CN206592140U - A kind of recyclable pressure-relieving achor bar - Google Patents
A kind of recyclable pressure-relieving achor bar Download PDFInfo
- Publication number
- CN206592140U CN206592140U CN201720191740.7U CN201720191740U CN206592140U CN 206592140 U CN206592140 U CN 206592140U CN 201720191740 U CN201720191740 U CN 201720191740U CN 206592140 U CN206592140 U CN 206592140U
- Authority
- CN
- China
- Prior art keywords
- anchor
- fixed
- brute spring
- anchor head
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A kind of recyclable pressure-relieving achor bar that the utility model is provided, including anchor bar body, nut, metal washer, rubber bush, brute spring, pallet, support and fixed anchor head.The brute spring is enclosed on the top of anchor bar body, between pallet and metal washer, and the outside of packing ring applies prestressing force by nut.The brute spring outer cover rubber sleeve cylinder, can play a part of protecting spring, lower nut can be directly unloaded when reclaiming spring, reclaim spring and sleeve is reused.Wherein anchor pole end is the bigger fixation anchor head of diameter, and fixed anchor head is connected through a screw thread with anchor pole.Fixed anchor head afterbody has four supports, plays a part of increasing anchor force, anchor pole is not drawn out easily.When moderate finite deformation occurs for country rock, anchor pole end is fixed in the presence of fixed anchor head and strut, and brute spring compressive deformation is realized to allow and is pressed into and protects anchor pole from breaking.
Description
Technical field
The utility model is related to a kind of anchor pole, and in particular to a kind of recyclable, makes pressure effect good, can absorb country rock strain
The pressure-relieving achor bar of energy.
Background technology
In recent years, with the depleted of superficial part coal resources, the mining depth of coal is continued to increase, and is formd and is adopted greatly
Deep, highland pressure, thump, the situation of complicated mining conditions.Traditional rigid anchor pole is under this geological environment, usually because fast
Failure is broken in fast or violent deformation, it is difficult to play due support action.Rigidity will result in greatly that elongation percentage is relatively low, and this is also
Why common bolt can not adapt to the heavily stressed key reason of deep-well.In addition, most of anchor pole is only using once, this gives coal
Ore deposit brings certain economic loss and the wasting of resources.
The content of the invention
Relatively low in order to solve common bolt elongation percentage in the prior art, anchor pole is easily pulled off and irretrievable problem,
The utility model provides a kind of recyclable pressure-relieving achor bar.
A kind of recyclable pressure-relieving achor bar, including anchor bar body, nut, metal washer, rubber bush, brute spring, pallet, support
Frame and fixed anchor head.Described brute spring internal diameter is slightly larger than anchor bar body, is directly sleeved on anchor bar body, positioned at pallet and metal gasket
Between circle and brute spring outer cover rubber sleeve cylinder.Metal washer rear portion abuts nut, and anchor pole end is provided with fixed anchor head,
It is connected through a screw thread with anchor bar body.The fixed anchor head is provided with support, is fixed on by way of welding on anchor head.
The utility model compared with prior art, has the advantages that:
A kind of above-mentioned recyclable pressure-relieving achor bar using brute spring as pressure device is allowed, when country rock occurs acutely rapidly to become
During shape, spring stress compression deforms, and absorbs the energy of outside surrouding rock deformation, the kinetic energy of outside surrouding rock deformation is changed into
Elastic potential energy, plays a part of protecting anchor rod body;While brute spring outer cover rubber sleeve cylinder, can be by under spring and mine
Wet environment isolation, spring corrosion is effectively prevented, beneficial to recovery;The anchor pole end has the device for strengthening anchoring, fixed
Anchor head internal diameter is bigger, is connected by screw thread with anchor pole, and anchor head afterbody is provided with support, when anchor pole is by outside pulling force, support
Drilling palisades will be blocked, prevent anchor pole from sliding, increase the anchor force of anchor pole.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is principle schematic diagram of the present utility model.
Fig. 2 is the stereogram of rubber bush 4.
Fig. 3 is the stereogram of fixed anchor head 8.
In Fig. 1,2,3,1 anchor bar body, 2 nuts, 3 metal washers, 4 rubber bush, 5 brute springs, 6 pallets, 7 supports, 8 are consolidated
Determine anchor head
Embodiment
The utility model is described in detail with reference to Fig. 1.
A kind of recyclable pressure-relieving achor bar, including 1 anchor bar body, 2 nuts, 3 metal washers, 4 rubber bush, 5 brute springs, 6
Anchor head is fixed in pallet, 7 supports and 8.Fixed anchor head 8 is connected with anchor bar body 1 first when equipment is installed, then by the brill in drilling
Bits and rubble clean out, be put into after resin explosive roll and anchor anchor bar body 1 in the borehole, then by a pallet 6, brute spring 5,
Rubber bush 4, metal washer 3 are inserted in the afterbody of anchor bar body 1 respectively, are finally fastened and fixed the body of rod 1 with nut 2, make each part
It is in close contact and pallet 6 is close to country rock, last tension to regulation pretightning force.
When acutely rapidly deformation occurs for country rock, anchor bar body 1 is by the pulling force towards lane space, in Anchor Agent, support
Anchor pole end is fixed in the presence of frame 7 and fixed anchor head 8, provides larger anchor force for anchor pole, now the stress of brute spring 5
Compression realization allows pressure;When anchor pole, which completes support work, to be reclaimed, nut 2 is unloaded into taking-up brute spring 5 and rubber bush 4
Complete to reclaim.
Claims (4)
1. a kind of recyclable pressure-relieving achor bar, by anchor bar body, nut, metal washer, rubber bush, brute spring, pallet, support and
Fixed anchor head composition, it is characterised in that brute spring is located between pallet and metal washer, and metal washer rear portion abuts spiral shell
Mother, anchor pole end is provided with fixed anchor head, and the fixed anchor head is provided with support.
2. a kind of recyclable pressure-relieving achor bar as claimed in claim 1, it is characterised in that the internal diameter of brute spring is slightly larger than anchor pole
Body, is directly sleeved on anchor bar body, and brute spring outer cover rubber sleeve cylinder.
3. a kind of recyclable pressure-relieving achor bar as claimed in claim 1, it is characterised in that fixed anchor head passes through screw thread with anchor bar body
Connection, support is fixed on anchor head by way of welding.
4. a kind of recyclable pressure-relieving achor bar as claimed in claim 2, it is characterised in that the brute spring and rubber bush can
Reclaimed by dismantling rearward nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720191740.7U CN206592140U (en) | 2017-03-01 | 2017-03-01 | A kind of recyclable pressure-relieving achor bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720191740.7U CN206592140U (en) | 2017-03-01 | 2017-03-01 | A kind of recyclable pressure-relieving achor bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206592140U true CN206592140U (en) | 2017-10-27 |
Family
ID=60126792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720191740.7U Expired - Fee Related CN206592140U (en) | 2017-03-01 | 2017-03-01 | A kind of recyclable pressure-relieving achor bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206592140U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107559033A (en) * | 2017-10-31 | 2018-01-09 | 武汉理工大学 | A kind of multi-functional pressure-relieving achor bar |
CN110344409A (en) * | 2019-07-12 | 2019-10-18 | 中南大学 | A kind of anchor pole anchor head assembly of energy-absorbing damping |
CN110924999A (en) * | 2019-12-12 | 2020-03-27 | 山东里能鲁西矿业有限公司 | Anchor-withdrawing yielding device |
CN111075486A (en) * | 2019-12-30 | 2020-04-28 | 安徽理工大学 | Recoverable anchor rod with external friction nails |
CN112360528A (en) * | 2020-10-27 | 2021-02-12 | 国网经济技术研究院有限公司 | Surrounding rock anchoring supporting structure with controllable anchoring force and large deformation adaptability |
CN113982663A (en) * | 2021-09-24 | 2022-01-28 | 中国矿业大学(北京) | Yielding anchor rod and supporting method |
CN114411724A (en) * | 2022-01-21 | 2022-04-29 | 浙江工业大学 | Load-holding and shock-absorbing device for anchor head of recyclable anchor rod |
-
2017
- 2017-03-01 CN CN201720191740.7U patent/CN206592140U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107559033A (en) * | 2017-10-31 | 2018-01-09 | 武汉理工大学 | A kind of multi-functional pressure-relieving achor bar |
CN110344409A (en) * | 2019-07-12 | 2019-10-18 | 中南大学 | A kind of anchor pole anchor head assembly of energy-absorbing damping |
CN110344409B (en) * | 2019-07-12 | 2024-01-26 | 中南大学 | Energy-absorbing and shock-absorbing anchor rod head device |
CN110924999A (en) * | 2019-12-12 | 2020-03-27 | 山东里能鲁西矿业有限公司 | Anchor-withdrawing yielding device |
CN111075486A (en) * | 2019-12-30 | 2020-04-28 | 安徽理工大学 | Recoverable anchor rod with external friction nails |
CN112360528A (en) * | 2020-10-27 | 2021-02-12 | 国网经济技术研究院有限公司 | Surrounding rock anchoring supporting structure with controllable anchoring force and large deformation adaptability |
CN113982663A (en) * | 2021-09-24 | 2022-01-28 | 中国矿业大学(北京) | Yielding anchor rod and supporting method |
CN114411724A (en) * | 2022-01-21 | 2022-04-29 | 浙江工业大学 | Load-holding and shock-absorbing device for anchor head of recyclable anchor rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206592140U (en) | A kind of recyclable pressure-relieving achor bar | |
CN103016035B (en) | Abdicating buffer energy-absorbing shock-proof anchor rod cable for coal mine | |
CN206397530U (en) | A kind of self extending large deformation anchor rod | |
CN108868856B (en) | Energy-absorbing anchoring method of high-impact-resistant large-deformation energy-absorbing anchoring tray assembly | |
CN206419054U (en) | A kind of self-drilling type two-stage, which allows, presses recyclable grouted anchor bar | |
CN205330701U (en) | Extensible energy -absorbing anchor | |
CN203669901U (en) | Mining telescopic energy absorption and scour prevention viscous damping anchor rod | |
CN105909288B (en) | Ripple energy-consumption anchor rod is inhaled in a kind of anti-rock burst | |
CN102182478B (en) | Fast wave eliminating/energy dissipating/cushioning device for mining | |
CN105736023A (en) | Large-deformation energy-absorption anchor rod | |
CN109026105A (en) | The anchor rod component and its method for protecting support of coal mine roadway buffering surrouding rock deformation | |
CN108775253A (en) | A kind of damping energy-absorption anchor rod pallet | |
CN104818723A (en) | Anti-sliding pile for slope support | |
CN105822332A (en) | Mining abdication friction-type energy absorption and impact prevention anchor rod | |
CN108547649B (en) | Large-deformation energy-absorbing anchor rod with fine and simplified structure | |
CN103541746B (en) | A kind of energy-absorbing erosion control backboard of support | |
CN205117379U (en) | Let pressure stock from advancing formula large deformation | |
CN110259495A (en) | A kind of compound support method based on erosion control decompression anchor cable | |
CN102536280B (en) | Resistance-increasing yielding anchor rod | |
CN111828067A (en) | Expansion anchoring bolt for controlling roadway surrounding rock and using method thereof | |
CN205618183U (en) | Mining friction formula energy -absorbing scour protection stock of stepping down | |
CN105422151B (en) | A kind of extensible energy-absorbing anchor | |
CN103982212B (en) | The anti-energy-absorbing checking motion that allows of mining hexagon tubular type | |
CN206233942U (en) | Frictional spring pressure-relieving achor bar | |
CN103590844A (en) | High pre-stressing force pressure yielding and equalizing coupling anchorage device for soft rock supporting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171027 Termination date: 20180301 |