CN206585176U - Connecting element maintenance of equipment - Google Patents

Connecting element maintenance of equipment Download PDF

Info

Publication number
CN206585176U
CN206585176U CN201720027713.6U CN201720027713U CN206585176U CN 206585176 U CN206585176 U CN 206585176U CN 201720027713 U CN201720027713 U CN 201720027713U CN 206585176 U CN206585176 U CN 206585176U
Authority
CN
China
Prior art keywords
tin
connecting element
head assembly
work head
mechanisms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720027713.6U
Other languages
Chinese (zh)
Inventor
周学军
胡勇
张旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ming Dakang Science And Technology Ltd
Original Assignee
Shenzhen Ming Dakang Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ming Dakang Science And Technology Ltd filed Critical Shenzhen Ming Dakang Science And Technology Ltd
Priority to CN201720027713.6U priority Critical patent/CN206585176U/en
Application granted granted Critical
Publication of CN206585176U publication Critical patent/CN206585176U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Connection Of Electric Components To Printed Circuits (AREA)

Abstract

Connecting element maintenance of equipment of the present utility model, including delivery track, connection component, the second work head assembly and the first work head assembly, first work head assembly includes Chai Liao mechanisms, tin remover structure and Tu Xi mechanisms, and the second work head assembly includes attachment mechanism.The circuit board that delivery track conveying needs repairing;Connection component includes a pair of fixed plates, it is arranged on a pair first driving guide rails in fixed plate, first crossbeam and second cross beam, first work head assembly is fixed on first crossbeam, second work head assembly is fixed on second cross beam, and the two ends of first crossbeam and second cross beam drive at a pair first respectively to be slided on guide rail;Chai Liao mechanisms retract connecting element, and tin remover structure draws scolding tin on circuit board, and tin cream, attachment mechanism installs connector element are smeared welding position by Tu Xi mechanisms.The utility model realizes the dismounting of connecting element, except tin, painting tin and attachment action in same equipment, improves maintenance efficiency, reduces space hold.

Description

Connecting element maintenance of equipment
Technical field
The utility model is related to circuit board repair field, more particularly to a kind of connecting element maintenance of equipment.
Background technology
Connecting element is that a kind of install is used for the electrical equipment of grafting order wire, connecting element size on circuit boards Larger, with multiple pins, the communication of data is realized in welding by grafting line interface afterwards on circuit boards, and its is easy to connect.When Connecting element goes wrong when needing dismounting and change, and multiple equipment is connected to a pipeline formation service lane, multiple Equipment to the connecting element heating on circuit board, except tin, crawl and is installed respectively.Therefore, connector is first in the prior art The maintenance of part usually requires multiple equipment pipelining, and one of equipment operationally has to receive and set from upper one Standby circuit board, circuit board not only expends the time, causes production efficiency to reduce from an equipment is delivered to another equipment; And the maintenance line volume of multiple equipment composition is larger, space-consuming.
Utility model content
The purpose of this utility model is to provide a kind of connecting element maintenance unit, it is intended to solve to utilize multiple equipment pair Maintenance efficiency is low when connecting element is repaired, the technical problem of space-consuming.
What the utility model was realized in:
The utility model embodiment provides a kind of connecting element maintenance of equipment, including workbench, the connector member Part maintenance of equipment also includes:
Delivery track, the delivery track is fixed on the workbench, for conveying the circuit board needed repairing;
Connection component, the connection component is positioned at the workbench;
Second work head assembly and the first work head assembly, second work head assembly and first work head assembly It is respectively positioned in the connection component and is slided on the connection component;
Second work head assembly includes:
Mechanism is mounted, the attachment mechanism is used to take connecting element to be installed and is installed in the installation of circuit board On position;
First work head assembly includes:
Chai Liao mechanisms, the Chai Liao mechanisms wait to tear open for heating connecting element to be removed on circuit board, and retracting The connecting element unloaded;
Tin remover structure, the tin remover structure draws the scolding tin after being heated on circuit board;
Tu Xi mechanisms, the Tu Xi mechanisms are used to smear tin cream to the welding position of connecting element.
Further, the connection component includes:
Two fixed plates, fixed plate described in two is individually fixed in two side edges relative on the workbench, described two Fixed plate is parallel to each other perpendicular to the delivery track, and in the same plane;
Two drive mechanisms, drive mechanism described in two is fixed along fixed plate described in two respectively;
Second cross beam, the two ends of the second cross beam are respectively positioned in drive mechanism described in two, and in the drive mechanism It is upper to slide;
First crossbeam, the two ends of the first crossbeam are respectively positioned in drive mechanism described in two, and in the drive mechanism It is upper to slide;
Second work head assembly is positioned at the second cross beam, and first work head assembly is positioned at described first Crossbeam.
Further, the drive mechanism includes:
Slide rail, is set along the fixed plate bearing of trend;
First driving guide rail, the first driving guide rail is set along the fixed plate bearing of trend, and first driving is led The sliding shoe that rail includes body and is positioned on the body and slided relative to body;
One end of the second cross beam is positioned at the slide rail of drive mechanism described in one, the other end of the second cross beam It is positioned at the driving guide rail of another drive mechanism;Driven in the slide rail with described first at the two ends of the second cross beam Slided on dynamic guide rail;
One end of the first crossbeam is positioned at the first driving guide rail of drive mechanism described in one, the first crossbeam The other end be positioned at the slide rail of another drive mechanism;The two ends of the first crossbeam are in the slide rail and the first institute State and slided on driving guide rail.
Further, second work head assembly also includes the second drive component, and described second drive component one end is determined On the second cross beam, the other end is positioned at the attachment mechanism, and second drive component drives the attachment mechanism It is flexible perpendicular to the circuit board direction;
First work head assembly also includes the first drive component, and described first drive component one end is fixed on described the On one crossbeam, the other end is fixed with the Chai Liao mechanisms, the tin remover structure and the Tu Xi mechanisms, first drive component Drive the Chai Liao mechanisms, the tin remover structure and the Tu Xi mechanisms flexible perpendicular to the circuit board direction.
Further, second drive component includes the 3rd driving guide rail, and first drive component includes second and driven Dynamic guide rail;The 3rd driving guide rail is fixed on the second cross beam and described first vertically respectively with the described second driving guide rail Crossbeam.
Further, the attachment mechanism includes:
Support, the support is positioned at the 3rd driving guide rail, is moved vertically under the driving of the described 3rd driving guide rail It is dynamic;
Asepwirator pump, the asepwirator pump is used for air-breathing;
Suction pipe is mounted, described attachment suction pipe one end is connected with the asepwirator pump, turned on the asepwirator pump;
Suction nozzle is mounted, the attachment suction nozzle is connected to the other end of the attachment suction pipe, and is turned on the attachment suction pipe;
During the attachment suction pipe air-breathing, the attachment suction nozzle suction element.
Further, the Chai Liao mechanisms include:
Air-heater, the air-heater produces hot blast;
Heat gun, the heat gun is connected with the air-heater;
Air pressure gun head, the air pressure gun head is connected to the heat gun and turned on the heat gun;
The air pressure gun head be metal material, it includes air outlet and is arranged on the contact site of air outlet both sides, it is described go out Air port is used to hot blast blowing to the connecting element, and connecting element is heated;It is described to connect after the connecting element heating Contact portion is contacted with the connecting element, and connecting element is contained in the air outlet, so that the connecting element be torn open Unload.
Further, the tin remover structure includes:
Vacuum cavity, the vacuum cavity is used to accommodate the scolding tin drawn on circuit board;
Except tin suction pipe, described one end except tin suction pipe is turned on the vacuum cavity;
It is described except tin suction nozzle is installed on the other end for removing tin suction pipe except tin suction nozzle, for drawing circuit board after heating On scolding tin.
Further, the Tu Xi mechanisms include:
The scolding tin of molten condition is accommodated in scolding tin accommodating chamber, the scolding tin accommodating chamber;
Connecting tube, the connecting tube is turned on the scolding tin accommodating chamber;
Tin jet pipe is applied, the painting tin jet pipe is turned on the connecting tube;
Tin nozzle is applied, the painting tin nozzle is connected to the painting tin jet pipe;
The scolding tin of molten condition is ejected to connecting element on circuit board through the connecting tube, painting tin jet pipe and painting tin nozzle Welding position.
The utility model has the advantages that:
Connecting element maintenance of equipment of the present utility model is by Chai Liao mechanisms, tin remover structure, Tu Xi mechanisms and placement equipment Structure it is integrated with same equipment on, and pass through connection component and control Chai Liao mechanisms, tin remover structure, Tu Xi mechanisms and attachment mechanism Motion so that realize the dismounting of connecting element, except tin, apply tin and attachment action, compared to using multiple equipment difference Realize and remove, except maintenance efficiency is improved for tin, painting tin and attachment action, reduce space hold.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the utility model maintenance of equipment overall structure diagram;
Fig. 2 is the structural representation of the work head assembly of the utility model second;
Fig. 3 is the structural representation of the work head assembly of the utility model first;
Fig. 4 is the structural representation of the utility model connection component;
Fig. 5 is the structural representation of the utility model Chai Liao mechanisms and Tu Xi mechanisms;
Fig. 6 is the structural representation of the utility model tin remover structure;
Fig. 7 is the structural representation of the utility model air pressure gun head.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The all other embodiment obtained, belongs to the scope of the utility model protection.
Referring to Fig. 1, the utility model embodiment provides a kind of connecting element maintenance of equipment, and the equipment includes:Work is flat Platform 100, delivery track 200, the work head assembly 500 of connection component 300 and first and the second work head assembly 400.Conveyor track Road 200 is fixed on workbench 100, and thereon for conveying the circuit board needed repairing, connection component 300 is positioned at work and put down Platform 100, the first work head assembly 500 and the second work head assembly 400 are connected with connection component 300 respectively, and in connection group Slided on part 300.Cooperation completes connector on circuit board jointly for first work head assembly 500 and the second work head assembly 400 The dismounting of element, except tin, apply tin and attachment action.Refering to Fig. 2 and Fig. 3, the first work head assembly 500 includes:Chai Liao mechanisms 51st, tin remover structure 52 and Tu Xi mechanisms 53.Chai Liao mechanisms 51 are used to heat connecting element to be removed on circuit board, and Retract connecting element to be removed.Tin remover structure 52 draws the scolding tin after being heated on circuit board, cleaning circuit board connector member The solder joint of part.Tin remover structure 52 is used to smear tin cream to the scolding tin position of connecting element.Second work head assembly 400 includes patch Mounting mechanism 41, attachment mechanism 41 is used to take connecting element to be installed and is installed in the installation site of circuit board;
In the present embodiment, connection component 300 drives the first work head assembly 500 and the second work head assembly 400 to exist Slide thereon, the circuit board being on delivery track 200 when the first work head assembly 500 and the second work head assembly 400 just on Fang Shi, the first work head assembly 500 is started working respectively with the second work head assembly 400, and the course of work is as follows:
First, delivery track 200 conveys the circuit board needed repairing;
Then, the first work head assembly 500 is slid on the circuit board needed repairing in the presence of connection component 300 Side, Chai Liao mechanisms 51 are heated to connecting element to be removed on circuit board, and the scolding tin on device element to be connected melts in molten When melting state, Chai Liao mechanisms 51 disassemble connecting element to be removed;
Afterwards, the tin cream of residual is removed in the welding position of 52 pairs of dismounting connecting elements of tin remover structure;
Then, Tu Xi mechanisms 53 treat the welding position spraying scolding tin of installs connector element;
Finally, the second work head assembly 400 is slid on the circuit board needed repairing in the presence of connection component 300 Side, attachment mechanism 41 connecting element to be replaced taken before is placed on welding position so that complete change and The action of welding.
In the present embodiment, connecting element maintenance of equipment by Chai Liao mechanisms 51, tin remover structure 52, Tu Xi mechanisms 53 with And attachment mechanism 41 it is integrated with same equipment on, and pass through connection component 300 and control Chai Liao mechanisms 51, tin remover structure 52, apply Tin mechanism 53 and the motion for mounting mechanism 41, so that realize the dismounting of connecting element, except tin, painting tin and attachment action, Dismounting is realized respectively, except maintenance efficiency is improved for tin, painting tin and attachment action, reduce compared to using multiple equipment Space hold.
Refering to Fig. 4, further, connection component 300 include two fixed plates 31, two drive mechanisms 32, first crossbeam 34 with And second cross beam 33.Two fixed plates 31 are individually fixed in two side edges relative on workbench 100, and two fixed plates 31 are vertical It is parallel to each other in delivery track 200, and in the same plane;Two drive mechanisms 32 are fixed along two fixed plates 31 respectively;First is horizontal The two ends of beam 34 are respectively positioned in two drive mechanisms 32, and are slided in drive mechanism 32;The two ends of second cross beam 33 are fixed respectively Slided positioned at two drive mechanisms 32, and in drive mechanism 32;The first work head assembly of drive mechanism drive mechanism 500 is positioned at First crossbeam 34, the second work head assembly 400 is positioned at second cross beam 33.
In the present embodiment, fixed plate 31, drive mechanism 32 and first crossbeam 34 and second cross beam 33 are above work Make platform 100, positioned at the top of delivery track 200.First crossbeam 34 or second cross beam 33 is driven to move in drive mechanism 32 Afterwards, the second work head assembly 400 being fixed on second cross beam 33 and the first work head group being fixed on first crossbeam 34 Part 500 can move to the surface of delivery track 200, so that from the top of delivery track 200 to being placed on delivery track 200 Circuit board carry out Job Operations, it is therefore prevented that the movement of circuit board in the horizontal plane.
Refering to Fig. 1, in the present embodiment, drive mechanism 32 successively drives first crossbeam 34 and second cross beam 33 to move It is dynamic, so that the dismounting of the second work head assembly 400 and the first work head assembly 500 collaborative work completion connecting element, The action of tin and attachment is removed, applied to scolding tin, and time availability is higher, can effectively improve production efficiency.
Specifically, drive mechanism 32 first drives first crossbeam 34 to drive the first work head assembly 500 to be moved on circuit board Chai Liao mechanisms 51, tin remover structure 52 and Tu Xi mechanisms 53 on side, the first work head assembly 500 is successively respectively on circuit board Connecting element remove, remove scolding tin and apply tin action, when applying that tin action closes to an end, the driving of drive mechanism 32 the Two crossbeams 33 drive the second work head assembly 400 to be moved to circuit board, while driving first crossbeam 34 to drive the first work head group Part 500 recovers to circuit board initial position;After the second work head assembly 400 is moved to circuit board, the second work The connecting element to be installed taken is attached on the corresponding position of circuit board by the attachment mechanism 41 for making head assembly 400, so that Complete welding.
As in Fig. 4, further, drive mechanism 32 includes slide rail 321 and first and drives guide rail 322, and the first driving is led Rail 322 includes body 323 and sliding shoe 324.Specifically, slide rail 321 is set along the bearing of trend of fixed plate 31;First driving is led Rail 322 is set along the bearing of trend of fixed plate 31, and sliding shoe 324 is positioned on body 323 and slided relative to body 323;First One end of crossbeam 34 is positioned at the first driving guide rail 322 of a drive mechanism 32, and the other end of first crossbeam 34 is positioned at another The slide rail 321 of drive mechanism 32;Slided on the driving guide rail of slide rail 321 and first at the two ends of first crossbeam 34.Second cross beam 33 One end be positioned at the slide rail 321 of a drive mechanism 32, the other end of second cross beam 33 is positioned at the drive of another drive mechanism 32 Dynamic guide rail;The two ends of second cross beam 33 sliding drive mechanism drive mechanism on the driving guide rail 322 of slide rail 321 and first.
In the present embodiment, the two ends of second cross beam 33 are respectively positioned in the slide rail 321 of drive mechanism 32 and another On the sliding shoe 324 of drive mechanism 32, the two ends of second cross beam 33 are slided on slide rail 321 and sliding shoe 324, sliding shoe 324 provide the driving force that second cross beam 33 is slided;The two ends of first crossbeam 34 be positioned at drive mechanism 32 sliding shoe 324 and On the slide rail 321 of another drive mechanism 32, the two ends of first crossbeam 34 are also slided on slide rail 321 and sliding shoe 324, are slided Block 324 provides the driving force of first crossbeam 34.In the present embodiment, it is only necessary to which two first driving guide rails 322 can just drive Dynamic second cross beam 33 and first crossbeam 34 are independent of each other to be slided, and is just needed relative to single first crossbeam 34 or second cross beam 33 Want for the two first slidable modes of the driving driving ability of guide rail 322, first required for reducing drives the number of guide rail 322 Amount, advantageously reduces cost.
Referring to Fig. 2, further, the first work head assembly 500 also includes the first drive component 50, the first drive component 50 one end are fixed on first crossbeam 34, and the other end is fixed with Chai Liao mechanisms 51, tin remover structure 52 and Tu Xi mechanisms 53, and first drives The dynamic driving Chai Liao of component 50 mechanisms 51, tin remover structure 52 and Tu Xi mechanisms 53 are flexible perpendicular to circuit board direction.Second work head Component 400 also includes the second drive component 40, and the one end of the second drive component 40 is positioned on second cross beam 33, and the other end is positioned at Mechanism 41 is mounted, the second drive component 40 driving attachment mechanism 41 is flexible perpendicular to circuit board direction.
In the present embodiment, the first work head assembly 500 is moved to circuit board under the drive of first crossbeam 34 Afterwards, the first drive component 50 driving Chai Liao mechanisms 51, tin remover structure 52 and Tu Xi mechanisms 53 are moved perpendicular to circuit board, tear material open Mechanism 51, tin remover structure 52 and Tu Xi mechanisms 53 realize connecting element dismounting, except tin and painting tin work respectively.Equally , after the second work head assembly 400 is moved to the top of circuit board under the drive of second cross beam 33, the second drive component 40 drives Dynamic attachment mechanism 41 is moved perpendicular to circuit board, so that attachment mechanism 41 is moved to the upper of circuit board connecting element to be replaced Near side, mechanism 41 is mounted afterwards and places connecting element to be mounted.
In the present embodiment, the second drive component 40 realizes the second work head assembly with the collective effect of drive mechanism 32 400 movement in three dimensions, the first drive component 50 realizes the first work head assembly with the collective effect of drive mechanism 32 500 movement in three dimensions, wherein, drive mechanism 32 respectively with the second drive component 40 and the first drive component 50 Coordinate the movement for realizing Chai Liao mechanisms 51, tin remover structure 52, Tu Xi mechanisms 53 and attachment mechanism 41 in space, to realize Dismantle, except tin, painting tin and attachment work are provided and ensured.
Further, the second drive component 40 includes the 3rd driving guide rail 401, and the first drive component 50 includes the second driving Guide rail 501;The 3rd driving driving guide rail 501 of guide rail 401 and second is fixed on second cross beam 33 and first crossbeam 34 vertically respectively.
In the present embodiment, the 3rd driving guide rail 401 drives the second work head assembly 400 to be moved perpendicular to circuit board, Second driving guide rail 501 drives the first work head assembly 500 to be moved perpendicular to circuit board.3rd driving guide rail 401 and second drives The setting of dynamic guide rail 501 is respectively that the second work head assembly 400 and vertically moving for the second work package provide guarantee.
In the present embodiment, when the first driving driving driving guide rail 501 of guide rail 401 and second of guide rail the 322, the 3rd exists Under electrical control environment, by controlling electric parameter to realize, the first driving guide rail the 322, the 3rd drives guide rail 401 and second to drive Movement, stopping and the mobile distance of dynamic guide rail 501, so as to realize the second work head assembly 400 and the first work Accurate control of the head assembly 500 in three-dimensional environment.
Refering to Fig. 2, further, attachment mechanism 41 includes support 411, asepwirator pump 412, attachment suction pipe 413 and attachment Suction nozzle 414.Wherein, support 411 is positioned at the 3rd driving guide rail 401, the vertical shift under the driving of the 3rd driving guide rail 4012; Asepwirator pump 412 is used for air-breathing;Attachment one end of suction pipe 413 is connected with asepwirator pump 412, is turned on asepwirator pump 412;Mount suction nozzle 414 The other end of attachment suction pipe 413 is connected to, and is turned on attachment suction pipe 413;When mounting 413 air-breathing of suction pipe, attachment suction nozzle 414 is inhaled Take connecting element.
In the present embodiment, the 3rd driving driving arm 411 of guide rail 401 is moved, so as to indirectly drive whole attachment Mechanism 41 is moved perpendicular to circuit board, after asepwirator pump 412 is started working, so that the air pressure in attachment suction pipe 413 reduces, attachment Suction nozzle 414 draws connecting element to be mounted;When mounting mechanism 41 near circuit board surface, asepwirator pump 412 stops Only work connecting element being placed on welding position.By the way of suction pipe air-breathing suction element, do not allow Fragile connecting element.
Fig. 3, Fig. 5 and Fig. 7 are referred to, further, Chai Liao mechanisms 51 include:Air-heater 511, heat gun 513 and Air pressure gun first 513, wherein, air-heater 511 produces hot blast;Heat gun 513 is connected with air-heater 511;Air pressure gun first 513 is connected to hot blast Rifle 513 is simultaneously turned on heat gun 513;Air pressure gun first 513 is metal material, and it includes air outlet 5131 and is arranged on air outlet The contact site 5132 of 5131 both sides, air outlet 5131 is used to hot blast blowing to connecting element, and connecting element is heated;Connection After the heating of device element, contact site 5132 is contacted with connecting element, and connecting element is contained in air outlet 5131, so that will even Connect the dismounting of device element.
In the present embodiment, the hot blast that air-heater 511 is produced blows to circuit by heat gun 513 and air pressure gun first 513 Connecting element to be removed on plate, device element to be connected is heated after scolding tin thawing, and air pressure gun first 513 continues to move towards circuit board It is dynamic, and fastened in the contact site 5132 of air pressure gun first 513 at the edge of connecting element body 323, connecting element is contained in After air outlet 5131, air pressure gun first 513 drives connecting element to be moved away from circuit board direction, so that connecting element be dismantled down Come.The action that whole heating and dismounting are taken is fully completed by a Ge Chailiao mechanisms 51, and a Ge Chailiao mechanisms 51 complete two Individual operation acts, are not needing by other equipment or mechanism, relatively more coherent between two operation acts, are conducive to improving and dismantle The operating efficiency of connecting element.
Referring to Fig. 6, further, tin remover structure 52 includes vacuum cavity 521, except tin suction pipe 522 and except tin suction nozzle 523.Vacuum cavity 521 is used to accommodate the scolding tin drawn on circuit board;Except one end of tin suction pipe 522 is turned on vacuum cavity 521; Except tin suction nozzle 523 is installed on except the other end of tin suction pipe 522, for drawing the scolding tin after heating on circuit board.
In the present embodiment, the gas pressure in vacuum cavity 521 is smaller, except tin suction pipe 522 is by thawing Scolding tin being sucked by way of negative pressure except tin suction nozzle 523 near the scolding tin of molten condition, so that scolding tin be contained in very In cavity body 521, the removing of scolding tin is by the way of negative pressure, and elimination efficiency is higher, and elimination effect is preferable.
Referring to Fig. 5, further, Tu Xi mechanisms 53 include scolding tin accommodating chamber 531, connecting tube 532, apply tin jet pipe 533 And apply tin nozzle 534.The scolding tin of molten condition is accommodated in scolding tin accommodating chamber 531;Connecting tube 532 and scolding tin accommodating chamber 531 Conducting;Tin jet pipe 533 is applied, tin jet pipe 533 is applied and is turned on connecting tube 532;Apply tin nozzle 534 and be connected to painting tin jet pipe 533;Melting The scolding tin of state is through connecting tube 532, painting tin jet pipe 533 and applies the welding that tin nozzle 534 is ejected to connecting element on circuit board Position.
In the present embodiment, what is accommodated in scolding tin accommodating chamber 531 is the scolding tin in molten condition after heating, and scolding tin holds Chamber 531 of receiving is connected by connecting tube 532 with applying tin jet pipe 533, and scolding tin is through applying tin jet pipe 533 and applying the company of being applied to of tin nozzle 534 In the weld pads for connecing device element, mechanism 41 is mounted afterwards connecting element is placed on the solder joint for scribble scolding tin, so as to complete The installation of connecting element.
In the utility model, the dismounting of connecting element, it is dynamic that scolding tin removing, scolding tin spraying and connecting element are mounted It is fully completed on one device, and various pieces use mechanized operation, are respectively completed compared to using multiple equipment Element dismounting, the action for removing scolding tin, spraying scolding tin and mount components, improve the maintenance efficiency of connecting element.
Preferred embodiment of the present utility model is these are only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.

Claims (8)

1. a kind of connecting element maintenance of equipment, including workbench, it is characterised in that the connecting element maintenance of equipment is also Including:
Delivery track, the delivery track is fixed on the workbench, for conveying the circuit board needed repairing;
First work head assembly, first work head assembly includes:
Chai Liao mechanisms, the Chai Liao mechanisms are used to heat connecting element to be removed on circuit board, and retract to be removed Connecting element;
Tin remover structure, the tin remover structure draws the scolding tin after being heated on circuit board;And
Tu Xi mechanisms, the Tu Xi mechanisms are used to smear tin cream to the welding position of connecting element;And
Second work head assembly, second work head assembly includes:
Mechanism is mounted, the attachment mechanism is used to take connecting element to be installed and is installed in the installation site of circuit board On;And
Connection component, is positioned at the workbench, and the connection component includes:
A pair of fixed plates, fixed plate described in a pair is individually fixed in both sides relative on the workbench, fixed described in a pair Plate is respectively perpendicular to the delivery track;
A pair of drive mechanisms, drive mechanism described in a pair is fixed with fixed plate described in a pair respectively;
First crossbeam, the two ends of the first crossbeam are respectively positioned in drive mechanism described in a pair, and in the drive mechanism Slide;
Second cross beam, the two ends of the second cross beam are respectively positioned in drive mechanism described in a pair, and in the drive mechanism Slide;
First work head assembly is positioned at the first crossbeam and slided relative to the corresponding fixed plate, described second Work head assembly is positioned at the second cross beam and slided relative to the corresponding fixed plate.
2. connecting element maintenance of equipment according to claim 1, it is characterised in that each described drive mechanism bag Include:
Slide rail, is set along the fixed plate bearing of trend;And
First driving guide rail, the first driving guide rail is set along the fixed plate bearing of trend, the first driving guide rail bag The sliding shoe for including body and being positioned on the body and being slided relative to the body;
Wherein, the sliding shoe of one of them drive mechanism is fixed in one end of the first crossbeam, and described first is horizontal The other end of beam is located at the slide rail of another drive mechanism;The two ends of the first crossbeam are in the slide rail and first Slided on the first driving guide rail;
One end of the second cross beam is positioned at the slide rail of one of them drive mechanism, the second cross beam it is another End is positioned at the sliding shoe of another drive mechanism;The two ends of the second cross beam are in the slide rail and described first Drive and slided on guide rail.
3. connecting element maintenance of equipment according to claim 2, it is characterised in that first work head assembly is also wrapped The first drive component is included, described first drive component one end is fixed on the first crossbeam, the other end, which is fixed with, described tears material open Mechanism, the tin remover structure and the Tu Xi mechanisms, first drive component drive the Chai Liao mechanisms, the tin remover structure And the Tu Xi mechanisms are flexible perpendicular to the circuit board direction;
Second work head assembly also includes the second drive component, and it is horizontal that described second drive component one end is positioned at described second Liang Shang, the other end is positioned at the attachment mechanism, and the second drive component driving attachment mechanism is perpendicular to the circuit Stretch in plate direction.
4. connecting element maintenance of equipment according to claim 3, it is characterised in that first drive component includes the Two driving guide rails, second drive component includes the 3rd driving guide rail;The second driving guide rail is led with the described 3rd driving Rail is fixed on the first crossbeam and the second cross beam vertically respectively.
5. connecting element maintenance of equipment according to claim 4, it is characterised in that the attachment mechanism includes:
Support, the support is positioned at the 3rd driving guide rail, the vertical shift under the driving of the described 3rd driving guide rail;
Asepwirator pump, the asepwirator pump is used for air-breathing;
Suction pipe is mounted, described attachment suction pipe one end is connected with the asepwirator pump, turned on the asepwirator pump;
Suction nozzle is mounted, the attachment suction nozzle is connected to the other end of the attachment suction pipe, and is turned on the attachment suction pipe;
During the attachment suction pipe air-breathing, the attachment suction nozzle suction element.
6. connecting element maintenance of equipment according to claim 3, it is characterised in that the Chai Liao mechanisms include:
Air-heater, the air-heater produces hot blast;
Heat gun, the heat gun is connected with the air-heater;
Air pressure gun head, the air pressure gun head is connected to the heat gun and turned on the heat gun;
The air pressure gun head is metal material, and it includes air outlet and is arranged on the contact site of air outlet both sides, the air outlet For hot blast to be blowed into the connecting element, connecting element is heated;After the connecting element heating, the contact site Contacted with the connecting element, connecting element is contained in the air outlet, so that the connecting element be dismantled.
7. connecting element maintenance of equipment according to claim 3, it is characterised in that the tin remover structure includes:
Vacuum cavity, the vacuum cavity is used to accommodate the scolding tin drawn on circuit board;
Except tin suction pipe, described one end except tin suction pipe is turned on the vacuum cavity;
It is described except tin suction nozzle is installed on the other end for removing tin suction pipe except tin suction nozzle, for drawing after heating on circuit board Scolding tin.
8. connecting element maintenance of equipment according to claim 3, it is characterised in that the Tu Xi mechanisms include:
The scolding tin of molten condition is accommodated in scolding tin accommodating chamber, the scolding tin accommodating chamber;
Connecting tube, the connecting tube is turned on the scolding tin accommodating chamber;
Tin jet pipe is applied, the painting tin jet pipe is turned on the connecting tube;
Tin nozzle is applied, the painting tin nozzle is connected to the painting tin jet pipe.
CN201720027713.6U 2017-01-11 2017-01-11 Connecting element maintenance of equipment Expired - Fee Related CN206585176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720027713.6U CN206585176U (en) 2017-01-11 2017-01-11 Connecting element maintenance of equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720027713.6U CN206585176U (en) 2017-01-11 2017-01-11 Connecting element maintenance of equipment

Publications (1)

Publication Number Publication Date
CN206585176U true CN206585176U (en) 2017-10-24

Family

ID=60109908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720027713.6U Expired - Fee Related CN206585176U (en) 2017-01-11 2017-01-11 Connecting element maintenance of equipment

Country Status (1)

Country Link
CN (1) CN206585176U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981350A (en) * 2021-11-03 2022-01-28 吉林建筑大学 Tin removing and coating equipment for electrical equipment and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113981350A (en) * 2021-11-03 2022-01-28 吉林建筑大学 Tin removing and coating equipment for electrical equipment and using method thereof

Similar Documents

Publication Publication Date Title
CN104439598B (en) A kind of automatic infiltration welding machine and immersed solder method
CN206474358U (en) A kind of flat board firmware spraying equipment
CN103407279B (en) Polarizer peeling machine and stripping means
CN203708651U (en) PCB plate dismounting, turning and pasting automated all-in-one machine
CN209532330U (en) Battery strings device for repairing
CN105170420B (en) Online LCM point gum machines
JP6093480B2 (en) Coating apparatus, coating head, and coating method
CN204769289U (en) Antifoulingly prevent fingerprint filming equipment
CN206585176U (en) Connecting element maintenance of equipment
CN104669788B (en) Planar image-text printer
CN105472905A (en) Magnetic fixture and FPC non-reinforced support electronic assembly welding process applying magnetic fixture
CN204046941U (en) A kind of film for flexible PCB sticks equipment automatically
CN204672628U (en) A kind of clean cull device
CN103737144A (en) Lcm welding device
CN207343931U (en) The multifunctional intellectual welding machine of cover plate LCM
CN104308316A (en) Welding mechanism and welding method for PCB (printed circuit board)
CN111224056A (en) Lithium battery wiping device
CN207522220U (en) The drilling device of mechanical fitting
CN105345205A (en) Cable tinning machine with feeding and discharging automatic control function
CN215468648U (en) Automatic system of dismantling of abandonment circuit board
CN112742650B (en) Organic coating treatment system for surface of anticorrosion sucker rod
CN205324049U (en) Brake hoof auto -induction spouts mucilage binding and puts
CN110636706B (en) Production process of charger
CN105857810A (en) Labeling machine
CN208392889U (en) A kind of OLED flexible display cleans ink jet numbering machine with US

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

Termination date: 20190111