CN206605409U - A kind of chucking device of building materials processing - Google Patents

A kind of chucking device of building materials processing Download PDF

Info

Publication number
CN206605409U
CN206605409U CN201720243306.9U CN201720243306U CN206605409U CN 206605409 U CN206605409 U CN 206605409U CN 201720243306 U CN201720243306 U CN 201720243306U CN 206605409 U CN206605409 U CN 206605409U
Authority
CN
China
Prior art keywords
fix bar
fixedly connected
bar
spring
building materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720243306.9U
Other languages
Chinese (zh)
Inventor
陈伟群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quanzhou Pinchuang Intellectual Property Services Co Ltd
Original Assignee
Quanzhou Pinchuang Intellectual Property Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Pinchuang Intellectual Property Services Co Ltd filed Critical Quanzhou Pinchuang Intellectual Property Services Co Ltd
Priority to CN201720243306.9U priority Critical patent/CN206605409U/en
Application granted granted Critical
Publication of CN206605409U publication Critical patent/CN206605409U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of chucking device of building materials processing, including the first fix bar, clamping device, whole link device and support meanss, first fix bar grips frame provided with first, second fix bar and the first spring, clamping device includes supporting rod, contiguous block, connecting rod, first grip block, 3rd fix bar and the second holding rod, whole link device includes the 4th fix bar, 5th fix bar, link, 6th fix bar, 7th fix bar and restriction bar, support meanss include the 8th fix bar, carriage, second spring, second grip block, the 3rd spring and support bar positioned at the 8th fix bar left and right sides.What the utility model can be consolidated clamps building materials, and clamping is firm, and hand labor intensity is big, simple to operate, reduces harm of the building materials to hand.

Description

A kind of chucking device of building materials processing
Technical field
The utility model is related to building material machinery technical field, more particularly, to a kind of chucking device of building materials processing.
Background technology
During building materials working process, it is often necessary to which building materials are clamped, to be processed to it.It is existing to building The mode of material clamping is mainly held by artificial hand, and what it was not only clamped not enough consolidates, and hand labor intensity is big, Hand is easily injured, or even threatens the healthy of workman.
Therefore, it is necessary to provide a kind of new technical scheme to overcome drawbacks described above.
Utility model content
The purpose of this utility model is to provide a kind of clamping for the building materials processing that can effectively solve above-mentioned technical problem Equipment.
To reach the purpose of the utility model, adopt the following technical scheme that:
A kind of chucking device of building materials processing, the chucking device of the building materials processing includes the first fix bar, is located at Clamping device above first fix bar, the whole link device on the left of first fix bar and it is arranged at described first Support meanss in fix bar, first fix bar is provided with first be positioned above and grips frame, held positioned at described first The second fix bar on the left of frame and the first spring on the left of second fix bar are held, the clamping device includes clamping Bar, the contiguous block below the supporting rod, the connecting rod below the contiguous block, on the right side of the contiguous block First grip block, the 3rd fix bar on the right side of first grip block and second on the right side of the 3rd fix bar are held Hold bar, the whole link device includes the 4th fix bar, the 5th fix bar on the right side of the 4th fix bar, positioned at described the Link on the left of four fix bars, the 6th fix bar above the 5th fix bar, above the 4th fix bar The 7th fix bar and the restriction bar above the 7th fix bar, the support meanss include the 8th fix bar, be located at Carriage above 8th fix bar, positioned at the second spring of the left and right sides above the carriage, positioned at described second The second grip block above spring, the 3rd spring and support bar positioned at the 8th fix bar left and right sides.
The left end of the first gripping frame is fixedly connected with the upper surface of first fix bar, second fix bar Lower end is fixedly connected with first fix bar, and the upper end of second fix bar is fixedly connected with the described first gripping frame, institute The lower end for stating the first spring is fixedly connected with first fix bar.
The supporting rod is located at the top of first fix bar, and the contiguous block is fixedly connected with the supporting rod, institute The lower end for stating connecting rod is fixedly connected with first fix bar, and the upper end of the connecting rod is provided with the first groove, the connection Block is contained in first groove and pivotally connected with the connecting rod, and upper end and the supporting rod of first spring are consolidated Fixed connection, the left end of the second gripping frame is fixedly connected with the right-hand member of the supporting rod, one end of the 3rd fix bar and The supporting rod is fixedly connected, and the other end of the 3rd fix bar is fixedly connected with the described second gripping frame, first folder The upper surface for holding block is fixedly connected with the lower surface of the supporting rod.
4th fix bar is in cuboid, and the left end of first fix bar and the right surface of the 4th fix bar are consolidated Fixed connection, the right-hand member of the 5th fix bar is fixedly connected with first fix bar, the left end of the 5th fix bar and institute State the 4th fix bar to be fixedly connected, the two ends of the link are fixedly connected with the left surface of the 4th fix bar, the described 6th The left end of fix bar is fixedly connected with the 4th fix bar, and the right-hand member of the 6th fix bar is fixed with the connecting rod to be connected Connect, the lower end of the 7th fix bar is fixedly connected with the upper end of the 4th fix bar, the upper end of the 7th fix bar with The restriction bar is fixedly connected, and the right-hand member for limiting bar is fixedly connected with the left surface of the connecting rod, the restriction bar position In the lower section of the supporting rod left end.
The lower end of 8th fix bar is fixedly connected with first fix bar, the upper end of the 8th fix bar and institute The lower end for stating carriage is fixedly connected, and the cross section of the carriage is in the shape of the letter V, and the second spring is provided with two, described the The lower end of two springs is fixedly connected with the carriage, and the upper end of the second spring is fixedly connected with second grip block, Second grip block is located at the lower section of first grip block, and the 3rd spring is provided with two, the 3rd spring End is fixedly connected with first fix bar, and the upper end of the 3rd spring is fixedly connected with the side of the carriage, described Support bar is provided with two, and the support bar is in cuboid, and the lower end of the support bar is fixedly connected with first fix bar.
Compared with prior art, the utility model has the advantages that:The clamping of the utility model building materials processing What equipment can be consolidated clamps building materials, and clamping is firm, and hand labor intensity is big, simple to operate, reduces building materials opponent The harm in portion.
Brief description of the drawings
Fig. 1 is the structural representation of the chucking device of the utility model building materials processing.
Embodiment
Clearly complete explanation is made to the chucking device of the utility model building materials processing below in conjunction with accompanying drawing.
As shown in figure 1, the chucking device of the utility model building materials processing includes the first fix bar 1, positioned at described first The clamping device 2 of the top of fix bar 1, the whole link device 3 positioned at the left side of the first fix bar 1 and it is arranged at described first and fixes Support meanss 4 on bar 1.
As shown in figure 1, first fix bar 1 is in cuboid, first fix bar 1 is provided with the be positioned above One grips frame 11, second fix bar 12 in the left side of frame 11 is gripped positioned at described first and positioned at the left side of the second fix bar 12 First spring 13.The left end of the first gripping frame 11 is fixedly connected with the upper surface of first fix bar 1, and described first holds The right-hand member for holding frame 11 stretches out to the right.Second fix bar 12 be in bending, the lower end of second fix bar 12 with it is described First fix bar 1 is fixedly connected, and the upper end of second fix bar 12 is fixedly connected with the described first gripping frame 11.Described first The lower end of spring 13 is fixedly connected with first fix bar 1.
As shown in figure 1, the clamping device 2 includes supporting rod 21, the contiguous block 22 positioned at the lower section of supporting rod 21, position In the connecting rod 23 of the lower section of contiguous block 22, the first grip block 26 on the right side of the contiguous block 22, positioned at described first 3rd fix bar 25 on the right side of grip block 26 and the second holding rod 24 positioned at the right side of the 3rd fix bar 25.The supporting rod 21 in cuboid and positioned at the top of first fix bar 1.The contiguous block 22 be in cuboid, the contiguous block 22 with it is described Supporting rod 21 is fixedly connected.The connecting rod 23 is in cuboid, and the lower end of the connecting rod 23 is fixed with first fix bar 1 Connection, the upper end of the connecting rod 23 is provided with the first groove, the contiguous block 22 be contained in first groove and with it is described Connecting rod 23 is pivotally connected so that the contiguous block 22 can rotate in first groove, and then causes the supporting rod 21 are rotated around the upper end of the connecting rod 23, and the upper end of first spring 13 is fixedly connected with the supporting rod 21.It is described The left end of second gripping frame 24 is fixedly connected with the right-hand member of the supporting rod 21, and the right-hand member of the second gripping frame 24 is stretched to the right Go out and positioned at the described first top for gripping frame 11.3rd fix bar 25 is in bending, the one of the 3rd fix bar 25 End is fixedly connected with the supporting rod 21, and the other end of the 3rd fix bar 25 is fixedly connected with the described second gripping frame 24. First grip block 26 is in cuboid, and the upper surface of first grip block 26 and the lower surface of the supporting rod 21 fix company Connect, first grip block 26 is made of the larger material of coefficient of friction, so that between the first grip block 26 and building materials Frictional force it is larger.
As shown in figure 1, the whole link device 3 includes the 4th fix bar 31, the positioned at the right side of the 4th fix bar 31 Five fix bars 32, the link 33 positioned at the left side of the 4th fix bar 31, the above the 5th fix bar 32 the 6th consolidate Fixed pole 34, the 7th fix bar 35 positioned at the top of the 4th fix bar 31 and the restriction positioned at the top of the 7th fix bar 35 Bar 36.4th fix bar 31 is in cuboid, the left end of first fix bar 1 and the right surface of the 4th fix bar 31 It is fixedly connected.The right-hand member of 5th fix bar 32 is fixedly connected with first fix bar 1, a left side for the 5th fix bar 32 End is fixedly connected with the 4th fix bar 31.The link 33 is in bending, and the two ends of the link 33 are consolidated with the described 4th The left surface of fixed pole 31 is fixedly connected, convenient by the utility model hung on a wall, facility of taking.6th fix bar 34 is in length Cube, the left end of the 6th fix bar 34 is fixedly connected with the 4th fix bar 31, the right-hand member of the 6th fix bar 34 It is fixedly connected with the connecting rod 23.7th fix bar 35 be in cuboid, the lower end of the 7th fix bar 35 with it is described The upper end of 4th fix bar 31 is fixedly connected, and the upper end of the 7th fix bar 35 is fixedly connected with the restriction bar 36.It is described It is in cuboid to limit bar 36, and the right-hand member of the restriction bar 36 is fixedly connected with the left surface of the connecting rod 23, the restriction bar 36 are located at the lower section of the left end of supporting rod 21, can prevent the left end of the supporting rod 21 from excessively moving down, to supporting rod 21 play a part of restriction.
As shown in figure 1, the support meanss 4 include the 8th fix bar 41, the branch positioned at the top of the 8th fix bar 41 Support frame 42, the second spring 43 positioned at the top left and right sides of carriage 42, second positioned at the top of second spring 43 Grip block 44, the 3rd spring 45 and support bar 46 positioned at the left and right sides of the 8th fix bar 41.8th fix bar 41 Lower end be fixedly connected with first fix bar 1, the upper end of the 8th fix bar 41 and the lower end of the carriage 42 are consolidated Fixed connection.The cross section of the carriage 42 is in the shape of the letter V, and the carriage 42 is made of the larger material of elasticity, from without Second grip block 44 can only be played a supporting role, buffering can also be played a part of to it.The second spring 43 Provided with two, the lower end of the second spring 43 is fixedly connected with the carriage 42, the upper end of the second spring 43 and institute The second grip block 44 is stated to be fixedly connected.Second grip block 44 is in cuboid and is located at the lower section of first grip block 26, Second grip block 44 is made of the larger material of coefficient of friction, and the elastic force of the second spring 43 is larger, makes it to institute Stating the second grip block 44 can both be played a supporting role, and cushioning effect can be played again.3rd spring 45 is provided with two, institute The lower end for stating the 3rd spring 45 is fixedly connected with first fix bar 1, upper end and the carriage of the 3rd spring 45 42 side is fixedly connected, so as to be played a supporting role to the carriage 42.The support bar 46 is provided with two, the support Bar 46 is in cuboid, and the lower end of the support bar 46 is fixedly connected with first fix bar 1, the two ends of the carriage 42 to During outer lateral bend, the carriage 42 can be acted against on the support bar 46, made so as to play support to the carriage 42 With.
As shown in figure 1, the chucking device of the utility model building materials processing in use, will need what is clamped to build first Material is placed on second grip block 44, and then one hand of user holds the first gripping frame 11, and another hand holds second Frame 24 is gripped, then causing first to grip frame 11 and second, to grip frame 24 close to each other, then causes the first grip block 26 and the Two grip blocks 44 are close to each other, and the supporting rod 21 turns clockwise around the upper end of the connecting rod 23, until the first clamping Block 26 is acted against on the building materials of the top of the first grip block 44, and then the first grip block 26 continues to move down, the second spring 43 are compressed, the two laterally outsides bending of the carriage 42, and the 3rd spring 45 is compressed, until the carriage 42 is pushed up Lean against on the support bar 46,46 pairs of the support bar carriage 42 plays enough supporting roles, and then causes described First grip block 26 and the second grip block 44, which coordinate, to be then moved into the position of needs to clamping that building materials are consolidated It is processed.When not in use, can be by the hook of its hung on a wall by link 33, or other positions are convenient User takes.So far, the chucking device of the utility model building materials processing is finished using process description.

Claims (5)

1. a kind of chucking device of building materials processing, it is characterised in that:The chucking device of the building materials processing includes first and consolidated Fixed pole, the clamping device above first fix bar, the whole link device on the left of first fix bar and setting Support meanss in first fix bar, first fix bar is provided with the first gripping frame being positioned above, is located at Described first grips the second fix bar on the left of frame and the first spring on the left of second fix bar, the clamping device Contiguous block including supporting rod, below the supporting rod, the connecting rod below the contiguous block, positioned at the connection The first grip block on the right side of block, the 3rd fix bar on the right side of first grip block and on the right side of the 3rd fix bar The second holding rod, the whole link device include the 4th fix bar, the 5th fix bar on the right side of the 4th fix bar, position It is link on the left of the 4th fix bar, the 6th fix bar above the 5th fix bar, solid positioned at the described 4th The 7th fix bar above fixed pole and the restriction bar above the 7th fix bar, the support meanss include the 8th and fixed Bar, the carriage above the 8th fix bar, above the carriage second spring of the left and right sides, positioned at institute State the second grip block above second spring, the 3rd spring and support bar positioned at the 8th fix bar left and right sides.
2. the chucking device of building materials processing as claimed in claim 1, it is characterised in that:It is described first grip frame left end with The upper surface of first fix bar is fixedly connected, and the lower end of second fix bar is fixedly connected with first fix bar, The upper end of second fix bar is fixedly connected with the described first gripping frame, and the lower end of first spring is fixed with described first Bar is fixedly connected.
3. the chucking device of building materials processing as claimed in claim 2, it is characterised in that:The supporting rod is located at described first The top of fix bar, the contiguous block is fixedly connected with the supporting rod, the lower end of the connecting rod and first fix bar Be fixedly connected, the upper end of the connecting rod is provided with the first groove, the contiguous block be contained in first groove and with it is described Connecting rod is pivotally connected, and the upper end of first spring is fixedly connected with the supporting rod, it is described second grip frame left end with The right-hand member of the supporting rod is fixedly connected, and one end of the 3rd fix bar is fixedly connected with the supporting rod, and the described 3rd consolidates The other end of fixed pole is fixedly connected with the described second gripping frame, the upper surface of first grip block and the following table of the supporting rod Face is fixedly connected.
4. the chucking device of building materials processing as claimed in claim 3, it is characterised in that:4th fix bar is in rectangular Body, the left end of first fix bar is fixedly connected with the right surface of the 4th fix bar, the right-hand member of the 5th fix bar It is fixedly connected with first fix bar, the left end of the 5th fix bar is fixedly connected with the 4th fix bar, it is described to hang The two ends of ring are fixedly connected with the left surface of the 4th fix bar, left end and the 4th fix bar of the 6th fix bar Be fixedly connected, the right-hand member of the 6th fix bar is fixedly connected with the connecting rod, the lower end of the 7th fix bar with it is described The upper end of 4th fix bar is fixedly connected, and the upper end of the 7th fix bar is fixedly connected with the restriction bar, the restriction bar Right-hand member be fixedly connected with the left surface of the connecting rod, it is described limit bar be located at the supporting rod left end lower section.
5. the chucking device of building materials processing as claimed in claim 4, it is characterised in that:The lower end of 8th fix bar with First fix bar is fixedly connected, and the upper end of the 8th fix bar is fixedly connected with the lower end of the carriage, the branch The cross section of support frame is in the shape of the letter V, and the second spring is provided with two, and the lower end of the second spring is fixed with the carriage to be connected Connect, the upper end of the second spring is fixedly connected with second grip block, second grip block is located at the described first clamping The lower section of block, the 3rd spring is provided with two, and the lower end of the 3rd spring is fixedly connected with first fix bar, described The upper end of 3rd spring is fixedly connected with the side of the carriage, and the support bar is provided with two, and the support bar is in rectangular Body, the lower end of the support bar is fixedly connected with first fix bar.
CN201720243306.9U 2017-03-14 2017-03-14 A kind of chucking device of building materials processing Expired - Fee Related CN206605409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720243306.9U CN206605409U (en) 2017-03-14 2017-03-14 A kind of chucking device of building materials processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720243306.9U CN206605409U (en) 2017-03-14 2017-03-14 A kind of chucking device of building materials processing

Publications (1)

Publication Number Publication Date
CN206605409U true CN206605409U (en) 2017-11-03

Family

ID=60165829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720243306.9U Expired - Fee Related CN206605409U (en) 2017-03-14 2017-03-14 A kind of chucking device of building materials processing

Country Status (1)

Country Link
CN (1) CN206605409U (en)

Similar Documents

Publication Publication Date Title
CN106944948B (en) A kind of firm chemical industry dangerous goods clamping equipment
CN208034703U (en) A kind of fixture handgrip for robot
CN204954842U (en) Fragment of brick presss from both sides
CN107553162A (en) A kind of grip device for processing gear
CN108163440A (en) A kind of brickwork of removing for building has
CN106513409A (en) Clamping device for artware cleaning
CN206605409U (en) A kind of chucking device of building materials processing
CN207127569U (en) A kind of grip device for processing gear
CN206484460U (en) A kind of metal handicrafts chucking device
CN205394579U (en) Fixture
CN106312867A (en) Clamping device used for stacking of electrical equipment
CN208826442U (en) A kind of torque arm clamping device
CN206811391U (en) A kind of tie hoop fixture
CN206859682U (en) A kind of building template quick-gripping device
CN204430140U (en) A kind of mechanical clamp for forging manipulator
CN208624269U (en) A kind of transplanting tree transfer device
CN202833463U (en) Elastic lifting ring fixing device and elastic fixing clamp
CN205397473U (en) Tongs
CN207574238U (en) A kind of kelp seedling clipping device
CN207091848U (en) One kind draws rail device
CN108466200A (en) A kind of firm processing accessory clamping device of machinery field
CN205698206U (en) A kind of special limit forceps of ophthalmologic operation
CN204552123U (en) A kind of symmetrical structure building block clamping device
CN202829311U (en) Double-hinge supporting clamp
CN204324156U (en) A kind of brick clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103

Termination date: 20180314

CF01 Termination of patent right due to non-payment of annual fee