CN206580492U - Movable lifting and positioning device for pipeline of pipe gallery - Google Patents
Movable lifting and positioning device for pipeline of pipe gallery Download PDFInfo
- Publication number
- CN206580492U CN206580492U CN201720097311.3U CN201720097311U CN206580492U CN 206580492 U CN206580492 U CN 206580492U CN 201720097311 U CN201720097311 U CN 201720097311U CN 206580492 U CN206580492 U CN 206580492U
- Authority
- CN
- China
- Prior art keywords
- poles
- pipeline
- lower floor
- upper strata
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 38
- 239000010959 steel Substances 0.000 claims description 38
- 230000009286 beneficial effect Effects 0.000 abstract description 4
- 238000003466 welding Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a movable lifting and positioning device for a pipe gallery and a pipeline, which comprises a supporting structure, a pipeline lifting system and a pipeline horizontal transportation system, wherein the pipeline lifting system and the pipeline horizontal transportation system are fixed on the supporting structure; the supporting structure comprises a supporting platform and universal wheels fixed at four corners of the bottom of the supporting platform; the pipeline lifting system comprises a hydraulic pump, four lower-layer supporting rods and four upper-layer supporting rods, wherein the bottom ends of the hydraulic pump and the lower-layer supporting rods are fixed on the supporting structure. The vertical position adjusting mechanism is arranged at the bottom of the pipe gallery through the bottom supporting structure, so that the pipeline can be lifted without installing hoisting equipment at high altitude, and the operation is simple, convenient and safe; when needing to remove, as long as required remove bottom sprag structure can, need not to relapse high altitude construction dismouting, practice thrift the labour, can conveniently adjust the construction position, have flexible operation, adjust convenient beneficial effect.
Description
Technical field
The utility model is related to a kind of removable lifting positioning apparatus, especially a kind of vertical for pipe gallery interior conduit
Lifting and the positioning apparatus of horizontal pipeline erection stage.
Background technology
In modern city and townsization fast-developing period, country carries forward vigorously Urban Underground pipe gallery construction, due to integrated pipe
Form of fracture is more in corridor, electromechanical pipeline quantity is more and size is big, and space is limited in piping lane, support is more and pipeline is intensive, causes
The difficulty such as pipeline vertical lifting, in place and welding are big, many at present to be carried out using manpower, lifting and inefficiency in place, Gong Renlao
Fatigue resistance is big, thus all the time piping lane interior conduit vertical lifting, install and it is in place be all the electromechanical difficulty installed in pipe gallery
Point.
Utility model content
The purpose of this utility model is the difficulty such as the current underground pipe gallery pipeline vertical lifting of solution, in place and welding
Greatly, Pipeline lift and inefficiency in place, the big technical problem of labor strength are caused.
To realize above utility model purpose, the utility model provides a kind of piping lane pipeline removable lifting positioning apparatus,
Including supporting construction, the Pipeline lift system being fixed in the supporting construction and pipe level transportation system;
The supporting construction includes support platform and is fixed on the universal wheel of support platform bottom corner;
The Pipeline lift system includes hydraulic pump, four lower floor's poles and four upper strata poles, and the hydraulic pump is with
The bottom of layer pole is fixed in the supporting construction;
Four lower floor's poles are divided into two groups, and every group includes two parallel lower floor's poles, every group of parallel lower floor's branch
Connected between bar by fixed connecting rod, two groups of parallel lower floor's poles are mutually pressed close between intersection, two crosspoints two-by-two leads to
Link point is crossed through four lower floor's pole connections;
Four upper strata poles are divided into two groups, and every group includes two parallel upper strata poles, every group of parallel upper strata branch
Connected between bar by lifting linking member, two groups of parallel upper strata poles intersect to form two crosspoints two-by-two, two intersections
Connected between point by link point through four upper strata poles;
Each upper strata pole bottom is respectively perpendicular to the top of different lower floor's poles and presses close to X-shape with it
Into four crosspoints, run through between the relative crosspoint of each two by link point described in two lower floor's poles and two
Upper strata pole connection;
The hydraulic pump is respectively connecting to two hydraulic cylinders being arranged side by side, the piston of two hydraulic cylinders by oil pipe
Bar is connected to wherein one lifting linking member;
The pipe level transportation system includes symmetrically setting on appear on the stage plate-girder, table top and platform, the platform from the bottom to top
There are two parallel crossbeams, each crossbeam is provided with roller group, wheel support angle steel, wheel support channel-section steel, support band steel, fixed angles
Iron, square steel and harness cord nut;The roller group includes two lateral rollers and a horizontal roller, and the horizontal roller is arranged on
Between described two lateral rollers, each lateral roller is welded on described by the support band steel and the wheel support angle steel
On square steel, the square steel is fixed on the crossbeam by the harness cord nut, and the horizontal roller is arranged on the wheel support
On channel-section steel, the wheel support channel-section steel is welded on the crossbeam.
Further, correspondence is drilled with multiple fixing holes, the fixing hole provided with described on square steel and the crossbeam both sides
Harness cord nut.
Further, the lateral roller is arranged to form triangle model with horizontal roller.
Further, the universal wheel is provided with brake apparatus.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is compared to the side for setting suspension centre to install cucurbit on traditional suspension and support in piping lane or piping lane top plate
Formula, because vertical position governor motion by lower support structure is placed on piping lane bottom, installing hanging device without high-altitude is
Pipeline can be lifted, easy to operate, safety;When needing to move, as long as code-on-demand migration lower support structure, without
High-altitude construction dismounting, saves labour, can be conveniently adjusted construction location repeatedly, flexible, easy to adjust has with operating
Beneficial effect;
When needing to adjust adaptation each system pipeline different installations on same support in piping lane, vertical lifting system is utilized
Adjust pipeline lifting absolute altitude, you can be adapted to the pipeline of all size in piping lane, disclosure satisfy that installations different during Pipe installing
Height requirement, with the stronger beneficial effect of adaptability;
Utilize the lateral roller and horizontal roller in the pipe level transportation system being fixed in lifting system so that pipeline
Can on the apparatus be moved horizontally with less resistance, thus avoid because pipeline can not be moved in piping lane support, it is necessary to
Boom hoisting will be set by installing every pipeline, and solve piping lane the superiors pipeline because space is limited, it is impossible to which installation is hung
The problem of utensil is filled, operating efficiency is substantially increased;
Using the utility model device, pipeline welding setting can be achieved and fixes, overcomes in traditional installations, welds
Operation is distributed in whole piping lane, and welding position is narrow and small, the problems such as welding quality should not be controlled.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure, universal wheel 1;Support platform 2;Support platform intermediate beam 3;Vertical spacing 4;Lower floor's pole 5;Hydraulic pump 6;Connection
Tie hinge 7;Lifting linking member 8;Hydraulic cylinder 9;Fixed connecting rod 10;Appear on the stage plate-girder 11;Table top 12;Platform 13;Crossbeam 14;Harness cord spiral shell
Mother 15;Square steel 16;Take turns support angle steel 17;Lateral roller 18;Connect band steel 19;Support band steel 20;Fixed angle bar 21;Take turns support slot
Steel 22;Horizontal roller 23;Oil pipe 24;Upper strata pole 25.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, the removable lifting positioning apparatus of piping lane pipeline of the present utility model, including supporting construction, it is fixed on
Pipeline lift system and pipe level transportation system in supporting construction;
Supporting construction includes support platform 2 and is fixed on the universal wheel 1 of the bottom corner of support platform 2;It is flat for enhancing support
The steadiness of platform 2, support platform intermediate beam 3 is welded with the middle part of support platform 2;It is welded with support platform 2 multiple vertical
Spacing 4, it is three vertical spacings 4 such as in Fig. 1, vertical spacing 4 is the descending spacing of plate-girder 11 and table top 12 of appearing on the stage, for protecting
Hydraulic pump 6 is not subject to appear on the stage the gravity of pipe level transportation system when declining of plate-girder 11.Pipeline lift system include hydraulic pump 6,
The bottom of four lower floor's poles 5 and four upper strata poles 25, hydraulic pump 6 and lower floor's pole 5 is fixed on the support structure;
Four 5 points of lower floor's poles are two groups, and every group includes two parallel lower floor's poles 5, every group of parallel lower floor's pole 5
Between connected by fixed connecting rod 10, two groups of parallel lower floor's poles 5 mutually press close to intersect two-by-two, lead between two crosspoints
Link point 7 is crossed to connect through four lower floor's poles 5;
Four 25 points of upper strata poles are two groups, and every group includes two parallel upper strata poles 25, every group of parallel upper strata branch
Connected between bar 25 by lifting linking member 8, two groups of parallel upper strata poles 25 intersect to form two crosspoints, two two-by-two
Connected between crosspoint by link point 7 through four upper strata poles 25;
Each bottom of upper strata pole 25 is respectively perpendicular to the top of different lower floor's poles 5 and presses close to intersect to form four with it
Connected between crosspoint, the relative crosspoint of each two by link point 7 through Liang Gen lower floors pole 5 and two upper strata poles 25
Connect;
Hydraulic pump 6 is respectively connecting to two hydraulic cylinders being arranged side by side 9, the piston rod of two hydraulic cylinders 9 by oil pipe 24
It is connected to wherein one lifting linking member 8;
Pipe level transportation system includes symmetrically setting on appear on the stage plate-girder 11, table top 12 and platform 13, platform 13 from the bottom to top
Have two parallel crossbeams 14, each crossbeam 14 provided with roller group, wheel support angle steel 17, wheel support channel-section steel 22, support band steel 20,
Fixed angle bar 21, square steel 16 and harness cord nut 15;Roller group includes two lateral rollers 18 and a horizontal roller 23, level rolling
Wheel 23 is arranged between two lateral rollers 18, and each lateral roller 18 is by supporting band steel 20 and wheel support angle steel 17 side of being welded on
On steel 16, square steel 16 is fixed on crossbeam 14 by harness cord nut 15, and horizontal roller 23 is arranged on wheel support channel-section steel 22, wheel branch
Support channel-section steel 22 is welded on crossbeam 14.
Preferably, correspondingly it is drilled with provided with harness cord nut 15 in multiple fixing holes, fixing hole on square steel 16 and the both sides of crossbeam 14,
Spacing to adjust lateral roller 18, the installation for meeting different tube diameters pipeline is in place.
Preferably, lateral roller 18 forms triangle model with the arrangement of horizontal roller 23, while pipe level is transported, protects
Demonstrate,prove pipeline not sideslip.
Preferably, universal wheel 1 is provided with brake apparatus, and brake apparatus can make universal wheel 1 be in the lock state or unlock shape
State, when brake apparatus is in the lock state, universal wheel 1 can brake lower support structure in piping lane bottom, work as brake apparatus
In released state, lower support structure can be relative to moving in piping lane.Using such structure, bottom is enabled to support
Structure is on demand in locking or released state, to meet actual transport, the movement of two kinds of operating modes of operation or spacing demand.
The present apparatus in use, pipeline is lain on two horizontal rollers 23, hydraulic pump 6 by oil pipe 24 by power conduct to
On hydraulic cylinder 9, hydraulic cylinder 9 is welded on lower floor's pole 5 and conducts lifting force to lower floor's pole 5 by lifting linking member 8, real
The conduction of this existing power is, it is necessary to ensure that hydraulic cylinder 9, in the welding of low side, forms the support end of power conduction with lower floor's pole 5, it is ensured that
The conduction of power is upward, and hydraulic cylinder 9 is welded together with lower floor pole 5 by lifting linking member 8, it is ensured that hydraulic cylinder 9 passes through liter
Drop connecting rod 8 to conduct upward lifting force to Liang Gen lower floors pole 5 simultaneously, chain hinge 7 by upper strata pole 25 and lower floor's pole 5
Tightened through the screw on pole, and at two ends with nut, form the form of connection upper strata pole 25 and lower floor's pole 5, but it is logical
Cross lifting linking member 8, the change that the angle of upper strata pole 25 and lower floor's pole 5 can be formed in certain range of degrees, such as 30 ° -90 °,
To reach required height.Fixed connecting rod 10 is to ensure the steady rising of lower floor's pole 5, be welded on upper strata pole 5
Balanced force arrangement.Connection between lower floor's pole 5 is realized by chaining hinge 7.
Using it is above-mentioned according to desirable embodiment of the present utility model as enlightenment, pass through above-mentioned description, related work people
Member can carry out various changes and amendments in the range of without departing from this utility model technological thought completely.This reality
The content on specification is not limited to new technical scope, it is necessary to its technology is determined according to right
Property scope.
Claims (4)
1. the removable lifting positioning apparatus of piping lane pipeline, it is characterised in that including supporting construction, be fixed in the supporting construction
Pipeline lift system and pipe level transportation system;
The supporting construction includes support platform and is fixed on the universal wheel of support platform bottom corner;
The Pipeline lift system includes hydraulic pump, four lower floor's poles and four upper strata poles, the hydraulic pump and lower floor's branch
The bottom of bar is fixed in the supporting construction;
Four lower floor's poles are divided into two groups, and every group includes two parallel lower floor's poles, every group of parallel lower floor's pole it
Between connected by fixed connecting rod, two groups of parallel lower floor's poles mutually press close to intersect two-by-two, pass through connection between two crosspoints
Hinge is tied through four lower floor's pole connections;
Four upper strata poles are divided into two groups, and every group includes two parallel upper strata poles, every group of parallel upper strata pole it
Between connected by lifting linking member, two groups of parallel upper strata poles intersect to form two crosspoints two-by-two, two crosspoints it
Between connected by link point through four upper strata poles;
Each upper strata pole bottom is respectively perpendicular to the top of different lower floor's poles and presses close to intersect to form four with it
Two lower floor's poles and two upper stratas are run through by link point between individual crosspoint, the relative crosspoint of each two
Pole connects;
The hydraulic pump is respectively connecting to two hydraulic cylinders being arranged side by side by oil pipe, and the piston rod of two hydraulic cylinders is equal
It is connected to wherein one lifting linking member;
The pipe level transportation system includes being arranged with two on appear on the stage plate-girder, table top and platform, the platform from the bottom to top
The parallel crossbeam of root, each crossbeam provided with roller group, wheel support angle steel, wheel support channel-section steel, support band steel, fixed angle bar,
Square steel and harness cord nut;The roller group includes two lateral rollers and a horizontal roller, and the horizontal roller is arranged on institute
State between two lateral rollers, each lateral roller is welded on the side by the support band steel and the wheel support angle steel
On steel, the square steel is fixed on the crossbeam by the harness cord nut, and the horizontal roller is arranged on the wheel support slot
On steel, the wheel support channel-section steel is welded on the crossbeam.
2. the removable lifting positioning apparatus of piping lane pipeline according to claim 1, it is characterised in that the square steel and crossbeam
Correspondence, which is drilled with multiple fixing holes, the fixing hole, on both sides is provided with the harness cord nut.
3. the removable lifting positioning apparatus of piping lane pipeline according to claim 1, it is characterised in that the lateral roller with
Horizontal roller is arranged to form triangle model.
4. the removable lifting positioning apparatus of piping lane pipeline according to claim 1, it is characterised in that the universal wheel is provided with
Brake apparatus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720097311.3U CN206580492U (en) | 2017-01-25 | 2017-01-25 | Movable lifting and positioning device for pipeline of pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720097311.3U CN206580492U (en) | 2017-01-25 | 2017-01-25 | Movable lifting and positioning device for pipeline of pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206580492U true CN206580492U (en) | 2017-10-24 |
Family
ID=60110504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720097311.3U Active CN206580492U (en) | 2017-01-25 | 2017-01-25 | Movable lifting and positioning device for pipeline of pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206580492U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107827032A (en) * | 2017-11-27 | 2018-03-23 | 西南交通大学 | A kind of underground pipe gallery carrier |
CN108163747A (en) * | 2017-11-28 | 2018-06-15 | 河北建设集团股份有限公司 | A kind of underground pipe gallery pipeline transportation installation special tool vehicle |
CN108482940A (en) * | 2018-04-17 | 2018-09-04 | 陕西建工安装集团有限公司 | A kind of pipeline mounting device and installation method |
-
2017
- 2017-01-25 CN CN201720097311.3U patent/CN206580492U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107827032A (en) * | 2017-11-27 | 2018-03-23 | 西南交通大学 | A kind of underground pipe gallery carrier |
CN107827032B (en) * | 2017-11-27 | 2023-05-26 | 西南交通大学 | Underground pipe gallery carrier |
CN108163747A (en) * | 2017-11-28 | 2018-06-15 | 河北建设集团股份有限公司 | A kind of underground pipe gallery pipeline transportation installation special tool vehicle |
CN108482940A (en) * | 2018-04-17 | 2018-09-04 | 陕西建工安装集团有限公司 | A kind of pipeline mounting device and installation method |
CN108482940B (en) * | 2018-04-17 | 2023-11-14 | 陕西建工安装集团有限公司 | Pipeline conveying and installing device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206580492U (en) | Movable lifting and positioning device for pipeline of pipe gallery | |
CN103630416B (en) | Test platform of hoisting mechanism | |
CN102155089A (en) | Self-jacking construction platform integrating vertical transportation equipment and mold base | |
CN201417657Y (en) | Installation device of indoor transformer | |
CN105484162B (en) | Suspension bridge construction stiff girder secondary on the bank swings moving device and method | |
CN107130770A (en) | A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inversion construction method | |
CN104632088A (en) | Petroleum drilling machine tower-shaped derrick sleeving mounting method | |
CN106315389B (en) | A kind of large scale prefabricated plate posture adjustment suspension bracket and its method | |
CN104675179B (en) | Jack up head tower installation hanger device and head tower construction method | |
CN103938653A (en) | Steel pipe hoisting method used in hole-pile method steel tube column construction | |
CN204454235U (en) | A kind of novel many suspension centres equalizing bar device | |
CN206667458U (en) | The constructing device of vestibule system steel structure girder | |
CN203844767U (en) | Novel vehicle stop system of inclined roadway | |
CN107217993A (en) | Pylon | |
CN205802769U (en) | A kind of movable truss hoisting with stable support structure | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN203441380U (en) | Novel movable pedestal of marine workover rig | |
CN101695984A (en) | Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge | |
CN201052950Y (en) | Crane | |
CN203682928U (en) | Electric hydraulic lifting device | |
CN103723638B (en) | Climbing frame of tower crane and tower crane | |
CN203938388U (en) | Restricted clearance tubing installation in position device | |
CN106284073B (en) | A kind of suspension cable beam-ends hanging cable equipment | |
CN206256384U (en) | Large-span steel box beam support system | |
CN204457048U (en) | Self lift type head tower installation hanger device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |