CN102182478B - Fast wave eliminating/energy dissipating/cushioning device for mining - Google Patents
Fast wave eliminating/energy dissipating/cushioning device for mining Download PDFInfo
- Publication number
- CN102182478B CN102182478B CN 201110124952 CN201110124952A CN102182478B CN 102182478 B CN102182478 B CN 102182478B CN 201110124952 CN201110124952 CN 201110124952 CN 201110124952 A CN201110124952 A CN 201110124952A CN 102182478 B CN102182478 B CN 102182478B
- Authority
- CN
- China
- Prior art keywords
- rigid sleeve
- energy
- mining
- absorbing material
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The invention belongs to a support facility for mining security and particularly relates to a fast wave eliminating/energy dissipating/cushioning device for mining. The device comprises an upper rigid sleeve (1) and a lower rigid sleeve (2), wherein the bottom of the lower rigid sleeve (2) is fixed with an external bottom cover (6) through threaded connection, the lower rigid sleeve (2) on the external bottom cover (6) is internally provided with a cylindrical compressible energy absorbing material (5), an internal rigid bottom cover (4) is mounted on the energy absorbing material (5), the upper rigid sleeve (1) is arranged on the internal rigid bottom cover (4) through threaded connection, four pin clamps (3) with the same shape are mounted on the lower rigid sleeve (2) in a clamping manner, the internal surface of a circular ring is provided with a trapezoidal boss (3-3), and the trapezoidal boss (3-3) is embedded in a trapezoidal groove (1-1) in the external wall of the upper rigid sleeve (1). Thus, the fast wave eliminating/energy dissipating/cushioning device for mining can avoid damage of mechanical production facilities and casualty accidents of working personnel to the greatest extent.
Description
Technical field
The invention belongs to the mine safety support apparatus, particularly a kind of fast wave eliminating/energy dissipating/cushioning device for mining.
Background technology
Bump is one of main dynamic disaster of mining engineering, the increase that day by day becomes along with the mining mineral resource degree of depth, the bump generation frequency and destructiveness are also further strong, the a large amount of impact energy of abrupt release when occuring to impact, cause tunnel wall caving, roof fall and collapse, the whole unstability of supporting and protection structure, plant equipment is tumbled, is destroyed, even the accident such as casualties, have a strong impact on mineral resources safe working and staff's life security.
Mining support equipment commonly used has timbering, steel bracket, U-shaped steel bracket, hydraulic prop and hydraulic support etc., and all take rigid protection as main, safety factor is very high under the action of static load, substantially can guarantee the safety requirements of support system in the mine.But, in a single day bump happens suddenly in the ore deposit, flexibly pressure energy moment of country rock body inner accumulated, the form with shock wave discharged, be in rigid protection body under the stable state with violent percussion to former, cause support apparatus generation sudden destroying, such as, hydraulic support can cause hydraulic valve to be washed out owing to release is untimely, and hydraulic support is killed.
Existing snubber is divided into fluid pressure buffering and elastic buffer two kinds basically, shock-absorbing capacity and effect are relatively good, but it is not very good using in mine support, bump is same often with the high speed deformation failure of rock mass what discharge a large amount of impact energys, it is fast that this requires snubber to have reaction speed, the strong characteristics of ability of the large and impact-absorbing energy of deflection, and elastic buffer is that the elastic potential energy that impact energy is converted into self can't be laid down energy, oil buffer is facing under the high speed impact and can because release damages not as good as causing, both can not effectively solve the serious problems that bump brings.
Summary of the invention
The object of the invention is to overcome above-mentioned technical deficiency, providing a kind of can subdue shock wave fast, absorbs the fast wave eliminating/energy dissipating/cushioning device for mining of a large amount of bumps energy.
The technical scheme that technical solution problem of the present invention adopts is: fast wave eliminating/energy dissipating/cushioning device for mining comprises the top rigid sleeve, the bottom rigid sleeve, be characterized in being connected and fixed an outside bottom in the bottom thread of bottom rigid sleeve, externally in the bottom rigid sleeve above the bottom columniform compressibility energy-absorbing material is housed, be provided with the gap between energy-absorbing material and the bottom rigid sleeve inwall, dress internal rigid bottom on energy-absorbing material, a top rigid sleeve is threaded above the internal rigid bottom, top rigid sleeve outer wall in upper end thickening place of corresponding bottom rigid sleeve is provided with trapezoidal groove, at corresponding top rigid sleeve outer wall upper trapezoid groove, clamp four with the pin card of shape at the bottom rigid sleeve, pin card is less than 90 degree annulars, the medial surface of annulus is provided with trapezoid boss, in the trapezoidal groove on the rigid sleeve outer wall of trapezoid boss embedding top, the annulus both ends of the surface are equipped with the adpting flange boss, establish screw hole on the adpting flange boss, every adjacent two adpting flange boss all are connected with wing nut with screw rod, at the screw jacket shock mount.
The invention has the beneficial effects as follows: fast wave eliminating/energy dissipating/cushioning device for mining is when occuring for bump; the characteristics that large energy discharges and rock mass is out of shape at a high speed; utilize the larger plastic compression deformation of foamed alloy material based on the flexing principle; the characteristics of higher compressive strength and good good impact toughness; in addition organic cooperation of rigid material; the function of fast wave-damping power consumption under effective performance of the rigid protection ability under the realization action of static load and the percussion; reaching the buffer protection function to the miscellaneous equipment in the support system, thereby farthest avoid machinery production device damage and staff's casualty accident to occur.
Description of drawings
Specify with embodiment below in conjunction with accompanying drawing.
Fig. 1 is fast wave eliminating/energy dissipating/cushioning device for mining structure sectional view.
Fig. 2 is the A-A sectional view among Fig. 1.
Fig. 3 is the structural front view of pin card among Fig. 1.
Fig. 4 is the top view of Fig. 3.
Fig. 5 is the left side view of Fig. 3.
Among the figure, 1-top rigid sleeve; The 1-1-trapezoidal groove; 2-bottom rigid sleeve; The 2-1-gap; The 3-pin card; 3-1-adpting flange boss; The 3-2-screw hole; The 3-3-trapezoid boss; 4-internal rigid bottom; The 5-energy-absorbing material; The outside bottom of 6-; The 7-screw rod; The 8-spring; The 9-wing nut.
The specific embodiment
Embodiment, with reference to accompanying drawing 1 ~ 3, the bottom rigid sleeve 2 of fast wave eliminating/energy dissipating/cushioning device for mining is the cylinder of top barrel thickening, lower thread is connected and fixed outside bottom 6, externally in the bottom rigid sleeve 2 above the bottom 6 columned plasticity energy-absorbing material 5 is housed, energy-absorbing material 5 is reserved gap 2-1 with the inwall of bottom rigid sleeve 2.On energy-absorbing material 5, establish internal rigid bottom 4, the internal rigid bottom 4 fixedly top rigid sleeve 1 that is threaded, top rigid sleeve 1 overlaps with 2 top thickenings place of bottom rigid sleeve, is provided with trapezoidal groove 1-1 at top rigid sleeve 1 outer wall and bottom rigid sleeve 2 inwall overlapping positions.Trapezoidal groove 1-1 place on rigid sleeve 1 outer wall of corresponding top, fill four with the pin card 3 of shape at bottom rigid sleeve 2, pin card 3 is the annular less than 90 degree, the medial surface of annulus is provided with trapezoid boss 3-3, trapezoid boss 3-3 is installed in the trapezoidal groove 1-1 on top rigid sleeve 1 outer wall, the annulus both ends of the surface are equipped with adpting flange boss 3-1, adpting flange boss 3-1 is provided with screw hole 3-2, per two two adjacent adpting flange boss 3-2 all are connected connection with screw rod 7 with wing nut, at screw rod 7 outer pocketed springs 8.
The operating principle of fast wave eliminating/energy dissipating/cushioning device for mining is: place end in contact internal rigid bottom 4 on the plasticity energy-absorbing material 5 in the bottom rigid sleeve 2, the lower end is pressed on the outside bottom 6, does not bear the action of static load of support force and working resistance.Top rigid sleeve 1 embeds in the bottom rigid sleeve 2, trapezoid boss 3-3 on trapezoidal groove 1-1 on the top rigid sleeve 1 and the pin card 3 annulus medial surfaces coincide, rigid sleeve 1 usefulness pin card 3 in top is stuck in trapezoid boss 3-3 place, under the constraint of pin card 3, play and bear and the effect of transmitting static load, when shock loading surpasses nominal load-bearing capacity, top rigid sleeve 1 is broken through the constraint of pin card 3, sink to being embedded in the bottom rigid sleeve 2, by internal rigid bottom 4 impact compress energy-absorbing materials 5, bottom rigid sleeve 2 provides the effect of pin card 3 movable channels and constraint energy-absorbing material 5 distortion expansion, and 6 of outside bottoms are born in top static load and the impact compress process energy-absorbing material 5 bottoms to its pressure-acting.Whole device plays the cushioning effect of fast wave-damping power consumption during bump to burst.
Claims (1)
1. fast wave eliminating/energy dissipating/cushioning device for mining, comprise top rigid sleeve (1), bottom rigid sleeve (2), it is characterized in that being connected and fixed an outside bottom (6) in the bottom thread of bottom rigid sleeve (2), externally in the bottom rigid sleeve (2) above the bottom (6) columniform compressibility energy-absorbing material (5) is housed, be provided with gap (2-1) between energy-absorbing material (5) and bottom rigid sleeve (2) inwall, dress internal rigid bottom (4) on energy-absorbing material (5), a top rigid sleeve (1) is threaded above the internal rigid bottom (4), top rigid sleeve (1) outer wall in corresponding bottom rigid sleeve (2) upper end thickening place is provided with trapezoidal groove (1-1), locate at corresponding top rigid sleeve (1) outer wall upper trapezoid groove (1-1), clamp four pin cards with shape (3) at bottom rigid sleeve (2), pin card (3) is less than 90 degree annulars, the medial surface of annulus is provided with trapezoid boss (3-3), in the trapezoidal groove (1-1) on trapezoid boss (3-3) embedding top rigid sleeve (1) outer wall, the annulus both ends of the surface are equipped with adpting flange boss (3-1), establish screw hole (3-2) on the adpting flange boss (3-1), every adjacent two adpting flange boss (3-1) all use screw rod (7) to be connected 9 with wing nut) connect pocketed springs (8) outside screw rod (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110124952 CN102182478B (en) | 2011-05-16 | 2011-05-16 | Fast wave eliminating/energy dissipating/cushioning device for mining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110124952 CN102182478B (en) | 2011-05-16 | 2011-05-16 | Fast wave eliminating/energy dissipating/cushioning device for mining |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102182478A CN102182478A (en) | 2011-09-14 |
CN102182478B true CN102182478B (en) | 2013-03-13 |
Family
ID=44568756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110124952 Expired - Fee Related CN102182478B (en) | 2011-05-16 | 2011-05-16 | Fast wave eliminating/energy dissipating/cushioning device for mining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102182478B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321660B (en) * | 2013-06-25 | 2015-04-22 | 辽宁工程技术大学 | Mining constant-resistance yielding energy-absorbing impact-resisting supporting device |
CN103541747B (en) * | 2013-10-10 | 2015-08-19 | 辽宁工程技术大学 | A kind of flower shape thin-walled energy-absorbing erosion control suspension device |
CN103557017B (en) * | 2013-11-08 | 2015-06-17 | 辽宁工程技术大学 | Impact-resistance and energy-absorption lengthening bar for single prop |
CN103628901B (en) * | 2013-12-10 | 2016-09-28 | 辽宁工程技术大学 | Mining diameter-expanding type anti-impact single hydraulic bracket |
CN104228729B (en) * | 2014-09-29 | 2017-10-20 | 长城汽车股份有限公司 | Anticollision beam assembly, vehicle body and automobile |
CN104806265B (en) * | 2015-03-31 | 2017-01-25 | 辽宁工程技术大学 | Impact ground pressure preventing method of full seam gateway |
CN106494450A (en) * | 2016-12-26 | 2017-03-15 | 深圳市乾行达科技有限公司 | A kind of can Fast-Maintenance energy absorption device |
CN106894832B (en) * | 2017-04-25 | 2019-01-15 | 沈阳航空航天大学 | A kind of metal cutting formula energy-absorbing erosion control hydraulic vertical prop |
CN112648332A (en) * | 2020-12-03 | 2021-04-13 | 北京科技大学 | Spherical cell hole ladder-shaped deformation ore pressure controller and method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2756828Y (en) * | 2004-12-22 | 2006-02-08 | 吴先法 | Hydraulic sinigle support pole movable pole protective sleeve |
CN2875900Y (en) * | 2006-01-23 | 2007-03-07 | 株洲时代新材料科技股份有限公司 | Elastic energy absorbing device of rail vehicle |
US20070245674A1 (en) * | 2006-03-30 | 2007-10-25 | Hubbell David A | Structural support system |
CN201696063U (en) * | 2010-06-08 | 2011-01-05 | 辽宁工程技术大学 | Hard-soft energy-absorbing coupling monomer bracket device |
CN202039873U (en) * | 2011-05-16 | 2011-11-16 | 辽宁工程技术大学 | Fast wave absorption and energy dissipation buffering device for mines |
-
2011
- 2011-05-16 CN CN 201110124952 patent/CN102182478B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102182478A (en) | 2011-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102182478B (en) | Fast wave eliminating/energy dissipating/cushioning device for mining | |
CN108868856B (en) | Energy-absorbing anchoring method of high-impact-resistant large-deformation energy-absorbing anchoring tray assembly | |
CN103573279A (en) | Mining telescopic energy adsorption anti-impact viscous damping anchor rod and supporting method thereof | |
CN103321660B (en) | Mining constant-resistance yielding energy-absorbing impact-resisting supporting device | |
CN102787678B (en) | Shear wall structure with energy-consuming horizontal seam | |
CN102619539A (en) | Mining fast energy absorption erosion prevention yielding component | |
CN105736023A (en) | Large-deformation energy-absorption anchor rod | |
CN103541746B (en) | A kind of energy-absorbing erosion control backboard of support | |
CN204572019U (en) | A kind of hydraulic supporting dagger with buffering | |
CN203144886U (en) | Pot type rubber bearing with damping mechanism | |
CN103089282B (en) | High-strength light erosion prevention support | |
CN202039873U (en) | Fast wave absorption and energy dissipation buffering device for mines | |
CN108049402B (en) | Prestressed anchor rod | |
CN110259495A (en) | A kind of compound support method based on erosion control decompression anchor cable | |
CN103982208A (en) | Mine inner and outer turnover resistive energy-absorption anti-impact device | |
CN107299697B (en) | Energy-dissipating type shear wall foundation | |
CN208415084U (en) | A kind of road and bridge construction device | |
CN218177258U (en) | Constant-resistance yielding anchor rod | |
CN103557008B (en) | The erosion control supporting and protection structure of walled metallic structure and the coupling of tunnel anchoring country rock | |
CN102400695A (en) | Intelligent anti-impact bracket device | |
CN116291656A (en) | Belleville spring type impact energy-absorbing protective device | |
CN202596748U (en) | Mine supporting member capable of rapidly absorbing energy and preventing scouring for avoidance | |
CN103306693B (en) | Mining Double energy protecting against shock beam | |
CN105464239A (en) | Combined pre-compression automatic rebound horizontal shearing locking device | |
CN218716869U (en) | Anti-impact hydraulic support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130313 Termination date: 20160516 |