CN206599981U - Elevator safety devices installation operation platform - Google Patents

Elevator safety devices installation operation platform Download PDF

Info

Publication number
CN206599981U
CN206599981U CN201720257169.4U CN201720257169U CN206599981U CN 206599981 U CN206599981 U CN 206599981U CN 201720257169 U CN201720257169 U CN 201720257169U CN 206599981 U CN206599981 U CN 206599981U
Authority
CN
China
Prior art keywords
operation platform
safety devices
installation operation
beams
elevator safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720257169.4U
Other languages
Chinese (zh)
Inventor
孟宪芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720257169.4U priority Critical patent/CN206599981U/en
Application granted granted Critical
Publication of CN206599981U publication Critical patent/CN206599981U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Indicating And Signalling Devices For Elevators (AREA)

Abstract

The utility model is related to elevator safety devices installation operation platform, including column, landing beam, pinching beams, bearing diagonal, symmetrically arranged column is fixedly connected with landing beam, two groups of pinching beams for being used to clamp concrete wall are flexibly connected by fastener with column up and down, pinching beams include interior pinching beams and outer pinching beams, it is provided between column and landing beam on the outside of bearing diagonal, two landing beams and is provided with folding stage support, laying pedal net above landing beam.The utility model easy installation and removal, main body frame is integrally probeed into elevator by elevator door opening, is anchored on door opening concrete wall, triangle is encorbelmented, and load force is big, meet requirement.The operating platform for forming all round victory formula after pedal net in hoistway is installed, the operating environment and condition of safety and stability are provided for operating personnel, gains in depth of comprehension hand is answered in operation.

Description

Elevator safety devices installation operation platform
Technical field
The utility model is related to the realm of building construction, more particularly to elevator safety devices installation operation platform.
Background technology
In high-building construction, it is desirable to which hard cut-off, horizontal safety net are set up for every two layers in elevator.But it is due to Existing auxiliary operation platform difficulty of setting up is big, and high-risk operations have potential safety hazard.The hard cut-off of installation can not be complete with horizontal safety net The full requirement for meeting national security management regulation.Accordingly, it would be desirable to a kind of job platform rational in infrastructure, safe and reliable.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of elevator safety devices installation operation platform, is used for Hard cut-off and horizontal safety net construction operation in stair shaft.Assemble and disassemble that process operation is simple, safe and reliable, load force big, Turnover rate is high.
To achieve the above object, the utility model is realized using following technical scheme:
Elevator safety devices installation operation platform, including column, landing beam, pinching beams, bearing diagonal, it is symmetrically arranged Column is fixedly connected with landing beam, and two groups of pinching beams for being used to clamp concrete wall are flexibly connected by fastener with column up and down, Pinching beams include interior pinching beams and outer pinching beams, are provided with the outside of bearing diagonal, two landing beams and set between column and landing beam There is laying pedal net above folding stage support, landing beam.
The lower section of upper group of described pinching beams is provided with folding clamping support, and the lower section of the following group pinching beams is provided with folder Tight cushion block.
The distance between two described landing beams are less than elevator door opening width.
Described landing beam is provided with contraction regulation inner beam in hollow chamber profile, landing beam.
Connecting rod and scissors strut are fixed between two described landing beams.
Connecting rod and scissors strut are fixed between two described columns.
The fastener includes U-shaped card ring, clamp, screw mandrel, tommy bar, and U-shaped card ring and clamp are flexibly connected, clamp and screw mandrel It is connected through a screw thread, tommy bar is set in screw mandrel.
Described pedal net is assembled by polylith list web plate.
Compared with prior art, the beneficial effects of the utility model are:
1. the utility model easy installation and removal, main body frame is integrally probeed into elevator by elevator door opening, it is anchored on Door opening concrete wall, triangle is encorbelmented, and load force is big, meet requirement.
2. installing the operating platform for forming all round victory formula after pedal net in hoistway, safety and stability is provided for operating personnel Gains in depth of comprehension hand is answered in operating environment and condition, operation.
3. the operating platform realize improve operating efficiency reduce various materials, reduction engineering that original measure consumed into This,
Reduce labour cost expenditure, civilized construction, realize regularization, tool.
4. migrated in building, can be using hand hydraulic carrier saving of labor, laborsaving, quick during horizontal transport.Vertical transport can Double cage elevators are transported to complete.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is structure top view of the present utility model.
Fig. 3 is structural side view of the present utility model.
Fig. 4 is the structure top view that the utility model is applied.
Fig. 5 is the structural representation of platform support.
Fig. 6 is the structural representation for clamping support.
Fig. 7 is the structural representation of fastener.
Fig. 8 is the structure front view of fastener.
In figure:Column 1, landing beam 2, interior pinching beams 3, outer pinching beams 4, bearing diagonal 5, scissors strut 2 13, fastening Part 6, pedal net 8, clamp support 9, connecting rod 1, platform support 11, scissors strut 1, elevator door opening 14, connecting rod 2 15, U-shaped card ring 16, clamp 17, screw mandrel 18, tommy bar 19, lock 20, inner beam 21.
Embodiment
Embodiment of the present utility model is further illustrated below in conjunction with the accompanying drawings:
Such as Fig. 1-Fig. 6, elevator safety devices installation operation platform, including support, support include column 1, landing beam 2, Bearing diagonal 5, symmetrically arranged column 1 is fixedly connected with landing beam 2, and bearing diagonal 5 is provided between column 1 and landing beam 2.Two columns Connecting rod 2 15 and scissors strut 2 13 are fixed between 1.Up and down two groups be used to clamping the pinching beams of elevator door opening concrete wall by Fastener 6 is flexibly connected with column 1.The top of landing beam 2 laying pedal net 8.
Pinching beams include interior pinching beams 3 and outer pinching beams 4, and the lower section of upper group of pinching beams is provided with folding folder Locking bracket 9, the lower section of the following group pinching beams is provided with clamping cushion block 7.The C points for clamping support 9 are provided with swivel pin, and D points are provided with activity Swivel pin.When dismantling platform, clamp support 9 and disconnected at D points, clamp the outside of support 9 swivel pin at C points and fold.
Connecting rod 1 and scissors strut 1 are fixed between two landing beams, the distance between two landing beams 2 are less than elevator The width of door opening 14.The outside of two landing beam 2 is provided with folding stage support 11.Landing beam 2 is to be provided with hollow chamber profile, landing beam Regulation inner beam 21 is shunk, by provided with multiple pin-and-holes being mutually located between inner beam 21 and landing beam 2.
The moveable hinge pin that can be disconnected is set on platform support 11 at B points, the swivel pin at A points of the platform support 11 after disconnection Fold.
Such as Fig. 7-Fig. 8, fastener includes U-shaped card ring 16, clamp 17, screw mandrel 18, tommy bar 19, U-shaped card ring 16 and clamp 17 It is flexibly connected, clamp 17 and screw mandrel 18 are coordinated by screw thread, and tommy bar 19 is set in screw mandrel 18.The side of clamp 17 is provided with lock 20。
During construction, the support being fixedly connected is pushed into from elevator door opening, platform support 11 is folded state during push-in, is made Landing beam 2 passes through door opening.After support is in place, two groups of pinching beams it will be fixed on up and down on portal concrete wall, and by fastening Part 6 is clamped.Support safety and firmness, loading force are big.Workmen lays pedal net 8 on landing beam 2 afterwards, forms operation flat Platform.According to the big minor adjustment inner beam 21 of elevator operating platform can be made to be applied to the elevator of any size.
Described above is only general principle of the present utility model, and not the utility model is imposed any restrictions, every foundation The utility model carries out equivalent variations and modification to it, within the category of the art of this patent protection scheme.

Claims (8)

1. elevator safety devices installation operation platform, it is characterised in that including column, landing beam, pinching beams, bearing diagonal, Symmetrically arranged column is fixedly connected with landing beam, and two groups are used for the pinching beams for clamping concrete wall by fastener and column up and down It is flexibly connected, pinching beams include interior pinching beams and outer pinching beams, bearing diagonal, two platforms is provided between column and landing beam Laying pedal net above folding stage support, landing beam is provided with the outside of beam.
2. elevator safety devices installation operation platform according to claim 1, it is characterised in that upper group of described clamping The lower section of crossbeam is provided with folding clamping support, and the lower section of the following group pinching beams is provided with clamping cushion block.
3. elevator safety devices installation operation platform according to claim 1, it is characterised in that two described landing beams The distance between be less than elevator door opening width.
4. elevator safety devices installation operation platform according to claim 1, it is characterised in that described landing beam is Provided with contraction regulation inner beam in hollow chamber profile, landing beam.
5. elevator safety devices installation operation platform according to claim 1, it is characterised in that two landing beam it Between fix connecting rod and scissors strut.
6. elevator safety devices installation operation platform according to claim 1, it is characterised in that two described columns it Between fix connecting rod and scissors strut.
7. elevator safety devices installation operation platform according to claim 1, it is characterised in that the fastener includes U-shaped card ring, clamp, screw mandrel, tommy bar, U-shaped card ring and clamp are flexibly connected, and clamp and screw mandrel are connected through a screw thread, and tommy bar is arranged In screw mandrel.
8. elevator safety devices installation operation platform according to claim 1, it is characterised in that described pedal net by Polylith list web plate assembles.
CN201720257169.4U 2017-03-16 2017-03-16 Elevator safety devices installation operation platform Expired - Fee Related CN206599981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720257169.4U CN206599981U (en) 2017-03-16 2017-03-16 Elevator safety devices installation operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720257169.4U CN206599981U (en) 2017-03-16 2017-03-16 Elevator safety devices installation operation platform

Publications (1)

Publication Number Publication Date
CN206599981U true CN206599981U (en) 2017-10-31

Family

ID=60145510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720257169.4U Expired - Fee Related CN206599981U (en) 2017-03-16 2017-03-16 Elevator safety devices installation operation platform

Country Status (1)

Country Link
CN (1) CN206599981U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972849A (en) * 2019-04-23 2019-07-05 杭州昂创科技有限公司 Inside and outside self-stabilising in sliding type electric stair shaft safety device construction method
CN111119461A (en) * 2020-01-10 2020-05-08 日立电梯(中国)有限公司 A operation platform that is used for steel construction elevator well installation top hoisting point
CN111576831A (en) * 2020-05-14 2020-08-25 中国化学工程第三建设有限公司 Method for building overhanging platform of prilling tower, lifting method and overhanging platform
CN111576900A (en) * 2020-04-23 2020-08-25 张达芬 Safety protection device for building construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972849A (en) * 2019-04-23 2019-07-05 杭州昂创科技有限公司 Inside and outside self-stabilising in sliding type electric stair shaft safety device construction method
CN111119461A (en) * 2020-01-10 2020-05-08 日立电梯(中国)有限公司 A operation platform that is used for steel construction elevator well installation top hoisting point
CN111576900A (en) * 2020-04-23 2020-08-25 张达芬 Safety protection device for building construction
CN111576831A (en) * 2020-05-14 2020-08-25 中国化学工程第三建设有限公司 Method for building overhanging platform of prilling tower, lifting method and overhanging platform
CN111576831B (en) * 2020-05-14 2022-06-03 中国化学工程第三建设有限公司 Method for building overhanging platform of prilling tower, lifting method and overhanging platform

Similar Documents

Publication Publication Date Title
CN206599981U (en) Elevator safety devices installation operation platform
CN203867216U (en) Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN206110656U (en) Scalable foldable integrally lift up tube formwork of elevartor shaft
CN204126230U (en) Assembly scaffold unit
CN205224567U (en) Collapsible foldable elevartor shaft construction platform
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN202787926U (en) Overhanging scaffold simple and convenient to disassemble and assemble
AU2017268028A1 (en) A perimeter safety screen assembly
CN105776092B (en) A kind of extended position nacelle device
CN212866793U (en) Assembled construction elevator stops layer platform
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN105256989A (en) Elevator shaft civil construction movable platform
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN106193586A (en) Elevator Telescopic folding Integral lifting core
CN102720357B (en) High form-tie assembly
CN108756197A (en) A kind of construction method of hoistway operation platform
CN114687567B (en) Method for hanging construction tool of ultrahigh heavy embedded part
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN208363559U (en) A kind of hoistway operation platform level adjusting structure
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN201808660U (en) Movable scaffold hook

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031

Termination date: 20210316

CF01 Termination of patent right due to non-payment of annual fee