CN206591501U - A kind of hydraulic engineering flood discharging groove - Google Patents

A kind of hydraulic engineering flood discharging groove Download PDF

Info

Publication number
CN206591501U
CN206591501U CN201720234019.1U CN201720234019U CN206591501U CN 206591501 U CN206591501 U CN 206591501U CN 201720234019 U CN201720234019 U CN 201720234019U CN 206591501 U CN206591501 U CN 206591501U
Authority
CN
China
Prior art keywords
steel plate
plate
steel
tiltedly
discharging groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720234019.1U
Other languages
Chinese (zh)
Inventor
李东杰
任锦朝
孟剑
古集贤
张亚波
崔丽分
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720234019.1U priority Critical patent/CN206591501U/en
Application granted granted Critical
Publication of CN206591501U publication Critical patent/CN206591501U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开了一种水利工程用泄洪槽,包括多个钢结构板组,相邻钢结构板组之间采用螺栓固定,钢结构板组包括左斜钢板、右斜钢板、第一连接钢板、第二连接钢板和加宽钢板,左斜钢板的上端面、第一连接钢板的左右两个侧面、加宽钢板的右侧面、第二连接钢板的右端面以及右斜钢板的上端面均设有规格相同的钢连接板,各个部件上的刚连接板与其部件之间均为一体成型,左斜钢板的下端面、加宽钢板的左侧面、第二连接钢板的左侧面以及右斜钢板的下端面上均设有与刚连接板相匹配的连接槽,左斜钢板、第一连接钢板、加宽钢板、第二连接钢板和右斜钢板通过刚连接板插入连接槽从左到右依次连接,并通过螺栓固定。本实用新型结构简单,便于安装,连接牢固。

The utility model discloses a flood discharge trough for water conservancy engineering, which comprises a plurality of steel structure plate groups, and bolts are used to fix the adjacent steel structure plate groups, and the steel structure plate groups include left inclined steel plates, right inclined steel plates and first connecting steel plates , the second connecting steel plate and the widening steel plate, the upper end surface of the left inclined steel plate, the left and right sides of the first connecting steel plate, the right side of the widening steel plate, the right end surface of the second connecting steel plate and the upper end surface of the right inclined steel plate There are steel connecting plates with the same specifications, and the rigid connecting plates on each component are integrally formed with their components. The lower end surface of the left inclined steel plate, the left side of the widened steel plate, the left side of the second connecting steel plate and the right The lower end surface of the inclined steel plate is provided with a connecting groove matching the rigid connecting plate. The left inclined steel plate, the first connecting steel plate, the widened steel plate, the second connecting steel plate and the right inclined steel plate are inserted into the connecting groove through the rigid connecting plate from left to right. Connect right in turn and secure with bolts. The utility model has the advantages of simple structure, convenient installation and firm connection.

Description

一种水利工程用泄洪槽A flood discharge channel for water conservancy projects

技术领域technical field

本实用新型涉及水利工程领域,具体为一种水利工程用泄洪槽。The utility model relates to the field of water conservancy engineering, in particular to a flood discharge trough for water conservancy engineering.

背景技术Background technique

泄洪槽是用于宣泄规划库容所不能容纳的洪水,保证坝体安全的开敞式或带有胸墙进水口的溢流泄水建筑物,一般不经常工作,但却是水库枢纽中的重要建筑物。泄洪槽按泄洪标准和运用情况,分为正常泄洪槽和非常泄洪槽。前者用以宣泄设计洪水,后者用于宣泄非常洪水。按其所在位置,分为河床式泄洪槽和岸边泄洪槽。The spillway is an open type or an overflow discharge structure with breast wall water inlet used to vent the flood that cannot be accommodated by the planned reservoir to ensure the safety of the dam body. It generally does not work frequently, but it is an important building in the reservoir hub. things. According to flood discharge standards and operating conditions, the flood discharge channels are divided into normal flood discharge channels and extraordinary flood discharge channels. The former is used to vent design floods, and the latter is used to vent extraordinary floods. According to its location, it can be divided into riverbed spillway and bank spillway.

在遇到紧急洪灾的时候,为了泄洪需要,往往会人工挖取泄洪道,由于刚挖出的泄洪道两侧土质松软,经常会被洪水冲垮,还需要不断的加固,十分费时费力,还具有一定的危险,为了解决这些问题,我们提出了一种水利工程用泄洪槽。In the event of an emergency flood, in order to discharge the flood, the spillway is often manually excavated. Because the soil on both sides of the newly dug spillway is soft, it is often washed away by the flood, and it needs continuous reinforcement, which is very time-consuming and labor-intensive. Certain dangers, in order to solve these problems, we propose a kind of spillway for water conservancy projects.

实用新型内容Utility model content

本实用新型的目的在于提供一种水利工程用泄洪槽,方便生活中的使用,增加使用的安全性。The purpose of the utility model is to provide a flood discharge channel for water conservancy projects, which is convenient for use in daily life and increases the safety of use.

为实现上述目的,本实用新型提供如下技术方案:一种水利工程用泄洪槽,包括多个钢结构板组,相邻钢结构板组之间采用螺栓固定,所述钢结构板组包括左斜钢板、右斜钢板、第一连接钢板、第二连接钢板和加宽钢板,所述左斜钢板的上端面、第一连接钢板的左右两个侧面、加宽钢板的右侧面、第二连接钢板的右端面以及右斜钢板的上端面均设有规格相同的钢连接板,各个部件上的刚连接板与其部件之间均为一体成型,所述左斜钢板的下端面、加宽钢板的左侧面、第二连接钢板的左侧面以及右斜钢板的下端面上均设有与刚连接板相匹配的连接槽,所述左斜钢板、第一连接钢板、加宽钢板、第二连接钢板和右斜钢板通过刚连接板插入连接槽从左到右依次连接,并通过螺栓固定。In order to achieve the above purpose, the utility model provides the following technical solutions: a flood discharge trough for water conservancy projects, including a plurality of steel structure plate groups, and bolts are used to fix the adjacent steel structure plate groups, and the steel structure plate groups include left inclined steel plate, right inclined steel plate, first connecting steel plate, second connecting steel plate and widened steel plate, the upper end surface of the left inclined steel plate, the left and right sides of the first connecting steel plate, the right side of the widened steel plate, the second connecting The right end surface of the steel plate and the upper end surface of the right inclined steel plate are provided with steel connecting plates of the same specification, and the rigid connecting plate on each part and its parts are integrally formed. The lower end surface of the left inclined steel plate and the widened steel plate The left side, the left side of the second connecting steel plate and the lower end surface of the right inclined steel plate are all provided with connecting grooves matching the rigid connecting plate. The left inclined steel plate, the first connecting steel plate, the widened steel plate, the second The connecting steel plate and the right inclined steel plate are connected sequentially from left to right through the insertion of the rigid connecting plate into the connecting groove, and are fixed by bolts.

优选的,所述第一连接钢板的左侧面和第二连接钢板的右侧面为对称的斜面,每个面与水平面的夹角均为四十五度,与左斜钢板和右斜钢板连接时可以形成槽状。Preferably, the left side of the first connecting steel plate and the right side of the second connecting steel plate are symmetrical inclined planes, and the angle between each plane and the horizontal plane is 45 degrees, which is different from the left inclined steel plate and the right inclined steel plate. Grooves can be formed when connected.

优选的,所述加宽钢板的数量可根据实际需要的泄洪槽宽度进行增减,可以满足不同宽度规模的泄洪槽使用,加宽钢板可以进行预装,以节省时间。Preferably, the number of widened steel plates can be increased or decreased according to the actual width of the spillway, which can meet the needs of floodways with different widths, and the widened steel plates can be pre-installed to save time.

优选的,所述左斜钢板和右斜钢板的数量根据实际泄洪槽所需要的高度进行增减,能够满足不同高度要求的泄洪槽,可以对其进行提前预装,以节省时间。Preferably, the number of the left inclined steel plate and the right inclined steel plate is increased or decreased according to the height required by the actual flood discharge channel, and the flood discharge channel that can meet different height requirements can be pre-installed in advance to save time.

与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the utility model are as follows:

1、本实用新型结构简单,采用钢板结构,能够应对洪水的冲击,节省了人力,而且泄洪性好,每个部件连接方便;1. The utility model has a simple structure, adopts a steel plate structure, can cope with the impact of floods, saves manpower, has good flood discharge performance, and is convenient to connect each part;

2、本实用新型能够根据泄洪的规模对泄洪槽的宽度和高度进行增减,以满足使用需求,而且能够提前对部件进行预装,可以减少现场组装的时间,提高施工效率。2. The utility model can increase or decrease the width and height of the flood discharge trough according to the scale of the flood discharge to meet the needs of use, and can pre-install components in advance, which can reduce the time for on-site assembly and improve construction efficiency.

附图说明Description of drawings

图1为本实用新型侧视结构示意图;Fig. 1 is the utility model side view structural representation;

图2为本实用新型俯视结构示意图;Fig. 2 is a schematic view of the structure of the utility model;

图中:1-左斜钢板,2-右斜钢板,3-第一连接钢板,4-第二连接钢板,5-加宽钢板。In the figure: 1-left inclined steel plate, 2-right inclined steel plate, 3-first connecting steel plate, 4-second connecting steel plate, 5-widened steel plate.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-2,本实用新型提供一种技术方案:一种水利工程用泄洪槽,包括多个钢结构板组,相邻钢结构板组之间采用螺栓固定,所述钢结构板组包括左斜钢板1、右斜钢板2、第一连接钢板3、第二连接钢板4和加宽钢板5,所述左斜钢板1的上端面、第一连接钢板3的左右两个侧面、加宽钢板5的右侧面、第二连接钢板4的右端面以及右斜钢板2的上端面均设有规格相同的钢连接板,各个部件上的刚连接板与其部件之间均为一体成型,所述左斜钢板1的下端面、加宽钢板5的左侧面、第二连接钢板4的左侧面以及右斜钢板2的下端面上均设有与刚连接板相匹配的连接槽,所述左斜钢板1、第一连接钢板3、加宽钢板5、第二连接钢板4和右斜钢板2通过刚连接板插入连接槽从左到右依次连接,并通过螺栓固定。Please refer to Figure 1-2, the utility model provides a technical solution: a flood discharge trough for water conservancy projects, including a plurality of steel structure plate groups, bolts are used between adjacent steel structure plate groups, and the steel structure plate groups It includes a left inclined steel plate 1, a right inclined steel plate 2, a first connecting steel plate 3, a second connecting steel plate 4 and a widened steel plate 5, the upper end surface of the left inclined steel plate 1, the left and right sides of the first connecting steel plate 3, and the The right side of the wide steel plate 5, the right end of the second connecting steel plate 4 and the upper end of the right inclined steel plate 2 are all provided with steel connecting plates with the same specifications, and the rigid connecting plates on each part and their parts are integrally formed. The lower end surface of the left inclined steel plate 1, the left side of the widened steel plate 5, the left side of the second connecting steel plate 4 and the lower end surface of the right inclined steel plate 2 are all provided with connecting grooves matching the rigid connecting plate, The left inclined steel plate 1, the first connecting steel plate 3, the widened steel plate 5, the second connecting steel plate 4 and the right inclined steel plate 2 are connected sequentially from left to right through the rigid connecting plate inserted into the connecting groove, and fixed by bolts.

所述第一连接钢板3的左侧面和第二连接钢板4的右侧面为对称的斜面,每个面与水平面的夹角均为四十五度,与左斜钢板1和右斜钢板2连接时可以形成槽状,所述加宽钢板5的数量可根据实际需要的泄洪槽宽度进行增减,可以满足不同宽度规模的泄洪槽使用,加宽钢板5可以进行预装,以节省时间,所述左斜钢板1和右斜钢板2的数量根据实际泄洪槽所需要的高度进行增减,能够满足不同高度要求的泄洪槽,可以对其进行提前预装,以节省时间。The left side of the first connecting steel plate 3 and the right side of the second connecting steel plate 4 are symmetrical inclined planes, and the angle between each plane and the horizontal plane is 45 degrees, which is different from the left inclined steel plate 1 and the right inclined steel plate. 2 When connecting, it can form a groove shape. The number of the widened steel plate 5 can be increased or decreased according to the actual width of the spillway, which can meet the needs of floodwaters with different widths and scales. The widened steel plate 5 can be pre-installed to save time , the number of the left inclined steel plate 1 and the right inclined steel plate 2 is increased or decreased according to the height required by the actual flood discharge tank, and the flood discharge tank that can meet different height requirements can be pre-installed in advance to save time.

工作原理:本实用新型结构简单,采用钢板结构,能够应对洪水的冲击,节省了人力,而且泄洪性好,每个部件连接方便,本实用新型能够根据泄洪的规模对泄洪槽的宽度和高度进行增减,以满足使用需求,而且能够提前对部件进行预装,可以减少现场组装的时间,提高施工效率。Working principle: The utility model has a simple structure, adopts a steel plate structure, can cope with the impact of floods, saves manpower, has good flood discharge performance, and is convenient to connect each part. The utility model can adjust the width and height of the flood discharge groove according to the scale of flood discharge. Increase or decrease to meet the needs of use, and the components can be pre-assembled in advance, which can reduce the time for on-site assembly and improve construction efficiency.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (4)

1. fixed between a kind of hydraulic engineering flood discharging groove, including multiple steel construction plate groups, adjacent steel structural slab group using bolt, It is characterized in that:The steel construction plate group includes left tiltedly steel plate (1), right tiltedly steel plate (2), the first junction steel plate (3), the second connection Steel plate (4) and widen steel plate (5), the left tiltedly upper surface of steel plate (1), the side of left and right two of the first junction steel plate (3) plus The right flank of wide steel plate (5), the upper surface of the oblique steel plate (2) in the right side of the second junction steel plate (4) and the right side are equipped with specification phase It is formed in one between firm connecting plate and its part on same steel connecting plate, all parts, under the left tiltedly steel plate (1) It is all provided with end face, the left surface for widening steel plate (5), the left surface of the second junction steel plate (4) and the right tiltedly lower surface of steel plate (2) There is a link slot matched with firm connecting plate, left tiltedly steel plate (1), first junction steel plate (3), widen steel plate (5), second connect Connect steel plate (4) and right tiltedly steel plate (2) inserts link slot by firm connecting plate and is from left to right sequentially connected, and be bolted.
2. a kind of hydraulic engineering flood discharging groove according to claim 1, it is characterised in that:First junction steel plate (3) Left surface and the right flank of the second junction steel plate (4) be symmetrical inclined-plane, the angle of each face and horizontal plane is 45 Degree.
3. a kind of hydraulic engineering flood discharging groove according to claim 1, it is characterised in that:The number for widening steel plate (5) Amount can be according to actual needs flood discharge well width increased and decreased.
4. a kind of hydraulic engineering flood discharging groove according to claim 1, it is characterised in that:Left tiltedly steel plate (1) and the right side Height of the quantity of oblique steel plate (2) according to required for actual flood discharging groove is increased and decreased.
CN201720234019.1U 2017-03-12 2017-03-12 A kind of hydraulic engineering flood discharging groove Expired - Fee Related CN206591501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720234019.1U CN206591501U (en) 2017-03-12 2017-03-12 A kind of hydraulic engineering flood discharging groove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720234019.1U CN206591501U (en) 2017-03-12 2017-03-12 A kind of hydraulic engineering flood discharging groove

Publications (1)

Publication Number Publication Date
CN206591501U true CN206591501U (en) 2017-10-27

Family

ID=60123827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720234019.1U Expired - Fee Related CN206591501U (en) 2017-03-12 2017-03-12 A kind of hydraulic engineering flood discharging groove

Country Status (1)

Country Link
CN (1) CN206591501U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809572A (en) * 2020-08-18 2020-10-23 中国电建集团成都勘测设计研究院有限公司 Orifice flood discharge structure in concrete dam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809572A (en) * 2020-08-18 2020-10-23 中国电建集团成都勘测设计研究院有限公司 Orifice flood discharge structure in concrete dam

Similar Documents

Publication Publication Date Title
CN104179159B (en) Power station bright flowing full tail water system
CN207003391U (en) A kind of water gate energy-dissipating installation
CN109267549A (en) Diversion tunnel structure
CN206591501U (en) A kind of hydraulic engineering flood discharging groove
CN205475065U (en) Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank
CN204662387U (en) Large-scale deep water inlet air vent arrangement structure
CN111236179A (en) Method and structure for improving surge impact resistance of radial gate
CN110990932B (en) Check dam and design method thereof
CN216041032U (en) Impedance type surge chamber structure with connecting pipe
CN214245623U (en) Aeration facility combining dovetail ridge and wedge-shaped groove
CN116732950A (en) Flow-picking energy dissipation structure suitable for curve river spillway
CN212052583U (en) Water blocking and draining structure
CN212200306U (en) Inner toe board structure for face plate rock-fill dam
CN102912771A (en) Stepped surface local sidewall for air entrainment and cavitation alleviation behind X-type flaring gate pier
CN211498767U (en) Prevent table hole arc gate door top structure that gushes damp
CN203878546U (en) Culvert with energy dissipation function
CN208733587U (en) A kind of large volume cavity type connection monolith structure on step-like foundation plane
CN101235633B (en) water fin remover
CN109797715B (en) Method for optimizing hydraulic flow state of diffusion section of aqueduct
CN209194485U (en) Diversion tunnel structure
CN222666727U (en) Double-side overflow channel structure for solving excessive high flushing wave of power station gate
CN202899091U (en) Stepped upstream wrap for longitudinal cofferdams
CN223074678U (en) A slope protection brick for water conservancy engineering
CN202390806U (en) Debris flow guide structure
CN221682016U (en) A kind of anti-leakage structure of basement car ramp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027

CF01 Termination of patent right due to non-payment of annual fee