CN205475725U - Post -construction concrete floor beam board steel bar connection device stagnates - Google Patents

Post -construction concrete floor beam board steel bar connection device stagnates Download PDF

Info

Publication number
CN205475725U
CN205475725U CN201620153639.8U CN201620153639U CN205475725U CN 205475725 U CN205475725 U CN 205475725U CN 201620153639 U CN201620153639 U CN 201620153639U CN 205475725 U CN205475725 U CN 205475725U
Authority
CN
China
Prior art keywords
steel bar
fitting
sleeve pipe
reinforced steel
floor beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620153639.8U
Other languages
Chinese (zh)
Inventor
申雨
王洪
陈斌
陈树林
张向东
樊元晔
马俊达
李晶
陈丁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620153639.8U priority Critical patent/CN205475725U/en
Application granted granted Critical
Publication of CN205475725U publication Critical patent/CN205475725U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a post -construction concrete floor beam board steel bar connection device stagnates, include: the built -in fitting, pre -buried in among the reinforced concrete vertical structure, adapter sleeve, pre -buried in reinforced concrete vertical structure, adapter sleeve's one end connect in the built -in fitting, adapter sleeve's the other end is equipped with the screw thread and seals through airtight stopper, and the beam slab reinforcing bar, the link has, the link be equipped with be used for with another end screw thread connection's of adapter sleeve screw thread. The utility model discloses a built -in fitting is pre -buried in vertical structure 's mode, has improved the intensity and the shock resistance of structure, compares in forms such as other expansion bolts, uses the connecting sleeve to make more cheap of cost to can not cause the influence to bearing of wall body because of reasons such as picking the chisel, to sum up, the utility model discloses it is novel to have the structure, and the cost is lower, and the security performance is high, easy operation's, and help the green construction in job site.

Description

A kind of delayed construction concrete floor beam reinforced steel bar attachment means
Technical field
This utility model relates to building engineering field, particularly relates to a kind of delayed construction concrete floor beam Plate reinforcing steel bar connecting device.
Background technology
Along with the development of Building technology, vertical structure is more and more general prior to the situation that horizontal structure is constructed Time, this relates to the beam reinforced steel bar of horizontal structure (such as: floor girder and board) in vertical structure Anchorage problem.Up to now, the method that domestic construction mainly uses is embedded bar method, pre-embedded steel slab Welding, template burrow the pre-buried method of joint bar, embed expansion bolt welding and the chemical agent bar planting that burrows Method.
These methods have certain problems demand to solve.Embedded bar method is owing to watering at wall column concrete To be chiseled pre-buried reinforcement metal straightening by concrete after building, picking chisel has certain to the intensity of wall, post Infringement, bending also can affect reinforced steel bar strength;Pre-embedded steel slab welding also due to pick chisel also to wall column Can affect the intensity of wall column, and the quality that is welded to connect it cannot be guaranteed that, the application of steel plate also can increase into This;The template pre-buried method of joint bar that burrows has infringement to template, pretty troublesome during form removal, and application is limited to very much;Embedding Entering expansion bolt welding can affect working bolt performance due to welding, and expansion bolt is relatively costly; And the chemical agent bar planting method special-purpose adhesive price that burrows is higher, and adhesive fragility is relatively big, bearing capacity Relatively low.
Utility model content
In view of the foregoing, it would be desirable to provide a kind of in the vertical structure of concrete, beam reinforced steel bar Anchor structure, solve vertical structure is preferentially constructed when, the construction of horizontal beam plate structure.
For achieving the above object, this utility model adopts the technical scheme that:
A kind of delayed construction concrete floor beam reinforced steel bar attachment means, including: built-in fitting, it is embedded in advance In described armored concrete vertical structure;Connect sleeve pipe, be embedded in described armored concrete vertical structure in advance, One end of described connection sleeve pipe is connected to described built-in fitting, and the other end of described connection sleeve pipe is provided with screw thread And by airtight plug sealing;And beam reinforced steel bar, there is connection end, described connection end be provided with for The screw thread that the other end of described connection sleeve pipe is threaded.
The beneficial effects of the utility model are, use built-in fitting to be embedded in the mode of vertical structure in advance, carry The intensity of high structure and shock resistance, compared to forms such as other expansion bolts, use branch sleeve to make Obtain cost the cheapest, and because of picking the reasons such as chisel, the carrying of body of wall will not be impacted, combine Upper described, this utility model has structure novelty, and cost is relatively low, and security performance is high, simple to operate, And contribute to job site green construction.
Improving further of this utility model delayed construction concrete floor beam reinforced steel bar attachment means In, described built-in fitting is reinforcing bar or steel pipe.
Improving further of this utility model delayed construction concrete floor beam reinforced steel bar attachment means In, described built-in fitting is bending muscle or the bending tube of mid portion bending.
Improving further of this utility model delayed construction concrete floor beam reinforced steel bar attachment means In, one end of described built-in fitting connects described adapter sleeve pipe.
Improving further of this utility model delayed construction concrete floor beam reinforced steel bar attachment means In, the two ends of described built-in fitting are respectively connected with described connection sleeve pipe.
Improving further of this utility model delayed construction concrete floor beam reinforced steel bar attachment means In, described connection sleeve pipe with the connected mode of described built-in fitting for welding or threaded.
Improving further of this utility model delayed construction concrete floor beam reinforced steel bar attachment means In, described airtight it is provided with screw thread beyond the Great Wall, is connected to described connection sleeve pipe by screw thread tight thread.
Accompanying drawing explanation
Fig. 1 is the first knot of this utility model delayed construction concrete floor beam reinforced steel bar attachment means Structure schematic diagram.
Fig. 2 is the first knot of this utility model delayed construction concrete floor beam reinforced steel bar attachment means A kind of implementation result figure of structure.
Fig. 3 is the first knot of this utility model delayed construction concrete floor beam reinforced steel bar attachment means The another kind of implementation result figure of structure.
Fig. 4 is the second knot of this utility model delayed construction concrete floor beam reinforced steel bar attachment means Structure schematic diagram.
Fig. 5 is the second knot of this utility model delayed construction concrete floor beam reinforced steel bar attachment means A kind of implementation result figure of structure.
Fig. 6 is the second knot of this utility model delayed construction concrete floor beam reinforced steel bar attachment means The another kind of implementation result figure of structure.
Detailed description of the invention
For the benefit of the understanding to structure of the present utility model, says below in conjunction with drawings and Examples Bright.
A kind of embodiment of this utility model delayed construction concrete floor beam reinforced steel bar attachment means is:
Please be refering to Fig. 1, Fig. 1 discloses this utility model delayed construction concrete floor beam reinforced steel bar The first structural representation of attachment means.
As it is shown in figure 1, this utility model delayed construction concrete floor beam reinforced steel bar attachment means is intended to In time solving to carry out transversary construction on armored concrete vertical structure, how beam reinforced steel bar is carried out Anchoring.In order to achieve the above object, existing this utility model provides a kind of delayed construction concrete floor beam Plate reinforcing steel bar connecting device, including:
Built-in fitting 1, is embedded in described armored concrete vertical structure 5 in advance;Connect sleeve pipe 2, pre-buried In described armored concrete vertical structure 5, one end of described connection sleeve pipe 2 is connected to described built-in fitting 1, the other end of described connection sleeve pipe 2 is provided with screw thread and is sealed by airtight plug 3;And beam slab steel Muscle 4, has connection end 41, described connection end 41 be provided with for described another of sleeve pipe 2 of being connected Hold threaded screw thread.
Hereinafter said modules is described in detail:
Built-in fitting 1 is buried by this utility model delayed construction concrete floor beam reinforced steel bar attachment means in advance It is located in the armored concrete vertical structure 5 constructed in advance, in order to when connecting beam reinforced steel bar 4, right It is minimum that armored concrete vertical structure 5 picks chisel degree, and does not affect overall construction intensity, built-in fitting 1 Sleeve pipe 2 and built-in fitting 1 should be connected also for convenient near the wall of armored concrete vertical structure 5 Connection.Preferably, built-in fitting 1 is reinforcing bar or steel pipe.
Refer to Fig. 2 and Fig. 3, Fig. 2 and disclose this utility model delayed construction concrete floor beam slab A kind of implementation result figure of the first structure of reinforcing steel bar connecting device;It is stagnant that Fig. 3 discloses this utility model The another kind of implementation result figure of the first structure of rear construction concrete floor beam reinforced steel bar attachment means.
As in figure 2 it is shown, carry out the anchoring of beam reinforced steel bar 4 in the side of armored concrete vertical structure 5 Time, one end of built-in fitting 1 is provided with screw thread, and has been threaded connection a connection sleeve pipe 2;Such as Fig. 3 Shown in, when the both sides of armored concrete vertical structure 5 carry out the anchoring of beam reinforced steel bar 4, built-in fitting The two ends of 1 are equipped with helicitic texture, and the helicitic texture at two ends is respectively connected with connection sleeve pipe 2.Because even Female connector pipe 2 is also pre-being embedded in armored concrete vertical structure 5, so connecting the structure of sleeve pipe 2 Intensity also to meet pre-buried requirement, it is impossible to armored concrete vertical structure 5 intensity produces impact, excellent Selection of land, connects sleeve pipe 2 and selects inwall to set threaded steel pipe.
In the foregoing description, connecting sleeve pipe 2 is that the mode threadeded links together with built-in fitting 1, But the present embodiment is not limited thereto, connection sleeve pipe 2 can also use with built-in fitting 1 and directly weld Mode link together.
Beam reinforced steel bar 4 is anchored on armored concrete vertical structure 5, as the structure base of horizontal structure Plinth, the connection end 41 of beam reinforced steel bar 4 is connected to connect sleeve pipe 2, it is preferable that beam reinforced steel bar 4 is for setting There is the reinforcing bar of threaded ends 41, be bolted in connection sleeve pipe 2 by connecting end 41.
For ease of airtight plug 3 and the connection being connected sleeve pipe 2 and dismounting, it is preferable that airtight plug 3 sets There is screw thread, and be threaded togather with being connected sleeve pipe 2.
The present embodiment the present embodiment be embodied as operating procedure and effect is:
By built-in fitting 1 be reinforcing bar time as a example by, real in armored concrete vertical structure 5 as required After the data that border is measured, before armored concrete vertical structure 5 construction casting, by horizontal for reinforcing bar 1 It is embedded in advance in the structure-steel framing of armored concrete vertical structure 5, at the welding of the end of reinforcing bar 1 or screw thread Connect and have connection sleeve pipe 2 (if simply carrying out beam slab steel in the side of armored concrete vertical structure 5 The anchoring of muscle 4, then have only to connect sleeve pipe 2 in one end of reinforcing bar welding or threaded being connected with; If all carry out the anchoring of beam reinforced steel bar 4 at the two ends of armored concrete vertical structure 5, then need The two ends of reinforcing bar 1 all weld or threaded have connection sleeve pipe 2), then airtight plug 3 is filled in Connect the other end of sleeve pipe 2, the port connecting sleeve pipe 2 is carried out airtight, carries out reinforced concrete afterwards After soil the pouring of vertical structure 5, only need to carry out picking chisel on armored concrete vertical structure 5, chisel Go out airtight plug 3, and carry out rotation and remove, screwed beam reinforced steel bar 4 precession inwall is set threaded Connect in sleeve pipe 2.
The another kind of embodiment of this utility model delayed construction concrete floor beam reinforced steel bar attachment means For:
Fig. 4 discloses the second of this utility model delayed construction concrete floor beam reinforced steel bar attachment means Plant structural representation.
Existing this utility model provides a kind of delayed construction concrete floor beam reinforced steel bar attachment means, bag Include:
Built-in fitting 1a, is embedded in armored concrete vertical structure 5 in advance, and described built-in fitting 1a is bending Muscle or bending tube;Connect sleeve pipe 2, be embedded in described armored concrete vertical structure 5, described company in advance One end of female connector pipe 2 is connected to described built-in fitting 1, and the other end of described connection sleeve pipe 2 is provided with screw thread And sealed by airtight plug 3;And beam reinforced steel bar 4, there is connection end 41, described connection end 41 It is provided with for the screw thread threaded with the described other end being connected sleeve pipe 2.
Hereinafter said modules is described in detail:
So that pre-buried part of the present utility model is the most stable, it is not easy to loosen or occur non- Conventional displacement, it is preferable that built-in fitting 1a is bending muscle or bending tube.
Referring to Fig. 5, Fig. 6, Fig. 5 discloses this utility model delayed construction concrete floor beam slab A kind of implementation result figure of the second structure of reinforcing steel bar connecting device;It is stagnant that Fig. 6 discloses this utility model The another kind of implementation result figure of the second structure of rear construction concrete floor beam reinforced steel bar attachment means.
As it is shown in figure 5, carry out the anchoring of beam reinforced steel bar 4 in the side of armored concrete vertical structure 5 Time, one end of built-in fitting 1a is provided with screw thread, and has been threaded connection a connection sleeve pipe 2;Such as Fig. 6 Shown in, when the both sides of armored concrete vertical structure 5 carry out the anchoring of beam reinforced steel bar 4, built-in fitting The two ends of 1a are equipped with helicitic texture, and the helicitic texture at two ends is respectively connected with connection sleeve pipe 2.Preferably, Connect sleeve pipe 2 for setting threaded steel pipe.
In the foregoing description, connecting sleeve pipe 2 is that the mode threadeded is connected to one with built-in fitting 1a Rise, but the present embodiment is not limited thereto, connect sleeve pipe 2 and can also use directly with built-in fitting 1a The mode connecing welding links together.
Beam reinforced steel bar 4 is for being anchored on armored concrete vertical structure 5, as the structure of horizontal structure Basis, the connection end 41 of beam reinforced steel bar 4 is provided with screw thread and is threadingly attached to connect sleeve pipe 2, excellent Selection of land, beam reinforced steel bar 4 is the reinforcing bar being provided with threaded ends 41.
For ease of airtight plug 3 be connected sleeve pipe 2 be connected to dismounting, it is preferable that airtight plug 3 sets There is screw thread, and be threaded togather with being connected sleeve pipe 2.
The present embodiment be embodied as operating procedure and implementation result is:
As a example by built-in fitting 1a is for bending muscle, in armored concrete vertical structure 5 as required, After the actual data measured, before armored concrete vertical structure 5 construction casting, by bending muscle 1a Laterally it is embedded in advance in the structure-steel framing of armored concrete vertical structure 5, notes ensureing bending muscle 1a and company The junction of female connector pipe 2 is horizontally oriented, and welds or threaded in the end of bending muscle 1a There is connection sleeve pipe 2 (if simply carrying out beam reinforced steel bar 4 in the side of armored concrete vertical structure 5 Anchoring, then have only to one end of bending muscle 1a welding or threaded have connection sleeve pipe 2;As Fruit all carries out the anchoring of beam reinforced steel bar 4 at the two ends of armored concrete vertical structure 5, then need at folding The two ends of curved muscle 1a all weld or threaded have connection sleeve pipe 2);Then airtight plug 3 is filled in Connect in sleeve pipe 2, the port connecting sleeve pipe 2 is carried out airtight;Carry out armored concrete afterwards vertical After the pouring of structure 5, only need to carry out picking chisel on armored concrete vertical structure 5, dig out airtight Plug 3, and carry out rotation and remove, screwed beam reinforced steel bar 4 precession is connected in sleeve pipe 2.
The beneficial effects of the utility model are, the beneficial effects of the utility model are, use pre-buried Part is embedded in the mode of vertical structure in advance, improves intensity and the shock resistance of structure, expands compared to other The forms such as bolt, use branch sleeve to make cost the cheapest, and will not be former because of picking chisel etc. Because impacting the carrying of body of wall, in sum, this utility model has structure novelty, and cost is relatively Low, security performance is high, simple to operate, and contributes to job site green construction.
Above in association with accompanying drawing embodiment, this utility model is described in detail, common skill in this area This utility model can be made multiple change by art personnel according to the above description.Thus, do not violating this reality On the premise of novel claim objective, some details in embodiment should not be constituted this practicality Novel restriction, this utility model by the scope that defines using appended claims as protection domain.

Claims (7)

1. a delayed construction concrete floor beam reinforced steel bar attachment means, after the armored concrete vertical structure in construction is preferentially constructed, the anchoring of concrete floor beam reinforced steel bar, it is characterised in that including:
Built-in fitting, is embedded in described armored concrete vertical structure in advance;
Connecting sleeve pipe, be embedded in described armored concrete vertical structure in advance, one end of described connection sleeve pipe is connected to described built-in fitting, and the other end of described connection sleeve pipe is provided with screw thread and by airtight plug sealing;And
Beam reinforced steel bar, has connection end, and described connection end is provided with for the screw thread threaded with the described other end being connected sleeve pipe.
Delayed construction concrete floor beam reinforced steel bar attachment means the most according to claim 1, it is characterised in that: described built-in fitting is reinforcing bar or steel pipe.
Delayed construction concrete floor beam reinforced steel bar attachment means the most according to claim 1, it is characterised in that: described built-in fitting is bending muscle or the bending tube of mid portion bending.
4. according to the delayed construction concrete floor beam reinforced steel bar attachment means described in claim 2 or 3, it is characterised in that: one end of described built-in fitting connects described adapter sleeve pipe.
5. according to the delayed construction concrete floor beam reinforced steel bar attachment means described in claim 2 or 3, it is characterised in that: the two ends of described built-in fitting are respectively connected with described connection sleeve pipe.
Delayed construction concrete floor beam reinforced steel bar attachment means the most according to claim 1, it is characterised in that: described connection sleeve pipe with the connected mode of described built-in fitting for welding or threaded.
Delayed construction concrete floor beam reinforced steel bar attachment means the most according to claim 1, it is characterised in that: described airtight it is provided with screw thread beyond the Great Wall, is connected to described connection sleeve pipe by screw thread tight thread.
CN201620153639.8U 2016-03-01 2016-03-01 Post -construction concrete floor beam board steel bar connection device stagnates Expired - Fee Related CN205475725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620153639.8U CN205475725U (en) 2016-03-01 2016-03-01 Post -construction concrete floor beam board steel bar connection device stagnates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620153639.8U CN205475725U (en) 2016-03-01 2016-03-01 Post -construction concrete floor beam board steel bar connection device stagnates

Publications (1)

Publication Number Publication Date
CN205475725U true CN205475725U (en) 2016-08-17

Family

ID=56658715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620153639.8U Expired - Fee Related CN205475725U (en) 2016-03-01 2016-03-01 Post -construction concrete floor beam board steel bar connection device stagnates

Country Status (1)

Country Link
CN (1) CN205475725U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412052A (en) * 2018-03-30 2018-08-17 德清县荣昌冷轧带钢有限公司 A kind of anti-float anchor rod loading test cold rolling girder steel
CN109296138A (en) * 2018-11-02 2019-02-01 广西建工集团第三建筑工程有限责任公司 The positioning device and construction method of reinforcing bar are planted after a kind of constructional column
CN109610737A (en) * 2018-12-06 2019-04-12 中铁十四局集团大盾构工程有限公司 One kind being molded into concrete embedded reinforcing bar connector and construction technology
CN113882654A (en) * 2021-10-27 2022-01-04 中国建筑第八工程局有限公司 Wall connecting device capable of being buckled with outer scaffold through turnover disc
CN116771119A (en) * 2023-08-22 2023-09-19 江苏省华建建设股份有限公司 Connection construction method for embedded straight thread sleeve assembly of tie bar of concrete constructional column

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412052A (en) * 2018-03-30 2018-08-17 德清县荣昌冷轧带钢有限公司 A kind of anti-float anchor rod loading test cold rolling girder steel
CN109296138A (en) * 2018-11-02 2019-02-01 广西建工集团第三建筑工程有限责任公司 The positioning device and construction method of reinforcing bar are planted after a kind of constructional column
CN109296138B (en) * 2018-11-02 2023-10-27 广西建工集团第三建筑工程有限责任公司 Positioning device for post-planting steel bars of constructional column and construction method
CN109610737A (en) * 2018-12-06 2019-04-12 中铁十四局集团大盾构工程有限公司 One kind being molded into concrete embedded reinforcing bar connector and construction technology
CN113882654A (en) * 2021-10-27 2022-01-04 中国建筑第八工程局有限公司 Wall connecting device capable of being buckled with outer scaffold through turnover disc
CN116771119A (en) * 2023-08-22 2023-09-19 江苏省华建建设股份有限公司 Connection construction method for embedded straight thread sleeve assembly of tie bar of concrete constructional column

Similar Documents

Publication Publication Date Title
CN205475725U (en) Post -construction concrete floor beam board steel bar connection device stagnates
CN105421470B (en) Assembled anchor pole arched framework combined type ecological revetment construction method
CN101851917B (en) Connection structure used for pull-out resistant pile foundation and connecting method thereof
CN106907166B (en) The locating connector of a kind of grillage and lock foot anchoring stock and its apply method
CN203034464U (en) Truss type foundation pit supporting structure
CN207229131U (en) A kind of precipitous broken formation tunnel portal section supporting construction
CN206956742U (en) High precipitous rock roadbed side slope repair system
CN105839651A (en) Roadbed slope assembly type deformation self-adaptive protective framework and splicing method thereof
CN204898672U (en) Discard device of pulling out of pile foundation
CN109695247A (en) Deep foundation pit temporary pipeline comprehensive arrangement system and construction method
CN102677685B (en) Surface fracture racheling and reinforcing method of dangerous rock
CN205653804U (en) Slope assembled warp self -adaptation protection skeleton
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN105782576B (en) Fluted tube line guard method is excavated below interim pipeline
CN107313790A (en) A kind of symmetrical trouble hole supporting construction and its construction method
CN102733395A (en) Connecting method of supporting beam at second path or under second path and vertical column pile in deep foundation pit of basement of building engineering
CN206816278U (en) The new recyclable supporting steel arch-shelf of horizontal ground settlement and tunnel
CN110486531A (en) It a kind of artificial push pipe and rams and manages united pipeline construction method
CN205804365U (en) A kind of cap excavation method top board node structure
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN110029653A (en) A kind of jackstone seabed foundations steel pipe pile foundation processing method
CN211057808U (en) Span pipeline of foundation ditch and suspend protection architecture in midair
CN103274329B (en) A kind of top draws jack for the construction method of pile-anchor retaining
CN210217354U (en) Building engineering is with stabilizing effectual guardrail
CN208803461U (en) A kind of building road built pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

CF01 Termination of patent right due to non-payment of annual fee