CN205348931U - Novel steel pylons base - Google Patents
Novel steel pylons base Download PDFInfo
- Publication number
- CN205348931U CN205348931U CN201521042862.7U CN201521042862U CN205348931U CN 205348931 U CN205348931 U CN 205348931U CN 201521042862 U CN201521042862 U CN 201521042862U CN 205348931 U CN205348931 U CN 205348931U
- Authority
- CN
- China
- Prior art keywords
- base
- plate
- base plate
- electric power
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model belongs to the technical field of the steel pylons technique and specifically relates to novel steel pylons base, including bottom plate and mounting panel, the perpendicular fixed connection of mounting panel is on the bottom plate to divide into four bibliographic categories's branch with the bottom plate, mutually perpendicular fixed connection between each mounting panel, be equipped with the circular mounting hole that is used for installing electric power iron tower principal post on the mounting panel, evenly distributed has four at least circular fixed orificess that are used for with the reinforcing bar fixed connection on electric power iron tower basis on the bottom plate, the fixed orifices is for being the ladder shape by lower surface to upper surface, and the radius of fixed orifices is crescent, can effectual assurances welding quality, prevent that the steel pylons sealing off from becoming flexible.
Description
Technical field
This utility model relates to electric power pylon technical field, especially Novel power transmission steel tower base.
Background technology
Power industry is the infrastructural industries and the public utilities that support national economy and social development, along with the fast development of Chinese national economy and improving constantly of living standards of the people, the degree of dependence of electric power is also more and more higher.Electricity needs is closely related with national economy, and electricity elasticity coefficients reflects the relativeness of electricity consumption growth rate and growth of the national economic speed.
Electric power pylon is as the bridge of remotely conveying electricity, and its importance is self-evident, its safety and stability most important especially.Owing to China mountain area is relatively more, in order to ensure that brandreth all can be arranged mountain top by safety when being typically in erection transmission of electricity brandreth, but the mutual pulling force of power transmission line is not only born on mountain top, and to bear and to expose to the weather, so the security and stability of electric power pylon is required significantly high, in order to ensure electric power pylon safety and stability, the fixed form of existing electric power tower is to dig a groove on the ground, a basis is gone out with concreting in groove, basis arranges reinforcing bar, it is fixed together by reinforcing bar and electric power tower base, general reinforcing bar and electric power tower base by thread are fixed, threaded time length will loosen, need often have staff to go to safeguard, waste time and energy, and maintenance cost is high.
Utility model content
The technical problems to be solved in the utility model is: be connected, with electric power tower base, the problem easily occurring loosening in order to solve the reinforcing bar on electric power pylon basis, this utility model provides a kind of Novel power transmission steel tower base, it is stepped shape by lower surface to upper surface by fixing hole is set to, and the radius of fixing hole is gradually increased, realize each flight and form a complete weld layer, ensure that reinforcing bar welds fully with base plate, thus effectively solving reinforcing bar to be connected, with electric power tower base, the problem easily occurring loosening.
This utility model solves its technical problem and be the technical scheme is that a kind of Novel power transmission steel tower base, including base plate and installing plate, installing plate is vertically fixedly connected on base plate, and base plate is divided into four parts, fixing connection it is mutually perpendicular between each installing plate, described installing plate is provided with the circular mounting hole for installing electric power tower principal post, described base plate is evenly distributed with for fixing at least four circular fixation hole being connected with the reinforcing bar of electric power iron tower foundation, described fixing hole is for being stepped shape by lower surface to upper surface, and the radius of fixing hole is gradually increased.
Specifically, on described fixing hole medial surface, distribution has projection, increases the contact area of solder side, it is possible to effectively prevent the problems such as sealing-off.
Specifically, described installing plate is fixed the both sides being connected and is provided with reinforcement plate with base plate, it is ensured that the steadiness of base plate and installing plate.
Further, described in be fixedly connected as welding, the weld width of welding is not less than the thickness of steel plate, it is prevented that sealing-off.
Further, four parts of described base plate are respectively equipped with 2 fixing holes, increase the stability of base plate and basis.
The beneficial effects of the utility model are: this utility model provides a kind of Novel power transmission steel tower base, by fixing hole is designed to stairstepping, one layer of weld layer of each Stepped welding, can effectively ensure that welding quality, it is prevented that electric power pylon sealing-off loosens, then arranges projection on fixing hole medial surface, increase the contact area of solder side, can effectively prevent the problems such as sealing-off, save cost, reduce the labor intensity of workman.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, this utility model is further illustrated.
Fig. 1 is the structural representation of this utility model Novel power transmission steel tower base.
In figure: 1. base plate;2. installing plate;3. installing hole;4. fixing hole;5. protruding.
Detailed description of the invention
Presently in connection with accompanying drawing, this utility model is described in further detail.These accompanying drawings are the schematic diagram of simplification, and basic structure of the present utility model is only described in a schematic way, and therefore it only shows the composition relevant with this utility model.
As shown in Figure 1, a kind of Novel power transmission steel tower base, including base plate 1 and installing plate 2, installing plate 2 is vertically fixedly connected on base plate 1, and base plate 1 is divided into four parts, fixing connection it is mutually perpendicular between each installing plate 2, installing plate 2 is provided with the circular mounting hole 3 for installing electric power tower principal post, base plate 1 is evenly distributed with for fixing four circular fixation hole 4 being connected with the reinforcing bar of electric power iron tower foundation, each part 1, fixing hole 4 is for being stepped shape by lower surface to upper surface, and the radius of fixing hole 4 is gradually increased, installing plate 2 is provided with reinforcement plate with the fixing both sides being connected of base plate 1.
As preferably, on fixing hole 4 medial surface, distribution has protruding 5, is fixedly connected as welding, and the weld width of welding is not less than the thickness of steel plate.
As preferably, four parts of base plate 1 are respectively equipped with 2 fixing holes 4.
As preferably, base plate 1 is provided with 6 fixing holes 4, and two parts near inner side, basis set a fixing hole 4 respectively, and two parts in outside set two fixing holes 4 respectively, and reinforcing bar is provided with screw thread.
During installation, the reinforcing bar on basis is through fixing hole 4, and the fixing hole 4 of base plate 1 lower surface coordinates with reinforcing bar, and upwards each step will weld one layer of scolding tin, reinforcing bar and base plate 1 is fixed with nut after having welded again.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not necessarily departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content in description, it is necessary to determine its technical scope according to right.
Claims (5)
1. a Novel power transmission steel tower base, including base plate (1) and installing plate (2), installing plate (2) is vertically fixedly connected on base plate (1), and base plate (1) is divided into four parts, fixing connection it is mutually perpendicular between each installing plate (2), it is characterized in that: described installing plate (2) is provided with the circular mounting hole (3) for installing electric power tower principal post, described base plate (1) is evenly distributed with for fixing at least four circular fixation hole (4) being connected with the reinforcing bar of electric power iron tower foundation, described fixing hole (4) is for being stepped shape by lower surface to upper surface, and the radius of fixing hole (4) is gradually increased.
2. Novel power transmission steel tower base as claimed in claim 1, it is characterised in that: on described fixing hole (4) medial surface, distribution has projection (5).
3. Novel power transmission steel tower base as claimed in claim 1 or 2, it is characterised in that: described installing plate (2) is provided with reinforcement plate with the fixing both sides being connected of base plate (1).
4. Novel power transmission steel tower base as claimed in claim 1 or 2, it is characterised in that: described in be fixedly connected as welding, the weld width of welding is not less than the thickness of steel plate.
5. Novel power transmission steel tower base as claimed in claim 1 or 2, it is characterised in that: four parts of described base plate (1) are respectively equipped with 2 fixing holes (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521042862.7U CN205348931U (en) | 2015-12-15 | 2015-12-15 | Novel steel pylons base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521042862.7U CN205348931U (en) | 2015-12-15 | 2015-12-15 | Novel steel pylons base |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205348931U true CN205348931U (en) | 2016-06-29 |
Family
ID=56168189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521042862.7U Expired - Fee Related CN205348931U (en) | 2015-12-15 | 2015-12-15 | Novel steel pylons base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205348931U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989457A (en) * | 2017-11-24 | 2018-05-04 | 国网山东省电力公司滨州市沾化区供电公司 | A kind of transmission angle steel tower column foot reinforcing device |
-
2015
- 2015-12-15 CN CN201521042862.7U patent/CN205348931U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989457A (en) * | 2017-11-24 | 2018-05-04 | 国网山东省电力公司滨州市沾化区供电公司 | A kind of transmission angle steel tower column foot reinforcing device |
CN107989457B (en) * | 2017-11-24 | 2019-06-25 | 国网山东省电力公司滨州市沾化区供电公司 | A kind of transmission angle steel tower column foot reinforcing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109184189A (en) | A kind of diameter Silo conical shell silo roof construction method | |
CN205348931U (en) | Novel steel pylons base | |
CN207218161U (en) | A kind of cable bridge | |
CN204437484U (en) | The support of duct of large-span steel rack | |
CN101692548A (en) | Tool for live replacing of hanging bottle string of drainage wire | |
CN209260578U (en) | Longitudinal temporary connecting structure of suspension bridge concrete stiffening girder installation | |
CN203568222U (en) | Side wall reinforcing structure of rectangular coal scuttle | |
CN206352307U (en) | A kind of iron tower foundation for frozen soil foundation | |
CN206680951U (en) | A kind of channel protection structure of hydraulic engineering | |
CN205911713U (en) | Overhead ground wire splint for overhead line | |
CN208594800U (en) | A kind of contact net column for rail traffic | |
CN205725588U (en) | A kind of clump crane span structure fixed structure | |
CN203393721U (en) | Inner support main purlin component | |
CN207218165U (en) | A kind of crane span structure | |
CN206582406U (en) | A kind of easy-to-dismount cable bearer of high intensity | |
CN207442411U (en) | A kind of extra large cable logs in step cable duct structure | |
CN204967185U (en) | Vertical section phaseisolated bus bearing structure | |
CN206800207U (en) | The arch rib installation system of bridge | |
CN204849808U (en) | Basis is assembled in prefabrication of large -scale tower machine concrete | |
CN206053498U (en) | A kind of connecting elements in electric power pylon | |
CN204000603U (en) | The special hitch of a kind of bridge overhauling nacelle | |
CN201960676U (en) | Protecting door device for multi-line cutting machine | |
CN205348930U (en) | Electric power iron tower base | |
CN204920416U (en) | Simple and easy transmission tower structure | |
CN105040588B (en) | A kind of multiplex pre-buried channel flow of railway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: No. 129, Changzhou section, 338 provincial road, Xinbei District, Changzhou, Jiangsu Patentee after: Jiangsu Tian de intelligent sensing Industry Group Co., Ltd. Address before: 213127 Jiangsu Province, Changzhou New District No. 288 money jiabian Patentee before: Jiangsu Tian De Power Equipment Co., Ltd. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160629 Termination date: 20191215 |
|
CF01 | Termination of patent right due to non-payment of annual fee |