CN206581979U - A kind of pre-buried channel flow for being easy to repair - Google Patents

A kind of pre-buried channel flow for being easy to repair Download PDF

Info

Publication number
CN206581979U
CN206581979U CN201720014146.0U CN201720014146U CN206581979U CN 206581979 U CN206581979 U CN 206581979U CN 201720014146 U CN201720014146 U CN 201720014146U CN 206581979 U CN206581979 U CN 206581979U
Authority
CN
China
Prior art keywords
buried
screw
buried bar
bar
conduit body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720014146.0U
Other languages
Chinese (zh)
Inventor
赵晓东
殷林杰
冯超
柴国敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dasen Mechanical And Electrical Co Ltd
Original Assignee
Henan Dasen Mechanical And Electrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dasen Mechanical And Electrical Co Ltd filed Critical Henan Dasen Mechanical And Electrical Co Ltd
Priority to CN201720014146.0U priority Critical patent/CN206581979U/en
Application granted granted Critical
Publication of CN206581979U publication Critical patent/CN206581979U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pre-buried channel flow for being easy to repair, including conduit body and pre-buried bar, the conduit body bottom portion is provided with screw, the screw is divided into bolt head bore and bolt rod aperture on the same center of circle, the conduit body is provided with orientation block below screw, and the orientation block also is provided with screw, and the pre-buried bar is adapted with screw, the pre-buried bar surface is provided with external screw thread, and the pre-buried bar bottom is provided with nut.This is easy to the pre-buried channel flow of maintenance, by the screw hole design of conduit body into two layers above and below bolt head bore and bolt rod aperture, the top of pre-buried bar can be made completely into screw, the use of conduit body is not influenceed;The bottom of pre-buried bar is provided with nut, by increasing capacitance it is possible to increase pre-buried bar is by the steadiness in cement of nuzzling, moreover it is possible to taken out pre-buried bar using machinery, and conduit body is repaired;Therefore, the utility model is simple in construction, reasonable in design, with social utility's value.

Description

A kind of pre-buried channel flow for being easy to repair
Technical field
The utility model belongs to technical field of traffic transportation, and in particular to a kind of pre-buried channel flow for being easy to repair.
Background technology
At present in subway construction, when affiliated facility is fixedly mounted, drilled after general use, the side fixed with expansion bolt Formula, over time, expansion bolt easily loosen under oscillatory load, and the easily generation dust in installation process;Or adopt The mode installed with pre-embedded steel slab, when mounted, it is necessary to be welded and external power supply, installation effectiveness is low, and welding easily make it is attached Facility deformation produces stress concentration;There is a method in which be exactly by the way of pre-buried installation, it is in advance that conduit is pre- by anchor pole It is embedded in concrete, this mode efficiency highest.
Existing subway conduit typically all by the way of fixed welding, is fixed and welded together pre-buried bar and chute, This is resulted in can not be repaired when conduit is damaged, and all pre-buried channel flows all can not be normally used, influence construction Progress;Accordingly, it would be desirable to one kind is designed when conduit is damaged, the pre-buried channel flow that can conveniently repair.
Utility model content
The purpose of this utility model is to provide a kind of pre-buried channel flow for being easy to repair, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of pre-buried channel flow for being easy to repair, including Conduit body and pre-buried bar, the conduit body bottom portion be provided with screw, the screw be divided on the same center of circle bolt head bore and Bolt rod aperture, the conduit body is provided with orientation block below screw, and the orientation block also is provided with screw, the pre-buried bar and spiral shell Hole is adapted, and the pre-buried bar surface is provided with external screw thread, and the pre-buried bar bottom is provided with nut.
It is preferred that, it is provided with internal thread in the screw of the orientation block.
It is preferred that, the top of the pre-buried bar is circle, and is adapted with bolt head bore.
It is preferred that, the top of the pre-buried bar is provided with inner hexagonal hole.
It is preferred that, it is provided with film layer on the outside of the pre-buried bar and orientation block.
Technique effect of the present utility model and advantage:This is easy to the pre-buried channel flow of maintenance, by the screw hole design of conduit body Two layers above and below into bolt head bore and bolt rod aperture, the top of pre-buried bar can be made completely into screw, conduit body is not influenceed Use;The orientation block of conduit body bottom portion, can prevent that the position of pre-buried bar shifts pre-buried when, after influence Maintenance;It is set to circular at the top of pre-buried bar, and provided with inner hexagonal hole, facilitates and be installed at the top of pre-buried bar in bolt head bore;In advance The bottom for burying bar is provided with nut, by increasing capacitance it is possible to increase pre-buried bar is by the steadiness in cement of nuzzling, moreover it is possible to taken pre-buried bar using machinery Go out, conduit body is repaired;Film layer is set on the outside of pre-buried bar and orientation block, can prevent cement from entering screw, shadow Ring the use of pre-buried bar;Therefore, the utility model is simple in construction, reasonable in design, with social utility's value.
Brief description of the drawings
Fig. 1 is structure cut away left side view of the present utility model;
Fig. 2 is top view of the present utility model.
In figure:1 conduit body, 2 screws, 21 bolt head bore, 22 bolt rod aperture, 3 orientation blocks, 4 pre-buried bars, 5 external screw threads, 6 Nut, 7 film layers.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
The utility model provides a kind of pre-buried channel flow for being easy to repair as depicted in figs. 1 and 2, including conduit body 1 With pre-buried bar 4, the bottom of conduit body 1 is provided with screw 2, and the screw 2 is divided into bolt head bore 21 and spiral shell on the same center of circle Tightening latch hole 22, the conduit body 1 is provided with orientation block 3 below screw 2, and the orientation block 3 also is provided with screw 2, the orientation Internal thread is provided with the screw of block 3, the pre-buried bar 4 is adapted with screw 2, the top of the pre-buried bar 4 is circle, and and spiral shell Bolt head bore 21 is adapted, and the top of the pre-buried bar 4 is provided with inner hexagonal hole, and the pre-buried surface of bar 4 is provided with external screw thread 5, described The pre-buried bottom of bar 4 is provided with nut 6, and the pre-buried bar 4 and the outside of orientation block 3 are provided with film layer 7.
This is easy to the pre-buried channel flow of maintenance, connects device using preceding, and is wrapped in pre-buried bar 4 and the outside of orientation block 3 Thin film is wrapped up in, pre-buried bar 4 is placed on specified location and upper cement is buried;When needing to repair conduit body 1, use Plant equipment is taken out pre-buried bar 4 by the hexagonal block hole at the top of pre-buried bar 4, it is possible to conduit body 1 is changed or Maintenance, it is simple and convenient.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, this is not limited to Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Equivalent substitution is carried out, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc., It should be included within protection domain of the present utility model.

Claims (5)

1. a kind of pre-buried channel flow for being easy to repair, including conduit body (1) and pre-buried bar (4), it is characterised in that:The conduit sheet Body (1) bottom is provided with screw (2), and the screw (2) is divided into bolt head bore (21) and bolt rod aperture (22), institute on the same center of circle Conduit body (1) is stated below screw (2) provided with orientation block (3), the orientation block (3) also is provided with screw (2), the pre-buried bar (4) it is adapted with screw (2), pre-buried bar (4) surface is provided with external screw thread (5), pre-buried bar (4) bottom is provided with nut (6)。
2. a kind of pre-buried channel flow for being easy to repair according to claim 1, it is characterised in that:The spiral shell of the orientation block (3) Internal thread is provided with hole.
3. a kind of pre-buried channel flow for being easy to repair according to claim 1, it is characterised in that:The top of the pre-buried bar (4) Portion is circle, and is adapted with bolt head bore (21).
4. a kind of pre-buried channel flow for being easy to repair according to claim 1 or 3, it is characterised in that:The pre-buried bar (4) Top is provided with inner hexagonal hole.
5. a kind of pre-buried channel flow for being easy to repair according to claim 1, it is characterised in that:The pre-buried bar (4) and fixed Film layer (7) is provided with the outside of to block (3).
CN201720014146.0U 2017-01-06 2017-01-06 A kind of pre-buried channel flow for being easy to repair Expired - Fee Related CN206581979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720014146.0U CN206581979U (en) 2017-01-06 2017-01-06 A kind of pre-buried channel flow for being easy to repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720014146.0U CN206581979U (en) 2017-01-06 2017-01-06 A kind of pre-buried channel flow for being easy to repair

Publications (1)

Publication Number Publication Date
CN206581979U true CN206581979U (en) 2017-10-24

Family

ID=60109511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720014146.0U Expired - Fee Related CN206581979U (en) 2017-01-06 2017-01-06 A kind of pre-buried channel flow for being easy to repair

Country Status (1)

Country Link
CN (1) CN206581979U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859533A (en) * 2017-12-06 2018-03-30 浙江皓特节能系统工程有限公司 A kind of plug-in conduit of shield tunnel hides support node and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859533A (en) * 2017-12-06 2018-03-30 浙江皓特节能系统工程有限公司 A kind of plug-in conduit of shield tunnel hides support node and its installation method

Similar Documents

Publication Publication Date Title
CN201326524Y (en) Composite tower cylinder of wind turbine
CN203639932U (en) Pre-embedded foundation structure used for installation of machine column of high-column signal machine of railway
CN206233102U (en) A kind of packaged type faces side operation work platform
CN206581979U (en) A kind of pre-buried channel flow for being easy to repair
CN208056594U (en) Novel overhanging type scaffold device
CN203113519U (en) Connection structure of structural outer wall and wall-attached rod of power plant cooling tower
CN207161101U (en) A kind of shield tunnel shock-resistant and energy-dissipating damping node structure
CN204127480U (en) A kind of detachable built-in pipe channel fixing device
CN205604824U (en) Fastener that pole suitability is strong
CN205688456U (en) A kind of construction exclusively foot bolt location and fixing device
CN203116746U (en) Central standard plate device
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN210034108U (en) Bolt lengthening device
CN207827724U (en) A kind of steel bracket structure for inner climbing crane tower
CN206554837U (en) A kind of jumbolter and its drop the wind-borne dust device
CN207646562U (en) A kind of crack on road fixing device
CN206956722U (en) One kind can have enough to meet the need pile crown repairing card
CN203230710U (en) Bolt sleeve
CN205348931U (en) Novel steel pylons base
CN204677102U (en) Adjustable gap bridge ladder
CN201343890Y (en) Erection tower of water storage tank
CN206245144U (en) A set of device for controlling the dynamic displacement of vibration-damping ballast
CN202416340U (en) Mounting structure of support for large-diameter air duct
CN206694656U (en) A kind of pipe gallery inner support
CN205029242U (en) Set up angle pulley ware that high voltage power cable laid usefulness

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

Termination date: 20200106

CF01 Termination of patent right due to non-payment of annual fee