CN206587361U - Spheroid lifting device - Google Patents

Spheroid lifting device Download PDF

Info

Publication number
CN206587361U
CN206587361U CN201720336363.1U CN201720336363U CN206587361U CN 206587361 U CN206587361 U CN 206587361U CN 201720336363 U CN201720336363 U CN 201720336363U CN 206587361 U CN206587361 U CN 206587361U
Authority
CN
China
Prior art keywords
spheroid
lifting device
transmission mechanism
shaped bracket
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720336363.1U
Other languages
Chinese (zh)
Inventor
陈侯灿
陈公湖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangzhou Flying Sports Goods Co Ltd
Original Assignee
Zhangzhou Flying Sports Goods Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangzhou Flying Sports Goods Co Ltd filed Critical Zhangzhou Flying Sports Goods Co Ltd
Priority to CN201720336363.1U priority Critical patent/CN206587361U/en
Application granted granted Critical
Publication of CN206587361U publication Critical patent/CN206587361U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Escalators And Moving Walkways (AREA)

Abstract

The utility model is related to a kind of spheroid lifting device, it includes the transmission mechanism of shuttling movement up and down, rises the goal track of side lower part located at transmission mechanism, decline upper lateral part located at transmission mechanism go out ball track and some between the upper and lower every being fixedly arranged on transmission mechanism and for the C-shaped bracket of support spheroid bottom;The port of export of the goal track provided with the trapping part that can be upturned through C-shaped bracket opening and its end, it is described go out ball track entrance point be provided with the part of receiving in C-shaped bracket opening.The purpose of this utility model is to provide a kind of spheroid lifting device for conveying that spheroid can be hoisted by lower automatically.The utility model has the advantage of:Spheroid lifting device is delivered to a high position by vertically arranged transmission mechanism, by the spheroid in low level goal track and goes out ball track, simple in construction, stable, realizes the Automatic Conveying of spheroid.

Description

Spheroid lifting device
Technical field
The utility model is related to a kind of spheroid lifting device.
Background technology
Sport ball is complicated due to production process, and the traditional forms of enterprises does not break away from the pure manual mode of production, causes enterprise's labor yet Power cost increase, production inefficiency.Conveying device is used as the passage between connecting different processes, its reality automated Apply can significant increase spheroid production efficiency.
The content of the invention
The purpose of this utility model is to provide a kind of spheroid lifting dress for conveying that spheroid can be hoisted by lower automatically Put.
The purpose of this utility model is achieved through the following technical solutions:A kind of spheroid lifting device, it includes circulating up and down The transmission mechanism of motion, the goal track for rising located at transmission mechanism side lower part, decline upper lateral part located at transmission mechanism and go out ball Track and some between the upper and lower every being fixedly arranged on transmission mechanism and for the C-shaped bracket of support spheroid bottom;The goal track The port of export provided with can pass through the trapping part that be upturned of C-shaped bracket opening and its end, it is described go out ball track entrance point set There is the part of receiving in C-shaped bracket opening.
For prior art, the utility model has the advantage of:
1. the spheroid in low level goal track is delivered to a high position by spheroid lifting device by vertically arranged transmission mechanism Go out ball track, it is simple in construction, it is stable, realize the Automatic Conveying of spheroid.
2. transmission mechanism uses chain drive structure, it is not only conveyed compared to V belt translation structure more stablizes, and will not Occur situation of the conveyer belt along journal offset in V belt translation structure;This outside gear mechanism sets two groups, and C-shaped bracket is located at two transmissions Between chain, the stability of C-shaped bracket conveying has been significantly greatly increased.
3. goal track at least runs the touch switch mechanism of half period provided with control transmission mechanism.Touch switch machine Structure, which is set, to be caused only when there is ball in goal track, and transmission mechanism just carries out intelligent conveying, effectively reaches energy-conserving action.
Brief description of the drawings
Fig. 1 is a kind of structural representation of spheroid lifting device embodiment of the utility model.
Fig. 2 is the structural representation of goal track.
Fig. 3 is the structural representation for ball track.
Fig. 4 is the front view of transmission mechanism.
Fig. 5 is the structural representation that a kind of C-shaped bracket coordinates with trapping part.
Fig. 6 is the structural representation that another C-shaped bracket coordinates with trapping part.
Fig. 7 is the front view of C-shaped bracket.
Fig. 8 is the longitudinal cross-section view of goal track.
Fig. 9 is the structural representation (non-triggering state) of touch switch mechanism.
Figure 10 is the structural representation (triggering state) of touch switch mechanism.
Label declaration:1 transmission mechanism, 11 driving wheels, 12 driven pulleys, 13 driving-chains, 14 motors, 15 connecting plates, 2 Goal track, 21 trapping parts, 3 go out ball track, 31 receive part, 4 C-shaped brackets, 5 touch switch mechanisms, 51 delay switch, Bar, 53 pendant parts, 54 touch panels, 55 rotary spacing bars, 56 jointed shafts are stuck up in 52 triggerings.
Embodiment
The utility model content is described in detail with reference to Figure of description and embodiment:
A kind of embodiment schematic diagram of the spheroid lifting device provided as shown in Figures 1 to 10 for the utility model.
A kind of spheroid lifting device, it is including the transmission mechanism 1 of shuttling movement up and down, under the uplifted side of transmission mechanism 1 The goal track 2 in portion, decline located at transmission mechanism 1 upper lateral part go out ball track 3 and some between the upper and lower every being fixedly arranged on driver On structure 1 and for the C-shaped bracket 4 of support spheroid bottom;
The port of export of the goal track 2 is provided with can be through the trapping part that C-shaped bracket 4 is open and its end is upturned 21, it is described go out ball track 3 entrance point be provided be located at C-shaped bracket 4 be open in part 31 of receiving.
C-shaped bracket 4 is horizontally disposed with, and it is open towards outside.When C-shaped bracket 4 by the both sides of trapping part 21 upwardly through when, Take away the spheroid stayed on trapping part 21;When C-shaped bracket 4 is passed downwardly through by the both sides of part 31 of receiving, spheroid thereon is stayed in Receive on part 31.
The outboard end for receiving part 31 is upturned to prevent spheroid from rolling out out ball track 3.
The entrance point bottom of goal track 2 is higher than port of export bottom, and the entrance point bottom for going out ball track 3 is higher than port of export bottom Portion.
The transmission mechanism 1 is chain-drive mechanism.
Chain-drive mechanism is conveyed compared to tape handler more to be stablized, and will not occur conveyer belt in tape handler Along the situation of journal offset.
Driving wheel 11 that the transmission mechanism 1 includes being driven by motor 14, located at the upside of driving wheel 11 driven pulley 12 with And around the driving-chain 13 being located between driving wheel 11 and driven pulley 12;The C-shaped bracket 4 is installed on driving-chain 13.
The transmission mechanism 1 is arranged side by side two groups, and two groups of transmission mechanisms 1 are rotated coaxially, and is set between two parallel drive chains 13 There are some horizontally disposed connecting plates 15, the C-shaped bracket 4 is installed on connecting plate 15.
It is coaxially disposed respectively between the driving wheel 11 of each group transmission mechanism 1 and between driven pulley 12.
Between two driving wheels 11 and two driven pulleys 12 synchronize rotation by the connection of rotary shaft respectively.
The goal track 2 and to go out the longitudinal section of ball track 3 be opening up arc.
Goal track 2 is made up of some spaced fix bars, and the arc that each fix bar is set by time interval is consolidated Fixed hoop is fixedly connected, and the bottom surface of goal track 2, which is left, holds the gap that touch panel 54 passes through.
The C-shaped bracket 4 is made up of (such as Fig. 5) a major arc.
Or the C-shaped bracket 4 includes the different major arc of two radius, the big major arc of radius is located on the small major arc of radius Side, and two major arcs are fixedly connected (such as Fig. 6).
The touch switch mechanism 5 that control transmission mechanism 1 at least runs half period is additionally provided with the goal track 2.Touch Dynamic switching mechanism 5, which is set, to be caused only when having ball in goal track 2, and transmission mechanism 1 just carries out intelligent conveying, so as to reach section Can effect.
The touch switch mechanism 5 includes delay switch 51 and bar 52 is stuck up in triggering;The triggering is stuck up the middle part of bar 52 and is hinged In the downside of goal track 2, triggering sticks up the one end of bar 52 provided with pendant part 53, and the other end is provided with touch panel 54;The nature of touch panel 54 When be upturned and stretch into the bottom of goal track 2, the trigger point of delay switch 51 is located at the downside of touch panel 54.
Spheroid is by pushing touch panel 54 during goal track 2;Touch panel 54 is rotated further under inertial force, until by calendering Shi Kaiguan 51 trigger point, the then reset in the case where pendant part 53 is acted on of touch panel 54;Delay switch 51 through controlling electricity after a period of time Machine 14 is rotated, by above by spheroid ball track 3 is delivered to out by goal track 2;Last motor 14 is out of service.
The touch switch mechanism 5 also includes the rotary spacing bar 55 located at the downside of pendant part 53.
Rotary spacing bar 55 is used to prevent triggering from sticking up bar 52 and being rotated further so that when the stopping of bar 52 is stuck up in triggering, touch panel 54 is stretched Enter the bottom of goal track 2.

Claims (10)

1. a kind of spheroid lifting device, it is characterised in that:It is including the transmission mechanism (1) of shuttling movement up and down, located at driver Structure (1) rises the goal track (2) of side lower part, declined located at transmission mechanism (1) in the going out ball track (3) and be some of upper lateral part Lower interval is fixedly arranged on transmission mechanism (1) and for the C-shaped bracket (4) of support spheroid bottom;
The port of export of the goal track (2) is provided with the trapping part that can be open through C-shaped bracket (4) and its end is upturned (21), it is described go out ball track (3) entrance point be provided be located at C-shaped bracket (4) be open in part of receiving (31).
2. spheroid lifting device according to claim 1, it is characterised in that:The transmission mechanism (1) is chain-drive mechanism.
3. spheroid lifting device according to claim 2, it is characterised in that:The transmission mechanism (1) is included by motor (14) driving wheel (11) of driving, the driven pulley (12) on the upside of driving wheel (11) and around being located at driving wheel (11) and driven Take turns the driving-chain (13) between (12);The C-shaped bracket (4) is installed on driving-chain (13).
4. spheroid lifting device according to claim 3, it is characterised in that:The transmission mechanism (1) is arranged side by side two groups, Two groups of transmission mechanisms (1) are rotated coaxially, and some horizontally disposed connecting plates (15) are provided between two parallel drive chains (13), described C-shaped bracket (4) is installed on connecting plate (15).
5. spheroid lifting device according to claim 1, it is characterised in that:The goal track (2) and go out ball track (3) Longitudinal section be opening up arc.
6. spheroid lifting device according to claim 1, it is characterised in that:It is different that the C-shaped bracket (4) includes two radius Major arc, the big major arc of radius is located on the upside of the small major arc of radius, and two major arcs are fixedly connected.
7. spheroid lifting device according to claim 1, it is characterised in that:The C-shaped bracket (4) is by a major arc structure Into.
8. the spheroid lifting device according to claim 1-7 any one, it is characterised in that:On the goal track (2) It is additionally provided with the touch switch mechanism (5) that control transmission mechanism (1) at least runs half period.
9. spheroid lifting device according to claim 8, it is characterised in that:The touch switch mechanism (5) includes delay Bar (52) is stuck up in switch (51) and triggering;The triggering is stuck up to be hinged on the downside of goal track (2) in the middle part of bar (52), and bar is stuck up in triggering (52) one end is provided with pendant part (53), and the other end is provided with touch panel (54);It is upturned and stretches during touch panel (54) nature Enter goal track (2) bottom, the trigger point of delay switch (51) is on the downside of touch panel (54).
10. spheroid lifting device according to claim 9, it is characterised in that:The touch switch mechanism (5) also includes setting Rotary spacing bar (55) on the downside of pendant part (53).
CN201720336363.1U 2017-03-31 2017-03-31 Spheroid lifting device Active CN206587361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720336363.1U CN206587361U (en) 2017-03-31 2017-03-31 Spheroid lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720336363.1U CN206587361U (en) 2017-03-31 2017-03-31 Spheroid lifting device

Publications (1)

Publication Number Publication Date
CN206587361U true CN206587361U (en) 2017-10-27

Family

ID=60122316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720336363.1U Active CN206587361U (en) 2017-03-31 2017-03-31 Spheroid lifting device

Country Status (1)

Country Link
CN (1) CN206587361U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108079526A (en) * 2018-01-24 2018-05-29 安吉县良朋文体用品厂 A kind of sphere extraction element
CN110314360A (en) * 2019-08-13 2019-10-11 武汉轻工大学 Ball transmission device and ball transmitting equipment
CN113160668A (en) * 2021-04-30 2021-07-23 电子科技大学成都学院 Touch screen type mathematical statistics demonstrator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108079526A (en) * 2018-01-24 2018-05-29 安吉县良朋文体用品厂 A kind of sphere extraction element
CN110314360A (en) * 2019-08-13 2019-10-11 武汉轻工大学 Ball transmission device and ball transmitting equipment
CN113160668A (en) * 2021-04-30 2021-07-23 电子科技大学成都学院 Touch screen type mathematical statistics demonstrator
CN113160668B (en) * 2021-04-30 2023-10-13 电子科技大学成都学院 Touch screen type mathematical statistics demonstrator

Similar Documents

Publication Publication Date Title
CN206587361U (en) Spheroid lifting device
CN105058523B (en) Automatic glue application anode machine
CN202226375U (en) Automatic turning equipment
CN206955133U (en) A kind of switching mechanism in channel-section steel conveying production line
CN103754606B (en) One is turned over base machine
CN102589311B (en) Stoking machine of electric resistance furnace
CN204489961U (en) Gloves are won correcting code and are put machine
CN206288711U (en) A kind of hopper formula quickly tears disk machine open
CN103910088B (en) A kind of automatic support separation machine storage device
CN108341266A (en) Device and method and Automated Sorting System for plate glass commutation transmission
CN202245309U (en) Automatic production line for fire-resistant decorative boards
CN107585501A (en) A kind of conveying device for logistics sorting
CN202625344U (en) Steering conveying line
CN206307686U (en) Squirrel-cage beddo switching mechanism
CN105689283A (en) Finger-stirring type fruit and vegetable sorting and discharging device and discharging method
CN209382796U (en) A kind of double-chain single bucket elevator
CN104925442A (en) Lifting mechanism of intelligent traditional Chinese medicine machine
CN210877906U (en) Automatic cutting separation blocking device
CN106995143A (en) A kind of grasping mechanism
CN204525879U (en) A kind of hydralic hose vulcanization conveying device
CN206916231U (en) A kind of electrolytic pole board scoreboard arranges panel assembly
CN108946084A (en) A kind of glass turnover device
CN109703820A (en) The gloves stacking mechanism of Full-automatic glove screening packing machine
CN206068829U (en) Sheet material commutation conveying mechanism
CN210557327U (en) Telescopic belt conveyor dust cover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant