CN206617178U - A kind of Tunnel Engineering locking angle attachment means - Google Patents
A kind of Tunnel Engineering locking angle attachment means Download PDFInfo
- Publication number
- CN206617178U CN206617178U CN201720170037.8U CN201720170037U CN206617178U CN 206617178 U CN206617178 U CN 206617178U CN 201720170037 U CN201720170037 U CN 201720170037U CN 206617178 U CN206617178 U CN 206617178U
- Authority
- CN
- China
- Prior art keywords
- riser
- section
- sleeve pipe
- thread segment
- locking angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a kind of Tunnel Engineering locking angle attachment means, including I-steel, U-shaped spiral, connection sleeve pipe and lock pin steel pipe, I-steel includes riser and two transverse slats;U-shaped spiral passes through the riser from the through hole on the riser, it includes middle overstriking section and two fastener for connection sections, two nuts are threaded with first thread segment, and the two nuts are born against in the both sides of the riser, the connection sleeve pipe is all connected with each second thread segment, each one end of the connection sleeve pipe away from first linkage section is all connected with the lock pin steel pipe.The utility model can effectively reduce the influence of construction technology level and skilled worker's weld horizontal, reduce the differential settlement influence of weak surrounding rock location, ensure steelframe and surrounding country rock one entirety of formation to greatest extent, vault sinking and horizontal convergence are controlled, so that reducing the later stage carries out excavation or the risk of other operations in stratum.
Description
Technical field
The utility model belongs to constructing tunnel field, more particularly, to a kind of Tunnel Engineering locking angle attachment means.
Background technology
At present, when implementing tunnel excavation operation, there is a critically important link in various engineering methods, be exactly locking angle steel
Pipe.More widespread practice is that locking angle anchor tube is installed using pneumatic pick or hammering feeding, locking angle anchor tube termination and shaped steel arch at present
Arch angle firm welding.And the welding quality of skilled worker, determine locking angle steel pipe to tunnel arch top settlement and the work of horizontal convergence
With.Skilled worker's welding technique is uneven, when not prison welding, and the locking angle does not become entirety with steelframe, is controlled by the locking angle
Vault sinking and horizontal convergence DeGrain processed.
Utility model content
For the disadvantages described above or Improvement requirement of prior art, the utility model is connected there is provided a kind of Tunnel Engineering locking angle
Device, reduces workman's welding technique level to lock pin steel pipe and the influence of steelframe globality, pin steel pipe functioning efficiency is locked improving
While can also control vault sinking and horizontal convergence to greatest extent.
To achieve the above object, according to the utility model there is provided a kind of Tunnel Engineering locking angle attachment means, its feature exists
In, including I-steel, U-shaped spiral, connection sleeve pipe and lock pin steel pipe, wherein,
The I-steel includes riser and two transverse slats, and two transverse slats are separately positioned on up and down the two of the riser
Through hole is provided through on end, the riser;
The U-shaped spiral passes through the riser from the through hole on the riser, and it includes middle overstriking section and two
Fastener for connection section, wherein, two fastener for connection sections are separately positioned on the both sides of the middle overstriking section, the middle overstriking
The first thread segment is provided with section, each described one end of fastener for connection section away from the middle overstriking section is provided with the second spiral shell
Two nuts are threaded with line section, first thread segment, and the riser, Mei Gesuo are clamped in the cooperation of the two nuts
State and the connection sleeve pipe is all connected with the second thread segment, each one end of the connection sleeve pipe away from first linkage section connects
Connect the lock pin steel pipe.
Preferably, the U-shaped spiral welds together at the position of the riser through hole with the riser.
Preferably, each it is provided with packing ring between the nut and the riser.
In general, by the contemplated above technical scheme of the utility model compared with prior art, it can obtain down
Row beneficial effect:
The utility model can effectively reduce the influence of construction technology level and skilled worker's weld horizontal, reduce weak surrounding rock
Location differential settlement influence, ensures steelframe and surrounding country rock one entirety of formation, control vault sinking and water to greatest extent
Flat convergence, so that reducing the later stage carries out excavation or the risk of other operations in stratum.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is side view of the present utility model;
Fig. 3 is the schematic diagram of connection sleeve pipe in the utility model.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation
Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only to explain
The utility model, is not used to limit the utility model.In addition, institute in each embodiment of the utility model disclosed below
As long as the technical characteristic being related to does not constitute conflict and can be just mutually combined each other.
1~Fig. 3 of reference picture, a kind of Tunnel Engineering locking angle attachment means, including I-steel 1, U-shaped spiral 2, adapter sleeve
Pipe 3 and lock pin steel pipe 4, wherein,
The I-steel 1 includes riser 11 and two transverse slats 12, and two transverse slats 12 are separately positioned on the riser 11
Upper and lower ends, be provided through through hole on the riser 11;
The U-shaped spiral 2 passes through the riser 11 from the through hole on the riser 11, and it includes middle overstriking section 21
And two fastener for connection sections 22, wherein, two fastener for connection sections 22 are separately positioned on the both sides of the middle overstriking section 21,
The first thread segment is provided with the middle overstriking section 21, each fastener for connection section 22 is away from the middle overstriking section 21
One end, which is provided with the second thread segment, first thread segment, is threaded with two nuts 5, and the two nuts 5 are matched somebody with somebody
Riser 11 is stated in co-clip residence, and the connection sleeve pipe 3 is all connected with each second thread segment, and each connection sleeve pipe 3 is remote
One end from first linkage section is all connected with the lock pin steel pipe 4.Thread has internal thread respectively at the two ends of connection sleeve pipe 3, with
It is easy to it to connect the fastener for connection section 22 and lock pin steel pipe 4.
Further, the U-shaped spiral 2 is welded on one at the position of the through hole of riser 11 and the riser 11
Rise.
Further, each it is provided with packing ring 6 between the nut 5 and the riser 11.
In use, first with rig, in the central bore of riser 11 of I-steel 1, to straight spiral double-ended vehicle
Silk and made it is U-shaped, to form U-shaped spiral 2, by U-shaped spiral 2 pass through steelframe, then nut 5, packing ring 6 are worn
On U-shaped spiral 2, it is pressed on after the welding of centre using the packing ring 6 of nut 5 on riser 11 and carries out add-back, then hammered after thread
Lock pin steel pipe 4 enter rock stratum and slip casting, then according to the lock position rotary U-type spiral 2 of pin steel pipe 4 alignment lock pin steel pipe 4,
And connected with branch sleeve, while nut 5 and packing ring 6 in the middle of fixed steelframe.Skill in construction is avoided using bolt washer 6 etc.
Art workman not prison welding causes lock pin steel pipe 4 to fail admittedly, and realization has control lock pin, control vault sinking and horizontal convergence.
As it will be easily appreciated by one skilled in the art that the foregoing is only preferred embodiment of the present utility model, not
To limit the utility model, all any modifications made within spirit of the present utility model and principle, equivalent substitution and change
Enter, should be included within protection domain of the present utility model.
Claims (3)
1. a kind of Tunnel Engineering locking angle attachment means, it is characterised in that including I-steel, U-shaped spiral, connection sleeve pipe and lock
Pin steel pipe, wherein,
The I-steel includes riser and two transverse slats, and two transverse slats are separately positioned on the upper and lower ends of the riser, institute
State and through hole is provided through on riser;
The U-shaped spiral passes through the riser from the through hole on the riser, and it includes middle overstriking section and two steel pipes
Linkage section, wherein, two fastener for connection sections are separately positioned on the both sides of the middle overstriking section, the middle overstriking section
The first thread segment is provided with, each described one end of fastener for connection section away from the middle overstriking section is provided with the second screw thread
Two nuts are threaded with section, first thread segment, and the riser is clamped in the cooperation of the two nuts, it is each described
The connection sleeve pipe is all connected with second thread segment, each one end of the connection sleeve pipe away from first thread segment is all connected with
The lock pin steel pipe.
2. a kind of Tunnel Engineering locking angle attachment means according to claim 1, it is characterised in that the U-shaped spiral
Weld together at the position of the riser through hole with the riser.
3. a kind of Tunnel Engineering locking angle attachment means according to claim 1, it is characterised in that each nut and institute
State and be provided with packing ring between riser.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720170037.8U CN206617178U (en) | 2017-02-24 | 2017-02-24 | A kind of Tunnel Engineering locking angle attachment means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720170037.8U CN206617178U (en) | 2017-02-24 | 2017-02-24 | A kind of Tunnel Engineering locking angle attachment means |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206617178U true CN206617178U (en) | 2017-11-07 |
Family
ID=60231362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720170037.8U Active CN206617178U (en) | 2017-02-24 | 2017-02-24 | A kind of Tunnel Engineering locking angle attachment means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206617178U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110486068A (en) * | 2019-08-09 | 2019-11-22 | 中铁十一局集团第四工程有限公司 | A kind of tunnel advanced support formula lock foot anchoring stock structure and its construction method |
-
2017
- 2017-02-24 CN CN201720170037.8U patent/CN206617178U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110486068A (en) * | 2019-08-09 | 2019-11-22 | 中铁十一局集团第四工程有限公司 | A kind of tunnel advanced support formula lock foot anchoring stock structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106907166B (en) | The locating connector of a kind of grillage and lock foot anchoring stock and its apply method | |
CN205955754U (en) | Tunnel lock foot stock / tub with strut steelframe connecting elements | |
CN106322347B (en) | The construction method of waste incineration and generating electricity waste heat boiler water-cooling wall integral head injection | |
CN205712137U (en) | Foundation pit supporting construction | |
CN104234724B (en) | A kind of for tunnel lock foot anchor tube precise positioning the device that is integrally forming with steelframe | |
CN106640147A (en) | Tunnel primary support steel arch frame lock foot fixing method | |
CN205475725U (en) | Post -construction concrete floor beam board steel bar connection device stagnates | |
CN206617178U (en) | A kind of Tunnel Engineering locking angle attachment means | |
CN106401617A (en) | Steel arch and joint thereof | |
CN207079900U (en) | A kind of construction resists suspension device stubbornly with scaffold soft drawn | |
CN204852606U (en) | Curve push pipe tube coupling bell and spigot connection form | |
CN106979024A (en) | A kind of construction method of fixed tunnel bracing members and lock pin | |
CN206972266U (en) | A kind of tunnel arch heavy in section junction steel plate structure with ribbing | |
CN205296807U (en) | Novel fastener -style steel pipe scaffold U type is wall spare even | |
CN205154191U (en) | Tunnel preliminary bracing steel pipe concrete steelframe | |
CN205688441U (en) | A kind of casing bit pulling out anchor cable | |
CN205000653U (en) | Concrete pump pipe fixing device | |
CN209855214U (en) | Scissor-bracing steel pipe connector | |
CN211341679U (en) | Cantilever scaffold puts up wall bolt pre-buried device | |
CN106223986A (en) | A kind of Support System in Soft Rock Tunnels framed bent formula preliminary bracing structure and method for protecting support | |
CN107035391B (en) | Connecting device of lock angle steel pipe and steel frame | |
CN209990022U (en) | Construction steel bar connecting piece | |
CN215761745U (en) | Connecting device of tunnel primary support locking anchor pipe and I-steel | |
CN110284512A (en) | It is a kind of can slip casting built-in pipe curtain sealing lock catch device | |
CN204253077U (en) | Anchor rope rigging is anti-collapses device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |