CN110005447A - A kind of grouting equipment that can be used repeatedly based on green building construction - Google Patents

A kind of grouting equipment that can be used repeatedly based on green building construction Download PDF

Info

Publication number
CN110005447A
CN110005447A CN201910433791.XA CN201910433791A CN110005447A CN 110005447 A CN110005447 A CN 110005447A CN 201910433791 A CN201910433791 A CN 201910433791A CN 110005447 A CN110005447 A CN 110005447A
Authority
CN
China
Prior art keywords
hose
screw rod
block
used repeatedly
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910433791.XA
Other languages
Chinese (zh)
Inventor
吴昆�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Billion Group Ltd By Share Ltd
Original Assignee
Qingdao Billion Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Billion Group Ltd By Share Ltd filed Critical Qingdao Billion Group Ltd By Share Ltd
Priority to CN201910433791.XA priority Critical patent/CN110005447A/en
Publication of CN110005447A publication Critical patent/CN110005447A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of grouting equipments that can be used repeatedly based on green building construction, it is related to technical field of building construction, specially a kind of grouting equipment that can be used repeatedly based on green building construction, it blocks up and the first link block including copper, the copper side blocked up is fixed with third screw rod, and the side of third screw rod is equipped with hose, the front end of the hose is internally provided with slurry outlet, metal clip is installed in the middle part of the hose, and the front end of metal clip is internally provided with mounting hole, the mounting hole is internally provided with installation screw rod, the side of the hose is equipped with end block, and end block is internally provided with fixing pipe.This is provided with metal clip and installation screw rod based on the grouting equipment that green building construction can be used repeatedly, hose is fixed by installing screw rod, so as to effectively limit the position of hose, avoids hose mobile, or be wound between exterior object, it is easy to cause hose to block.

Description

A kind of grouting equipment that can be used repeatedly based on green building construction
Technical field
It is specially a kind of to be used repeatedly based on green building construction the present invention relates to technical field of building construction Grouting equipment.
Background technique
With the expansion and transformation in city, original underground installation has been unable to meet demand, to improve urban infrastructure The underpass that interconnects increased newly between the extension improvement project of function, underpass and underground pipe gallery, business balcony Engineering largely occurs, and adds project because the above engineering belongs to the later period, preliminary engineering extends connection without the reserved later period in the design Mouthful, the connecting portion between engineering and former engineering is increased newly without special tectonic measure, and underpass is caused with skyscraper to get off The connecting portion that extends of the connecting portion in library, underpass and underground pipe gallery becomes the weak link of structural strength, in concrete It shrinks and creeps, under the long terms such as structure differential settlement, different degrees of appearance cracking leakage phenomenon seriously affects The use function of engineering.
It such as leaks, there are mainly two types of construction method, first is to dig out underground structure top cubic metre of earth to increase waterproof again Layer, second are in structure back side bored grouting leak stopping, and the above construction method is taken a lot of work arduously, and influences constructional appearance quality.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of notes that can be used repeatedly based on green building construction Starch equipment, solve in above-mentioned background technique and propose when leak, there are mainly two types of construction method, first is to dig out underground to tie The earthwork of structure top increases waterproof layer again, second is in structure back side bored grouting leak stopping, and the above construction method is taken a lot of work expense Power, and the problem of influence constructional appearance quality.
In order to achieve the above object, the present invention is achieved by the following technical programs: one kind can based on green building construction The grouting equipment being used repeatedly, including it is copper block up and the first link block, the copper side blocked up is fixed with third Screw rod, and the side of third screw rod is equipped with hose, the front end of the hose is internally provided with slurry outlet, the middle part of the hose Metal clip is installed, and the front end of metal clip is internally provided with mounting hole, the mounting hole is internally provided with installation screw rod, institute The side for stating hose is equipped with end block, and end block is internally provided with fixing pipe, and the side of the fixing pipe is equipped with the second spiral shell Bar is equipped with the first screw rod above first link block, and the first link block is located at the side of end block, first screw rod Top connecting tube is installed, and the side of connecting tube is equipped with fixed mechanism, and the side of the fixed mechanism is equipped with second Connecting tube, and the side front end of the second connecting tube is equipped with connector, the surrounding of the connector is internally provided with connecting hole.
Optionally, copper block up is integrally formed formula structure by third screw rod, and copper blocks up through third screw rod Formula structure is integrally formed between hose.
Optionally, the slurry outlet is uniformly distributed along the horizontal center line direction of hose, and the inside diameter of slurry outlet is 35μm。
Optionally, the outer dia of the hose is 12mm, and the inside diameter of hose is 8mm.
Optionally, the metal clip is uniformly distributed along the horizontal center line direction of hose, and hose is through metal clip Inside, and formula structure is integrally formed by installing screw rod between metal clip.
Optionally, the hose is integrally formed formula structure by fixing pipe, and the outside of fixing pipe structure in the shape of a spiral, and And the inside of fixing pipe is in hollow cylindrical structure, while hose is by constituting detachable structure between fixing pipe and end block.
It optionally, is in bell-mouth structure of air outside the side of the end block, and end block passes through the second screw rod and the first link block Between constitute detaching structure, and the first link block is integrally formed formula structure, while the second screw rod and first by the second screw rod The inside of screw rod is in hollow cylinder structure, and the first link block is by being integrally formed formula between the first screw rod and connecting tube Structure.
Optionally, the fixed mechanism includes end pipe, screwed pipe and hook, is respectively and fixedly provided with spiral shell at left and right sides of the end pipe Pipe, the two sides up and down of the end pipe are respectively and fixedly provided with hook, and the inside of the end pipe and screwed pipe is in hollow cylinder structure, and spiral shell The outside of pipe structure in the shape of a spiral, while the horizontal center line between linking up with about end pipe is symmetrical.
Optionally, the connecting hole is uniformly distributed along the surrounding of connector, and connector passes through the second connecting tube and fixed mechanism Between constitute connectivity structure.
The present invention provides a kind of grouting equipments that can be used repeatedly based on green building construction, have following beneficial Effect:
1, the grouting equipment that should can be used repeatedly based on green building construction is provided with third screw rod, passes through third spiral shell Bar can effectively increase hose and it is copper block up between the stability that connects, avoid inside hose liquid flow movable property unboiled water pressure When, copper block up is released into hose, so as to cause liquid outflow, and it is copper block up can effectively by liquid be blocked in hose with The copper junction blocked up, at this point, the pressure of the generation of inside hose, convenient for the discharge of liquid.
2, the grouting equipment that should can be used repeatedly based on green building construction is provided with slurry outlet, multiple slurry outlet energy It is enough effectively to provide multiple outlets for the discharge of liquid, so as to effectively improve the contact between liquid and fixation member Area, and then can effectively accelerate slurries and speed is made up to cracking leakage.
3. the grouting equipment that should can be used repeatedly based on green building construction is provided with metal clip and installation screw rod, will Metal clip wraps up the inside of hose, at this point, the inside that will install screw rod penetrating mounting holes, can effectively limit the position of metal clip It sets, hose can be fixed by installing screw rod, so as to effectively limit the position of hose, avoid hose mobile, Or be wound between exterior object, it is easy to cause hose to block.
4. the grouting equipment that should can be used repeatedly based on green building construction is provided with end block, the second screw rod and first Screw rod, connection that can effectively between hose and end block by end block provides convenient and fast connection structure, and the first link block It can effectively be improved between the first link block and end block and connecting tube by the cooperation between the first screw rod and the second screw rod Stability provides stable connection structure so as to the connection effectively between hose and connecting tube.
5. the grouting equipment that should can be used repeatedly based on green building construction is provided with end pipe and screwed pipe, pass through end pipe Between screwed pipe cooperation can the connection effectively between connecting tube and the second connecting tube stable connection is provided, so as to Enough effective connections guaranteed between connecting tube and the second connecting tube, and linking up with effectively to provide reliably for the fixation of equipment Fixed structure.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the present invention;
Fig. 2 is fixed mechanism structural schematic diagram of the present invention;
Fig. 3 is the first connecting block structure schematic diagram of the invention;
Fig. 4 is the schematic cross-sectional view of inventive hose;
Fig. 5 is the copper structural schematic diagram of blocking up of the present invention;
Fig. 6 is the schematic diagram of internal structure of end block of the present invention.
In figure: 1, copper to block up;2, slurry outlet;3, hose;4, metal clip;5, screw rod is installed;6, end block;7, the first connection Block;8, connecting tube;9, fixed mechanism;901, end pipe;902, screwed pipe;903, it links up with;10, the second connecting tube;11, connector;12, even Connect hole;13, the first screw rod;14, the second screw rod;15, mounting hole;16, third screw rod;17, fixing pipe.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term " on ", The orientation or positional relationship of the instructions such as "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and should not be understood as instruction or Imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connected " " connects Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Fig. 1 to Fig. 6 is please referred to, the present invention provides a kind of technical solution: one kind can be repeated several times based on green building construction The grouting equipment utilized, including copper block up 1 and first link block 7, copper 1 side of blocking up are fixed with third screw rod 16, and The side of third screw rod 16 is equipped with hose 3, and copper block up 1 is integrally formed formula structure by third screw rod 16, and copper blocks up 1 By being integrally formed formula structure between third screw rod 16 and hose 3, hose 3 and copper can effectively be increased by third screw rod 16 Matter is blocked up the stability connected between 1, when 3 fluid flow inside of hose being avoided to generate hydraulic pressure, by copper 1 release hose 3 of blocking up, So as to cause liquid outflow, and it is copper block up 1 can effectively by liquid be blocked in hose 3 and it is copper block up 1 junction, this When, the pressure of the generation inside hose 3, convenient for the discharge of liquid;
The outer dia of hose 3 is 12mm, and the inside diameter of hose 3 is 8mm, and the front end of hose 3 is internally provided with out Starch hole 2, slurry outlet 2 is uniformly distributed along the horizontal center line direction of hose 3, and the inside diameter of slurry outlet 2 is 35 μm, it is multiple go out Slurry hole 2 effectively can provide multiple outlets for the discharge of liquid, so as to effectively improve liquid and fixation member it Between contact area, and then can effectively accelerate slurries and speed is made up to cracking leakage, the middle part of hose 3 is equipped with gold Belong to folder 4, and the front end of metal clip 4 is internally provided with mounting hole 15, metal clip 4 uniformly divides along the horizontal center line direction of hose 3 Cloth, and hose 3 is integrally formed formula structure by installing screw rod 5 through the inside of metal clip 4, and between metal clip 4, it will be golden The inside for belonging to 4 package hose 3 of folder, at this point, the inside that will install 5 penetrating mounting holes 15 of screw rod, can effectively limit metal clip 4 Position, can by install screw rod 5 hose 3 is fixed, so as to effectively limit the position of hose 3, avoid soft Pipe 3 is mobile, or is wound between exterior object, and hose 3 is easy to cause to block, and mounting hole 15 is internally provided with installation spiral shell Bar 5, the side of hose 3 are equipped with end block 6, and end block 6 is internally provided with fixing pipe 17, and hose 3 is made up of fixing pipe 17 Integral structure, and the outside of fixing pipe 17 structure in the shape of a spiral, and the inside of fixing pipe 17 is in hollow cylindrical structure, simultaneously Hose 3, can be effective by the helicoidal structure of fixing pipe 17 by constituting detachable structure between fixing pipe 17 and end block 6 Increase the stability connected between end block 6 and hose 3, avoids hose 3 from being detached from end block 6, lead to the leakage of slurries, fixing pipe 17 Side is equipped with the second screw rod 14, is in bell-mouth structure of air outside the side of end block 6, and end block 6 passes through the second screw rod 14 and first Detaching structure is constituted between link block 7, and the first link block 7 is integrally formed formula structure, while second by the second screw rod 14 The inside of screw rod 14 and the first screw rod 13 is in hollow cylinder structure, and the first link block 7 is by the first screw rod 13 and even Formula structure is integrally formed between adapter tube 8, connection that can effectively between hose 3 and end block 6 by end block 6, it is convenient to provide Connection structure, and the first link block 7 can effectively improve the by cooperation between the first screw rod 13 and the second screw rod 14 Stability between one link block 7 and end block 6 and connecting tube 8, so as to the company effectively between hose 3 and connecting tube 8 It is logical, stable connection structure is provided, the top of the first link block 7 is equipped with the first screw rod 13, and the first link block 7 is located at end block 6 side, the top of the first screw rod 13 is equipped with connecting tube 8, and the side of connecting tube 8 is equipped with fixed mechanism 9, fixed mechanism 9 include that end pipe 901, screwed pipe 902 and hook 903, the left and right sides of end pipe 901 are respectively and fixedly provided with screwed pipe 902, end pipe 901 up and down Two sides are respectively and fixedly provided with hook 903, and the inside of end pipe 901 and screwed pipe 902 is in hollow cylinder structure, and the outside of screwed pipe 902 Structure in the shape of a spiral, while the horizontal center line linked up between 903 about end pipe 901 is symmetrical, passes through end pipe 901 and screwed pipe Between 902 cooperation can the connection effectively between connecting tube 8 and the second connecting tube 10 stable connection is provided, so as to Enough effective connections guaranteed between connecting tube 8 and the second connecting tube 10, and linking up with 903 can effectively mention for the fixation of equipment For reliable fixed structure;
The side of fixed mechanism 9 is equipped with the second connecting tube 10, and the side front end of the second connecting tube 10 is equipped with connector 11, the surrounding of connector 11 is internally provided with connecting hole 12, and connecting hole 12 is uniformly distributed along the surrounding of connector 11, and connector 11 passes through Connectivity structure is constituted between second connecting tube 10 and fixed mechanism 9, connector 11 can effectively be increased by connecting hole 12 and is connected The connecting portion between equipment is connect, so as to effectively improve the connective stability between external equipment and grouting equipment.
To sum up, should be constructed the grouting equipment that can be used repeatedly based on green building, in use, copper block up 1 passes through Third screw rod 16 runs through the one side edge into hose 3, then, metal clip 4 is wrapped up to the inside of hose 3, at this point, screw rod will be installed The inside of 5 penetrating mounting holes 15 limits the position of metal clip 4, therewith, is carried out by installation screw rod 5 and installation site to hose 3 It is fixed;
Secondly, hose 3 runs through the one side edge into end block 6 by fixing pipe 17, and end block 6 passes through the second screw rod 14 and the One link block 7 is attached, then, by the first link block 7 by being attached between the first screw rod 13 and connecting tube 8, and therewith, It will be attached between connecting tube 8 and the second connecting tube 10 by fixed mechanism 9, thirdly, pass through connector 11 and connecting hole 12 Between the external grouting pump of cooperation, injecting paste material will be imported to the inside of equipment by grouting pump, injecting paste material is acrylates, Acrylates grouting material is by calcium acrylate magnesium salt solution and a little methylene bisacrylamide, triethanolamine, ammonium persulfate and water Then slurries are carried out slip casting toward the inside of equipment by composition, slurries are discharged by slurry outlet 2, until slurries no longer flow and are, Slip casting is completed;
Finally, copper block up is separated between 1 and hose 3, then, water is flowed through equipment by outer water pump, is formed to equipment Pipeline cleaned.
More than, it is merely preferred embodiments of the present invention, but scope of protection of the present invention is not limited thereto, it is any Those familiar with the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its invents Design is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. a kind of constructed the grouting equipment that can be used repeatedly based on green building, including copper block up (1) and first connects Block (7), it is characterised in that: the copper side for blocking up (1) is fixed with third screw rod (16), and the side of third screw rod (16) It is equipped with hose (3), the front end of the hose (3) is internally provided with slurry outlet (2), is equipped with gold in the middle part of the hose (3) Belong to folder (4), and the front end of metal clip (4) is internally provided with mounting hole (15), the mounting hole (15) is internally provided with installation The side of screw rod (5), the hose (3) is equipped with end block (6), and end block (6) is internally provided with fixing pipe (17), described solid The side of fixed pipe (17) is equipped with the second screw rod (14), is equipped with the first screw rod (13) above first link block (7), and First link block (7) is located at the side of end block (6), is equipped with connecting tube (8) above first screw rod (13), and connecting tube (8) side is equipped with fixed mechanism (9), and the side of the fixed mechanism (9) is equipped with the second connecting tube (10), and second connects The side front end of adapter tube (10) is equipped with connector (11), and the surrounding of the connector (11) is internally provided with connecting hole (12).
2. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: described copper block up (1) is integrally formed formula structure by third screw rod (16), and copper block up (1) passes through third screw rod (16) formula structure is integrally formed between hose (3).
3. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: the slurry outlet (2) is uniformly distributed along the horizontal center line direction of hose (3), and the inside diameter of slurry outlet (2) is 35 μm。
4. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: the outer dia of the hose (3) is 12mm, and the inside diameter of hose (3) is 8mm.
5. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: the metal clip (4) is uniformly distributed along the horizontal center line direction of hose (3), and hose (3) is through metal clip (4) Inside, and between metal clip (4) by install screw rod (5) be integrally formed formula structure.
6. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: the hose (3) is integrally formed formula structure by fixing pipe (17), and the outside of fixing pipe (17) structure in the shape of a spiral, And the inside of fixing pipe (17) is in hollow cylindrical structure, while hose (3) between fixing pipe (17) and end block (6) by constituting Detachable structure.
7. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: in bell-mouth structure of air outside the side of the end block (6), and end block (6) passes through the second screw rod (14) and the first link block (7) detaching structure is constituted between, and the first link block (7) is integrally formed formula structure, while second by the second screw rod (14) The inside of screw rod (14) and the first screw rod (13) is in hollow cylinder structure, and the first link block (7) passes through the first screw rod (13) formula structure is integrally formed between connecting tube (8).
8. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: the fixed mechanism (9) includes end pipe (901), screwed pipe (902) and hook (903), the left and right two of the end pipe (901) Side is respectively and fixedly provided with screwed pipe (902), and the two sides up and down of the end pipe (901) are respectively and fixedly provided with hook (903), the end pipe (901) and The inside of screwed pipe (902) is in hollow cylinder structure, and the outside of screwed pipe (902) structure in the shape of a spiral, while linking up with (903) Between about end pipe (901) horizontal center line it is symmetrical.
9. a kind of grouting equipment that can be used repeatedly based on green building construction according to claim 1, feature Be: the connecting hole (12) is uniformly distributed along the surrounding of connector (11), and connector (11) is by the second connecting tube (10) and admittedly Determine to constitute connectivity structure between mechanism (9).
CN201910433791.XA 2019-05-23 2019-05-23 A kind of grouting equipment that can be used repeatedly based on green building construction Pending CN110005447A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910433791.XA CN110005447A (en) 2019-05-23 2019-05-23 A kind of grouting equipment that can be used repeatedly based on green building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910433791.XA CN110005447A (en) 2019-05-23 2019-05-23 A kind of grouting equipment that can be used repeatedly based on green building construction

Publications (1)

Publication Number Publication Date
CN110005447A true CN110005447A (en) 2019-07-12

Family

ID=67177757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910433791.XA Pending CN110005447A (en) 2019-05-23 2019-05-23 A kind of grouting equipment that can be used repeatedly based on green building construction

Country Status (1)

Country Link
CN (1) CN110005447A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203546725U (en) * 2013-07-09 2014-04-16 中铁十四局集团有限公司 Backfilling grouting device capable of being recycled
JP5555820B1 (en) * 2013-06-17 2014-07-23 東拓工業株式会社 Sheath conduit structure
CN104132191A (en) * 2014-07-25 2014-11-05 李朝阳 Multifunctional installation hanger for central air conditioner
CN205689219U (en) * 2016-06-16 2016-11-16 中铁三局集团有限公司 A kind of grouting device of backfill after bored tunnel two backing
CN206636585U (en) * 2017-04-21 2017-11-14 李峰 Grouting pipe and filling system
JP6236974B2 (en) * 2013-08-09 2017-11-29 株式会社大林組 Ground anchor and method for constructing ground anchor
CN108061198A (en) * 2017-12-12 2018-05-22 中国冶集团有限公司 Lifting pipeline device and its hanging method
CN208396340U (en) * 2018-06-19 2019-01-18 宿迁学院 A kind of structural cracks prosthetic device
CN208605764U (en) * 2018-04-18 2019-03-15 郭献进 A kind of environmental friendly material compo pipe can be used for express locomotive

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5555820B1 (en) * 2013-06-17 2014-07-23 東拓工業株式会社 Sheath conduit structure
CN203546725U (en) * 2013-07-09 2014-04-16 中铁十四局集团有限公司 Backfilling grouting device capable of being recycled
JP6236974B2 (en) * 2013-08-09 2017-11-29 株式会社大林組 Ground anchor and method for constructing ground anchor
CN104132191A (en) * 2014-07-25 2014-11-05 李朝阳 Multifunctional installation hanger for central air conditioner
CN205689219U (en) * 2016-06-16 2016-11-16 中铁三局集团有限公司 A kind of grouting device of backfill after bored tunnel two backing
CN206636585U (en) * 2017-04-21 2017-11-14 李峰 Grouting pipe and filling system
CN108061198A (en) * 2017-12-12 2018-05-22 中国冶集团有限公司 Lifting pipeline device and its hanging method
CN208605764U (en) * 2018-04-18 2019-03-15 郭献进 A kind of environmental friendly material compo pipe can be used for express locomotive
CN208396340U (en) * 2018-06-19 2019-01-18 宿迁学院 A kind of structural cracks prosthetic device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
风住尘散了的店: "《百度文库》", 18 October 2018 *

Similar Documents

Publication Publication Date Title
CN207920633U (en) Tunnel-liner vault band is molded into sizing device
CN103233481B (en) A kind of jacket support structure connected that is in the milk
CN210658751U (en) Waterproof slip casting embedded pipe of overlength underground structure
CN208201648U (en) Continuous rigid frame bridge web is the same as row's vertical prestressing pipeline communicating pipe
CN201165660Y (en) Steel pipe hole bottom grouting apparatus
CN200992812Y (en) Hole grout stopping plug for chemical grouting
CN206052744U (en) A kind of highway bridge construction cofferdam device
CN110005447A (en) A kind of grouting equipment that can be used repeatedly based on green building construction
CN206054998U (en) A kind of hydraulic engineering conduit coupling
CN209908519U (en) Mixing gun head for double-liquid-slurry synchronous grouting
CN209494575U (en) A kind of push pipe portal sealing device under low Water And Earth Pressures
CN206487492U (en) A kind of shield machine single fluid grouting pipe rapid translating two-liquid grouting device
CN210087341U (en) Secondary grouting device based on shield construction
CN212129147U (en) Multi-section sleeve valve pipe layered grouting device
CN105178971B (en) A kind of new pair of slurries injection device of shield machine
CN209308067U (en) The segmentation of assembled underground pipe gallery tube wall and multilayer flashing connecting node
CN211547838U (en) Pile foundation sounding pipe pull throughs
CN204424850U (en) Cable laying RC pipejacking
CN104018475B (en) A kind of embedded penstock backfill grouting structure and grouting process thereof
CN210888942U (en) Earth pressure balance shield constructs quick-witted sediment water system
CN209162798U (en) The anti-by-pass means of underground continuous wall connector
CN209619967U (en) For high water head, big flow, short diversion and power workshop tailrace tunnel discharge structure
CN103132529B (en) Design method of automatic plugging type mud-jacking connector
CN202039360U (en) Grout-stopping plug for anchorage cables
CN214662454U (en) Damping device is used in construction of sand ground push pipe among building engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190712