CN107009300A - A kind of tubing detection fixing equipment of the realm of building construction - Google Patents

A kind of tubing detection fixing equipment of the realm of building construction Download PDF

Info

Publication number
CN107009300A
CN107009300A CN201710342591.4A CN201710342591A CN107009300A CN 107009300 A CN107009300 A CN 107009300A CN 201710342591 A CN201710342591 A CN 201710342591A CN 107009300 A CN107009300 A CN 107009300A
Authority
CN
China
Prior art keywords
bar
fixedly connected
roller
support bar
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710342591.4A
Other languages
Chinese (zh)
Inventor
方彐云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Oushu Environmental Protection Technology Co Ltd
Original Assignee
Guangzhou Oushu Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Oushu Environmental Protection Technology Co Ltd filed Critical Guangzhou Oushu Environmental Protection Technology Co Ltd
Priority to CN201710342591.4A priority Critical patent/CN107009300A/en
Publication of CN107009300A publication Critical patent/CN107009300A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders

Abstract

A kind of tubing detection fixing equipment of the realm of building construction, the tubing detection fixing equipment of the realm of building construction includes bottom plate, the support meanss above the bottom plate, the electric machine being arranged on the bottom plate, the first roller devices positioned at the support meanss left and right sides, the fixing device being arranged in the support meanss, the second roller devices positioned at the support meanss left and right sides.The present invention automatically can fix tubing, simple to operate, and easy to use, hand labor intensity is low, and then easily tubing can be detected, efficiency high.

Description

A kind of tubing detection fixing equipment of the realm of building construction
Technical field
The present invention relates to constructional engineering machinery technical field, use is detected more particularly, to a kind of tubing of the realm of building construction Fixing equipment.
Background technology
Various tubing are needed to use in construction, tubing needs to detect it before the use, to ensure Whether the quality of tubing is qualified, but needs to use fixing device to be fixed during tubing detection, and existing fixed form is big Many by manually being clamped using clip, this kind of hand-operated clamping mode is not only cumbersome, inefficiency, and clamping is not steady enough Gu, influence the detection to pipeline.
Therefore, it is necessary to provide a kind of new technical scheme to overcome drawbacks described above.
The content of the invention
It is an object of the invention to provide a kind of inspection of the tubing of the realm of building construction that can effectively solve above-mentioned technical problem Survey fixing equipment.
To reach the purpose of the present invention, adopt the following technical scheme that:
A kind of tubing detection fixing equipment of the realm of building construction, the tubing detection of the realm of building construction is fixed Equipment include bottom plate, the support meanss above the bottom plate, the electric machine being arranged on the bottom plate, positioned at the branch First roller devices of the support arrangement left and right sides, the fixing device being arranged in the support meanss, positioned at the support meanss Second roller devices of the left and right sides, the bottom plate is provided with the universal wheel being disposed below, is positioned above the left and right sides First support bar, the first roller for being arranged at the first support bar upper end, the second support bar above the bottom plate, institute Stating support meanss includes supporting plate, the 3rd support bar positioned at the supporting plate top left and right sides, is arranged at described 3rd Sliding block on strut, the cushion block above the supporting plate, the cross bar positioned at the cushion block left and right sides, it is arranged at described The connection ring of three post uppers, the electric machine includes motor, the output shaft being arranged on the motor, positioned at the electricity The first fix bar above machine, the bracing wire positioned at the output shaft left and right sides, first roller devices, which include second, to be fixed Bar, the second roller being arranged in second fix bar, the fixing device include mobile bar, are arranged in the mobile bar Side restrictions bar, be arranged at the twisted plate of the mobile boom end, be arranged on the twisted plate leaning block, positioned at it is described shifting The spring of both sides above and below lever, second roller devices are provided with two and are located at the left and right two above the supporting plate respectively Side, second roller devices include the 4th fix bar, the 3rd roller being arranged in the 4th fix bar.
The first support bar is provided with two, and the lower end of the first support bar is fixedly connected with the bottom plate, and described the The upper end of one support bar is provided with the first groove, and first roller is provided with two and respectively positioned at the upper of the first support bar Side, first roller is in cylinder, first roller be contained in first groove and with the first support bar pivot Axle is connected, and the lower end of the second support bar is fixedly connected with the bottom plate, and the second support bar is provided with through its left and right The first through hole on surface.
The upper end of the second support bar is fixedly connected with the lower surface of the supporting plate, and the 3rd support bar is provided with two Individual, the lower end of the 3rd support bar is fixedly connected with the supporting plate, and the 3rd support bar, which is provided with, runs through its left and right table Second through hole in face, the lower surface of the cushion block is fixedly connected with the upper surface of the supporting plate, and the cross bar is provided with two, institute The one end for stating cross bar is fixedly connected with the side of the 3rd support bar, and the side of the other end of the cross bar and the cushion block is consolidated Fixed connection, the upper surface of the cross bar and the upper surface of the cushion block are in same plane, and the sliding block is described provided with two Sliding block is contained in second through hole and is fixedly connected with the 3rd support bar, and the connection ring is in bending, the company The two ends for connecing ring are fixedly connected with the side of the 3rd support bar.
The lower surface of the motor is fixedly connected with the bottom plate, and the output shaft is in cylinder, the one of the output shaft End and the motor connection, the lower end of first fix bar are fixedly connected with the motor, the upper end of first fix bar It is fixedly connected with the supporting plate, the bracing wire is provided with two, and the lower end of the bracing wire is fixedly connected with the output shaft, described The upper end of bracing wire is fixedly connected with the connection ring, described to be drawstring through the first through hole, described to be drawstring through described first Groove and act against on first roller.
One end of second fix bar is fixedly connected with the side of the 3rd support bar, second fix bar it is another One end is provided with the second groove, and second roller is in cylinder, second roller be contained in second groove and with institute State the second fix bar pivotally connected, it is described to be drawstring through second groove and act against on second roller.
The mobile bar horizontal positioned, the mobile bar through the sliding block left and right surface and with its sliding contact, institute State and limit the lower end of bar and be fixedly connected with the upper surface of the mobile bar, the twisted plate is in bending, under the twisted plate End is contacted with the upper surface slide of the cushion block, and the block that leans is fixedly connected with the inner surface of the twisted plate, the spring One end be fixedly connected with the twisted plate, the other end of the spring is fixedly connected with the side of the 3rd support bar.
One end of 4th fix bar is fixedly connected with the end of the mobile bar, the other end of the 4th fix bar Provided with the 3rd groove, the 3rd roller is in cylinder, and the 3rd roller is contained in the 3rd groove and with described the Four fix bars are pivotally connected, and the bracing wire is acted against on the 3rd roller.
Compared with prior art, the present invention has the advantages that:The tubing detection of the realm of building construction of the present invention is used Fixing equipment automatically can fix tubing, simple to operate, and easy to use, hand labor intensity is low, and then can facilitate Tubing is detected, efficiency high.
Brief description of the drawings
Fig. 1 is the structural representation of the tubing detection fixing equipment of the realm of building construction of the present invention.
Embodiment
Clearly complete is made with fixing equipment to the tubing detection of the realm of building construction of the present invention below in conjunction with accompanying drawing Explanation.
As shown in figure 1, the tubing detection of the realm of building construction of the present invention fixing equipment includes bottom plate 1, positioned at the bottom The support meanss 2 of the top of plate 1, the electric machine 3 being arranged on the bottom plate 1, the positioned at the left and right sides of support meanss 2 One roller devices 4, the fixing device 5 being arranged in the support meanss 2, second positioned at the left and right sides of support meanss 2 Roller devices 6.
As shown in figure 1, the bottom plate 1 is in cuboid and horizontal positioned, the bottom plate 1 is universal provided with what is be disposed below Wheel 11, the first roller 13 for being positioned above the first support bar 12 of the left and right sides, being arranged at the upper end of first support bar 12, Second support bar 14 positioned at the top of bottom plate 1.The universal wheel 11 is provided with four, and the universal wheel 11 is arranged at the bottom On the lower surface of plate 1, the universal wheel 11 can drive the bottom plate 1 to move.The first support bar 12 is described provided with two First support bar 12 is in cuboid and vertical placement, and the lower end of the first support bar 12 is fixedly connected with the bottom plate 1, described The upper end of first support bar 12 is provided with the first groove.First roller 13 is provided with two and respectively positioned at the first support bar 12 top, first roller 13 is in cylinder, and first roller 13 is contained in first groove and with described the One support bar 12 is pivotally connected so that first roller 13 can rotate in first groove.The second support bar 14 provided with two and respectively positioned at the left and right sides of the top of bottom plate 1, and the second support bar 14 is in cuboid and puts vertically Put, the lower end of the second support bar 14 is fixedly connected with the bottom plate 1, the second support bar 14 is provided with through its left and right The first through hole 141 on surface, the first through hole 141 is square.
As shown in figure 1, the support meanss 2 include supporting plate 22, the positioned at the top left and right sides of supporting plate 22 Three support bars 21, the sliding block 25 being arranged on the 3rd support bar 21, the cushion block 23 positioned at the top of the supporting plate 22, it is located at The cross bar 24 of the left and right sides of cushion block 23, the connection ring 26 for being arranged at the upper end of the 3rd support bar 21.The supporting plate 22 In cuboid and horizontal positioned, the upper end of the second support bar 14 is fixedly connected with the lower surface of the supporting plate 22.It is described 3rd support bar 21 is provided with two and respectively positioned at the left and right sides of the top of supporting plate 22, and the 3rd support bar 21 is in length Cube and vertical placement, the lower end of the 3rd support bar 21 are fixedly connected with the supporting plate 22, the 3rd support bar 21 The second through hole 211 through its left and right surface is provided with, second through hole 211 is square.The cushion block 23 is in cuboid, institute The lower surface for stating cushion block 23 is fixedly connected with the upper surface of the supporting plate 22.The cross bar 24 is provided with two and respectively positioned at institute State the left and right sides of cushion block 23, the cross bar 24 is in cuboid and horizontal positioned, one end of the cross bar 24 with described 3rd The side of strut 21 is fixedly connected, and the other end of the cross bar 24 is fixedly connected with the side of the cushion block 23, the cross bar 24 The upper surface of upper surface and the cushion block 23 be in same plane.The sliding block 25 is provided with two, and the sliding block 25 is housed It is fixedly connected in second through hole 211 and with the 3rd support bar 21, the sliding block 25 is made of smooth material. The connection ring 26 is provided with two and is respectively arranged at the upper end of the 3rd support bar 21, and the connection ring 26 is in bending, The two ends of the connection ring 26 are fixedly connected with the side of the 3rd support bar 21.
As shown in figure 1, the electric machine 3 includes motor 31, the output shaft 32 being arranged on the motor 31, positioned at institute State the first fix bar 33 of the top of motor 31, the bracing wire 34 positioned at the left and right sides of output shaft 32.The motor 31 and power supply It is (not shown) to be electrically connected with, it is that the motor 31 provides electric energy, the motor 31 is provided with switch (not shown), convenient control institute State motor 31 to open or close, the lower surface of the motor 31 is fixedly connected with the bottom plate 1.The output shaft 32 is in cylinder Body, one end of the output shaft 32 is connected with the motor 31 so that the motor 31 can drive the output shaft 32 to rotate. First fix bar 33 is in cuboid and vertical placement, and the lower end of first fix bar 33 is fixed with the motor 31 to be connected Connect, the upper end of first fix bar 33 is fixedly connected with the supporting plate 22.The bracing wire 34 is provided with two, the bracing wire 34 Lower end be fixedly connected with the output shaft 32, the upper end of the bracing wire 34 is fixedly connected with the connection ring 26, the bracing wire 34 pass through the first through hole 141, and the bracing wire 34 is through first groove and acts against on first roller 13.
As shown in figure 1, first roller devices 4 are provided with two and respectively positioned at the left and right sides of the support meanss 2, First roller devices 4 include the second fix bar 41, the second roller 42 being arranged in second fix bar 41.Described Two fix bars 41 are in cuboid, and one end of second fix bar 41 is fixedly connected with the side of the 3rd support bar 21, institute The other end for stating the second fix bar 41 is provided with the second groove.Second roller 42 is in cylinder, and second roller 42 is housed In in second groove and pivotally connected with second fix bar 41 so that second roller 42 can be described second Rotated in groove, the bracing wire 34 is through second groove and acts against on second roller 42.
As shown in figure 1, the fixing device 5 is provided with two and left and right is oppositely arranged, the fixing device 5 is respectively arranged at On 3rd support bar 21, the fixing device 5 includes mobile bar 51, is arranged at the restriction bar of the top of mobile bar 51 52nd, it is arranged at the twisted plate 53 of the end of mobile bar 51, is arranged at leaning block 54, being moved positioned at described on the twisted plate 53 The spring 55 of lever both sides about 51.The horizontal positioned of mobile bar 51, the mobile bar 51 runs through the left and right of the sliding block 25 Surface and with its sliding contact so that the mobile bar 51 can be moved left and right.The restriction bar 52 is in cuboid, the restriction The lower end of bar 52 is fixedly connected with the upper surface of the mobile bar 51.The twisted plate 53 is in bending, the twisted plate 53 Lower end is contacted with the upper surface slide of the cushion block 23 so that the twisted plate 53 can be moved left and right, positioned at the left and right sides Twisted plate 53, which is oppositely arranged, to live pipe clamping.The block 54 that leans is fixedly connected with the inner surface of the twisted plate 53, The block 54 that leans is made of the big material of coefficient of friction, is acted against it and is carried out effective consolidate when on tubing to tubing It is fixed.One end of the spring 55 is fixedly connected with the twisted plate 53, the other end of the spring 55 and the 3rd support bar 21 side is fixedly connected.
As shown in figure 1, second roller devices 6 are provided with two and respectively positioned at the left and right two of the top of supporting plate 22 Side, second roller devices 6 include the 4th fix bar 61, the 3rd roller 62 being arranged in the 4th fix bar 61.Institute The 4th fix bar 61 is stated in cuboid and horizontal positioned, one end of the 4th fix bar 61 is consolidated with the end of the mobile bar 51 Fixed connection, the other end of the 4th fix bar 61 is provided with the 3rd groove.3rd roller 62 is in cylinder, the 3rd rolling Wheel 62 is contained in the 3rd groove and pivotally connected with the 4th fix bar 61 so that the 3rd roller 62 can be Rotated in 3rd groove, the bracing wire 34 is acted against on the 3rd roller 62.
As shown in figure 1, the tubing detection fixing equipment of the realm of building construction of the present invention is in use, first by pipeline It is placed on the cushion block 23, and between the twisted plate 53.Then the switch of motor 31 is opened so that the output shaft 32 rotations, the lower end positioned at the bracing wire 34 of the left and right sides is wound on the output shaft 32, and the bracing wire 34 is tightened up, described to draw Line 34 promotes the 3rd roller 62 to centre so that the 3rd roller 62, the 4th fix bar 61 and mobile bar 51 are to centre Mobile, until the twisted plate 53 coats tubing, the block 54 that leans is acted against on tubing, and then can be by the stable folder of tubing Hold and fix, the spring 55 is now stretched, and then tubing can be detected.So far, the realm of building construction of the present invention Tubing detection finished with fixing equipment using process description.

Claims (7)

1. a kind of tubing detection fixing equipment of the realm of building construction, it is characterised in that:The tubing of the realm of building construction Detection fixing equipment include bottom plate, the support meanss above the bottom plate, the electric machine being arranged on the bottom plate, The first roller devices positioned at the support meanss left and right sides, the fixing device being arranged in the support meanss, positioned at institute The second roller devices of the support meanss left and right sides are stated, the bottom plate is provided with the universal wheel being disposed below, is positioned above The first support bar of the left and right sides, the first roller for being arranged at the first support bar upper end, above the bottom plate Two support bars, the support meanss include supporting plate, the 3rd support bar positioned at the supporting plate top left and right sides, are arranged at Sliding block on 3rd support bar, the cushion block above the supporting plate, the cross bar positioned at the cushion block left and right sides, set Be placed in the connection ring of the 3rd post upper, the electric machine include motor, the output shaft being arranged on the motor, The first fix bar above the motor, the bracing wire positioned at the output shaft left and right sides, the first roller devices bag The second fix bar, the second roller being arranged in second fix bar are included, the fixing device includes mobile bar, is arranged at institute State the restriction bar above mobile bar, be arranged at the twisted plate of the mobile boom end, be arranged on the twisted plate lean block, The spring of both sides above and below the mobile bar, second roller devices are provided with two and are located at respectively above the supporting plate The left and right sides, second roller devices include the 4th fix bar, the 3rd roller that is arranged in the 4th fix bar.
2. the tubing detection fixing equipment of the realm of building construction as claimed in claim 1, it is characterised in that:Described first Strut is provided with two, and the lower end of the first support bar is fixedly connected with the bottom plate, and the upper end of the first support bar is provided with First groove, first roller is provided with two and respectively positioned at the top of the first support bar, and first roller is in circle Cylinder, first roller is contained in first groove and pivotally connected with the first support bar, second support The lower end of bar is fixedly connected with the bottom plate, and the second support bar is provided with the first through hole through its left and right surface.
3. the tubing detection fixing equipment of the realm of building construction as claimed in claim 2, it is characterised in that:Described second The upper end of strut is fixedly connected with the lower surface of the supporting plate, and the 3rd support bar is provided with two, the 3rd support bar Lower end be fixedly connected with the supporting plate, the 3rd support bar be provided with through its left and right surface the second through hole, it is described The lower surface of cushion block is fixedly connected with the upper surface of the supporting plate, and the cross bar is provided with two, one end of the cross bar and institute The side for stating the 3rd support bar is fixedly connected, and the other end of the cross bar is fixedly connected with the side of the cushion block, the cross bar The upper surface of upper surface and the cushion block be in same plane, the sliding block is provided with two, and the sliding block is contained in described It is fixedly connected in second through hole and with the 3rd support bar, the connection ring is in bending, the two ends of the connection ring and institute The side for stating the 3rd support bar is fixedly connected.
4. the tubing detection fixing equipment of the realm of building construction as claimed in claim 3, it is characterised in that:The motor Lower surface is fixedly connected with the bottom plate, and the output shaft is in cylinder, one end of the output shaft and the motor connection, institute The lower end for stating the first fix bar is fixedly connected with the motor, and the upper end of first fix bar is fixed with the supporting plate to be connected Connect, the bracing wire is provided with two, and the lower end of the bracing wire is fixedly connected with the output shaft, the upper end of the bracing wire and the company Ring is connect to be fixedly connected, it is described to be drawstring through the first through hole, it is described to be drawstring through first groove and act against described On one roller.
5. the tubing detection fixing equipment of the realm of building construction as claimed in claim 4, it is characterised in that:Described second consolidates One end of fixed pole is fixedly connected with the side of the 3rd support bar, and the other end of second fix bar is provided with the second groove, Second roller is in cylinder, and second roller is contained in second groove and connected with the second fix bar pivot Connect, it is described to be drawstring through second groove and act against on second roller.
6. the tubing detection fixing equipment of the realm of building construction as claimed in claim 5, it is characterised in that:The mobile bar Horizontal positioned, the mobile bar through the sliding block left and right surface and with its sliding contact, the lower end of the restriction bar and institute The upper surface for stating mobile bar is fixedly connected, and the twisted plate is in bending, the lower end of the twisted plate and the upper table of the cushion block Face sliding contact, the block that leans is fixedly connected with the inner surface of the twisted plate, one end of the spring and the twisted plate It is fixedly connected, the other end of the spring is fixedly connected with the side of the 3rd support bar.
7. the tubing detection fixing equipment of the realm of building construction as claimed in claim 6, it is characterised in that:Described 4th consolidates One end of fixed pole is fixedly connected with the end of the mobile bar, and the other end of the 4th fix bar is provided with the 3rd groove, described 3rd roller is in cylinder, and the 3rd roller is contained in the 3rd groove and pivotally connected with the 4th fix bar, The bracing wire is acted against on the 3rd roller.
CN201710342591.4A 2017-05-16 2017-05-16 A kind of tubing detection fixing equipment of the realm of building construction Pending CN107009300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710342591.4A CN107009300A (en) 2017-05-16 2017-05-16 A kind of tubing detection fixing equipment of the realm of building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710342591.4A CN107009300A (en) 2017-05-16 2017-05-16 A kind of tubing detection fixing equipment of the realm of building construction

Publications (1)

Publication Number Publication Date
CN107009300A true CN107009300A (en) 2017-08-04

Family

ID=59450597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710342591.4A Pending CN107009300A (en) 2017-05-16 2017-05-16 A kind of tubing detection fixing equipment of the realm of building construction

Country Status (1)

Country Link
CN (1) CN107009300A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108500806A (en) * 2018-04-09 2018-09-07 张珩 A kind of environment-friendly novel outer wall of steel pipe derusting device in hydraulic engineering field
CN108942730A (en) * 2018-07-03 2018-12-07 柳州欧卡机器人有限公司 A kind of fast changeable robotic part fixture for processing
CN109178915A (en) * 2018-10-12 2019-01-11 夏士桀 A kind of aerospace novel pipeline clamping stabilising arrangement
CN109778922A (en) * 2019-02-26 2019-05-21 宁波交通工程咨询监理有限公司 A kind of cast-in-situ bored pile stake holes sediment thickness detection device and method
CN112518620A (en) * 2020-11-30 2021-03-19 盐城大孙庄新城建设有限公司 Supporting seat for water conservancy pipeline maintenance

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108500806A (en) * 2018-04-09 2018-09-07 张珩 A kind of environment-friendly novel outer wall of steel pipe derusting device in hydraulic engineering field
CN108500806B (en) * 2018-04-09 2020-05-19 湖南隆盛达钢管制造有限公司 Novel steel pipe outer wall rust cleaning of environmental protection in hydraulic engineering field device
CN108942730A (en) * 2018-07-03 2018-12-07 柳州欧卡机器人有限公司 A kind of fast changeable robotic part fixture for processing
CN109178915A (en) * 2018-10-12 2019-01-11 夏士桀 A kind of aerospace novel pipeline clamping stabilising arrangement
CN109778922A (en) * 2019-02-26 2019-05-21 宁波交通工程咨询监理有限公司 A kind of cast-in-situ bored pile stake holes sediment thickness detection device and method
CN112518620A (en) * 2020-11-30 2021-03-19 盐城大孙庄新城建设有限公司 Supporting seat for water conservancy pipeline maintenance
CN112518620B (en) * 2020-11-30 2022-04-19 盐城大孙庄新城建设有限公司 Supporting seat for water conservancy pipeline maintenance

Similar Documents

Publication Publication Date Title
CN107009300A (en) A kind of tubing detection fixing equipment of the realm of building construction
CN204136066U (en) Simple manipulator
CN206605325U (en) A kind of efficient hardware sheet material double face grinding apparatus
CN106944948B (en) A kind of firm chemical industry dangerous goods clamping equipment
CN106669881A (en) Test tube clamp for chemical experiments in high school
CN208178843U (en) Welding bench is used in a kind of processing of refrigeration accessory
CN206748275U (en) A kind of tubing detection fixed equipment of the realm of building construction
CN107161921A (en) A kind of bridge construction in science of bridge building field transports jacking equipment with material
CN109178915B (en) Aerospace is got with novel pipeline clamp and is stabilized device
CN207448455U (en) A kind of robot of electric operating weight carrying
CN207208917U (en) A kind of highway engineering pipeline arranging frame
CN208880567U (en) Insulating tube produces adjustable steel pipe clamp
CN208272162U (en) A kind of electrician's construction earthing or grounding means
CN206484460U (en) A kind of metal handicrafts chucking device
CN206811391U (en) A kind of tie hoop fixture
CN107321876A (en) A kind of efficient steel bar bending device of building engineering field
CN207997135U (en) A kind of screw Special Fixture for Machining
CN207884252U (en) A kind of cable bearer in cable duct
CN206767096U (en) A kind of machine-building grabbing device
CN105269623A (en) Power cable clamp punch press
CN207098428U (en) A kind of efficient industrial cable process equipment
CN107127695A (en) A kind of high-abrasive material production tool
CN206998302U (en) A kind of firm chucking device for handware processing
CN206605257U (en) A kind of five metalworking novel clamps
CN107932110A (en) A kind of screw Special Fixture for Machining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804

WD01 Invention patent application deemed withdrawn after publication