CN210827385U - Flood discharge drainage channel structure - Google Patents
Flood discharge drainage channel structure Download PDFInfo
- Publication number
- CN210827385U CN210827385U CN201921701327.6U CN201921701327U CN210827385U CN 210827385 U CN210827385 U CN 210827385U CN 201921701327 U CN201921701327 U CN 201921701327U CN 210827385 U CN210827385 U CN 210827385U
- Authority
- CN
- China
- Prior art keywords
- flood discharge
- water
- channel structure
- drainage channel
- discharge groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Hydraulic Turbines (AREA)
Abstract
The utility model belongs to the technical field of water conservancy and hydropower flood discharge sets up and specifically relates to a furthest reduces land levying, ingenious and reasonable space between the utilization diversion power generation system building carries out flood discharge drainage channel structure that the flood discharge building arranged, including at least one flood discharge groove to and along intake, factory building and the tailrace that rivers flow direction set gradually, the intake passes through the flood discharge groove and wears factory building section and tailrace intercommunication down, wherein, wear the factory building section down and set up in the factory building below. Because the plant penetrating section is arranged below the plant, the space between the buildings of the water diversion power generation system is fully utilized, and the independent arrangement of regions outside the water diversion power generation system as in the traditional design is not needed, so that the permanent land area of the project is greatly reduced, the excavation supporting amount is reduced, and the method is very favorable for engineering intensification and reduction of project investment. The utility model discloses be particularly useful for among the small-size hydroelectric engineering diversion flood discharge system building layout design.
Description
Technical Field
The utility model belongs to the technical field of water conservancy water and electricity flood discharge sets up and specifically relates to a flood discharge drainage channel structure.
Background
As for water conservancy and hydropower engineering in mountain canyon regions, the arrangement of the flood discharging hub is usually independent in regions other than the water diversion and power generation system, the arrangement mode can ensure that the flood discharging building and the water diversion and power generation building are not interfered with each other, and the spatial arrangement, the structural design and excavation supporting treatment of the flood discharging hub are simple. However, the arrangement mode greatly increases the permanent land acquisition area of the project, increases the excavation supporting amount, is not beneficial to the intensive design of the project and is also not beneficial to reducing the investment. Especially today, with more and more intensive construction requirements, such a design has not been able to meet practical needs.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a furthest reduces land levying is provided, and the space between the diversion power generation system building of ingenious and reasonable utilization carries out the flood discharge drainage channel structure that the building of flood discharge arranged.
The utility model provides a technical scheme that its technical problem adopted is: flood discharge drainage channel structure includes at least one flood discharge groove to and along intake, factory building and the tailrace that rivers flow direction set gradually, the intake passes through the flood discharge groove and wears factory building section and tailrace intercommunication down, wherein, it sets up in the factory building below to wear the factory building section down.
Further, including setting up the diversion penstock between intake and the factory building, be parallel arrangement each other between flood discharge groove and the diversion penstock.
Further, the flood discharge groove is communicated with the water intake through the water inlet, and is communicated with the underpass plant section through the water outlet, wherein the position of the water inlet is higher than that of the water outlet.
Further, the bottom surface of the inner wall of the flood discharge groove is of a slope structure.
Furthermore, the water inlet of the water diversion penstock and the water inlet of the flood discharge groove are adjacently arranged.
Furthermore, the flood discharge grooves are all arranged in the same width along the water flow direction.
Further, the slope range of the bottom of the inner wall of the flood discharge groove is 15-25 degrees.
Furthermore, the water inlet of the flood discharge groove is of a closed structure.
Furthermore, the lower-penetrating workshop section is of a closed structure.
Furthermore, in the flood discharge groove, except the water inlet, the rest parts are all of open channel structures.
The utility model has the advantages that: when in actual use, the water flow at the water intake can flow to the tail canal through the flood discharge groove and the underpass plant section very conveniently and smoothly. Wherein, owing to wear the factory building section and set up in the factory building below, this space between this just make full use of diversion power generation system building to also need not again and arrange alone in the region outside diversion power generation system like traditional design, thereby reduced the permanent area of seeking land of engineering by a wide margin, reduced excavation supporting volume, very be favorable to the engineering intensification and reduce the engineering investment. The utility model discloses be particularly useful for among the small-size hydroelectric engineering diversion flood discharge system building layout design.
Drawings
Fig. 1 is a plan view of the present invention.
Fig. 2 is a cross-sectional view of the flood discharge trough mechanism of the present invention.
Labeled as: the water diversion and drainage device comprises a tailrace 1, a plant 2, a downward-penetrating plant section 21, a flood discharge groove 3, a water inlet 31, a water outlet 32, a water diversion pressure steel pipe 4 and a water intake 5.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
The flood discharge drainage channel structure shown in fig. 1 and 2 comprises at least one flood discharge groove 3, and a water intake 5, a plant 2 and a tailrace 1 which are sequentially arranged along the flow direction of water, wherein the water intake 5 is communicated with the tailrace 1 through the flood discharge groove 3 and a lower plant section 21, and the lower plant section 21 is arranged below the plant 2.
The traditional flood discharging hub is usually arranged in a region outside a water diversion power generation system independently, the flood discharging building and the water diversion power generation building are not interfered with each other due to the arrangement mode, and the space arrangement, the structural design and excavation supporting treatment are simple. However, the arrangement mode greatly increases the permanent land acquisition area of the project, increases the excavation supporting amount, is not beneficial to the intensive design of the project and is also not beneficial to reducing the investment. The utility model discloses to foretell defect, ingenious utilization the space between the diversion power generation system building carry out the flood discharge building and arrange, wherein, at first through flood discharge groove 3 and wear factory building section 21 and tailrace 1 intercommunication down, guarantee normal drainage needs. Secondly, underpass building section 21 is disposed below building 2, thereby making full use of the space below building 2. The improvement does not need to be independently arranged in regions outside the water diversion power generation system like the traditional design, thereby greatly reducing the permanent land acquisition area of the project and reducing the excavation supporting amount. In combination with practical experience, it is generally preferred that the flood discharge troughs 3 are all arranged with equal width in the direction of water flow.
For further optimization of the structural arrangement, the following options can be selected: the device comprises a water diversion penstock 4 arranged between a water intake 5 and a plant 2, and the flood discharge grooves 3 and the water diversion penstock 4 are arranged in parallel. As shown in fig. 2, such a structural arrangement makes the space occupied by the flood discharge trough 3 as small as possible, and meanwhile, when the flood discharge trough 3 is actually arranged, the interference with the water diversion penstock 4 is avoided, so that the whole arrangement space is more orderly.
In order to obtain more ideal drainage effect, the following scheme can be selected: the flood discharge groove 3 is communicated with the water intake 5 through a water inlet 31, the flood discharge groove 3 is communicated with the underpass plant section 21 through a water outlet 32, wherein the position of the water inlet 31 is higher than that of the water outlet 32. Preferably, the bottom surface of the inner wall of the flood discharge trough 3 can be selected to be a slope structure. For practical purposes, the slope of the bottom of the inner wall of the flood discharge trough 3 is preferably in the range of 15 ° to 25 °.
To optimize the layout, further exploiting the good space, such a scheme can be chosen: the water inlet of the water diversion penstock 4 is arranged adjacent to the water inlet 31 of the flood discharge trough 3. The scheme can further optimize the drainage effect, so that the drainage efficiency is improved.
In consideration of safety, noise control, and the like in flood discharge, such a scheme is preferable: the water inlet 31 of the flood discharge groove 3 is of a closed structure. At the same time, it is preferred that the underpass building section 21 is of closed construction, based on the same concept.
In addition, because the whole closing of the flood discharge groove 3 can increase the construction cost, besides the section of the sealing structure, the actual construction and use requirements can be met by selecting the rest parts of the flood discharge groove 3 as the open channel structure except the water inlet 31.
Claims (10)
1. Flood discharge drainage channel structure, its characterized in that: including at least one flood discharge groove (3) to and along intake (5), factory building (2) and tailrace (1) that rivers flow direction set gradually, intake (5) are through flood discharge groove (3) and wear factory building section (21) and tailrace (1) intercommunication down, wherein, wear factory building section (21) and set up in factory building (2) below down.
2. A flood discharge drainage channel structure according to claim 1, wherein: the device comprises a water diversion pressure steel pipe (4) arranged between a water intake (5) and a workshop (2), and the flood discharge grooves (3) and the water diversion pressure steel pipe (4) are arranged in parallel.
3. A flood discharge channel structure according to claim 2, wherein: the flood discharge groove (3) is communicated with the water intake (5) through a water inlet (31), the flood discharge groove (3) is communicated with the underpass plant section (21) through a water outlet (32), and the position of the water inlet (31) is higher than that of the water outlet (32).
4. A flood discharge and drainage channel structure according to claim 3, wherein: the bottom surface of the inner wall of the flood discharge groove (3) is of a slope structure.
5. A flood discharge and drainage channel structure according to claim 3 or 4, wherein: the water inlet of the water diversion penstock (4) is arranged adjacent to the water inlet (31) of the flood discharge groove (3).
6. A flood discharge drainage channel structure according to claim 1, wherein: the flood discharge grooves (3) are all arranged in the same width along the water flow direction.
7. A flood discharge drainage channel structure according to claim 1, wherein: the slope range of the bottom of the inner wall of the flood discharge groove (3) is 15-25 degrees.
8. A flood discharge and drainage channel structure according to claim 3, wherein: the water inlet (31) of the flood discharge groove (3) is of a closed structure.
9. A flood discharge and drainage channel structure according to claim 8, wherein: the lower-penetrating workshop section (21) is of a closed structure.
10. A flood discharge and drainage channel structure according to claim 9, wherein: in the flood discharge groove (3), except the water inlet (31), the rest parts are all open channel structures.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921701327.6U CN210827385U (en) | 2019-10-11 | 2019-10-11 | Flood discharge drainage channel structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921701327.6U CN210827385U (en) | 2019-10-11 | 2019-10-11 | Flood discharge drainage channel structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210827385U true CN210827385U (en) | 2020-06-23 |
Family
ID=71264034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921701327.6U Active CN210827385U (en) | 2019-10-11 | 2019-10-11 | Flood discharge drainage channel structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210827385U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593226A (en) * | 2019-10-11 | 2019-12-20 | 中国电建集团成都勘测设计研究院有限公司 | Flood discharge drainage channel structure |
-
2019
- 2019-10-11 CN CN201921701327.6U patent/CN210827385U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593226A (en) * | 2019-10-11 | 2019-12-20 | 中国电建集团成都勘测设计研究院有限公司 | Flood discharge drainage channel structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103206331A (en) | Low-head efficient shaft-extension tubular pump turbine and blades thereof | |
CN204185835U (en) | Power station free pressure flow tail water discharge | |
CN111809582A (en) | Pumped storage power station constructed by utilizing conventional hydropower station resources | |
CN210827385U (en) | Flood discharge drainage channel structure | |
CN114908716B (en) | Water conservancy junction system based on conditions of high water head and large cutting depth | |
CN107973494B (en) | Lake-entering river channel water quality purification and water resource recycling system | |
CN204644955U (en) | A kind of water conservancy diversion, energy-dissipating structure being applicable to tidal waterway water drainage hinge | |
CN112727667A (en) | Intelligent adjustment type water delivery power generation device and monitoring feedback method thereof | |
CN110593226A (en) | Flood discharge drainage channel structure | |
CN206752427U (en) | A kind of power station ground power house tailrace outlet structure and its power station | |
CN104775964A (en) | Splitting type water turbine chamber | |
CN204385701U (en) | Be applicable to surface current underflow combined energy dissipater and the water-control project of wide shallow river course porous gate dam | |
CN104099909A (en) | Flood-discharge tunnel-based combined energy dissipater synchronizing flood discharge and power generation | |
CN105019414B (en) | Composite lock chamber structure for narrow water intake of mountain hydropower project | |
CN209194485U (en) | Diversion tunnel structure | |
CN112726491A (en) | Combined type flow control and energy recovery system | |
CN220953283U (en) | High-low bank structure for diversion ecological flow of tail water of power station | |
CN201221434Y (en) | Double-warehouse self-adjusting tide energy power generation system | |
CN2921348Y (en) | Water turbine set in hydropower station for dry season use | |
CN221030007U (en) | Energy dissipation structure of flood discharge tunnel water outlet | |
CN205934874U (en) | Diversion formula power house arrangement structure | |
CN219220616U (en) | Pumped storage power station for overall linkage reservoir feeding | |
CN101748714A (en) | End-to-end connection arrangement form of valley cascade hydropower station with leading reservoir | |
CN216809795U (en) | Reservoir flood regulation structure | |
CN219490885U (en) | Tail water channel arrangement structure of hydropower house |