve pipe 120, which should not be construed,
System.
Connecting tube 300 can include the first connection end 310 and second connection end 320, and details refer to Fig. 3, and first connects
The screw thread engaged with the inside thread of connection sleeve pipe 120 can be provided with by connecing the outer surface at end 310, and the second of connecting tube 300 connects
The screw thread engaged with the screw thread of the connecting portion of plug 200 210 can be provided with by connecing end 320.
It is appreciated that the second connection end 320 of connecting tube 300 can be connected with the connecting portion 210 of plug 200, also may be used
With for being connected with slip casting backfilling mechanism.
First connection end 310 of connecting tube 300 can detachably connect with connection sleeve pipe 120 by way of screw thread engages
Connect, the second connection end 320 of connecting tube 300 can be detachably connected with plug 200 by way of screw thread engages, i.e. connecting tube
300 can extend the length of grouting pipe 100, so as to which grouting pipe 100 is drawn from two lining structures 600.
First branch structure 400 is plays the structure of preliminary bracing effect in construction, usually using horizontal steel grating, vertical connection
Muscle, reinforced mesh and gunite concrete are constructed jointly.Gunite concrete is the concrete constructed with gunite.It is pulp-water
The stone of mud, sand and maximum particle diameter less than 25 millimeters after mix, loads spraying machine by a certain percentage, with compressed air by dry-mixing
Material along Pipeline transport to shower nozzle at, mix with water and is sprayed with the high speed of 40~60 meter per seconds to formation in the scope of operation.
Splash guard 500 is made up of waterproof material, is specifically as follows high molecular polymer, prevents fluid seepage, can also be pre-
Anti- gaseous volatilization.Specifically, the axis of grouting pipe 100 can be perpendicular with the plane where splash guard 500.
Two lining structures 600 refer to the structure formed during secondary lining, control the deformation of earth's surface and surface buildingses.Specifically
It can be main material by commerical ready-mixed concrete, be by cement, aggregate, water and the additive mixed as needed, mineral admixture
Etc. component according to a certain percentage, sold in mixing plant after metering, mixing and use transport vehicle, be transported to makes at the appointed time
With the concrete mix in place.
The grouting pipe 100 of the utility model embodiment offer and the operation principle of filling system are:
Just branch structure 400 is first built in the position that need to be constructed, then covers one layer of splash guard on the surface of first branch structure 400
500, then, the first end 111 of grouting pipe 100 is in contact with the surface of splash guard 500, or the of grouting pipe 100
One end 111 and the surface of splash guard 500 have a certain distance.After grouting pipe 100 is set, at connection sleeve pipe 120
Plug 200 as shown in Figure 3 is connected, and two lining structures 600 are irrigated in the region where the body 113 in grouting pipe 100, in detail
Feelings can be found in Fig. 4 and Fig. 5.After the perfusion for completing two lining structures 600, connection sleeve pipe 120 and plug 200 are exposed to two lining structures
600 surface.
Because the surface of splash guard 500 is oily material, so easily being produced between two lining structures 600 and splash guard 500
Raw gap, so as to have influence on the waterproof effect of splash guard 500, therefore, can outward winding plug 200, and at connection sleeve pipe 120
Connecting tube 300 is connected with, and connecting tube 300 is connected with slip casting backfilling mechanism, so as to be passed through successively by slip casting backfilling mechanism
Connecting tube 300, connection sleeve pipe 120 and body 113 backfill slip casting to the gap between two lining structures 600 and splash guard 500.And
And after slip casting step is backfilled, the annexation between connecting tube 300 and connection sleeve pipe 120 is released, then again by plug 200
Connection sleeve pipe 120 is blocked, prevents dust, cement etc. from entering in connection sleeve pipe 120 so as to cause to block to the grouting pipe 100.
Because grouting pipe 100 can be made up of steel material, the 100 more difficult deformation of grouting pipe of steel, two
After the completion of lining structure 600 (i.e. commerical ready-mixed concrete) pours, it can go out in plug 200 and leave mark, can easily find the position of conduit.
And slip casting backfilling mechanism to the slip casting of grouting pipe 100 pressurize when, the influence to grouting pipe 100 is smaller.And steel slip casting is led
Pipe 100 repeats utilization rate height, after slip casting backfilling operation, plug 200 can be used to be screwed in unsintered tape in connection sleeve pipe 120,
The sealing of assiatant's conduit is improved, can be with if still there is the phenomenon of percolating water at the lining structure 600 of later stage splash guard 500 and two
The grouting pipe 100 is continued through to cement injection at the gap of the lining structure 600 of splash guard 500 and two.
The grouting pipe 100 and filling system that the embodiment of the present application provides include:Pipe main body 110, connection sleeve pipe 120 and
Seal ring 130, the pipe main body 110 are hollow columnar structures, the pipe main body 110 include first end 111, the second end 112 with
And body 113, the seal ring 130 is sheathed on the surface of the body 113, and the seal ring 130 is arranged on described first
Between the end 112 of end 111 and second, the internal diameter of the connection sleeve pipe 120 is more than the external diameter of the pipe main body 110, the adapter sleeve
Pipe 120 is sheathed on the second end 112 of the pipe main body 110, and the connection sleeve pipe 120 is fixedly connected with the pipe main body 110.
Grouting operation can be performed into pipe main body 110 by connection sleeve pipe 120, so as to fill two lining structures 600 and splash guard 500 it
Between caused gap, improve splash guard 500 waterproof effect.
To make the purpose, technical scheme and advantage of the utility model embodiment clearer, above in conjunction with the utility model
Accompanying drawing in embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that retouched
The embodiment stated is the utility model part of the embodiment, rather than whole embodiments.Generally here described in accompanying drawing and
The component of the utility model embodiment shown can be configured to arrange and design with a variety of.
Therefore, the detailed description of of the present utility model embodiment of the above to providing in the accompanying drawings is not intended to limit requirement
The scope of the utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in the utility model
Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all
Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.
, it is necessary to explanation, the orientation of the instruction such as term " on ", " under ", " interior ", " outer " in description of the present utility model
Or position relationship be based on orientation shown in the drawings or position relationship, or the utility model product using when usually put
Orientation or position relationship, it is for only for ease of description the utility model and simplifies description, rather than indicates or imply signified dress
Put or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the utility model
Limitation.
In description of the present utility model, it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set
Put ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected,
Or it is integrally connected;Can be mechanical connection or electrical connection;Can be joined directly together, intermediary can also be passed through
It is indirectly connected, can is the connection of two element internals.For the ordinary skill in the art, can be managed with concrete condition
Solve concrete meaning of the above-mentioned term in the utility model.
Claims (10)
1. a kind of grouting pipe, it is characterised in that the grouting pipe includes:Pipe main body, connection sleeve pipe and seal ring, it is described
Pipe main body is hollow columnar structures, and the pipe main body includes first end, the second end and body,
The seal ring is sheathed on the surface of the body, and the seal ring is arranged between the first end and the second end,
The internal diameter of the connection sleeve pipe is more than the external diameter of the pipe main body, and the connection sleeve pipe is sheathed on the second of the pipe main body
End, and the connection sleeve pipe is fixedly connected with the pipe main body.
2. grouting pipe according to claim 1, it is characterised in that the pipe main body is hollow cylindrical structure.
3. grouting pipe according to claim 1, it is characterised in that the seal ring is circular ring, the sealing
The diameter of the inner ring of ring is equal to the diameter of the outer surface of the body, and the axis weight of the axis of the seal ring and the body
Close.
4. grouting pipe according to claim 1, it is characterised in that the pipe main body is steel tube main body, the connection
Sleeve pipe is steel connection sleeve pipe, and the seal ring is steel seal ring.
5. grouting pipe according to claim 1, it is characterised in that the one of the remote pipe main body of the connection sleeve pipe
Screw thread is provided with the inside of end.
A kind of 6. filling system, it is characterised in that the system include any one of claim 1 to 5 described in grouting pipe with
And plug,
The plug includes connecting portion and stop part, and the outer surface of the connecting portion is provided with the inner side spiral shell with the connection sleeve pipe
The screw thread that line is meshed, the plug can be detachably connected with the connection sleeve pipe by way of screw thread engages.
7. filling system according to claim 6, it is characterised in that also including connecting tube,
The connecting tube includes the first connection end, and the outer surface of the first connection end of the connecting tube is provided with and the adapter sleeve
The screw thread that the inside thread of pipe is meshed,
First connection end of the connecting tube can be detachably connected with the connection sleeve pipe by way of screw thread engages.
8. filling system according to claim 7, it is characterised in that the system also include first branch structure, splash guard with
And two lining structures, the splash guard are arranged at the surface of the just branch structure,
The first end of the grouting pipe is in contact with the splash guard, and the grouting pipe is arranged in two lining structure.
9. filling system according to claim 8, it is characterised in that the axis of the grouting pipe and the splash guard institute
Plane it is perpendicular.
10. filling system according to claim 8, it is characterised in that the material of the just branch structure is gunite concrete,
The material of two lining structure is commerical ready-mixed concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720424219.3U CN206636585U (en) | 2017-04-21 | 2017-04-21 | Grouting pipe and filling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720424219.3U CN206636585U (en) | 2017-04-21 | 2017-04-21 | Grouting pipe and filling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206636585U true CN206636585U (en) | 2017-11-14 |
Family
ID=60245644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720424219.3U Expired - Fee Related CN206636585U (en) | 2017-04-21 | 2017-04-21 | Grouting pipe and filling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206636585U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107737004A (en) * | 2017-11-30 | 2018-02-27 | 广东美的安川服务机器人有限公司 | Shock wave treatment instrument |
CN110005447A (en) * | 2019-05-23 | 2019-07-12 | 青岛亿联集团股份有限公司 | A kind of grouting equipment that can be used repeatedly based on green building construction |
-
2017
- 2017-04-21 CN CN201720424219.3U patent/CN206636585U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107737004A (en) * | 2017-11-30 | 2018-02-27 | 广东美的安川服务机器人有限公司 | Shock wave treatment instrument |
CN110005447A (en) * | 2019-05-23 | 2019-07-12 | 青岛亿联集团股份有限公司 | A kind of grouting equipment that can be used repeatedly based on green building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101914917B (en) | Anti-seepage and leak-blocking construction method for excavation of subway foundation pit in soft soil area | |
CN105735364B (en) | Concrete joint waterproof system, construction method and the protection component for the system | |
US20220145568A1 (en) | Concrete inside interface processing structure and method for secant pile construction | |
CN205172598U (en) | Pipe curtain spouts a supporting construction soon | |
CN111365032B (en) | Anti-seepage treatment method for ring beam of tunnel door of subway station | |
CN212003197U (en) | Subway station tunnel door ring beam seepage-proofing drainage construction structure | |
CN105986570B (en) | The Construction of High Pressure Jet Grouting Pile method of sealing is sealed as ground-connecting-wall interface external reinforcement | |
CN206636585U (en) | Grouting pipe and filling system | |
CN103321255A (en) | Underground concrete structural engineering joint waterproof construction method | |
CN105114753A (en) | Pipe internal repair method without excavating ground | |
CN108756941A (en) | Two lining trolley band of one kind being molded into slurry structure and band is molded into paste-making method | |
CN203321540U (en) | Multifunctional mining long-distance wet spraying machine with automatic proportioning | |
CN204254073U (en) | A kind of pre-stress steel cylinder RPC tubing | |
CN206845195U (en) | A kind of tunnel grouting device | |
CN108894247A (en) | A kind of Metro Connection Passage periphery soil body subsidence pressure circle spray reinforcement structure and construction method | |
CN109235668A (en) | Residential building curtain wall and wall crack plugging structure | |
CN103205986A (en) | Concrete raft foundation construction-joint grouting device and construction method | |
CN104197129A (en) | A novel reinforced concrete drainage pipe and a manufacturing method thereof | |
CN204781973U (en) | Antiseep plugging device in split bolt hole | |
CN103225718B (en) | Embedded prestressed steel cylinder concrete pipe having epoxy protective layer on inner wall | |
CN110985052A (en) | Self-compacting concrete pouring construction process method | |
CN105697922A (en) | Construction method based on shield method for anti-seepage anticorrosion sewage pipe segment lining | |
CN212478002U (en) | Non-excavation prosthetic devices of inspection shaft | |
CN109488333B (en) | Construction method for inserting pipe shed piles in horizontal stirring and spraying | |
CN109763391B (en) | Construction method for reinforcing base course and roadbed by single-hole composite grouting of damaged road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171114 Termination date: 20190421 |
|
CF01 | Termination of patent right due to non-payment of annual fee |