CN206625135U - A kind of gondola-hanging mechanism - Google Patents

A kind of gondola-hanging mechanism Download PDF

Info

Publication number
CN206625135U
CN206625135U CN201720341190.2U CN201720341190U CN206625135U CN 206625135 U CN206625135 U CN 206625135U CN 201720341190 U CN201720341190 U CN 201720341190U CN 206625135 U CN206625135 U CN 206625135U
Authority
CN
China
Prior art keywords
rope
hanging basket
suspension mechanism
base
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720341190.2U
Other languages
Chinese (zh)
Inventor
邓小秋
胡力绳
杜少腾
冀鸿飞
陈俊
全圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Second Bureau Construction Co ltd
China Railway No 2 Engineering Group Co Ltd
Shenzhen China Railway Second Bureau Engineering Co Ltd
Original Assignee
China Railway No 2 Engineering Group Co Ltd
Shenzhen China Railway Second Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 2 Engineering Group Co Ltd, Shenzhen China Railway Second Bureau Engineering Co Ltd filed Critical China Railway No 2 Engineering Group Co Ltd
Priority to CN201720341190.2U priority Critical patent/CN206625135U/en
Application granted granted Critical
Publication of CN206625135U publication Critical patent/CN206625135U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型涉及一种吊篮悬挂机构,包括支架一,设于结构梁一;支架二,固定连接于结构梁二;横梁,连接所述支架一和所述支架二,形成悬挂支撑体系;吊绳,一端固定连接于所述横梁,另一端连接吊篮。运用本实用新型所述的一种吊篮悬挂机构,横梁以支架一为支点形成杠杆,支架二连接横梁并将其固定,吊绳连接于横梁,相较卡夹式悬挂机构和骑墙式悬挂机构无配重形式的悬挂机构,该吊篮悬挂机构既无配重,又采用杠杆原理设计,悬挂机构的吊重能力大大增加,另外该吊篮悬挂机构能够解决在建筑顶部为结构梁时,卡夹式和骑墙式悬挂机构因嵌入梁体而非墙体,嵌入高度不足,影响吊重能力的问题,该吊篮悬挂机构结构简单,安装使用方便,承重能力突出。

The utility model relates to a hanging basket suspension mechanism, which comprises a bracket one, which is arranged on the first structural beam; a second bracket, which is fixedly connected to the second structural beam; One end of the rope is fixedly connected to the beam, and the other end is connected to the hanging basket. Using the hanging basket suspension mechanism described in the utility model, the beam takes the first bracket as the fulcrum to form a lever, the second bracket connects the beam and fixes it, and the hanging rope is connected to the beam. Compared with the clip-type suspension mechanism and the wall-riding suspension mechanism There is no counterweight suspension mechanism. The hanging basket suspension mechanism has no counterweight and is designed with the principle of leverage. The clip-type and wall-riding suspension mechanisms are embedded in the beam instead of the wall, and the embedded height is insufficient, which affects the lifting capacity. The hanging basket suspension mechanism is simple in structure, easy to install and use, and has outstanding load-bearing capacity.

Description

一种吊篮悬挂机构A hanging basket suspension mechanism

技术领域technical field

本实用新型涉及桥梁施工领域,特别是一种吊篮悬挂机构。The utility model relates to the field of bridge construction, in particular to a hanging basket suspension mechanism.

背景技术Background technique

高处作业吊篮被广泛应用于外墙的施工、装修、清洗及维护施工中,是外墙施工必不可少的机械设备之一,其上部由屋面悬挂机构固定在建筑物上。目前的屋面悬挂机构采用杠杆原理架设为常用方法,由不同规格的方管、加强筋焊接构成,辅以钢丝绳、斜拉杆等组成,在悬挂机构后端放置足够的配重,以保证整体不倾覆。然而配重重量一般几百公斤至一吨多,配重的搬运、安装都需要耗费大量的人力物力;对于屋面上还有多层框架结构的情况下,为保障安全,需在悬挂机构下搭设平台并铺设钢板,配重的搬运、安装则更为不便。The hanging basket for high-altitude operation is widely used in the construction, decoration, cleaning and maintenance of exterior walls. It is one of the necessary mechanical equipment for exterior wall construction. Its upper part is fixed on the building by the roof suspension mechanism. The current roof suspension mechanism adopts the principle of leverage as a common method. It is composed of square tubes of different specifications and welded reinforcement ribs, supplemented by steel wire ropes, diagonal rods, etc., and sufficient counterweight is placed at the rear end of the suspension mechanism to ensure that the whole does not overturn. . However, the weight of the counterweight is generally several hundred kilograms to more than one ton, and the handling and installation of the counterweight require a lot of manpower and material resources; for the case of a multi-layer frame structure on the roof, in order to ensure safety, it is necessary to set up under the suspension mechanism. The platform is laid with steel plates, and the handling and installation of counterweights are even more inconvenient.

目前简化配重的方式主要有卡夹式悬挂机构和骑墙式悬挂机构,卡夹式的悬挂机构支架形式通过卡紧墙体直接支撑吊篮,骑墙式的悬挂机构吊架在墙体上设置支点支撑,将吊篮的钢丝绳通过固绳梢或锁绳器附着主体结构上,这两种悬挂机构方式虽然简化了配重,但是都没有基于杠杆原理,悬挂机构的吊重能力较弱。At present, the methods of simplifying the counterweight mainly include clip-type suspension mechanism and wall-mounted suspension mechanism. The bracket form of the clip-type suspension mechanism directly supports the hanging basket by clamping the wall, and the hanger of the wall-mounted suspension mechanism sets a fulcrum on the wall. For support, the wire rope of the hanging basket is attached to the main structure through a fixed rope tip or a rope lock. Although these two suspension mechanisms simplify the counterweight, they are not based on the principle of leverage, and the lifting capacity of the suspension mechanism is weak.

实用新型内容Utility model content

本实用新型的发明目的在于:针对现有技术存在的现有卡夹式悬挂机构和骑墙式悬挂机构吊重能力较弱的问题,提供一种吊篮悬挂机构。The purpose of the invention of the utility model is to provide a hanging basket suspension mechanism in view of the weak lifting capacity of the existing clip-type suspension mechanism and the wall-mounted suspension mechanism in the prior art.

为了实现上述目的,本实用新型采用的技术方案为:In order to achieve the above object, the technical solution adopted by the utility model is:

一种吊篮悬挂机构,包括:A hanging basket suspension mechanism, comprising:

支架一,设于结构梁一;Support one, set on the structural beam one;

支架二,固定连接于结构梁二;The second bracket is fixedly connected to the second structural beam;

横梁,连接所述支架一和所述支架二,形成悬挂支撑体系;a crossbeam, connecting the first bracket and the second bracket to form a suspension support system;

吊绳,一端连接于所述横梁,另一端连接吊篮。One end of the suspension rope is connected to the beam, and the other end is connected to the hanging basket.

其中,所述结构梁一和所述结构梁二位于建筑顶部,所述结构梁一能够替换为建筑顶部其他支撑平台。Wherein, the first structural beam and the second structural beam are located on the top of the building, and the first structural beam can be replaced by other supporting platforms on the top of the building.

采用本实用新型所述的一种吊篮悬挂机构,横梁以支架一为支点形成杠杆,支架二连接横梁并将其固定,吊绳连接于横梁,相较卡夹式悬挂机构和骑墙式悬挂机构无配重形式的悬挂机构,该吊篮悬挂机构既无配重,又采用杠杆原理设计,悬挂机构的吊重能力大大增加,另外该吊篮悬挂机构能够解决在建筑顶部为结构梁时,卡夹式和骑墙式悬挂机构因嵌入梁体而非墙体,嵌入高度不足,影响吊重能力的问题,该吊篮悬挂机构结构简单,安装使用方便,承重能力突出。Adopt a kind of hanging basket suspension mechanism described in the utility model, the crossbeam takes the support one as the fulcrum to form a lever, the support two connects the crossbeam and fixes it, and the hanging rope is connected to the crossbeam. There is no counterweight-type suspension mechanism. The hanging basket suspension mechanism has neither counterweight nor leverage principle design, which greatly increases the lifting capacity of the suspension mechanism. The clip-type and wall-riding suspension mechanisms are embedded in the beam instead of the wall, and the embedded height is insufficient, which affects the lifting capacity. The hanging basket suspension mechanism is simple in structure, easy to install and use, and has outstanding load-bearing capacity.

优选地,所述支架一包括立柱一和基座一,所述基座一设于所述结构梁一上,所述立柱一连接于所述基座一上,所述支架二包括立柱二和基座二,所述基座二固定连接于所述结构梁二,所述立柱二连接于所述基座二上,所述立柱二的顶端连接所述横梁,所述立柱一的顶端高于所述横梁。Preferably, the support one includes a column one and a base one, the base one is set on the structural beam one, the column one is connected to the base one, and the support two comprises a column two and Base 2, the base 2 is fixedly connected to the structural beam 2, the column 2 is connected to the base 2, the top of the column 2 is connected to the beam, and the top of the column 1 is higher than the beam.

优选地,所述横梁水平设置。Preferably, the beams are arranged horizontally.

优选地,所述横梁的长度大于所述支架一和所述支架二的间距。Preferably, the length of the beam is greater than the distance between the first bracket and the second bracket.

优选地,所述吊绳一端固定连接于所述横梁的一端,所述吊绳绕过所述立柱一的顶端后连接于所述横梁的另一端并竖直向下连接于所述吊篮。Preferably, one end of the suspension rope is fixedly connected to one end of the crossbeam, and the suspension rope is connected to the other end of the crossbeam after winding around the top of the column one and vertically downwards to the hanging basket.

优选地,所述吊绳包括加强绳和工作绳,所述加强绳两端分别连接于所述横梁的两端,所述加强绳中部由所述立柱一顶端的滑轮支撑,起加强整体机构受力能力的作用,所述工作绳的一端连接于所述横梁的端部,另一端连接于所述吊篮。Preferably, the suspension rope includes a reinforcement rope and a working rope, the two ends of the reinforcement rope are respectively connected to the two ends of the beam, and the middle part of the reinforcement rope is supported by a pulley at the top of the column to strengthen the whole mechanism. One end of the working rope is connected to the end of the beam, and the other end is connected to the hanging basket.

优选地,所述基座二通过抱箍连接于所述结构梁二,所述抱箍包括U型箍筋、锁板和螺母,所述U型箍筋的两端包括螺纹段,所述锁板上设有适配所述U型箍筋两端的两个通孔,所述螺母适配所述螺纹段,所述U型箍筋的U型开口宽度适配所述结构梁二的宽度。Preferably, the base 2 is connected to the structural beam 2 through a hoop, the hoop includes a U-shaped hoop, a lock plate and a nut, both ends of the U-shaped hoop include threaded segments, and the lock The plate is provided with two through holes adapted to both ends of the U-shaped stirrup, the nut is adapted to the threaded section, and the width of the U-shaped opening of the U-shaped stirrup is adapted to the width of the second structural beam.

优选地,该吊篮悬挂机构还包括锁绳和绳卡,所述锁绳绕过所述基座二和所述结构梁二并由所述绳卡锁紧。Preferably, the suspension mechanism of the hanging basket further includes a lock rope and a rope clip, and the lock rope goes around the base 2 and the structural beam 2 and is locked by the rope clip.

优选地,所述基座一通过所述抱箍连接于所述结构梁一。Preferably, the base one is connected to the structural beam one through the hoop.

优选地,该吊篮悬挂机构还包括锁绳和绳卡,所述锁绳绕过所述基座一和所述结构梁一并由所述绳卡锁紧。Preferably, the suspension mechanism of the hanging basket further includes a lock rope and a rope clip, and the lock rope goes around the base 1 and the structural beam 1 and is locked by the rope clip.

综上所述,由于采用了上述技术方案,本实用新型的有益效果是:In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

运用本实用新型所述的一种吊篮悬挂机构,横梁以支架一为支点形成杠杆,支架二连接横梁并将其固定,吊绳连接于横梁,相较卡夹式悬挂机构和骑墙式悬挂机构无配重形式的悬挂机构,该吊篮悬挂机构既无配重,又采用杠杆原理设计,悬挂机构的吊重能力大大增加,另外该吊篮悬挂机构能够解决在建筑顶部为结构梁时,卡夹式和骑墙式悬挂机构因嵌入梁体而非墙体,嵌入高度不足,影响吊重能力的问题,该吊篮悬挂机构结构简单,安装使用方便,承重能力突出。Using the hanging basket suspension mechanism described in the utility model, the beam takes the first bracket as the fulcrum to form a lever, the second bracket connects the beam and fixes it, and the hanging rope is connected to the beam. Compared with the clip-type suspension mechanism and the wall-mounted suspension mechanism There is no counterweight-type suspension mechanism. The hanging basket suspension mechanism has neither counterweight nor leverage principle design, which greatly increases the lifting capacity of the suspension mechanism. The clip-type and wall-riding suspension mechanisms are embedded in the beam instead of the wall, and the embedded height is insufficient, which affects the lifting capacity. The hanging basket suspension mechanism is simple in structure, easy to install and use, and has outstanding load-bearing capacity.

附图说明Description of drawings

图1为实施例中所述吊篮悬挂机构的结构示意图;Fig. 1 is the structural representation of hanging basket suspension mechanism described in the embodiment;

图2为实施例中所述基座二与所述结构梁二的连接示意图。Fig. 2 is a schematic diagram of the connection between the second base and the second structural beam in the embodiment.

图中标记:1-支架一,11-立柱一,12-基座一,2-支架二,21-立柱二,22-基座二,3-横梁,4-吊绳,5-结构梁一,6-结构梁二,7-抱箍,71-U型箍筋,72-锁板,73-螺母,8-锁绳,9-绳卡。Marks in the figure: 1-bracket 1, 11-column 1, 12-base 1, 2-support 2, 21-column 2, 22-base 2, 3-beam, 4-sling, 5-structural beam 1 , 6-structural beam two, 7-hoop, 71-U-shaped stirrup, 72-lock plate, 73-nut, 8-lock rope, 9-rope clamp.

具体实施方式detailed description

下面结合附图,对本实用新型作详细的说明。Below in conjunction with accompanying drawing, the utility model is described in detail.

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

实施例Example

如图1-2所示,本实用新型所述的一种吊篮悬挂机构,包括:As shown in Figure 1-2, a hanging basket suspension mechanism described in the utility model includes:

支架一1,设于结构梁一5;Bracket one 1 is located on structural beam one 5;

支架二2,固定连接于结构梁二6;Support two 2, fixedly connected to the structural beam two 6;

横梁3,连接所述支架一1和所述支架二2,形成悬挂支撑体系;A beam 3 is connected to the first bracket 1 and the second bracket 2 to form a suspension support system;

吊绳4,一端连接于所述横梁3,另一端连接吊篮。One end of the suspension rope 4 is connected to the beam 3, and the other end is connected to the hanging basket.

所述支架一1包括立柱一11和基座一12,所述基座一12设于所述结构梁一5上,所述立柱一11连接于所述基座一12上,所述支架二2包括立柱二21和基座二22,所述基座二22固定连接于所述结构梁二6,所述立柱二21连接于所述基座二22上,所述立柱二21的顶端连接所述横梁3,所述立柱一11的顶端高于所述横梁3。所述横梁3水平设置。所述横梁3的长度大于所述支架一1和所述支架二2的间距,所述间距为4.2-4.6m。所述吊绳4包括加强绳和工作绳,所述加强绳两端分别连接于所述横梁3的两端,所述加强绳中部由所述立柱一11顶端的滑轮支撑,起加强整体机构受力能力的作用,所述工作绳的一端连接于所述横梁3的端部,另一端连接于所述吊篮Described support one 1 comprises column one 11 and base one 12, and described base one 12 is arranged on the described structural beam one 5, and described column one 11 is connected on the described base one 12, and described support two 2 includes column two 21 and base two 22, the base two 22 is fixedly connected to the structural beam two 6, the column two 21 is connected to the base two 22, and the top of the column two 21 is connected For the beam 3 , the top of the column one 11 is higher than the beam 3 . The beam 3 is arranged horizontally. The length of the beam 3 is greater than the distance between the first support 1 and the second support 2, and the distance is 4.2-4.6m. The sling 4 includes a reinforcing rope and a working rope, the two ends of the reinforcing rope are respectively connected to the two ends of the crossbeam 3, and the middle part of the reinforcing rope is supported by the pulley at the top of the column-11 to strengthen the whole mechanism by One end of the working rope is connected to the end of the beam 3, and the other end is connected to the hanging basket

所述基座二22通过抱箍7连接于所述结构梁二6,所述抱箍7包括U型箍筋71、锁板72和螺母73,所述U型箍筋71由两端包括螺纹段的光滑圆钢筋弯曲而成,所述锁板72上设有适配所述U型箍筋71两端的两个通孔,所述螺母73适配所述螺纹段,所述螺母73和所述锁板72间设置垫片,所述U型箍筋71的U型开口宽度适配所述结构梁二6的宽度。所述基座一12通过所述抱箍7连接于所述结构梁一5。The base two 22 is connected to the structural beam two 6 by hoops 7, the hoops 7 include U-shaped stirrups 71, lock plates 72 and nuts 73, and the U-shaped hoops 71 include threads at both ends. The smooth round steel bar of the segment is bent, the lock plate 72 is provided with two through holes adapted to the two ends of the U-shaped stirrup 71, the nut 73 is adapted to the threaded segment, the nut 73 and the Gaskets are arranged between the locking plates 72, and the U-shaped opening width of the U-shaped stirrups 71 is adapted to the width of the structural beam 26. The base one 12 is connected to the structural beam one 5 through the hoop 7 .

该吊篮悬挂机构还包括锁绳8和绳卡9,所述锁绳8绕过所述基座二22和所述结构梁二6并由所述绳卡9锁紧。所述锁绳8绕过所述基座一12和所述结构梁一5并由所述绳卡9锁紧。The suspension mechanism of the hanging basket also includes a lock rope 8 and a rope clip 9 , the lock rope 8 bypasses the base 22 and the structural beam 2 6 and is locked by the rope clip 9 . The locking rope 8 goes around the base one 12 and the structural beam one 5 and is locked by the rope clamp 9 .

运用本实用新型所述的一种吊篮悬挂机构,横梁3以支架一1为支点形成杠杆,支架二2连接横梁3并将其固定,吊绳4连接于横梁3,相较卡夹式悬挂机构和骑墙式悬挂机构无配重形式的悬挂机构,该吊篮悬挂机构既无配重,又采用杠杆原理设计,悬挂机构的吊重能力大大增加,另外该吊篮悬挂机构能够解决在建筑顶部为结构梁时,卡夹式和骑墙式悬挂机构因嵌入梁体而非墙体,嵌入高度不足,影响吊重能力的问题,该吊篮悬挂机构结构简单,安装使用方便,承重能力突出。Using the hanging basket suspension mechanism described in the utility model, the beam 3 takes the bracket one 1 as the fulcrum to form a lever, the bracket two 2 connects the beam 3 and fixes it, and the suspension rope 4 is connected to the beam 3, compared with the clip type suspension The mechanism and the wall-mounted suspension mechanism have no counterweight suspension mechanism. The hanging basket suspension mechanism has no counterweight and is designed with the principle of leverage. The lifting capacity of the suspension mechanism is greatly increased. When it is a structural beam, the clip-type and wall-riding suspension mechanisms are embedded in the beam instead of the wall, and the embedded height is insufficient, which affects the lifting capacity. The hanging basket suspension mechanism is simple in structure, easy to install and use, and has outstanding load-bearing capacity.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (10)

1.一种吊篮悬挂机构,其特征在于,包括:1. A hanging basket suspension mechanism, characterized in that, comprising: 支架一(1),设于结构梁一(5);Support one (1), is located at structural beam one (5); 支架二(2),固定连接于结构梁二(6);Support two (2), fixedly connected to the structural beam two (6); 横梁(3),连接所述支架一(1)和所述支架二(2),形成悬挂支撑体系;A crossbeam (3), which connects the first support (1) and the second support (2) to form a suspension support system; 吊绳(4),一端连接于所述横梁(3),另一端连接吊篮。One end of the suspension rope (4) is connected to the beam (3), and the other end is connected to the hanging basket. 2.根据权利要求1所述的一种吊篮悬挂机构,其特征在于,所述支架一(1)包括立柱一(11)和基座一(12),所述基座一(12)设于所述结构梁一(5)上,所述立柱一(11)连接于所述基座一(12)上,所述支架二(2)包括立柱二(21)和基座二(22),所述基座二(22)固定连接于所述结构梁二(6),所述立柱二(21)连接于所述基座二(22)上,所述立柱二(21)的顶端连接所述横梁(3),所述立柱一(11)的顶端高于所述横梁(3)。2. A hanging basket suspension mechanism according to claim 1, characterized in that, said support one (1) comprises a column one (11) and a base one (12), and said base one (12) is set On the structural beam one (5), the column one (11) is connected to the base one (12), and the support two (2) includes the column two (21) and the base two (22) , the second base (22) is fixedly connected to the second structural beam (6), the second column (21) is connected to the second base (22), and the top of the second column (21) is connected to The top of the beam (3), the column one (11) is higher than the beam (3). 3.根据权利要求2所述的一种吊篮悬挂机构,其特征在于,所述横梁(3)水平设置。3. A hanging basket suspension mechanism according to claim 2, characterized in that the beam (3) is arranged horizontally. 4.根据权利要求2所述的一种吊篮悬挂机构,其特征在于,所述横梁(3)的长度大于所述支架一(1)和所述支架二(2)的间距。4. A hanging basket suspension mechanism according to claim 2, characterized in that, the length of the beam (3) is greater than the distance between the first bracket (1) and the second bracket (2). 5.根据权利要求4所述的一种吊篮悬挂机构,其特征在于,所述吊绳(4)一端固定连接于所述横梁(3)的一端,所述吊绳(4)绕过所述立柱一(11)的顶端后连接于所述横梁(3)的另一端并竖直向下连接于所述吊篮。5. A hanging basket suspension mechanism according to claim 4, characterized in that, one end of the suspension rope (4) is fixedly connected to one end of the beam (3), and the suspension rope (4) goes around the The top of the column one (11) is connected to the other end of the beam (3) and connected vertically downward to the hanging basket. 6.根据权利要求5所述的一种吊篮悬挂机构,其特征在于,所述吊绳(4)包括加强绳和工作绳,所述加强绳两端分别连接于所述横梁(3)的两端,所述加强绳中部由所述立柱一(11)顶端的滑轮支撑,所述工作绳的一端连接于所述横梁(3)的端部,另一端连接于所述吊篮。6. The hanging basket suspension mechanism according to claim 5, characterized in that, the suspension rope (4) includes a reinforcement rope and a working rope, and the two ends of the reinforcement rope are respectively connected to the ends of the beam (3). Both ends, the middle part of the reinforcing rope is supported by the pulley at the top of the column one (11), one end of the working rope is connected to the end of the beam (3), and the other end is connected to the hanging basket. 7.根据权利要求2-6任一项所述的一种吊篮悬挂机构,其特征在于,所述基座二(22)通过抱箍(7)连接于所述结构梁二(6),所述抱箍(7)包括U型箍筋(71)、锁板(72)和螺母(73),所述U型箍筋(71)的两端包括螺纹段,所述锁板(72)上设有适配所述U型箍筋(71)两端的两个通孔,所述螺母(73)适配所述螺纹段。7. A hanging basket suspension mechanism according to any one of claims 2-6, characterized in that, the second base (22) is connected to the second structural beam (6) through a hoop (7), The hoop (7) includes a U-shaped stirrup (71), a lock plate (72) and a nut (73), and the two ends of the U-shaped stirrup (71) include threaded sections, and the lock plate (72) There are two through holes adapted to the two ends of the U-shaped stirrup (71), and the nut (73) is adapted to the threaded section. 8.根据权利要求7所述的一种吊篮悬挂机构,其特征在于,还包括锁绳(8)和绳卡(9),所述锁绳(8)绕过所述基座二(22)和所述结构梁二(6)并由所述绳卡(9)锁紧。8. A hanging basket suspension mechanism according to claim 7, characterized in that it further comprises a lock rope (8) and a rope clip (9), and the lock rope (8) bypasses the base two (22 ) and the structural beam two (6) and locked by the rope clamp (9). 9.根据权利要求7所述的一种吊篮悬挂机构,其特征在于,所述基座一(12)通过所述抱箍(7)连接于所述结构梁一(5)。9. The hanging basket suspension mechanism according to claim 7, characterized in that, the base one (12) is connected to the structural beam one (5) through the hoop (7). 10.根据权利要求7所述的一种吊篮悬挂机构,其特征在于,还包括锁绳(8)和绳卡(9),所述锁绳(8)绕过所述基座一(12)和所述结构梁一(5)并由所述绳卡(9)锁紧。10. A hanging basket suspension mechanism according to claim 7, characterized in that it further comprises a lock rope (8) and a rope clip (9), and the lock rope (8) bypasses the base one (12 ) and the structural beam one (5) and locked by the rope clamp (9).
CN201720341190.2U 2017-04-01 2017-04-01 A kind of gondola-hanging mechanism Expired - Fee Related CN206625135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720341190.2U CN206625135U (en) 2017-04-01 2017-04-01 A kind of gondola-hanging mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720341190.2U CN206625135U (en) 2017-04-01 2017-04-01 A kind of gondola-hanging mechanism

Publications (1)

Publication Number Publication Date
CN206625135U true CN206625135U (en) 2017-11-10

Family

ID=60207518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720341190.2U Expired - Fee Related CN206625135U (en) 2017-04-01 2017-04-01 A kind of gondola-hanging mechanism

Country Status (1)

Country Link
CN (1) CN206625135U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441091A (en) * 2018-12-26 2019-03-08 豪尔赛科技集团股份有限公司 A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket
CN112249990A (en) * 2020-10-27 2021-01-22 中交第一航务工程局有限公司 Hanging basket device convenient to operate and method
CN114737745A (en) * 2022-03-21 2022-07-12 五冶集团上海有限公司 Method for fixing support legs of hanging basket
CN115704243A (en) * 2021-08-16 2023-02-17 无锡雄宇集团吊蓝机械制造有限公司 Suspension bracket without counterweight

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441091A (en) * 2018-12-26 2019-03-08 豪尔赛科技集团股份有限公司 A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket
CN109441091B (en) * 2018-12-26 2024-02-20 豪尔赛科技集团股份有限公司 Counterweight-free suspension mechanism matched with hanging basket for use in building outer elevation construction
CN112249990A (en) * 2020-10-27 2021-01-22 中交第一航务工程局有限公司 Hanging basket device convenient to operate and method
CN112249990B (en) * 2020-10-27 2024-01-02 中交第一航务工程局有限公司 Hanging basket device and method convenient to operate
CN115704243A (en) * 2021-08-16 2023-02-17 无锡雄宇集团吊蓝机械制造有限公司 Suspension bracket without counterweight
CN114737745A (en) * 2022-03-21 2022-07-12 五冶集团上海有限公司 Method for fixing support legs of hanging basket

Similar Documents

Publication Publication Date Title
CN206625135U (en) A kind of gondola-hanging mechanism
CN108930228A (en) The construction method of bent cap hoop bracket overall pulling down
CN107100187A (en) Tower crane steel girder erection structure and installation method
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN211368423U (en) Stay cable tower top lifting traction operation platform
CN104631810A (en) High-altitude movable hanging basket system and construction method thereof
CN204626921U (en) A kind of fixed working platform without scaffold construction elevator
CN212027054U (en) Overhanging scaffold
CN203255914U (en) Unit-typed curtain wall lifting device
CN211622534U (en) Movable cantilever operation platform
CN205397785U (en) Construction elevator attaches wall interval superelevation subassembly
CN210658016U (en) Trolley for movably dismounting bridge guardrail template
CN211666401U (en) Chimney steel inner tube top hoist and mount festival
CN103754770B (en) Hoisting device for reinforcement cage
CN208122298U (en) A kind of whole formwork system for structure missing layer
CN206457187U (en) A kind of pole of mounting steel chimney
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN214462700U (en) Horizontal rebar binding platform
CN205663175U (en) Adjustable reinforcing pull rod formula scaffold frame of encorbelmenting
CN103938555B (en) A kind of method for designing detecting reinforcing prestressing force adjustable support
CN210973557U (en) A kind of high pier construction steel bar hoisting fixture
CN209637198U (en) A hook-type safety anti-tilt device
CN114991452A (en) Nonstandard cable-stayed hanging basket support and installation method
CN215368621U (en) Construction support device for elevator shaft
CN222822804U (en) Suspended basket heightening bracket and suspended basket operation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee after: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee after: China Railway Second Bureau Construction Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee before: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190809

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee after: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee before: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee before: China Railway Second Bureau Construction Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110

CF01 Termination of patent right due to non-payment of annual fee