CN205062764U - Double-gate structure for high-water-head large-flow discharge tunnel - Google Patents

Double-gate structure for high-water-head large-flow discharge tunnel Download PDF

Info

Publication number
CN205062764U
CN205062764U CN201520780737.XU CN201520780737U CN205062764U CN 205062764 U CN205062764 U CN 205062764U CN 201520780737 U CN201520780737 U CN 201520780737U CN 205062764 U CN205062764 U CN 205062764U
Authority
CN
China
Prior art keywords
gate
tunnel
maintenance
work
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520780737.XU
Other languages
Chinese (zh)
Inventor
杜帅群
湛正刚
慕洪友
李晓彬
杨鹏
申显柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201520780737.XU priority Critical patent/CN205062764U/en
Application granted granted Critical
Publication of CN205062764U publication Critical patent/CN205062764U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a double-gate structure for releasing large-traffic tunnel of high water head, a plurality of work gate and maintenance gate that arrange side by side along perpendicular tunnel axis direction are reached including the tunnel, the work gate sets up in maintenance gate below, and work gate and maintenance gate all are located water inlet low reaches, work gate below still is provided with air vent maintenance stair, the quantity of air vent maintenance stair, work gate and maintenance gate is two to cut off through the gate pier, work gate low reaches link up with the tunnel through the gradual change section. The utility model discloses a set up two or more gates side by side along perpendicular hole axis direction, not only effectively shared the size of single-leaf gate, reduced the gate size, reduced the metallic structure preparation, installation, the operation degree of difficulty, increased the area of intaking simultaneously, the manger plate ability of entire structure has also obtained the improvement, need not follow this problem of solving with traditional increase tunnel number again.

Description

A kind of double-gate structure for high head and large flow tunnel of releasing
Technical field
The utility model belongs to civil works technical field of structures, specifically relates to a kind of double-gate structure for high head and large flow tunnel of releasing.
Background technology
Along with the development of dam construction technique, China has higher requirement to the large storehouse emptying scale of the high dam in Hydraulic and Hydro-Power Engineering and the emptying degree of depth.But, according to the existing gate of China and opening/closing system manufacturing technology level, gate dash head is subject to the two ore control of hydraulic pressure and gate area, namely gate is less, can keep off more head, but gate is less, drawoff discharge is also less, and then reduction project benefit, increase engineering cost, do not reach the design and operation needs of engineering safety economical rationality.Therefore, traditional gate design mode cannot meet the needs of the large discharge engineering of high dam.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of double-gate structure for high head and large flow tunnel of releasing.Thus realize, under equal single gate makes requirement, making bleeder quantity and dash head rise to original twice, not only meet the requirement that engineering safety runs, reduce project playout build simultaneously, improve the globality of main structures, add project benefit, reduce engineering cost.
The utility model is achieved by following technical solution.
A kind of double-gate structure for high head and large flow tunnel of releasing, several Service gates comprising tunnel and be arranged side by side along vertical canal axes direction and Emergency Gate, described Service gate is arranged on below Emergency Gate, and Service gate and Emergency Gate are all positioned at water inlet downstream, below described Service gate, be also provided with air vent maintenance stair.
The quantity of described air vent maintenance stair, Service gate and Emergency Gate is two, and is cut off by gate pier.
Described Service gate downstream is connected with tunnel by transition section.
The beneficial effects of the utility model are:
Compared with prior art, the utility model efficiently solves and increases the contradiction that gate discharge can only reduce its dash head, by being arranged side by side two or more gates along vertical hole axis direction, not only the size of single gate is carried out effectively sharing, decrease igfet gate, reduce metal construction and make, install, run difficulty, increase into water area simultaneously, the water-retaining capacity of total have also been obtained raising, need not continue to use traditional increase tunnel number again and solve this problem.Reduce project playout build, improve the globality of main structures, improve hinge operational efficiency; Decrease the restrictive condition of project playout to comparison and choice, slope excavation, building foundation, improve structure construction, run its safety in production coefficient; Decrease construction investment and duration, be conducive to engineering structures secure persistent and run, add project benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-tunnel, 2-air vent maintenance stair, 3-Service gate, 4-Emergency Gate, 5-gate pier, 6-transition section, 7-water inlet.
Detailed description of the invention
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1, a kind of double-gate structure for high head and large flow tunnel of releasing described in the utility model, several Service gates 3 comprising tunnel 1 and be arranged side by side along vertical tunnel 1 axis direction and Emergency Gate 4, described Service gate 3 is arranged on below Emergency Gate 4, and Service gate 3 and Emergency Gate 4 are all positioned at water inlet 7 downstream, below described Service gate 3, be also provided with air vent maintenance stair 2.The technical program is by being arranged side by side multiple gate along vertical hole axis direction, not only the size of single gate is carried out effectively sharing, decrease igfet gate, reduce metal construction to make, install, run difficulty, increase into water area simultaneously, the water-retaining capacity of total have also been obtained raising, need not continue to use traditional increase tunnel number again and solve this problem.Reduce project playout build, improve the globality of main structures, improve hinge operational efficiency.
The quantity of described air vent maintenance stair 2, Service gate 3 and Emergency Gate 4 is two, and is cut off by gate pier 5.Air vent maintenance stair 2, Service gate 3 and Emergency Gate 4 are symmetrical about gate pier 5 respectively.
Described Service gate 3 downstream is connected with tunnel 1 by transition section 6.
Adopt technique scheme, achieve under equal single gate makes requirement, bleeder quantity and dash head is made to rise to original twice, not only meet the requirement that engineering safety runs, reduce project playout build simultaneously, improve the globality of main structures, add project benefit, reduce engineering cost.

Claims (3)

1. the double-gate structure for high head and large flow tunnel of releasing, it is characterized in that: comprise tunnel (1) and several Service gates (3) of being arranged side by side along vertical tunnel (1) axis direction and Emergency Gate (4), described Service gate (3) is arranged on Emergency Gate (4) below, and Service gate (3) and Emergency Gate (4) are all positioned at water inlet (7) downstream, described Service gate (3) below is also provided with air vent maintenance stair (2).
2. a kind of double-gate structure for high head and large flow tunnel of releasing according to claim 1, it is characterized in that: the quantity that described air vent overhauls stair (2), Service gate (3) and Emergency Gate (4) is two, and cut off by gate pier (5).
3. a kind of double-gate structure for high head and large flow tunnel of releasing according to claim 1, is characterized in that: described Service gate (3) downstream is connected with tunnel (1) by transition section (6).
CN201520780737.XU 2015-10-10 2015-10-10 Double-gate structure for high-water-head large-flow discharge tunnel Active CN205062764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520780737.XU CN205062764U (en) 2015-10-10 2015-10-10 Double-gate structure for high-water-head large-flow discharge tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520780737.XU CN205062764U (en) 2015-10-10 2015-10-10 Double-gate structure for high-water-head large-flow discharge tunnel

Publications (1)

Publication Number Publication Date
CN205062764U true CN205062764U (en) 2016-03-02

Family

ID=55389340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520780737.XU Active CN205062764U (en) 2015-10-10 2015-10-10 Double-gate structure for high-water-head large-flow discharge tunnel

Country Status (1)

Country Link
CN (1) CN205062764U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667248A (en) * 2018-12-21 2019-04-23 中国电建集团贵阳勘测设计研究院有限公司 A multistage manger plate emptying system for high dam engineering
CN109667247A (en) * 2018-12-21 2019-04-23 中国电建集团贵阳勘测设计研究院有限公司 High dam emptying system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667248A (en) * 2018-12-21 2019-04-23 中国电建集团贵阳勘测设计研究院有限公司 A multistage manger plate emptying system for high dam engineering
CN109667247A (en) * 2018-12-21 2019-04-23 中国电建集团贵阳勘测设计研究院有限公司 High dam emptying system

Similar Documents

Publication Publication Date Title
CN104179159B (en) Power station bright flowing full tail water system
CN201874614U (en) Drainage structure for emptying overhaul of derivation tunnel
CN106368185A (en) Hydropower station water inlet gallery desilting system and method
CN204343269U (en) Device of power station layering water intaking
CN205062764U (en) Double-gate structure for high-water-head large-flow discharge tunnel
CN204185835U (en) Power station free pressure flow tail water discharge
CN202181543U (en) Flood discharge tunnel structure
CN204023521U (en) For the drain cavern structure of rotational flow silo
CN202440787U (en) Riverway diversion device
CN207092033U (en) A kind of flood discharging tunnel
CN109518666B (en) Water retaining structure and blocking method for low-layer diversion tunnel
CN102505671B (en) Overhead maintenance passage for diversion tunnels
CN202626933U (en) Curve type water-binding and sand-dividing guide wall
CN204825820U (en) Pressure regulating well structure using traffic hole as upper chamber
CN211898215U (en) Water retaining structure of inverted siphon outlet
CN202064330U (en) Pressure steel pipe inspection access channel structure for high-head hydropower plant
CN109356125A (en) Diversion tunnel is used as the reconstruction structure of two drain caverns
CN206143743U (en) Husky corridor system is arranged to power station water inlet
CN214737829U (en) Small-size water conservancy assembled culvert gate
CN212052875U (en) Shaft flood discharge hole import structure
CN209429082U (en) Diversion tunnel is used as the reconstruction structure of two drain caverns
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN209482270U (en) High dam manger plate is concordance pipe for emptying system step by step
CN204000796U (en) Power station in river channel's structure
CN210827385U (en) Flood discharge drainage channel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant