CN206581302U CN201720025555.0U CN201720025555U CN206581302U CN 206581302 U CN206581302 U CN 206581302U CN 201720025555 U CN201720025555 U CN 201720025555U CN 206581302 U CN206581302 U CN 206581302U
Authority
CN
China
Prior art keywords
tunnel
beam structure
vacuum
under
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720025555.0U
Other languages
Chinese (zh)
Inventor
范国刚
贺维国
张美琴
张金伟
刘庆方
周华贵
阳军生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201720025555.0U priority Critical patent/CN206581302U/en
Application granted granted Critical
Publication of CN206581302U publication Critical patent/CN206581302U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of joint connection manner of vacuum submerged tunnel, it is related to technical field of traffic transportation;It includes tunnel box-beam structure, pile foundation, joist, drawing pedestal, rubber fastening band, drawing bolt, cushion under the prefabricated vacuum water of several segmenteds;The tunnel box-beam structure under drawing pedestal, the prefabricated vacuum water of segmented that is provided at both ends with of tunnel box-beam structure is arranged on joist under the prefabricated vacuum water of described segmented, and joist is arranged in pile foundation;It is fixedly connected under the prefabricated vacuum water of the adjacent segmented of each two between tunnel box-beam structure by drawing bolt with the bolt hole of drawing pedestal, and rubber fastening band and cushion is provided between two drawing pedestals.A kind of joint connection manner of vacuum submerged tunnel described in the utility model, tunnel joint is connected with the drawing of drawing bolt, manufacture difficulty is small, difficulty of construction is small, easy for installation, speed of application is fast, cost is low, has unique advantage in terms of quickly vacuum submerged tunnel is built.

Description

A kind of joint connection manner of vacuum submerged tunnel
Technical field
The utility model is related to technical field of traffic transportation, and in particular to a kind of joint connection side of vacuum submerged tunnel Formula.
Background technology
In the current society that this runs at high speed, there are countless people and thing daily in each intercity quick flowing , and everybody can with selection mode be also diversified, steamer, aircraft, car and railway etc. are all relatively common The vehicles.And develop with the continuous creation of rail industry, increasing people more likes selecting rail service.
The construction of Chinese high ferro originates in " 11 " five planning period.To year ends 2015, China Express Railway revenue kilometres Will be up to 1.8 ten thousand kilometers, using high-speed railway as skeleton, including the structure such as area border speed rail, inter-city passenger rail and Line of Existing Railway circuit Into speed rail net build up substantially, total scale is up to more than 40,000 kilometers, 500,000 population above cities of basic covering.Chinese high ferro Leap development so that the high railway network becomes to extend in all direction, and the people in each place can enjoy the high ferro service of high quality, Allow people trip condition can become it is incomparable smoothly with easily.High ferro is risen in each province and city, or even counties and districts, cities and towns, is not only changed Become the economic development in area, also change the trip life of people, it has also become the epoch artery between contemporary cities.
Although present high ferro has substantially reduced people's trip time on the way, people are to speed and efficiency Pursuit never stops.Under unlimited atmospheric condition, the principal element of restriction high ferro highest economic pace is dense air:It is empty Square into approximate proportional relation of atmidometer and train running speed, speed improves 2 times, and air drag will increase to 4 times.Work as train When traveling with 200 kilometers per hour, air drag accounts for 70% of drag overall or so;Harmony CRH380A is run in Beijing-Shanghai express railway When going out 486.1 kilometers of speed per hour, aerodynamic drag has exceeded the 92% of drag overall;If going to more than 500 kilometers, in drag overall, 95% All it is aerodynamic drag above.Bullet train speed per hour is more than 400 kilometers, energy consumption and noise severe overweight, nothing in dense atmosphere Method puts into commercial operation.If enclosed tunnel can be built, low vacuum is pumped into by being evacuated station, the superelevation of bullet train is can be achieved with Speed operation, i.e., " vacuum tunnel superexpress train ".
China is vast in territory, and seashore line length, river, river, lake and island are numerous.High ferro is also required to pass through above-mentioned water outward Domain.It is in recent years to use the submerged tunnel mode small to environment, landscape impact more.Working as in the future needs extra long distance ultrahigh speed water-borne transport When, it is then preferable selection using " vacuum tunnel superexpress train " under water.For vacuum submerged tunnel joint waterproofing and airtight Property is one of key factor of whole engineering success or failure.It is how quick, convenient, vacuum tunnel is economically built in water, and ensure The sealing and air-tightness of its joint will be one of technical problems that following submersible vacuum tunnel faces.
Utility model content
The purpose of this utility model be for prior art defect and not enough there is provided a kind of difficulty of construction is small, technique Simply, a kind of joint connection manner for the vacuum submerged tunnel that speed of application is fast, cost is low.
To achieve the above object, the technical solution adopted in the utility model is:It includes the prefabricated vacuum of several segmenteds Submerged tunnel box-beam structure, pile foundation, joist, drawing pedestal, rubber fastening band, drawing bolt, cushion;Described segmented The tunnel box-beam structure under drawing pedestal, the prefabricated vacuum water of segmented that is provided at both ends with of tunnel box-beam structure is set under prefabricated vacuum water Put on joist, joist is arranged in pile foundation;Lead under the prefabricated vacuum water of the adjacent segmented of each two between tunnel box-beam structure The bolt hole that drawing bolt is crossed with drawing pedestal is fixedly connected, and is provided with rubber fastening band and buffering between two drawing pedestals Bed course.
Preferably, tunnel box-beam structure and drawing pedestal are integral type structure under the prefabricated vacuum water of described segmented.
Preferably, the length of tunnel box-beam structure is not less than 120m under the prefabricated vacuum water of described segmented.
Preferably, described rubber fastening band is arranged on the inner side of the bolt hole of drawing pedestal.
When the utility model is operated, tunnel line plane, vertical line type are fitted according to underwater topography and line requirements; According to circuit is flat, vertical line type, tunnel box beam is divided into some sections;Under the prefabricated vacuum water of segmented between tunnel box-beam structure Pile foundation and joist are set near jointing, and joist top surface absolute altitude is identical with tunnel structure floor level;Applied in pile foundation and joist While work, tunnel box-beam structure under the prefabricated prefabricated vacuum water of segmented;By tunnel under drawing pedestal and the prefabricated vacuum water of segmented Road box-beam structure is simultaneously prefabricated, forms overall;Waterstop is arranged on the outside of drawing pedestal;Box beam is lifted on underwater pile Afterwards, tunnel box-beam structure drawing under the prefabricated vacuum water of segmented is connected to form tunnel by drawing bolt;By air in tunnel Discharge forms vacuum submerged tunnel.
After said structure, what the utility model was produced has the beneficial effect that:Tunnel under vacuum water described in the utility model A kind of joint connection manner in road, tunnel joint is connected with the drawing of drawing bolt, and manufacture difficulty is small, difficulty of construction is small, installation side Just, speed of application is fast, cost is low, it is quick build vacuum submerged tunnel in terms of have unique advantage, the utility model has structure Simply, set rationally, low manufacture cost the advantages of.
Brief description of the drawings
Fig. 1 is structure chart of the present utility model;
Fig. 2 is the structure chart that A-A is cutd open in Fig. 1;
Fig. 3 is the B portions enlarged drawing in Fig. 1.
Description of reference numerals:
Tunnel box-beam structure 1, pile foundation 2, joist 3, drawing pedestal 4, rubber water-proof under the prefabricated vacuum water of several segmenteds Band 5, drawing bolt 6, cushion 7.
Embodiment
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Referring to such as Fig. 1 --- shown in Fig. 3, present embodiment is adopted the following technical scheme that:It is segmented comprising several Tunnel box-beam structure 1, pile foundation 2, joist 3, drawing pedestal 4, rubber fastening band 5, drawing bolt 6, buffering under the prefabricated vacuum water of formula Bed course 7;Tunnel box-beam structure 1 is provided at both ends with drawing pedestal 4 under the prefabricated vacuum water of described segmented, and segmented is prefabricated true Empty submerged tunnel box-beam structure 1 is arranged on joist 3, and joist 3 is arranged in pile foundation 2;The adjacent segmented of each two is prefabricated true It is fixedly connected between empty submerged tunnel box-beam structure 1 by drawing bolt 6 with the bolt hole of drawing pedestal 4, and two drawing bases Rubber fastening band 5 and cushion 7 are provided between seat 4.
Preferably, tunnel box-beam structure 1 and drawing pedestal 4 are integral type knot under the prefabricated vacuum water of described segmented Structure.
Preferably, the length of tunnel box-beam structure 1 is not less than 120m under the prefabricated vacuum water of described segmented.
Preferably, described rubber fastening band 5 is arranged on the inner side of the bolt hole of drawing pedestal 4.
When present embodiment is operated, tunnel line plane, vertical section are fitted according to underwater topography and line requirements Line style;According to circuit is flat, vertical line type, tunnel box beam is divided into some sections;Tunnel box beam knot under the prefabricated vacuum water of segmented Pile foundation 2 and joist 3 are set between structure 1 near jointing, and the top surface absolute altitude of joist 3 is identical with tunnel structure floor level;In stake While base 2 and the construction of joist 3, tunnel box-beam structure 1 under the prefabricated prefabricated vacuum water of segmented;By drawing pedestal 4 and segmented Tunnel box-beam structure 1 is simultaneously prefabricated under prefabricated vacuum water, forms overall;In the outside of drawing pedestal 4 arrangement waterstop;Box beam is hung After on underwater pile 2, the drawing of tunnel box-beam structure 1 under the prefabricated vacuum water of segmented is connected by drawing bolt 6 to be formed Tunnel;Air in tunnel is discharged to form vacuum submerged tunnel.
After said structure, what present embodiment was produced has the beneficial effect that:It is true described in present embodiment A kind of joint connection manner of empty submerged tunnel, tunnel joint is connected with the drawing of drawing bolt, and manufacture difficulty is small, difficulty of construction Small, easy for installation, speed of application is fast, cost is low, has unique advantage, this specific implementation in terms of quickly vacuum submerged tunnel is built Mode have the advantages that it is simple in construction, set rationally, low manufacture cost.
General principle of the present utility model and principal character and advantage of the present utility model has been shown and described above.This The technical staff of industry is retouched in above-described embodiment and specification it should be appreciated that the utility model is not restricted to the described embodiments That states simply illustrates principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model Various changes and modifications are also had, these changes and improvements are both fallen within the range of claimed the utility model.This practicality is new Scope is claimed by appended claims and its equivalent thereof in type.

Claims (4)

1. a kind of joint connection manner of vacuum submerged tunnel, it is characterised in that:It includes the prefabricated vacuum water of several segmenteds Lower tunnel box-beam structure, pile foundation, joist, drawing pedestal, rubber fastening band, drawing bolt, cushion;Described segmented is pre- The tunnel box-beam structure under drawing pedestal, the prefabricated vacuum water of segmented that is provided at both ends with of tunnel box-beam structure is set under vacuum water processed On joist, joist is arranged in pile foundation;Pass through under the prefabricated vacuum water of the adjacent segmented of each two between tunnel box-beam structure Drawing bolt is fixedly connected with the bolt hole of drawing pedestal, and is provided with rubber fastening band and cushion pad between two drawing pedestals Layer.
2. a kind of joint connection manner of vacuum submerged tunnel according to claim 1, it is characterised in that:Described segmentation Tunnel box-beam structure and drawing pedestal are integral type structure under the prefabricated vacuum water of formula.
3. a kind of joint connection manner of vacuum submerged tunnel according to claim 1, it is characterised in that:Described segmentation The length of tunnel box-beam structure is not less than 120m under the prefabricated vacuum water of formula.
4. a kind of joint connection manner of vacuum submerged tunnel according to claim 1, it is characterised in that:Described rubber Waterstop is arranged on the inner side of the bolt hole of drawing pedestal.
CN201720025555.0U 2017-01-11 2017-01-11 A kind of joint connection manner of vacuum submerged tunnel Active CN206581302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720025555.0U CN206581302U (en) 2017-01-11 2017-01-11 A kind of joint connection manner of vacuum submerged tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720025555.0U CN206581302U (en) 2017-01-11 2017-01-11 A kind of joint connection manner of vacuum submerged tunnel

Publications (1)

Publication Number Publication Date
CN206581302U true CN206581302U (en) 2017-10-24

Family

ID=60110600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720025555.0U Active CN206581302U (en) 2017-01-11 2017-01-11 A kind of joint connection manner of vacuum submerged tunnel

Country Status (1)

Country Link
CN (1) CN206581302U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106854876A (en) * 2017-01-11 2017-06-16 中铁隧道勘测设计院有限公司 A kind of joint connection manner of vacuum submerged tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106854876A (en) * 2017-01-11 2017-06-16 中铁隧道勘测设计院有限公司 A kind of joint connection manner of vacuum submerged tunnel

Similar Documents

Publication Publication Date Title
CN102359044B (en) A kind of public transportation system and its method of construction
US20110146753A1 (en) Solar energy generation system
CN106013225A (en) Six-layer circular traffic, comprehensive pipe rack and sponge urban underground complex
CN101634126A (en) Ground-road combined comprehensive tunnel for underground pipeline and trolley bus
CN101831865A (en) Beam spanning multilayer deck
CN105253150A (en) Transportation pipeline for pipe traffic system
CN206581302U (en) A kind of joint connection manner of vacuum submerged tunnel
CN106013221A (en) Four-layer rectangle-like urban underground complex
CN106854876A (en) A kind of joint connection manner of vacuum submerged tunnel
CN206581303U (en) A kind of seabed vacuum tunnel of band sightseeing function
CN106759494A (en) A kind of seabed vacuum tunnel with sightseeing function
CN207141068U (en) A kind of submarine pipeline transportation system
CN207362621U (en) Complex layered anti-skid surface structure
CN106968144A (en) New continental rise threeway grade separation traffic system
CN101581159A (en) Building channel
CN205369200U (en) Inverted -siphon formula two -way staircase formula ship lift of passing a bridge
CN205276236U (en) Inverted -siphon formula two -way rectilinear ship lift of passing a bridge
CN102839599A (en) Multifunctional corridor bridge
RU2252880C2 (en) High-speed ground transport system
CN106256964A (en) Multipurpose over-water platform
CN207466654U (en) A kind of vacuum high-speed transit pipeline
CN106013938A (en) Overground and underground urban traffic and pipe network complex
CN101372825A (en) Method for using underground passage combined with ground road as trolley bus passage
CN205474629U (en) Combination box track roof beam that bottom plate opening, roof hung
CN214301033U (en) Small-size magnetic levitation micro-rail tram track girder steel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180615

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300000 Hebei Avenue, new Hongqiao, Hongqiao District, Tianjin City, No. 1

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.