CN202181543U - Spillway tunnel structure - Google Patents

Spillway tunnel structure Download PDF

Info

Publication number
CN202181543U
CN202181543U CN2011202368965U CN201120236896U CN202181543U CN 202181543 U CN202181543 U CN 202181543U CN 2011202368965 U CN2011202368965 U CN 2011202368965U CN 201120236896 U CN201120236896 U CN 201120236896U CN 202181543 U CN202181543 U CN 202181543U
Authority
CN
China
Prior art keywords
lock chamber
flood
gate
spillway
spillway tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202368965U
Other languages
Chinese (zh)
Inventor
沈明
张伟
赵瑞存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN2011202368965U priority Critical patent/CN202181543U/en
Application granted granted Critical
Publication of CN202181543U publication Critical patent/CN202181543U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

The utility model relates to a spillway tunnel structure, which is capable of improving operational flexibility while normal flood discharging is guaranteed and reducing influences of gate vibration resolving operations on comprehensive using efficiency of reservoirs. The technical scheme includes that the spillway tunnel structure comprises a spillway tunnel and a lock chamber connected to the tail of a gradient section of a spillway tunnel outlet, and two arc-shaped gates are mounted in the lock chamber. The spillway tunnel structure is characterized in that a middle mound is arranged from the tail of the gradient section of the spillway tunnel outlet to an outlet of the lock chamber, the two arc-shaped gates are arranged between each side of the middle mound and the corresponding side wall of the lock chamber respectively, and a gate groove is arranged corresponding to the motion trail of each arc-shaped gate. The spillway tunnel structure is applicable to structural improvement of single-hole spillway tunnels of small and medium water conservancy and hydropower engineering with earth and rockfill dam or in densely populated downstream areas such as towns and the like.

Description

A kind of flood-discharge tunnel structure
Technical field
The utility model relates to a kind of flood-discharge tunnel structure.Be applicable to that dam type is that earth and rockfill dam or downstream are the structure of improving the single hole flood discharging tunnel in the middle-size and small-size Hydraulic and Hydro-Power Engineering of personnel compact districts such as cities and towns.
Background technology
In middle-size and small-size Hydraulic and Hydro-Power Engineering, generally adopt the single hole flood discharge at flood discharge hole outlet at present, structural shape is simpler.If reservoir dam be earth and rockfill dam or reservoir from cities and towns etc. the personnel compact district nearer; But upper reaches incoming flow is generally less; Will occur because of the designed standard for flood control height causes the flood discharge hole outlet section bigger, the Segment gate build is bigger, makes Segment gate in frequent little aperture unlatching in flood season; Increased the risk of gate vibration, operation brings certain difficulty to headstock gear.The dumb comprehensive utilization to normal flood discharge and reservoir of operation all brings certain influence.
Summary of the invention
The technical problem that the utility model will solve is: according to the problem of above-mentioned existence, a kind of flood-discharge tunnel structure is provided, under the prerequisite that guarantees normal flood discharge, increases the flexibility of operation, reduce the efficient because of the operating influence reservoir comprehensive utilization that solves the gate vibration.
The technical scheme that the utility model adopted is: the flood-discharge tunnel structure; Comprise flood-discharge tunnel and be connected to the last lock chamber of flood-discharge tunnel outlet transition section; Segment gate is housed in the lock chamber, it is characterized in that: the exit at flood-discharge tunnel outlet transition section end to lock chamber is provided with pier in, and said Segment gate has two; Be arranged between Zhong Dun both sides and the lock chamber sidewall, gate slot be set corresponding to the movement locus of Segment gate.
The crest level of pier is identical with the maintenance elevation of lock chamber in described.
Pier is arranged on the axis of lock floor in described.
The The initial segment of pier is symmetrical circular arc pyramidal structure in said, and the terminal point section is both sides chamfering cavetto structures.
The beneficial effect of the utility model is: the flood-discharge tunnel outlet changes diplopore into the single hole structure that is provided with floodgate of middle pier.Hour only need to open the preparatory flood discharge water of a fan arc door, control discharge at incoming flow.Bigger like incoming flow, then open another fan arc door in succession.The aperture of arc door and arc door drop into quantity and control according to operational procedure according to the incoming flow situation.Because of the cross dimensions reason, the big arc gate opening of opening ratio single hole of little arc door wants big under same flow condition, has reduced the risk of vibration and cavitation corrosion etc.As adopting the single hole structure, big arc door often solves through increasing aperture for solving the possible vibration problem of the little aperture of arc door, so just possibly influence the reservoir comprehensive utilization ratio.The arc door of above-mentioned one-to-two is arranged the flexibility that can under the prerequisite that guarantees normal flood discharge, increase operation, improves the efficient of reservoir comprehensive utilization.
Description of drawings
Fig. 1 is the elevation of the utility model.
Fig. 2 is the plan view of the utility model.
The specific embodiment
Present embodiment is a kind of flood-discharge tunnel structure that middle pier is set in flood-discharge tunnel; Mainly comprise flood-discharge tunnel 1, lock chamber 3 and Segment gate 4; Wherein lock chamber is connected to flood-discharge tunnel outlet transition section 1-1 end; Segment gate places in the lock chamber, and the position, lock floor 3-1 axis of said lock chamber is provided with middle pier 2, changes flood discharging tunnel single hole structure into double-pore structure; Segment gate is arranged between Zhong Dun both sides and the lock chamber sidewall, in Zhong Dun both sides and lock chamber sidewall gate slot 5 is set corresponding to the movement locus of Segment gate.
Middle pier is begun by flood-discharge tunnel outlet transition section latter end, and till lock floor outlet 3-2 place, its crest level is identical with lock chamber maintenance elevation; Middle pier The initial segment is symmetrical circular arc pyramidal structure, and the terminal point section is both sides chamfering cavetto structures.Pier can be used as the braced structures of arc door trunnion beam and lock chamber in described, strengthens big width lock chamber export structure stability.
This structure can be according to designing requirements such as flood discharge hole outlet flood discharge, energy dissipatings, and the plane structure pattern of centering pier is adjusted.

Claims (4)

1. flood-discharge tunnel structure; Comprise flood-discharge tunnel (1) and be connected to the last lock chamber (3) of flood-discharge tunnel outlet transition section (1-1); Segment gate (4) is housed in the lock chamber, it is characterized in that: locate to be provided with pier in (2) at flood-discharge tunnel (1) outlet transition section end to the outlet (3-2) of lock chamber (3), said Segment gate (4) has two; Be arranged between Zhong Dun both sides and the lock chamber sidewall, gate slot (5) be set corresponding to the movement locus of Segment gate.
2. flood-discharge tunnel structure according to claim 1 is characterized in that: the crest level of pier (2) is identical with the maintenance elevation of lock chamber (3) in described.
3. flood-discharge tunnel structure according to claim 1 is characterized in that: pier (2) is arranged on the axis of lock floor (3-1) in described.
4. according to claim 1 or 2 or 3 described flood-discharge tunnel structures, it is characterized in that: the The initial segment of pier (2) is symmetrical circular arc pyramidal structure in said, and the terminal point section is both sides chamfering cavetto structures.
CN2011202368965U 2011-07-07 2011-07-07 Spillway tunnel structure Expired - Lifetime CN202181543U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202368965U CN202181543U (en) 2011-07-07 2011-07-07 Spillway tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202368965U CN202181543U (en) 2011-07-07 2011-07-07 Spillway tunnel structure

Publications (1)

Publication Number Publication Date
CN202181543U true CN202181543U (en) 2012-04-04

Family

ID=46174585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202368965U Expired - Lifetime CN202181543U (en) 2011-07-07 2011-07-07 Spillway tunnel structure

Country Status (1)

Country Link
CN (1) CN202181543U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410130A (en) * 2013-08-13 2013-11-27 中国水电顾问集团成都勘测设计研究院 Multi-purpose tunnel arrangement structure
CN104264638A (en) * 2014-08-29 2015-01-07 成都科创佳思科技有限公司 Flood discharge structure
CN104503389A (en) * 2014-11-26 2015-04-08 苏州迈创信息技术有限公司 Farm water supply flood discharge control system
CN105220661A (en) * 2015-10-22 2016-01-06 中国电建集团成都勘测设计研究院有限公司 The high-velocity flow flood discharging tunnel arc door buried in underground props up hinge crossbeam structure
CN105220659A (en) * 2015-08-21 2016-01-06 中国电建集团贵阳勘测设计研究院有限公司 A kind of high dam large storehouse ultra-deep layer dash blowdown system and method for operating thereof
CN110258475A (en) * 2019-06-04 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Hole reconstruction is overhauled as the reconstruction structure in ecological water supply hole

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410130A (en) * 2013-08-13 2013-11-27 中国水电顾问集团成都勘测设计研究院 Multi-purpose tunnel arrangement structure
CN103410130B (en) * 2013-08-13 2015-06-17 中国电建集团成都勘测设计研究院有限公司 Multi-purpose tunnel arrangement structure
CN104264638A (en) * 2014-08-29 2015-01-07 成都科创佳思科技有限公司 Flood discharge structure
CN104503389A (en) * 2014-11-26 2015-04-08 苏州迈创信息技术有限公司 Farm water supply flood discharge control system
CN104503389B (en) * 2014-11-26 2017-05-10 苏州迈创信息技术有限公司 Farm water supply flood discharge control system
CN105220659A (en) * 2015-08-21 2016-01-06 中国电建集团贵阳勘测设计研究院有限公司 A kind of high dam large storehouse ultra-deep layer dash blowdown system and method for operating thereof
CN105220659B (en) * 2015-08-21 2016-08-17 中国电建集团贵阳勘测设计研究院有限公司 A kind of high dam big storehouse ultra-deep layer dash blowdown system and operational approach thereof
CN105220661A (en) * 2015-10-22 2016-01-06 中国电建集团成都勘测设计研究院有限公司 The high-velocity flow flood discharging tunnel arc door buried in underground props up hinge crossbeam structure
CN110258475A (en) * 2019-06-04 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Hole reconstruction is overhauled as the reconstruction structure in ecological water supply hole

Similar Documents

Publication Publication Date Title
CN202181543U (en) Spillway tunnel structure
EP2464858B1 (en) Shaft power plant
CN103410130B (en) Multi-purpose tunnel arrangement structure
CN201785733U (en) Spillway chute structure
CN202323895U (en) Tail water channel structure for stepped hydro-junction
CN103031824A (en) Hydraulic horizontal dam
CN204825802U (en) Compound line type overflow weir
CN104099909B (en) Based on the flood discharge generating sync energy dissipater of flood-discharge tunnel
CN201874083U (en) Land-saving and energy-saving reservoir type pumping station drainage device for down digging channels
CN202718071U (en) Barrage structure capable of lowering silt of reservoir area
CN202298571U (en) Hydraulic horizontal dam
CN202899094U (en) Large-scale gate pier for water gate projects
CN204715318U (en) A kind of massif Inner guide hole gate shaft structure
CN204000796U (en) Power station in river channel's structure
CN202626933U (en) Curve type water-binding and sand-dividing guide wall
CN104895016A (en) Dam
CN105256782A (en) Navigation, power generation and energy dissipation integrated ship lock
CN205088657U (en) Can open navigation or air flight, integrated lock of electricity generation and energy dissipation
CN206721845U (en) A kind of diversion tunnel
CN204475286U (en) Novel hydropower absorption basin structure
CN204418124U (en) A kind of novel sand discharge apparatus
CN103939257A (en) Water-turbine generating set with ultrahigh efficiency
CN203307766U (en) Discharge structure
CN216712955U (en) Flood discharge and energy dissipation structure combining flood spillway hole and natural gully
CN102102356B (en) Horizontal rotary gate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120404