CN206811391U - A kind of tie hoop fixture - Google Patents

A kind of tie hoop fixture Download PDF

Info

Publication number
CN206811391U
CN206811391U CN201720766636.6U CN201720766636U CN206811391U CN 206811391 U CN206811391 U CN 206811391U CN 201720766636 U CN201720766636 U CN 201720766636U CN 206811391 U CN206811391 U CN 206811391U
Authority
CN
China
Prior art keywords
bar
fixedly connected
mobile bar
spring
cuboid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720766636.6U
Other languages
Chinese (zh)
Inventor
杜鹏
焦雷
栾中洋
褚宏臣
王金克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Second Construction Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Shandong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Shandong Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201720766636.6U priority Critical patent/CN206811391U/en
Application granted granted Critical
Publication of CN206811391U publication Critical patent/CN206811391U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Invalid Beds And Related Equipment (AREA)

Abstract

A kind of tie hoop fixture, the tie hoop fixture include holder device, the first clamping device being arranged on the holder device, the first grip device on the right side of first clamping device, the second clamping device below first clamping device, the second grip device on the right side of second clamping device.Tie hoop easily can be fixed in cage bar by the utility model, simple to operate, easy to use, and stability is high, ensure the efficient progress of welding, ensure the effect of welding.

Description

A kind of tie hoop fixture
Technical field
Building machinery technical field is the utility model is related to, more particularly, to a kind of tie hoop fixture.
Background technology
In the manufacturing process of tie hoop, it is often necessary to by tie hoop and the interim stationary positioned of cage bar, facilitate worker Tie hoop is subjected to.However, existing be fixed on mode in cage bar mainly by artificial hand by tie hoop Portion is carried out, and artificial hand, which is fixed, needs hand to apply larger power, and less stable, influences the progress of welding, or even meeting Cause failure welding, influence the use in later stage.
Therefore, it is necessary to a kind of new technical scheme is provided to overcome drawbacks described above.
Utility model content
The purpose of this utility model is to provide a kind of tie hoop fixture that can effectively solve above-mentioned technical problem.
To reach the purpose of the utility model, adopt the following technical scheme that:
A kind of tie hoop fixture, the tie hoop fixture include holder device, are arranged on the holder device First clamping device, the first grip device on the right side of first clamping device, below first clamping device The second clamping device, the second grip device on the right side of second clamping device, it is solid that the holder device includes first Fixed pole, the connecting rod on the left of first fix bar, the restriction bar for being arranged at the connecting rod upper and lower ends, described first Clamping device includes the first mobile bar, the first grip block below first mobile bar, is arranged at first movement The first spring above bar, the first sliding block being arranged in first mobile bar, on the left of first grip block One pin, first grip device include first and grip frame, second spring below frame is gripped positioned at described first, and described the Two clamping devices include the second mobile bar, the second grip block above second mobile bar, positioned at the described second clamping The second pin on the right side of block, the second sliding block being arranged in second mobile bar, below second mobile bar Three springs, the third gear bar on the left of second grip block, second grip device include second and grip frame, positioned at institute State the 4th spring above the second gripping frame.
First fix bar is in cuboid, and the left end of first fix bar is fixed with the right surface of the connecting rod to be connected Connecing, the connecting rod is mutually perpendicular to first fix bar, and the restriction bar is provided with two, and the restriction bar is in cuboid, The end of the connecting rod is fixedly connected with the restriction bar, and the restriction bar is mutually perpendicular to the connecting rod.
First mobile bar is in cuboid, and first mobile bar is provided with the first through hole through its upper and lower surface, First grip block is in cuboid, and company is fixed in the upper surface of first grip block and the lower surface of first mobile bar Connect, first spring is provided with two and is located at the left and right sides of the connecting rod, the upper end of first spring and limit respectively Fixed pole is fixedly connected, and the lower end of first spring is fixedly connected with first mobile bar, and first sliding block is in cuboid, First sliding block is contained in the first through hole and is fixedly connected with first mobile bar, and the connecting rod is through described The upper and lower surface of first sliding block and with its sliding contact.
First pin is in cuboid, and company is fixed in the upper end of first pin and the lower surface of first mobile bar Connect, the left surface of first grip block is fixedly connected with the right surface of first pin.
The left end of the first gripping frame is fixedly connected with the right-hand member of first mobile bar, and the first gripping frame is located at The top of first fix bar, the second spring are provided with two, and the upper end of the second spring grips frame with described first It is fixedly connected, the lower end of the second spring is fixedly connected with first fix bar.
Second mobile bar is in cuboid, and second mobile bar is provided with the second through hole through its upper and lower surface, Second grip block is in cuboid, and company is fixed in the lower surface of second grip block and the upper surface of second mobile bar Connect, second grip block is located at the lower section of first grip block, and second pin is in cuboid, second pin Lower end is fixedly connected with second mobile bar, and the right surface of second grip block is fixedly connected with second pin.
Second sliding block is in cuboid, and second sliding block is contained in second through hole and moved with described second Bar is fixedly connected, and the connecting rod runs through the upper and lower surface of second sliding block and set with its sliding contact, the 3rd spring There are two sides, the upper end of the 3rd spring is fixedly connected with second mobile bar, the lower end of the 3rd spring and restriction Bar is fixedly connected, and the third gear bar is in cuboid, and the lower end of the third gear bar and the upper surface of second mobile bar are consolidated Fixed connection, the left surface of second grip block is fixedly connected with the right surface of the third gear bar.
The left end of the second gripping frame is fixedly connected with the right-hand member of second mobile bar, and the 4th spring is provided with two Individual, the lower end of the 4th spring is fixedly connected with the described second gripping frame, and the upper end of the 4th spring is solid with described first Fixed pole is fixedly connected.
Compared with prior art, the utility model has the advantages that:The utility model tie hoop fixture can Easily tie hoop is fixed in cage bar, it is simple to operate, it is easy to use, and stability is high, ensures efficiently entering for welding OK, the effect of welding is ensured.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model tie hoop fixture.
Embodiment
Clearly complete explanation is made to the utility model tie hoop fixture below in conjunction with accompanying drawing.
As shown in figure 1, the utility model tie hoop fixture includes holder device 1, is arranged on the holder device 1 First clamping device 2, the first grip device 3 positioned at the right side of first clamping device 2, positioned at first clamping device 2 Second clamping device 4 of lower section, the second grip device 5 positioned at the right side of the second clamping device 4.
As shown in figure 1, the holder device 1 includes the first fix bar 11, the company positioned at the left side of the first fix bar 11 Extension bar 12, the restriction bar 13 for being arranged at the upper and lower ends of connecting rod 12.First fix bar 11 is in cuboid, and described first The left end of fix bar 11 is fixedly connected with the right surface of the connecting rod 12.The connecting rod 12 is in cuboid, the connecting rod 12 are mutually perpendicular to first fix bar 11.The bar 13 that limits is provided with two and respectively positioned at the two of the connecting rod 12 End, the restriction bar 13 are in cuboid, and the end of the connecting rod 12 is fixedly connected with the restriction bar 13, the restriction bar 13 It is mutually perpendicular to the connecting rod 12, and is parallel to each other with first fix bar 11.
As shown in figure 1, first clamping device 2 includes the first mobile bar 21, positioned at the lower section of the first mobile bar 21 The first grip block 22, be arranged at the first spring 23 of the top of first mobile bar 21, be arranged at first mobile bar 21 On the first sliding block 24, the first pin 25 positioned at the left side of first grip block 22.First mobile bar 21 is in cuboid, First mobile bar 21 is provided with the first through hole 211 through its upper and lower surface, and the first through hole 211 is square.It is described First grip block 22 is in cuboid, and company is fixed in the upper surface of first grip block 22 and the lower surface of first mobile bar 21 Connect, first grip block 22 is made of the big material of coefficient of friction, so as to which tie hoop is clamped.First spring 23 are provided with two and are located at the left and right sides of the connecting rod 12, the upper end of first spring 23 and limit above respectively Fixed pole 13 is fixedly connected, and the lower end of first spring 23 is fixedly connected with first mobile bar 21, first spring 23 In the state of being stretched.First sliding block 24 is in cuboid, first sliding block 24 be contained in the first through hole 211 and It is fixedly connected with first mobile bar 21, first sliding block 24 is made of smooth material, and the connecting rod 12 runs through The upper and lower surface of first sliding block 24 and with its sliding contact, the connecting rod 12 and first sliding block 24 are using smooth Material be made so that the frictional force very little between the connecting rod 12 and first sliding block 24, so cause described first Sliding block 24 can smoothly move up and down in the connecting rod 12.First pin 25 is in cuboid, first pin 25 Upper end be fixedly connected with the lower surface of first mobile bar 21, the left surface of first grip block 22 and the first gear The right surface of bar 25 is fixedly connected.
Grip frame 31 as shown in figure 1, first grip device 3 includes first, the lower section of frame 31 is gripped positioned at described first Second spring 32.The left end of the first gripping frame 31 is fixedly connected with the right-hand member of first mobile bar 21, and described first Grip the top that frame 31 is located at first fix bar 11.The second spring 32 be provided with two, the second spring 32 it is upper End is fixedly connected with the described first gripping frame 31, and the lower end of the second spring 32 is fixedly connected with first fix bar 11, And then the described first gripping frame 31 is played a supporting role.
As shown in figure 1, second clamping device 4 includes the second mobile bar 41, above second mobile bar 41 The second grip block 42, the second pin 43 positioned at the right side of second grip block 42, be arranged in second mobile bar 41 The second sliding block 44, the 3rd spring 45 positioned at the lower section of second mobile bar 41, positioned at the left side of the second grip block 42 Third gear bar 46.Second mobile bar 41 is in cuboid, and second mobile bar 41 is provided with the through its upper and lower surface Two through holes 411, second through hole 411 are square.Second grip block 42 is in cuboid, under second grip block 42 Surface is fixedly connected with the upper surface of second mobile bar 41, and second grip block 42 is located at first grip block 22 Lower section, second grip block 42 is made of the big material of coefficient of friction, to coordinate with first grip block 22 by spiral shell Rotation stirrup clamps.Second pin 43 is in cuboid, and the lower end of second pin 43 is solid with second mobile bar 41 Fixed connection, the right surface of second grip block 42 are fixedly connected with second pin 43, above and below second pin 43 The distance on surface is more than the distance of the upper and lower surface of the second grip block 42.Second sliding block 44 is in cuboid, and described second Sliding block 44 is contained in second through hole 411 and is fixedly connected with second mobile bar 41, and second sliding block 44 uses Smooth material is made, the connecting rod 12 through second sliding block 44 upper and lower surface and with its sliding contact so that institute Stating the second sliding block 44 can move in the connecting rod 12, because connecting rod 12 and second sliding block 44 use smooth material Material is made so that the frictional force very little between the connecting rod 12 and second sliding block 44, so that second sliding block 44 can smoothly move up and down in the connecting rod 12.3rd spring 45 is provided with two and is located at the connection respectively The left and right sides of bar 12, the upper end of the 3rd spring 45 are fixedly connected with second mobile bar 41, the 3rd spring 45 Lower end with it is underlying restriction bar 13 be fixedly connected.The third gear bar 46 is in cuboid, under the third gear bar 46 End is fixedly connected with the upper surface of second mobile bar 41, the left surface of second grip block 42 and the third gear bar 46 Right surface be fixedly connected, the third gear bar 46 is located at the lower section of first pin 25, following table on the third gear bar 46 The distance in face is more than the distance of the upper and lower surface of the second grip block 42.
Grip frame 51 as shown in figure 1, second grip device 5 includes second, gripped positioned at described second above frame 51 The 4th spring 52.The second gripping frame 51 is located at the lower section of first fix bar 11, and described second grips a left side for frame 51 End is fixedly connected with the right-hand member of second mobile bar 41.4th spring 52 is provided with two, under the 4th spring 52 End is fixedly connected with the described second gripping frame 51, and the upper end of the 4th spring 52 is fixedly connected with first fix bar 11.
As shown in figure 1, the utility model tie hoop fixture is in use, user holds the first gripping frame 31 and Two grip on framves 51, are then moved into beside tie hoop, and together with tie hoop leaned with cage bar, Ran Houyi Dynamic the utility model so that tie hoop and cage bar are between the first grip block 22 and second grip block 42.Then hand Portion's pressing first grips frame 31 and second and grips frame 51 so that described first, which grips frame 31 and second, grips frame 51 close to described the One fix bar 11, and then make it that first mobile bar 21 and second mobile bar 41 are close to each other, until the described first folder Hold the grip block 42 of block 22 and second and act against tie hoop with cage bar, fixed effect is played to tie hoop and cage bar, and And now the upper end of second baffle 43 is acted against on the right surface of the first grip block 22, while the first pin 25 and third gear bar 46 Setting so that tie hoop and cage bar can be only between the first grip block 22 and the second grip block 42, block tie hoop And cage bar, prevent tie hoop and cage bar from departing from the first grip block 22 and the second grip block 42, and then the folder that can be stablized Handle, then weld together tie hoop and cage bar.So far, the utility model tie hoop fixture is retouched using process State and finish.

Claims (8)

  1. A kind of 1. tie hoop fixture, it is characterised in that:The tie hoop fixture includes holder device, is arranged at the support The first clamping device on device, the first grip device on the right side of first clamping device, positioned at described first clamping The second clamping device below device, the second grip device on the right side of second clamping device, the holder device bag The first fix bar, the connecting rod on the left of first fix bar, the restriction bar for being arranged at the connecting rod upper and lower ends are included, First clamping device include the first mobile bar, the first grip block below first mobile bar, be arranged at it is described The first spring above first mobile bar, the first sliding block being arranged in first mobile bar, positioned at first grip block First pin in left side, first grip device include first and grip frame, the second bullet below the described first gripping frame Spring, second clamping device include the second mobile bar, the second grip block above second mobile bar, positioned at described The second pin on the right side of second grip block, the second sliding block being arranged in second mobile bar, positioned at second mobile bar The 3rd spring, the third gear bar on the left of second grip block of lower section, second grip device include second and gripped Frame, the 4th spring above the described second gripping frame.
  2. 2. tie hoop fixture as claimed in claim 1, it is characterised in that:First fix bar is in cuboid, and described The left end of one fix bar is fixedly connected with the right surface of the connecting rod, and the connecting rod is mutually hung down with first fix bar Directly, the restriction bar is provided with two, and the restriction bar is in cuboid, and the end of the connecting rod is fixed with the restriction bar to be connected Connect, the restriction bar is mutually perpendicular to the connecting rod.
  3. 3. tie hoop fixture as claimed in claim 2, it is characterised in that:First mobile bar is in cuboid, and described One mobile bar is provided with the first through hole through its upper and lower surface, and first grip block is in cuboid, first grip block Upper surface be fixedly connected with the lower surface of first mobile bar, first spring is provided with two and is located at the company respectively The left and right sides of extension bar, the upper end of first spring are fixedly connected with limiting bar, the lower end of first spring and described the One mobile bar is fixedly connected, and first sliding block is in cuboid, first sliding block be contained in the first through hole and with institute The first mobile bar is stated to be fixedly connected, the connecting rod through first sliding block upper and lower surface and with its sliding contact.
  4. 4. tie hoop fixture as claimed in claim 3, it is characterised in that:First pin is in cuboid, and described first The upper end of pin is fixedly connected with the lower surface of first mobile bar, left surface and the first gear of first grip block The right surface of bar is fixedly connected.
  5. 5. tie hoop fixture as claimed in claim 4, it is characterised in that:Described first grips the left end and described first of frame The right-hand member of mobile bar is fixedly connected, and the first gripping frame is located at the top of first fix bar, and the second spring is provided with Two, the upper end of the second spring is fixedly connected with the described first gripping frame, the lower end of the second spring and described first Fix bar is fixedly connected.
  6. 6. tie hoop fixture as claimed in claim 5, it is characterised in that:Second mobile bar is in cuboid, and described Two mobile bars are provided with the second through hole through its upper and lower surface, and second grip block is in cuboid, second grip block Lower surface be fixedly connected with the upper surface of second mobile bar, second grip block is located under first grip block Side, second pin is in cuboid, and the lower end of second pin is fixedly connected with second mobile bar, second folder The right surface for holding block is fixedly connected with second pin.
  7. 7. tie hoop fixture as claimed in claim 6, it is characterised in that:Second sliding block is in cuboid, and described second Sliding block is contained in second through hole and is fixedly connected with second mobile bar, and the connecting rod runs through second sliding block Upper and lower surface and be provided with two sides, the upper end and described second of the 3rd spring with its sliding contact, the 3rd spring Mobile bar is fixedly connected, and the lower end of the 3rd spring is fixedly connected with limiting bar, and the third gear bar is in cuboid, and described the The lower end of three pins is fixedly connected with the upper surface of second mobile bar, the left surface of second grip block and the described 3rd The right surface of pin is fixedly connected.
  8. 8. tie hoop fixture as claimed in claim 7, it is characterised in that:Described second grips the left end and described second of frame The right-hand member of mobile bar is fixedly connected, and the 4th spring is provided with two, and the lower end of the 4th spring grips frame with described second It is fixedly connected, the upper end of the 4th spring is fixedly connected with first fix bar.
CN201720766636.6U 2017-06-29 2017-06-29 A kind of tie hoop fixture Expired - Fee Related CN206811391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720766636.6U CN206811391U (en) 2017-06-29 2017-06-29 A kind of tie hoop fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720766636.6U CN206811391U (en) 2017-06-29 2017-06-29 A kind of tie hoop fixture

Publications (1)

Publication Number Publication Date
CN206811391U true CN206811391U (en) 2017-12-29

Family

ID=60762686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720766636.6U Expired - Fee Related CN206811391U (en) 2017-06-29 2017-06-29 A kind of tie hoop fixture

Country Status (1)

Country Link
CN (1) CN206811391U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108568895A (en) * 2018-04-25 2018-09-25 广东省智能制造研究所 A kind of fixing device of building beam column intelligent manufacturing equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108568895A (en) * 2018-04-25 2018-09-25 广东省智能制造研究所 A kind of fixing device of building beam column intelligent manufacturing equipment

Similar Documents

Publication Publication Date Title
CN106944948B (en) A kind of firm chemical industry dangerous goods clamping equipment
TWM466750U (en) Improved position limiting structure of clamp
CN107009300A (en) A kind of tubing detection fixing equipment of the realm of building construction
CN105665061A (en) Portable foldable test tube clamp
CN206811391U (en) A kind of tie hoop fixture
CN203109845U (en) Clamping device for facilitating assembly and disassembly
CN207127569U (en) A kind of grip device for processing gear
CN207375144U (en) A kind of brick clamp carried for municipal tile work
CN202507090U (en) Auxiliary clamp for pipe fitting machining
CN107878014A (en) A kind of gold stamping clamping device of plastic plate
CN206484460U (en) A kind of metal handicrafts chucking device
CN106312867A (en) Clamping device used for stacking of electrical equipment
CN104858815A (en) Fixture positioning device and application method thereof
CN206859682U (en) A kind of building template quick-gripping device
CN210306411U (en) 60 degree work piece welding frock
CN202683910U (en) Auxiliary manipulator for forging and pressing equipment
CN204397672U (en) A kind of fixture
CN203426333U (en) Single core cable straightening pliers
CN203156612U (en) Hand-operated rocker arm spring clamp
CN205817132U (en) A kind of temperature control noble metal room temperature pad soldering equipment
CN206605409U (en) A kind of chucking device of building materials processing
CN204368194U (en) A kind of beam column transport trolley built for municipal room
CN205703369U (en) A kind of handware fixture
CN202667534U (en) Auxiliary mechanical arm of forging and pressing device
CN205237598U (en) Drilling clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Building 1, Nord center, No.128, South Fourth Ring Road West, Fengtai District, Beijing, 100070

Patentee after: China Railway Construction Engineering Group

Patentee after: China Railway Construction Group No.2 Construction Co.,Ltd.

Address before: 100000 Fengtai District, Beijing

Patentee before: China Railway Construction Engineering Group

Patentee before: CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP SHANDONG Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229