CN206616421U - A kind of interim bedding structure across Metro station excavation - Google Patents

A kind of interim bedding structure across Metro station excavation Download PDF

Info

Publication number
CN206616421U
CN206616421U CN201720196099.6U CN201720196099U CN206616421U CN 206616421 U CN206616421 U CN 206616421U CN 201720196099 U CN201720196099 U CN 201720196099U CN 206616421 U CN206616421 U CN 206616421U
Authority
CN
China
Prior art keywords
bearing
metro station
interim
guan liang
station excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720196099.6U
Other languages
Chinese (zh)
Inventor
杜江涛
汪龙兵
华志刚
曹龙
曹一龙
彭磊
佘海洋
姚文康
张毅力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201720196099.6U priority Critical patent/CN206616421U/en
Application granted granted Critical
Publication of CN206616421U publication Critical patent/CN206616421U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of interim bedding structure across Metro station excavation, it is characterised in that:Including foundation pit enclosure structure, Guan Liang, some groups of bearings, some prior selection plates, supercrusts;It is provided with above the foundation pit enclosure structure above the Guan Liang, the Guan Liang and is provided with the bearing, is provided with above the bearing above the prior selection plate, the prior selection plate and is provided with the supercrust;Bearing described in one group is respectively provided with below each two ends for first opening hair Prestressed cored beams or boards;The foundation pit enclosure structure uses diaphram wall or campshed;The Guan Liang is monolithic reinforced concrete structure;Bearing described in every group has two bearings;The bearing is laminated rubber bearing;The supercrust is blacktop;The supercrust both sides are provided with intercepting ditch so that vehicle can on interim bedding normal pass.

Description

A kind of interim bedding structure across Metro station excavation
Technical field
The utility model belongs to foundation pit construction technical field, is related to a kind of interim bedding knot across Metro station excavation Structure.
Background technology
In subway line building course, the subway station of soft clay area typically uses cut and cover tunneling, using cut and cover method During construction, underground station need to first carry out foundation pit supporting construction construction, and foundation ditch could be excavated, then in constructed foundation ditch Carry out the construction of station internal structure.But the intensive urban district of road network is placed in because subway station is standing, traffic pressure is larger, During using cut and cover tunneling, the normal pass of vehicle can be hindered, causes the traffic in urban district further to deteriorate.
In order to reduce the influence caused during metro station construction to urban transportation, often use to set above foundation ditch and face When bedding mode so that vehicle can pass through on interim bedding.And the interim bedding being currently mainly used has two kinds, respectively It is:
1st, it is used as interim bedding using cast in situ reinforced concrete beam and floor;
2nd, army's suspension bridge using steel truss is used as interim bedding;
It is most commonly seen as interim bedding using cast in situ reinforced concrete beam and floor, but due to the width one of Metro station excavation As be more than 20m, when set cast in situ reinforced concrete beam and floor when, in addition it is also necessary to set 2-3 arrange lattice column and pile foundation, can now deposit In obvious shortcoming:
(1) lattice column set influences the waterproof effect of underground structure;
(2) work efficiency that the lattice column influence pit earthwork set is excavated.
During using army's suspension bridge of steel truss as interim bedding, there is also shortcoming:
(1) applicable foundation ditch span has limitation;When using army's suspension bridge of steel truss as interim bedding, foundation ditch across Degree is generally no greater than 24m;
(2) army's suspension bridge rigidity of steel truss is smaller, and amount of deflection is larger, there is certain traffic safety hidden danger.
Utility model content
In order to overcome above-mentioned technological deficiency, the utility model provides a kind of interim bedding knot across Metro station excavation Structure, ensure Metro station excavation construction period traffic above-ground it is unimpeded while, moreover it is possible to do not influence underground structure waterproof effect, The work efficiency for not influenceing pit earthwork to excavate, and the big foundation ditch of span is can be suitably used for, and ensure the intensity height of interim bedding, hold Carry power strong.
In order to solve the above problems, the utility model is achieved by following technical scheme:
It is described in the utility model, it is characterised in that:Including foundation pit enclosure structure, Guan Liang, some groups of bearings, some pre-tensioning systems Prestressed cored beams or boards, supercrust;
It is provided with above the foundation pit enclosure structure above the Guan Liang, the Guan Liang and is provided with the bearing, the branch Seat top is provided with above the prior selection plate, the prior selection plate and is provided with the road Surface layer.
Further, it is characterised in that:One group is respectively provided with below each two ends for first opening hair Prestressed cored beams or boards The bearing.
Further, it is characterised in that:The foundation pit enclosure structure uses diaphram wall or campshed.
Further, it is characterised in that:The Guan Liang is monolithic reinforced concrete structure.
Further, it is characterised in that:Bearing described in every group has two bearings.
Further, it is characterised in that:The bearing is laminated rubber bearing.
Further, it is characterised in that:The supercrust is blacktop.
Further, it is characterised in that:The supercrust both sides are provided with intercepting ditch.
A kind of interim bedding structure across Metro station excavation described in the utility model, in Metro station excavation construction Period, set above foundation pit enclosure structure and prior selection is set on setting bearing, bearing above Guan Liang, Guan Liang Plate, supercrust is set above pre-tensioning system Prestressed cored beams or boards.
Compared with prior art, the beneficial effects of the utility model are:
(1) using this interim bedding of prior selection plate structure, not only can ground ensure traffic above-ground it is smooth It is logical, and lattice column need not be set, the waterproof effect of underground structure is not interfered with, the matter of foundation pit construction has been favorably improved Amount.
(2) using the structure of this interim bedding of prior selection plate, it is not necessary to set lattice column, Bu Huiying The work efficiency that pit earthwork is excavated is rung, the efficiency of foundation pit construction has been effectively ensured.
(3) while the adaptability of prior selection plate is stronger, the larger foundation ditch of span can be used in, model is applicable Enclose wide;
(4) and prior selection plate intensity it is high, when being used in the larger foundation ditch of span, also have stronger Bearing capacity, can effective guarantee road vehicles normal pass.
Brief description of the drawings
Fig. 1 is the diagrammatic cross-section that the utility model embodiment is provided
Fig. 2 is the elevational schematic view that the utility model embodiment is provided
Fig. 3 is the Hollow screws sectional view that the utility model embodiment is provided
In figure:1-foundation pit enclosure structure;2-Guan Liang;3-bearing;4-prior selection plate;5-road surface Layer;6-intercepting ditch
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
As shown in FIG. 1 to 3, a kind of interim bedding structure across Metro station excavation described in the utility model, bag Include foundation pit enclosure structure 1, Guan Liang 2, bearing 3, prior selection plate 4, supercrust 5, intercepting ditch 6.
In the present embodiment, the top of foundation pit enclosure structure 1 is provided with Guan Liang 2, and the top of Guan Liang 2 is provided with bearing 3, propped up The top of seat 3 is provided with prior selection plate 4, and the top of prior selection plate 4 is provided with supercrust 5, road The both sides of surface layer 5 are provided with intercepting ditch 6.
The foundation pit enclosure structure 1 is using the structure of diaphram wall, and during using this structure, Construction Vibration is small, wall Rigidity is big, good integrity, and speed of application is fast, can save the cubic metre of earth and stone, and construction adaptability is strong, is applicable to various geological conditions. But foundation pit enclosure structure 1 of the present utility model is not limited to this structure of diaphram wall, it would however also be possible to employ campshed etc. possesses perpendicular To the structure of bearing capacity, it is clear that also among protection domain of the present utility model.
The top of foundation pit enclosure structure 1 is provided with the Guan Liang 2 of armored concrete, and Guan Liang 2 uses the knot of armored concrete Structure both be can guarantee that and was reliably connected with building enclosure, and the cost of manufacture can be effectively reduced again.
The top of Guan Liang 2 is provided with the bearing 3 of board-like rubber, and bearing 3 not only constructs letter using the structure of board-like rubber Single, easy for installation and cheap, maintenance is easy, and also good function of shock insulation.
The top of bearing 3 is provided with prior selection plate 4, each prior selection plate 4 The both sides of side are each provided with the bearing 3 of one group of board-like rubber as support, and one group of rubber support is made up of two rubber supports, Two rubber supports constitute one group, both can guarantee that good shock resistance, the cost for interim bedding of constructing can be efficiently controlled again.
And use described prior selection plate 4 as interim bedding, road traffic can not interrupted Under the premise of excavate station pit and underground structure of constructing, first in road side construction prior selection plate 4 during operation Interim bedding, original path is dredged on so far interim bedding, then the structure below original path of constructing, reaching does not influence road to hand over Logical purpose.
During using the prior selection plate 4 as interim bedding, during construction foundation pit, it is not necessary to set The structures such as lattice column are put, is conducive to carrying out the waterproof construction of underground structure, is favorably improved the construction quality of waterproof.And be not required to The structures such as lattice column are set, the excavation that foundation ditch carries out the earthwork is also beneficial to, the work efficiency of excavation of foundation pit is improved.
The prior selection plate 4 is concrete structure, and the foundation ditch span of interim bedding is installed as needed The sectional dimension of prior selection plate and the length of Hollow screws are calculated, is determined first according to the width of interim bedding The quantity of method Prestressed cored beams or boards 4, then be processed by concrete prefabricated factory, using this structure adapt to it is various across Degree, the particularly foundation ditch of large span;And when the span of foundation ditch is larger, the prior selection plate 4 can also be protected Stronger bearing capacity is held, the normal pass of road vehicles is effectively ensured;Because prior selection plate 4 is hollow mixed Coagulate soil structure, also with low cost, weight is small the features such as.
The top of prior selection plate 4 is additionally provided with the supercrust 5 of pitch, and road is used as using asphalt material Surface layer 5 so that the few dirt of evenness of road surface so that current vehicle has good stability and comfortableness.The both sides of supercrust 5 are also set up There is intercepting ditch 6, make rainwater be accumulated not on road surface, ensured the safe passing of rainy day vehicle
A kind of other structures of interim bedding structure across Metro station excavation described in the present embodiment referring to prior art, It will not be repeated here.
It is described above, only it is preferred embodiment of the present utility model, not makees any formal to the utility model Limitation, it is therefore every without departing from technical solutions of the utility model content, implement according to technical spirit of the present utility model to more than Example any modification, equivalent variations and the modification made, in the range of still falling within technical solutions of the utility model.

Claims (8)

1. a kind of interim bedding structure across Metro station excavation, it is characterised in that:If including foundation pit enclosure structure, Guan Liang, Dry group bearing, some prior selection plates, supercrust;
It is provided with above the Guan Liang, the Guan Liang and is provided with the bearing, the bearing above the foundation pit enclosure structure Side is provided with above the prior selection plate, the prior selection plate and is provided with the road surface Layer.
2. a kind of interim bedding structure across Metro station excavation according to claim 1, it is characterised in that:It is each described Bearing described in one group is respectively provided with below the two ends for first opening hair Prestressed cored beams or boards.
3. a kind of interim bedding structure across Metro station excavation according to claim 1, it is characterised in that:The foundation ditch Building enclosure uses diaphram wall or campshed.
4. a kind of interim bedding structure across Metro station excavation according to claim 1, it is characterised in that:The Guan Liang For monolithic reinforced concrete structure.
5. a kind of interim bedding structure across Metro station excavation according to claim 2, it is characterised in that:Described in every group Bearing has two bearings.
6. a kind of interim bedding structure across Metro station excavation according to claim 5, it is characterised in that:The bearing For laminated rubber bearing.
7. a kind of interim bedding structure across Metro station excavation according to claim 1, it is characterised in that:The road surface Layer is blacktop.
8. a kind of interim bedding structure across Metro station excavation according to claim 7, it is characterised in that:The road surface Layer both sides are provided with intercepting ditch.
CN201720196099.6U 2017-03-01 2017-03-01 A kind of interim bedding structure across Metro station excavation Active CN206616421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720196099.6U CN206616421U (en) 2017-03-01 2017-03-01 A kind of interim bedding structure across Metro station excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720196099.6U CN206616421U (en) 2017-03-01 2017-03-01 A kind of interim bedding structure across Metro station excavation

Publications (1)

Publication Number Publication Date
CN206616421U true CN206616421U (en) 2017-11-07

Family

ID=60231640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720196099.6U Active CN206616421U (en) 2017-03-01 2017-03-01 A kind of interim bedding structure across Metro station excavation

Country Status (1)

Country Link
CN (1) CN206616421U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505242A (en) * 2018-11-08 2019-03-22 广州地铁设计研究院股份有限公司 A kind of composite beam for interim bedding system
CN114016516A (en) * 2021-11-08 2022-02-08 贵州建工集团第一建筑工程有限责任公司 Concrete-steel structure mixed angle brace construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505242A (en) * 2018-11-08 2019-03-22 广州地铁设计研究院股份有限公司 A kind of composite beam for interim bedding system
CN109505242B (en) * 2018-11-08 2024-05-17 广州地铁设计研究院股份有限公司 Superimposed beam for temporary covering system
CN114016516A (en) * 2021-11-08 2022-02-08 贵州建工集团第一建筑工程有限责任公司 Concrete-steel structure mixed angle brace construction method

Similar Documents

Publication Publication Date Title
CN201087426Y (en) Novel effective vibration isolation trench structure
CN101967786A (en) Airfield pavement structure with box-type shock-isolation foundation
CN110846963A (en) Steel plate structure, steel plate pavement structure and construction method thereof
CN206616421U (en) A kind of interim bedding structure across Metro station excavation
CN209836778U (en) Light bridge abutment
CN210013075U (en) Highway subgrade with waterproof settlement prevention function
CN108222060A (en) High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
CN206529660U (en) A kind of water proof road structure
CN201502019U (en) Permeable ground structure
KR20200024519A (en) Solar panel installing structure using linear site
CN212077787U (en) Water conservancy and hydropower engineering bank wall
CN109113045A (en) A kind of soft-soil foundation treatment method
CN211848680U (en) Steel plate structure and steel plate pavement structure
CN110205982A (en) Improve the channel design and its construction method of existing river levee flood control standard
KR100245048B1 (en) Reinforced soil structure
CN205444258U (en) Highway subtracts vibration isolation integrated configuration in succession
CN205329429U (en) Subtract shock insulation honeycomb wave drag area structure in succession
CN214005282U (en) Waterproof anti-settlement highway subgrade structure
CN107476209A (en) A kind of culvert structure in grade separation traffic
CN113123356A (en) Slope protection device for traffic engineering construction and laying method thereof
CN209816577U (en) Coastal soft soil foundation riverside embankment widening structure
JP3793777B2 (en) Ground strengthening method
CN208072453U (en) High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
CN105369702A (en) Road vibration isolation system for preventing underground spatial structure vibration and construction method thereof
CN214938884U (en) Strengthen stone layer bank protection roadbed structure of domatic cooling of road bed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee before: Guangzhou Metro Design & Research Institute Co., Ltd.