CN205117379U - Let pressure stock from advancing formula large deformation - Google Patents

Let pressure stock from advancing formula large deformation Download PDF

Info

Publication number
CN205117379U
CN205117379U CN201520861680.6U CN201520861680U CN205117379U CN 205117379 U CN205117379 U CN 205117379U CN 201520861680 U CN201520861680 U CN 201520861680U CN 205117379 U CN205117379 U CN 205117379U
Authority
CN
China
Prior art keywords
sleeve
friction
strength
diameter
anchor rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520861680.6U
Other languages
Chinese (zh)
Inventor
徐开山
朱庆文
陆登科
许垒
杜贻腾
段会玲
陈佃浩
尚黎明
吴帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201520861680.6U priority Critical patent/CN205117379U/en
Application granted granted Critical
Publication of CN205117379U publication Critical patent/CN205117379U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a let pressure stock from advancing formula large deformation, by outer nut, bearing plate, the friction sleeve section of thick bamboo that excels in, the stock body of rod, anti hinder the sleeve pipe and excel in the drill bit constitutes, the friction sleeve section of thick bamboo outer wall that excels in is equipped with the screw thread, the inner wall is equipped with the wedge clutch blocks that the interval equals, the size is unanimous, the inside round platform form friction joint that is equipped with of sleeve, the stock body of rod is both ends threaded smooth rod personally experiences sth. Part of the body, can realize round platform form friction joint and the anti sheathed tube that hinders and wholly be connected, anti hinder the sleeve pipe surface and being equipped with the external screw thread, the internal surface contains the internal thread, and the external diameter is the same with the external diameter of the friction sleeve section of thick bamboo that excels in, just all is less than the maximum diameter of the drill bit that excels in. The utility model discloses can realize the dual pressure effect that lets well, while simple structure, construction convenience, but the wide application is in large deformation weak surrounding rock struts the engineering.

Description

一种自进式大变形让压锚杆A Self-advancing Large Deformation Yield Anchor Rod

技术领域 technical field

本实用新型涉及一种用于岩土工程中常用的让压锚杆,特别是涉及到岩土工程锚固技术领域的一种自进式大变形让压锚杆。 The utility model relates to a yield anchor commonly used in geotechnical engineering, in particular to a self-propelled large-deformation yield anchor in the technical field of geotechnical engineering anchoring.

背景技术 Background technique

对于矿山工程、隧道工程等地下工程,当在软弱围岩中进行施工时,开挖围岩产生的变形能会向自由空间释放。随着施工深度的增加,深部巷道围岩常常表现出大变形的特征,对于其支护问题则要求支架具有很高的初撑力、工作阻力和可伸缩量。 For underground projects such as mine engineering and tunnel engineering, when construction is carried out in weak surrounding rock, the deformation energy generated by excavating the surrounding rock will be released to the free space. With the increase of the construction depth, the surrounding rock of the deep roadway often shows the characteristics of large deformation, and the supporting problem requires the support to have a high initial support force, working resistance and scalability.

目前,锚杆或锚索是作为地下工程围岩支护中应用最多最广的一种形式,可以有效的控制围岩自身的变形。但是传统锚杆存在的以下问题在工程支护中具有一定的局限性: At present, anchor rod or anchor cable is the most widely used form in underground engineering surrounding rock support, which can effectively control the deformation of surrounding rock itself. However, the following problems of traditional bolts have certain limitations in engineering support:

(1)传统锚杆延伸率低,不能满足围岩大变形的要求。围岩发生大变形时,会产生较大的变形能,当围岩变形超出锚杆所能承受的范围时,锚杆或锚索等就会失效; (1) The elongation rate of traditional bolts is low, which cannot meet the requirements of large deformation of surrounding rock. When the surrounding rock undergoes large deformation, a large deformation energy will be generated. When the deformation of the surrounding rock exceeds the range that the anchor can bear, the anchor or anchor cable will fail;

(2)传统锚杆施工过程中,通常采取先成型锚孔再插入锚杆注浆的方式,但在软弱围岩的加固支护中,该方式易出现塌孔现象,导致成孔率较低; (2) In the process of traditional anchor bolt construction, the method of forming the anchor hole first and then inserting the anchor bolt for grouting is usually adopted. However, in the reinforcement and support of weak surrounding rock, this method is prone to hole collapse, resulting in a low porosity rate ;

(3)传统施工插入锚杆过程中,由于受到复杂作用力,很难保持直线状态,使锚杆难以插入锚孔。此时多采用自进式锚杆,即锚杆带有钻头,可充当钻杆自行钻进,而作为钻杆的锚杆体无需拔出。 (3) In the process of inserting the anchor rod in traditional construction, it is difficult to maintain a straight line due to complex forces, making it difficult for the anchor rod to be inserted into the anchor hole. At this time, self-advancing anchor rods are mostly used, that is, the anchor rod has a drill bit, which can be used as a drill rod to drill by itself, and the anchor rod body as a drill rod does not need to be pulled out.

通过以上可知,传统锚杆及其施工过程中,存在延伸率低、成孔效果差、钻进难度大等问题,因此亟需开发一种高强度、高延伸率的新型锚杆。 From the above, it can be seen that the traditional anchor and its construction process have problems such as low elongation, poor hole forming effect, and difficult drilling. Therefore, it is urgent to develop a new anchor with high strength and high elongation.

发明内容 Contents of the invention

为了克服传统锚杆延伸率低,无法满足巷道围岩,特别是软弱围岩发生大变形时的支护需要,有效的避免锚杆体被拉断,本实用新型提出了一种自进式大变形让压锚杆,通过该结构装置可以很好的解决传统锚杆中的一些问题。 In order to overcome the low elongation rate of traditional bolts, which cannot meet the supporting needs of roadway surrounding rock, especially when the weak surrounding rock undergoes large deformation, and effectively prevent the bolt body from being pulled off, the utility model proposes a self-propelled large The deformation gives way to the anchor rod, and some problems in the traditional anchor rod can be solved well through this structural device.

本实用新型是通过下述技术方案予以实现。 The utility model is realized through the following technical solutions.

一种自进式大变形让压锚杆,由外螺母、承压板、高强摩擦套筒、锚杆杆体、抗阻套管和高强钻头组成,其中所述高强摩擦套筒外壁设有螺纹,内壁设有间距相等、大小一致的楔形摩擦块,套筒内部设有一圆台状摩擦接头;所述锚杆杆体为两端带螺纹的光滑杆体,能够实现圆台状摩擦接头与抗阻套管的整体连接;所述抗阻套管外表面设有外螺纹,内表面含有内螺纹,抗阻套管的外径与高强摩擦套筒的外径相同,且均小于高强钻头的最大直径。 A self-propelled large-deformation yielding anchor rod is composed of an outer nut, a pressure bearing plate, a high-strength friction sleeve, an anchor rod body, a resistance sleeve and a high-strength drill bit, wherein the outer wall of the high-strength friction sleeve is provided with threads, The inner wall is provided with wedge-shaped friction blocks with equal spacing and the same size, and a frustum-shaped friction joint is provided inside the sleeve; the anchor rod body is a smooth rod with threads at both ends, which can realize the integration of the frustum-shaped friction joint and the resistance casing Connection; the outer surface of the resistance sleeve is provided with external threads, and the inner surface contains internal threads. The outer diameter of the resistance sleeve is the same as that of the high-strength friction sleeve, and both are smaller than the maximum diameter of the high-strength drill bit.

作为改进,所述高强摩擦套筒为端部开口、底部预留中心圆孔的空心套筒,中心圆孔的直径与所述锚杆杆体的外径相等。 As an improvement, the high-strength friction sleeve is a hollow sleeve with an open end and a central hole reserved at the bottom, and the diameter of the central hole is equal to the outer diameter of the anchor rod body.

作为改进,所述高强摩擦套筒为设置有防腐防锈保护结构的摩擦套筒,其内壁楔形摩擦块为一连续的闭合环体。 As an improvement, the high-strength friction sleeve is a friction sleeve provided with an anti-corrosion and anti-rust protection structure, and the wedge-shaped friction block on its inner wall is a continuous closed ring.

作为改进,所述圆台状摩擦接头下底直径与所述高强摩擦套筒内径相同,上底直径大于锚杆杆体直径且小于高强摩擦套筒内壁楔形摩擦块尖端形成的断面内径;圆台状摩擦接头上底面处留有与锚杆杆体直径相同的内螺纹;另外,该摩擦接头外壁设有楔形凸起,其凸起角度与所述高强摩擦套筒内壁楔形摩擦块角度相同,且间距相等。 As an improvement, the diameter of the lower bottom of the frustum-shaped friction joint is the same as the inner diameter of the high-strength friction sleeve, and the diameter of the upper bottom is larger than the diameter of the anchor rod body and smaller than the inner diameter of the section formed by the tip of the wedge-shaped friction block on the inner wall of the high-strength friction sleeve; the frustum-shaped friction joint An internal thread with the same diameter as the anchor rod body is left on the upper bottom surface; in addition, the outer wall of the friction joint is provided with wedge-shaped protrusions, and the angle of the protrusions is the same as that of the wedge-shaped friction blocks on the inner wall of the high-strength friction sleeve, and the spacing is equal.

作为改进,所述抗阻套管表面设有外螺纹,其外径由最大处渐变至与锚杆杆体外径相同。 As an improvement, the surface of the resistance sleeve is provided with an external thread, the outer diameter of which gradually changes from the largest point to the same outer diameter as the anchor rod.

作为改进,所述锚杆杆体一端套有环形弹性块,该环形弹性块外径小于高强摩擦套筒内壁楔形摩擦块尖端形成的断面内径。 As an improvement, one end of the bolt body is covered with an annular elastic block, and the outer diameter of the annular elastic block is smaller than the inner diameter of the section formed by the tip of the wedge-shaped friction block on the inner wall of the high-strength friction sleeve.

作为改进,在高强摩擦套筒底部圆孔周边安置橡胶工字圈,保证该套筒的封闭状态。 As an improvement, a rubber I-shaped ring is placed around the round hole at the bottom of the high-strength friction sleeve to ensure the closed state of the sleeve.

本实用新型的有益效果为: The beneficial effects of the utility model are:

1)对巷道围岩、特别是大变形软弱围岩支护时,本实用新型锚杆能够随大变形的发生而自动延伸,发挥了高强摩擦套筒的让压作用,使围岩中的变形能得到有效释放。当变形继续增大,光滑锚杆体上的粘结力消失,增加了锚杆体变形的有效长度,变形压力由高强摩擦套筒与抗阻套管共同承担,从而实现了本实用新型的双重让压作用,保证了巷道围岩的稳定; 1) When supporting the surrounding rock of the roadway, especially the weak surrounding rock with large deformation, the anchor rod of the utility model can automatically extend with the occurrence of large deformation, and exert the pressure-relieving effect of the high-strength friction sleeve to make the deformation in the surrounding rock can be effectively released. When the deformation continues to increase, the cohesive force on the smooth anchor body disappears, increasing the effective length of the deformation of the anchor body, and the deformation pressure is jointly borne by the high-strength friction sleeve and the resistance sleeve, thus realizing the dual function of the utility model. The yielding effect ensures the stability of the roadway surrounding rock;

2)本实用新型锚杆端部接有高强钻头,可自行钻进,避免了软弱围岩支护过程中先钻孔再插入锚杆造成的塌孔现象。此外,作为钻杆的锚杆体钻入后无需拔出,提高了施工效率,可广泛应用于大变形软弱围岩支护工程中。 2) The end of the anchor rod of the utility model is connected with a high-strength drill bit, which can be drilled by itself, avoiding the phenomenon of hole collapse caused by drilling first and then inserting the anchor rod in the support process of weak surrounding rock. In addition, the bolt body used as the drill rod does not need to be pulled out after drilling, which improves the construction efficiency and can be widely used in large-deformation weak surrounding rock support projects.

附图说明 Description of drawings

图1为本实用新型一种自进式大变形让压锚杆的结构示意图。 Fig. 1 is a structural schematic diagram of a self-propelled large-deformation yielding anchor rod of the present invention.

图例说明:1-封堵螺母;2-外螺母;3-弹性垫圈;4-承压板;5-高强摩擦套筒;6-圆台状摩擦接头;7-锚杆杆体;8-抗阻套管;9-高强钻头;10-环形弹性块;11-楔形摩擦块;12-橡胶工字圈;13-外螺纹。 Legend: 1-blocking nut; 2-outer nut; 3-elastic washer; 4-pressure bearing plate; 5-high-strength friction sleeve; 6-conical friction joint; Tube; 9-high-strength drill bit; 10-annular elastic block; 11-wedge friction block; 12-rubber I-shaped ring; 13-external thread.

具体实施方式 detailed description

下面结合附图对本实用新型的具体实施方式进行详细说明。 The specific embodiment of the utility model will be described in detail below in conjunction with the accompanying drawings.

如图1所示,本实用新型所述一种自进式大变形让压锚杆,由外螺母2、承压板4、高强摩擦套筒5、锚杆杆体7、抗阻套管8和高强钻头9组成。高强摩擦套筒5为高强度合金套筒,安置于锚杆的尾部,承压板4和外螺母2依次套装在高强摩擦套筒5上,承压板4中间部分预留一中心圆孔,以便其穿过高强摩擦套筒5,承压板4与外螺母2之间增设一弹性垫圈3。高强摩擦套筒5尾部圆孔直径与锚杆杆体7直径相等,套筒内壁粗糙且设有等间距的楔形摩擦块11。 As shown in Figure 1, a self-propelled large deformation pressure anchor rod described in the utility model consists of an outer nut 2, a pressure bearing plate 4, a high-strength friction sleeve 5, an anchor rod body 7, a resistance sleeve 8 and High-strength drill consists of 9 components. The high-strength friction sleeve 5 is a high-strength alloy sleeve, which is placed at the tail of the anchor rod. The pressure bearing plate 4 and the outer nut 2 are sequentially set on the high-strength friction sleeve 5. A central circular hole is reserved in the middle part of the pressure bearing plate 4. An elastic washer 3 is added between the pressure bearing plate 4 and the outer nut 2 so that it passes through the high-strength friction sleeve 5 . The diameter of the round hole at the end of the high-strength friction sleeve 5 is equal to the diameter of the anchor rod body 7, and the inner wall of the sleeve is rough and is provided with wedge-shaped friction blocks 11 at equal intervals.

圆台状摩擦接头6内置于高强摩擦套筒5端部,与锚杆杆体7一端通过螺纹连接。锚杆杆体7为表面光滑的实心杆体,其长度大于高强摩擦套筒5的长度,锚杆杆体7另一端与抗阻套管8连接成一个整体。抗阻套管8为高强合金套管,其表面设有外螺纹13,外径由最大处渐变至与锚杆杆体7外径相同。抗阻套管8另一端与高强钻头9相连接,高强钻头9的直径大于抗阻套管8的外径。锚杆尾部则依次安装承压板4、弹性垫圈3、外螺母2及封堵螺母1,保证了本实用新型锚杆的整体性。 The frustum-shaped friction joint 6 is built into the end of the high-strength friction sleeve 5, and is threadedly connected with one end of the anchor rod body 7. The anchor rod body 7 is a solid rod body with a smooth surface, and its length is greater than that of the high-strength friction sleeve 5. The other end of the anchor rod body 7 is connected with the resistance sleeve 8 as a whole. The resistance casing 8 is a high-strength alloy casing, and its surface is provided with an external thread 13, and its outer diameter gradually changes from the largest point to the same outer diameter as the bolt body 7. The other end of the resistance sleeve 8 is connected with a high-strength drill 9 , and the diameter of the high-strength drill 9 is greater than the outer diameter of the resistance sleeve 8 . Anchor rod rear part then installs bearing plate 4, elastic washer 3, outer nut 2 and plugging nut 1 successively, has guaranteed the integrality of the anchor rod of the present utility model.

为实现本实用新型的大变形性能,该锚杆受拉应力后向外变形延伸,延伸过程中,在圆台状摩擦接头6到达高强摩擦套筒5底部前,该接头外壁的楔形凸起与套筒内壁楔形摩擦块11紧密咬合,使围岩变形产生的压力得到释放,即变形的压力卸载过程中高强摩擦套筒5发挥其逐级让压作用。当圆台状摩擦接头6到达高强摩擦套筒5底部后,围岩继续发生变形,此时因高强摩擦套筒5与抗阻套管8之间的锚杆杆体7较光滑,锚杆杆体7上的粘结力消失,变形产生的压力由高强摩擦套筒5与抗阻套管8共同承担,增加了锚杆体变形的有效长度,即围岩继续变形的压力卸载过程中,高强摩擦套筒5与抗阻套管8共同发挥让压作用,进而实现了本实用新型的双重让压作用。 In order to realize the large deformation performance of the utility model, the bolt deforms and extends outward after being subjected to tensile stress. The wedge-shaped friction blocks 11 on the inner wall of the barrel are tightly engaged, so that the pressure generated by the deformation of the surrounding rock is released, that is, the high-strength friction sleeve 5 exerts its pressure relief function step by step during the pressure unloading process of the deformation. When the frustum-shaped friction joint 6 reaches the bottom of the high-strength friction sleeve 5, the surrounding rock continues to deform. At this time, because the anchor rod body 7 between the high-strength friction sleeve 5 and the resistance sleeve 8 is relatively smooth, The cohesive force disappears, and the pressure generated by the deformation is jointly borne by the high-strength friction sleeve 5 and the resistance sleeve 8, which increases the effective length of the deformation of the bolt body, that is, during the pressure unloading process of the surrounding rock continuing to deform, the high-strength friction sleeve 5 and the resistance casing 8 jointly play the pressure-relieving effect, and then realize the dual pressure-releasing effect of the utility model.

锚杆杆体7上设置环形弹性块10,优化设置在圆台状摩擦接头6与锚杆杆体7连接处,该环形弹性块10外径小于高强摩擦套筒5内壁楔形摩擦块11尖端形成的断面内径,用来缓冲圆台状摩擦接头6达到底部时与高强摩擦套筒5接触时的冲击力。 The anchor rod body 7 is provided with an annular elastic block 10, which is optimally arranged at the junction of the conical friction joint 6 and the anchor rod body 7. The outer diameter of the annular elastic block 10 is smaller than the inner diameter of the section formed by the tip of the wedge-shaped friction block 11 on the inner wall of the high-strength friction sleeve 5 , to buffer the impact force when the frustum-shaped friction joint 6 reaches the bottom and contacts the high-strength friction sleeve 5 .

为了防止水分及岩土颗粒进入高强摩擦套筒5内导致内部结构锈蚀,在高强摩擦套筒5底部圆孔周边上安装一橡胶工字圈12,保证该套筒的封闭状态。 In order to prevent moisture and soil particles from entering the high-strength friction sleeve 5 and cause internal structure corrosion, a rubber I-shaped ring 12 is installed on the periphery of the round hole at the bottom of the high-strength friction sleeve 5 to ensure the closed state of the sleeve.

本实用新型的施工工艺包括以下步骤: Construction technique of the present utility model comprises the following steps:

(1)将环形弹性块10套于锚杆杆体7一端,连接圆台状摩擦接头6与锚杆杆体7,通过高强摩擦套筒5底部圆孔安置该结构,使该结构恰好置于高强摩擦套筒5中心,并依次连接抗阻套管8和高强钻头9; (1) Put the annular elastic block 10 on one end of the anchor rod body 7, connect the circular frustum-shaped friction joint 6 and the anchor rod body 7, and place the structure through the round hole at the bottom of the high-strength friction sleeve 5, so that the structure is just placed on the high-strength friction sleeve The center of the cylinder 5, and sequentially connect the resistance casing 8 and the high-strength drill bit 9;

(2)利用专用钻机将圆台状摩擦接头6与高强摩擦套筒5一起锁定,将连接好的锚杆钻入至指定深度; (2) Use a special drilling rig to lock the frustum-shaped friction joint 6 and the high-strength friction sleeve 5 together, and drill the connected anchor rod to the specified depth;

(3)对该锚杆进行压力注浆,使浆液完全充满整个锚杆体,注浆完毕待浆液达到一定强度时,依次安装承压板4、弹性垫圈3、外螺母2和封堵螺母1,固定。 (3) Perform pressure grouting on the anchor rod to make the grout completely fill the entire anchor rod body. After the grouting is completed and the grout reaches a certain strength, install the pressure bearing plate 4, elastic washer 3, outer nut 2 and plugging nut 1 in sequence ,fixed.

所述步骤(1)中,高强摩擦套筒5在安装前,应检查其筒内是否清洁,若有异物需及时清理。为了防止水分及岩土颗粒进入高强摩擦套筒5内导致内部结构锈蚀,在高强摩擦套筒5底部圆孔周边上安装一橡胶工字圈12,保证该套筒的封闭状态。 In the step (1), before installing the high-strength friction sleeve 5, it should be checked whether the inside of the sleeve is clean, and if there are foreign objects, it should be cleaned up in time. In order to prevent moisture and soil particles from entering the high-strength friction sleeve 5 and cause internal structure corrosion, a rubber I-shaped ring 12 is installed on the periphery of the round hole at the bottom of the high-strength friction sleeve 5 to ensure the closed state of the sleeve.

所述步骤(2)中,锚杆钻进前,利用专用钻机将圆台状摩擦接头6与高强摩擦套筒5一起锁定,防止锚杆在钻入过程中圆台状摩擦接头6与高强摩擦套筒5同时转动。钻入完毕后,对钻孔进行清理。 In the step (2), before the anchor rod is drilled, use a special drilling rig to lock the frustum-shaped friction joint 6 and the high-strength friction sleeve 5 together to prevent the frustum-shaped friction joint 6 from colliding with the high-strength friction sleeve 5 during the drilling of the anchor rod. 5 rotate simultaneously. After drilling, clean the borehole.

所述步骤(3)中,对锚杆全长压力注浆,使浆液完全充填锚杆周围的围岩裂隙,锚杆与周围岩土体粘结成一体,从而加固围岩。当水泥浆体达到一定强度时安装承压板4,拧紧各螺母。 In the step (3), pressure grouting is applied to the entire length of the anchor rod, so that the grout completely fills the cracks in the surrounding rock around the anchor rod, and the anchor rod and the surrounding rock and soil are bonded together, thereby reinforcing the surrounding rock. When the cement slurry reaches a certain strength, the bearing plate 4 is installed, and each nut is tightened.

Claims (3)

1.一种自进式大变形让压锚杆,由外螺母、承压板、高强摩擦套筒、锚杆杆体、抗阻套管和高强钻头组成,其特征在于:所述高强摩擦套筒外壁设有螺纹,内壁设有间距相等、大小一致的楔形摩擦块,套筒内部设有一圆台状摩擦接头;所述锚杆杆体为两端带螺纹的光滑杆体,能够实现圆台状摩擦接头与抗阻套管的整体连接;所述抗阻套管外表面设有外螺纹,内表面含有内螺纹,抗阻套管的外径与高强摩擦套筒的外径相同,且均小于高强钻头的最大直径。 1. A self-propelled large-deformation yielding anchor rod is composed of an outer nut, a pressure bearing plate, a high-strength friction sleeve, an anchor rod body, a resistance sleeve and a high-strength drill bit, and is characterized in that: the high-strength friction sleeve The outer wall is provided with threads, the inner wall is provided with wedge-shaped friction blocks with equal spacing and the same size, and a frustum-shaped friction joint is provided inside the sleeve; the anchor rod body is a smooth rod with threads at both ends, which can realize frustum-shaped friction joints and anti-friction joints. The overall connection of the resistance sleeve; the outer surface of the resistance sleeve is provided with external threads, and the inner surface contains internal threads. The outer diameter of the resistance sleeve is the same as that of the high-strength friction sleeve, and both are smaller than the maximum diameter of the high-strength drill diameter. 2.根据权利要求1所述的一种自进式大变形让压锚杆,其特征在于:所述高强摩擦套筒为端部开口、底部预留中心圆孔的空心套筒,中心圆孔的直径与所述锚杆杆体的外径相等;该高强摩擦套筒外壁设有螺纹,内壁粗糙且设有间距相等、大小一致的楔形摩擦块。 2. A self-propelled large deformation yield anchor according to claim 1, characterized in that: the high-strength friction sleeve is a hollow sleeve with an open end and a central hole reserved at the bottom, and the central hole The diameter is equal to the outer diameter of the anchor rod body; the outer wall of the high-strength friction sleeve is provided with threads, and the inner wall is rough and provided with wedge-shaped friction blocks with equal spacing and the same size. 3.根据权利要求1所述的一种自进式大变形让压锚杆,其特征在于:所述圆台状摩擦接头下底直径与所述高强摩擦套筒内径相同,上底直径大于所述锚杆杆体直径且小于高强摩擦套筒内壁楔形摩擦块尖端形成的断面内径;圆台状摩擦接头上底面处留有与所述锚杆杆体直径相同的内螺纹;另外,该摩擦接头外壁设有楔形凸起,其凸起角度与高强摩擦套筒内壁楔形摩擦块角度相同,且间距相等。 3. A self-propelled large-deformation pressure anchor according to claim 1, characterized in that: the diameter of the lower bottom of the frustum-shaped friction joint is the same as the inner diameter of the high-strength friction sleeve, and the diameter of the upper bottom is larger than the inner diameter of the high-strength friction sleeve. The diameter of the anchor rod body is smaller than the inner diameter of the cross-section formed by the tip of the wedge-shaped friction block on the inner wall of the high-strength friction sleeve; an internal thread with the same diameter as the anchor rod body is left on the upper bottom of the frustum-shaped friction joint; in addition, the outer wall of the friction joint is provided with wedge-shaped The protrusions have the same protrusion angle as the wedge-shaped friction block on the inner wall of the high-strength friction sleeve, and the distances are equal.
CN201520861680.6U 2015-11-03 2015-11-03 Let pressure stock from advancing formula large deformation Expired - Fee Related CN205117379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520861680.6U CN205117379U (en) 2015-11-03 2015-11-03 Let pressure stock from advancing formula large deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520861680.6U CN205117379U (en) 2015-11-03 2015-11-03 Let pressure stock from advancing formula large deformation

Publications (1)

Publication Number Publication Date
CN205117379U true CN205117379U (en) 2016-03-30

Family

ID=55572998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520861680.6U Expired - Fee Related CN205117379U (en) 2015-11-03 2015-11-03 Let pressure stock from advancing formula large deformation

Country Status (1)

Country Link
CN (1) CN205117379U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822332A (en) * 2016-05-05 2016-08-03 辽宁工程技术大学 Mining abdication friction-type energy absorption and impact prevention anchor rod
CN106707332A (en) * 2016-12-06 2017-05-24 山东大学 TSP sensor anchoring device and application method
CN106869977A (en) * 2017-02-28 2017-06-20 河南理工大学 Screw type constant-resistance anchor pole
CN109505640A (en) * 2018-11-19 2019-03-22 陕西煤业化工技术研究院有限责任公司 A kind of screw-type metal pressure-relieving achor bar device
CN110331998A (en) * 2019-07-24 2019-10-15 古小辉 A kind of adaptive pressure release type grouted anchor bar
CN117287243A (en) * 2023-11-07 2023-12-26 中铁隆昌铁路器材有限公司 A stepped compression anchor and its installation method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822332A (en) * 2016-05-05 2016-08-03 辽宁工程技术大学 Mining abdication friction-type energy absorption and impact prevention anchor rod
CN105822332B (en) * 2016-05-05 2018-01-30 辽宁工程技术大学 A kind of mining frictional energy-absorbing impact preventing anchor rod of stepping down
CN106707332A (en) * 2016-12-06 2017-05-24 山东大学 TSP sensor anchoring device and application method
CN106707332B (en) * 2016-12-06 2019-02-26 山东大学 A TSP sensor anchoring device and using method
CN106869977A (en) * 2017-02-28 2017-06-20 河南理工大学 Screw type constant-resistance anchor pole
CN109505640A (en) * 2018-11-19 2019-03-22 陕西煤业化工技术研究院有限责任公司 A kind of screw-type metal pressure-relieving achor bar device
CN110331998A (en) * 2019-07-24 2019-10-15 古小辉 A kind of adaptive pressure release type grouted anchor bar
CN117287243A (en) * 2023-11-07 2023-12-26 中铁隆昌铁路器材有限公司 A stepped compression anchor and its installation method

Similar Documents

Publication Publication Date Title
CN205117379U (en) Let pressure stock from advancing formula large deformation
CN109236337B (en) Arrow anchor rod anchored by multi-section type clamping grouting and using method thereof
CN101906977B (en) Method for preventing and treating large deformation and collapse of softrock tunnel
CN204357467U (en) Scalable internal-injection type secondary anchoring type anchor pole
CN103277122B (en) Method for drilling anchor rod hole and anchoring anchor rod in broken roof
CN205117377U (en) Gob entry driving fender is consolidated and is used slip casting anchor rope
CN103422873B (en) Strong-strength extendable anchor rod
CN102536278B (en) Progressive yielding combined-type extensible anchor rod and construction method thereof
CN108035742B (en) A method of active and passive harmonious support for extremely weak coal seam roadway
CN108979691A (en) A kind of multistage pressure-relieving achor bar
CN102536280B (en) Resistance-increasing yielding anchor rod
CN202882965U (en) Non-resin multi-anchor rock bolt capable of stopping rotation reversely
CN100422448C (en) A kind of anti-corrosion bolt with capsule body
CN105626109B (en) It is a kind of that there is the method for repeating to apply prestressed cable bolting
CN107975041B (en) A casing device for anticorrosion of anchor bolts and an anticorrosion construction method for anchor bolts
CN206256920U (en) Deformed steel bar high-pressure slip casting stock
CN103982211A (en) High-strength large-deformation piston-type resistance-increasing anchor rod
CN204877514U (en) Modular cavity slip casting stock
CN102953742B (en) End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof
CN204663561U (en) A kind of large deformation hollow self-feeding anchor pile
CN103603684B (en) A kind of large deformation prestressed anchor
CN206942798U (en) A kind of coal wall caving anchor pole supplementary anchorage device
CN201214788Y (en) Grouting device under pressure for mortar anchor rod
CN205000980U (en) Stock is drawn in large deformation
CN203847138U (en) Self-propelled hollow grouting anchor rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160330

Termination date: 20161103