CN205062764U - Double-gate structure for high-water-head large-flow discharge tunnel - Google Patents
Double-gate structure for high-water-head large-flow discharge tunnel Download PDFInfo
- Publication number
- CN205062764U CN205062764U CN201520780737.XU CN201520780737U CN205062764U CN 205062764 U CN205062764 U CN 205062764U CN 201520780737 U CN201520780737 U CN 201520780737U CN 205062764 U CN205062764 U CN 205062764U
- Authority
- CN
- China
- Prior art keywords
- gate
- tunnel
- maintenance
- work
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012423 maintenance Methods 0.000 claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 8
- 230000007704 transition Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
Landscapes
- Barrages (AREA)
Abstract
The utility model discloses a double-gate structure for releasing large-traffic tunnel of high water head, a plurality of work gate and maintenance gate that arrange side by side along perpendicular tunnel axis direction are reached including the tunnel, the work gate sets up in maintenance gate below, and work gate and maintenance gate all are located water inlet low reaches, work gate below still is provided with air vent maintenance stair, the quantity of air vent maintenance stair, work gate and maintenance gate is two to cut off through the gate pier, work gate low reaches link up with the tunnel through the gradual change section. The utility model discloses a set up two or more gates side by side along perpendicular hole axis direction, not only effectively shared the size of single-leaf gate, reduced the gate size, reduced the metallic structure preparation, installation, the operation degree of difficulty, increased the area of intaking simultaneously, the manger plate ability of entire structure has also obtained the improvement, need not follow this problem of solving with traditional increase tunnel number again.
Description
Technical field
The utility model belongs to civil works technical field of structures, specifically relates to a kind of double-gate structure for high head and large flow tunnel of releasing.
Background technology
Along with the development of dam construction technique, China has higher requirement to the large storehouse emptying scale of the high dam in Hydraulic and Hydro-Power Engineering and the emptying degree of depth.But, according to the existing gate of China and opening/closing system manufacturing technology level, gate dash head is subject to the two ore control of hydraulic pressure and gate area, namely gate is less, can keep off more head, but gate is less, drawoff discharge is also less, and then reduction project benefit, increase engineering cost, do not reach the design and operation needs of engineering safety economical rationality.Therefore, traditional gate design mode cannot meet the needs of the large discharge engineering of high dam.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of double-gate structure for high head and large flow tunnel of releasing.Thus realize, under equal single gate makes requirement, making bleeder quantity and dash head rise to original twice, not only meet the requirement that engineering safety runs, reduce project playout build simultaneously, improve the globality of main structures, add project benefit, reduce engineering cost.
The utility model is achieved by following technical solution.
A kind of double-gate structure for high head and large flow tunnel of releasing, several Service gates comprising tunnel and be arranged side by side along vertical canal axes direction and Emergency Gate, described Service gate is arranged on below Emergency Gate, and Service gate and Emergency Gate are all positioned at water inlet downstream, below described Service gate, be also provided with air vent maintenance stair.
The quantity of described air vent maintenance stair, Service gate and Emergency Gate is two, and is cut off by gate pier.
Described Service gate downstream is connected with tunnel by transition section.
The beneficial effects of the utility model are:
Compared with prior art, the utility model efficiently solves and increases the contradiction that gate discharge can only reduce its dash head, by being arranged side by side two or more gates along vertical hole axis direction, not only the size of single gate is carried out effectively sharing, decrease igfet gate, reduce metal construction and make, install, run difficulty, increase into water area simultaneously, the water-retaining capacity of total have also been obtained raising, need not continue to use traditional increase tunnel number again and solve this problem.Reduce project playout build, improve the globality of main structures, improve hinge operational efficiency; Decrease the restrictive condition of project playout to comparison and choice, slope excavation, building foundation, improve structure construction, run its safety in production coefficient; Decrease construction investment and duration, be conducive to engineering structures secure persistent and run, add project benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-tunnel, 2-air vent maintenance stair, 3-Service gate, 4-Emergency Gate, 5-gate pier, 6-transition section, 7-water inlet.
Detailed description of the invention
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1, a kind of double-gate structure for high head and large flow tunnel of releasing described in the utility model, several Service gates 3 comprising tunnel 1 and be arranged side by side along vertical tunnel 1 axis direction and Emergency Gate 4, described Service gate 3 is arranged on below Emergency Gate 4, and Service gate 3 and Emergency Gate 4 are all positioned at water inlet 7 downstream, below described Service gate 3, be also provided with air vent maintenance stair 2.The technical program is by being arranged side by side multiple gate along vertical hole axis direction, not only the size of single gate is carried out effectively sharing, decrease igfet gate, reduce metal construction to make, install, run difficulty, increase into water area simultaneously, the water-retaining capacity of total have also been obtained raising, need not continue to use traditional increase tunnel number again and solve this problem.Reduce project playout build, improve the globality of main structures, improve hinge operational efficiency.
The quantity of described air vent maintenance stair 2, Service gate 3 and Emergency Gate 4 is two, and is cut off by gate pier 5.Air vent maintenance stair 2, Service gate 3 and Emergency Gate 4 are symmetrical about gate pier 5 respectively.
Described Service gate 3 downstream is connected with tunnel 1 by transition section 6.
Adopt technique scheme, achieve under equal single gate makes requirement, bleeder quantity and dash head is made to rise to original twice, not only meet the requirement that engineering safety runs, reduce project playout build simultaneously, improve the globality of main structures, add project benefit, reduce engineering cost.
Claims (3)
1. the double-gate structure for high head and large flow tunnel of releasing, it is characterized in that: comprise tunnel (1) and several Service gates (3) of being arranged side by side along vertical tunnel (1) axis direction and Emergency Gate (4), described Service gate (3) is arranged on Emergency Gate (4) below, and Service gate (3) and Emergency Gate (4) are all positioned at water inlet (7) downstream, described Service gate (3) below is also provided with air vent maintenance stair (2).
2. a kind of double-gate structure for high head and large flow tunnel of releasing according to claim 1, it is characterized in that: the quantity that described air vent overhauls stair (2), Service gate (3) and Emergency Gate (4) is two, and cut off by gate pier (5).
3. a kind of double-gate structure for high head and large flow tunnel of releasing according to claim 1, is characterized in that: described Service gate (3) downstream is connected with tunnel (1) by transition section (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520780737.XU CN205062764U (en) | 2015-10-10 | 2015-10-10 | Double-gate structure for high-water-head large-flow discharge tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520780737.XU CN205062764U (en) | 2015-10-10 | 2015-10-10 | Double-gate structure for high-water-head large-flow discharge tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205062764U true CN205062764U (en) | 2016-03-02 |
Family
ID=55389340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520780737.XU Active CN205062764U (en) | 2015-10-10 | 2015-10-10 | Double-gate structure for high-water-head large-flow discharge tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205062764U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667248A (en) * | 2018-12-21 | 2019-04-23 | 中国电建集团贵阳勘测设计研究院有限公司 | A multistage manger plate emptying system for high dam engineering |
CN109667247A (en) * | 2018-12-21 | 2019-04-23 | 中国电建集团贵阳勘测设计研究院有限公司 | High dam emptying system |
-
2015
- 2015-10-10 CN CN201520780737.XU patent/CN205062764U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667248A (en) * | 2018-12-21 | 2019-04-23 | 中国电建集团贵阳勘测设计研究院有限公司 | A multistage manger plate emptying system for high dam engineering |
CN109667247A (en) * | 2018-12-21 | 2019-04-23 | 中国电建集团贵阳勘测设计研究院有限公司 | High dam emptying system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104179159B (en) | Power station bright flowing full tail water system | |
CN201874614U (en) | Drainage structure for emptying overhaul of derivation tunnel | |
CN106368185A (en) | Hydropower station water inlet gallery desilting system and method | |
CN204343269U (en) | Device of power station layering water intaking | |
CN205062764U (en) | Double-gate structure for high-water-head large-flow discharge tunnel | |
CN204185835U (en) | Power station free pressure flow tail water discharge | |
CN202181543U (en) | Flood discharge tunnel structure | |
CN204023521U (en) | For the drain cavern structure of rotational flow silo | |
CN202440787U (en) | Riverway diversion device | |
CN207092033U (en) | A kind of flood discharging tunnel | |
CN109518666B (en) | Water retaining structure and blocking method for low-layer diversion tunnel | |
CN102505671B (en) | Overhead maintenance passage for diversion tunnels | |
CN202626933U (en) | Curve type water-binding and sand-dividing guide wall | |
CN204825820U (en) | Pressure regulating well structure using traffic hole as upper chamber | |
CN211898215U (en) | Water retaining structure of inverted siphon outlet | |
CN202064330U (en) | Pressure steel pipe inspection access channel structure for high-head hydropower plant | |
CN109356125A (en) | Diversion tunnel is used as the reconstruction structure of two drain caverns | |
CN206143743U (en) | Husky corridor system is arranged to power station water inlet | |
CN214737829U (en) | Small-size water conservancy assembled culvert gate | |
CN212052875U (en) | Shaft flood discharge hole import structure | |
CN209429082U (en) | Diversion tunnel is used as the reconstruction structure of two drain caverns | |
CN210262966U (en) | Reconstruction ecological water drainage hole structure combined with permanent plug | |
CN209482270U (en) | High dam manger plate is concordance pipe for emptying system step by step | |
CN204000796U (en) | Power station in river channel's structure | |
CN210827385U (en) | Flood discharge drainage channel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |