CN206256384U - Large-span steel box beam support system - Google Patents
Large-span steel box beam support system Download PDFInfo
- Publication number
- CN206256384U CN206256384U CN201621250024.3U CN201621250024U CN206256384U CN 206256384 U CN206256384 U CN 206256384U CN 201621250024 U CN201621250024 U CN 201621250024U CN 206256384 U CN206256384 U CN 206256384U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- support system
- pipe column
- standard knot
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 96
- 239000010959 steel Substances 0.000 title claims abstract description 96
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 17
- 230000002787 reinforcement Effects 0.000 claims abstract description 10
- 239000004567 concrete Substances 0.000 claims description 6
- 239000000126 substance Substances 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 2
- 210000003205 muscle Anatomy 0.000 claims 1
- 239000011150 reinforced concrete Substances 0.000 claims 1
- 239000002689 soil Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 208000020442 loss of weight Diseases 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of large-span steel box beam support system, including some interior pedestals for being provided with pre-embedded steel slab, a support frame is fixed with each pedestal, support frame as described above is removably vertically connected with and formed successively by multiple standard knots, standard knot includes at least three parallel and equal length steel pipe columns, is connected by fixed mount between adjacent steel pipe column in single standard knot;Steel pipe column in orlop standard knot is connected with the pre-embedded steel slab in pedestal, and the steel pipe column top in the superiors' standard knot is provided with the top board for holding up steel box-girder.The utility model uses the dismountable multiple standard knots being made up of steel pipe column, realizes the repeatable utilization to support system, effectively saves cost, takes up an area small;By the standard knot from suitable length and quantity, coordinate adjustable bracket and fine setting cushion block, realize the arbitrariness regulation to support system height;It is connected with the reinforcement on connecting plate by fixed mount, it is ensured that the resistance to overturning and security of support system.
Description
Technical field
The utility model belongs to urban track traffic steel box-girder installing area, and in particular to a kind of large-span steel box beam branch
Support body system.
Background technology
Steel box-girder is in installation process, it usually needs support frame is installed, as temporary supporting system.For business district inner city
The characteristic of city's steel box-girder overpass support system, is considered as reducing envelope road operation in the road crossing construction of heavy traffic, does
To " construct Bian Baotong on side ", " night construction Bao Tong ".According to engineering site actual conditions, with reference to steel box girder form, weight,
The key elements such as construction live load, often can build support system from lattice column.If installing support system using welding manner,
The component that temporary supporting system is removed after removing is difficult to reuse, and causes the wasting of resources;Installed according to bolt connection
Support system, due to the component more than this kind of temporary supporting system of structure using steel flanged beam, weight is relatively large, installs also not side
Just, so as to cause cost to significantly improve.
Utility model content
For the deficiency existing for prior art, the problem that the utility model is solved is how to provide one kind to weigh
Multiple utilization, the steel box beam erection combined support system that cost is relatively low, quick and easy for installation, occupation of land is small, overall structure is stable.
To achieve the above object, the utility model uses following scheme:
Large-span steel box beam support system, it is characterised in that including some interior pedestals for being provided with pre-embedded steel slab, each pedestal
On be fixed with a support frame, support frame as described above is removably vertically connected with and formed successively by multiple standard knots, the standard knot
Including at least three vertical and equal length steel pipe columns, connected by fixed mount between adjacent two steel pipe column in single standard knot
Connect, the steel pipe column quantity on same support frame in all standard knots is identical and position is corresponding;Steel pipe in orlop standard knot
Post lower end is connected with the pre-embedded steel slab in pedestal, and the steel pipe column top in the superiors' standard knot is provided with for holding up steel box-girder
Top board.
Further, adjustable bracket, the adjustable bracket bag are additionally provided between the top board and the superiors' standard knot
The Collapsible structure being made up of inner and outer tubes of steel pipe column quantity in correspondence standard knot is included, inner tube is inserted in outer tube;Adjustable support
The outer tube of frame steel pipe column upper end connection corresponding with the superiors standard knots, inner tube is connected with top board, hydraulic jack top support
Surface adjusts entrance depth of the inner tube in outer tube with by top board under the top plate, so as to adjust adjustable bracket highly.
Further, the steel pipe column length in different layers standard knot is not quite similar.
Further, the fixed mount includes some cross bars and connects the brace of diagonal positions between adjacent two cross bar.
Further, the cross bar and brace are rectangular steel tube.
Further, the steel pipe column in the orlop standard knot is by the pre-embedded steel slab in rearmounted chemical bolt and pedestal
Connection.
Further, the pedestal is poured using armored concrete and formed, and its concrete grade is not less than C25.
Further, the steel pipe column upper and lower ends are equipped with horizontal connecting plate, and connecting plate is provided with and supplies bolt connection
Connecting hole, fixed by connecting connecting plate by bolt between the steel pipe column of adjacent modular section correspondence position.
Further, it is provided with reinforcement at the connecting plate.
Further, the two ends of the fixed mount are connected with reinforcement.
Compared to prior art, the utility model has the advantages that:
1st, the utility model uses dismountable multiple standard knots for being made up of steel pipe column, realize to support system can
Recycling, has been effectively saved cost, takes up an area also small.
2nd, the utility model coordinates adjustable bracket and fine setting cushion block by the standard knot from suitable length and quantity,
The arbitrariness regulation to support system height can be realized.
3rd, bolt is carried out by the connecting hole on connecting plate that aligns between the steel pipe column of adjacent modular section in the utility model
It is fixed, facilitate Fast Installation and the dismounting of standard knot.
4th, the utility model is connected by fixed mount with the reinforcement on connecting plate, it is ensured that the entirety of support system is steady
Qualitative and security.
Brief description of the drawings
Fig. 1 is the structural representation of steel box beam erection support meanss in the embodiment of the present application;
Wherein, 1- steel pipe columns, 2- fixed mounts, 3- pedestals, the rearmounted chemical anchor bolts of 4-, 5- reinforcements, 6- connecting plates, 7- is adjustable
Section bracket.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, but implementation method of the present utility model is not limited to
This.
Embodiment:
The simple adjustable supports system of large-span steel pile equipment Quick Release, as shown in figure 1, including being provided with pre-embedded steel slab in some
Pedestal 3, a support frame is fixed with each pedestal 3, support frame as described above is removably connected up and down successively by multiple standard knots
Connect and form, the standard knot includes at least three vertically and the steel pipe column 1 of equal length, adjacent two steel pipe column in single standard knot
Connected by fixed mount 2 between 1, the quantity of steel pipe column 1 on same support frame in all standard knots is identical and position is corresponding;Most
The lower end of steel pipe column 1 in lower floor's standard knot is connected with the pre-embedded steel slab in pedestal 3, and the steel pipe column 1 in the superiors' standard knot is pushed up
End is provided with the top board for holding up steel box-girder.The quantity of steel pipe column is typically more than 3, preferably 4 in single standard knot.This
Sample one, the repeatable utilization of steel box-girder supporting construction is realized by dismountable multiple steel pipe rod structure, saves cost,
Take up an area small.
Adjustable bracket 7 is additionally provided between the top board and the superiors' standard knot, the adjustable bracket 7 includes that correspondence is marked
The Collapsible structure being made up of inner and outer tubes of the quantity of steel pipe column 1 in quasi- section, inner tube is inserted in outer tube;Outside adjustable bracket 7
Pipe is connected with the upper end of corresponding steel pipe column 1 in the superiors standard knots, and inner tube is connected with top board, and hydraulic jack is supported on top board
Lower surface adjusts entrance depth of the inner tube in outer tube with by top board, so as to adjust the height of adjustable bracket 7.So,
Support system highly can flexibly be adjusted, to ensure the effective support to steel box-girder.
The length of steel pipe column 1 in different layers standard knot is not quite similar.For example, same support frame can include steel pipe column length
Some standard knots of 3.2m and some standard knots of steel pipe column length 1.1m are spent, 3.2a+1.1b can be so constituted(A and b are
Natural number)Height, as needed adjust a, b size(Correspond to the quantity of standard knot)And coordinate adjustable bracket, you can
Easily reach the height of needs.So, when in use can be according to job site actual conditions by the suitable number of selection
The standard knot of amount and length and then can be reached with approaching object height by hydraulic jack jacking simultaneously top adjustable bracket
To object height, it is finely adjusted finally by setting pad or cushion block on top support frame, it is achieved thereby that high to support system
The arbitrariness regulation of degree.
The fixed mount 2 includes some cross bars and connects the brace of diagonal positions between adjacent two cross bar.Steel pipe column with
Cross bar and brace composition triangular structure, can so ensure the resistance to overturning of support system.
The cross bar is rectangular steel tube with brace.Compared with pipe, the bending strength and tensile strength of rectangular steel tube are bigger,
Quality is lighter, so while fixed mount stability is ensured can also loss of weight to a certain extent, it is convenient to install.
Steel pipe column 1 in the orlop standard knot is connected by rearmounted chemical anchor bolts 4 with the pre-embedded steel slab in pedestal 3.
So can be effectively firm on pedestal by support frame.
The pedestal 3 is poured using armored concrete and formed, and its strength grade of concrete is not less than C25.For steel box-girder
The strength and stability of pedestal is extremely important for support system, is not less than the concrete of C25 using strength grade to pour base
Seat is in order to the support to steel box-girder is better achieved.
The upper and lower ends of the steel pipe column 1 are equipped with horizontal connecting plate 6, and connecting plate 6 is provided with for bolted connection
Hole, is fixed by bolt between the steel pipe column 1 of adjacent modular section correspondence position by connecting connecting plate 6.Connecting plate can be in
Circle, connecting hole spaced set on plate, the quantity of connecting hole is preferably 12.The Fast Installation of steel pipe column can so be realized
And remove.
Reinforcement 5 is provided with the connecting plate 6.Can so make the connection between upper and lower steel pipe column more stable and firm.
The two ends of the fixed mount 2 are connected with reinforcement 5.When the fixed mount is made up of cross bar and brace, can pass through
The two ends of cross bar or brace are connected with reinforcement.So the resistance to overturning and safety of support system can be better ensured that
Property.
According to engineering site actual conditions, with reference to key elements such as steel box girder form, weight, construction live loads, from mark
Quasi- section plus adjustable bracket support system.When support system is installed, it is accurately positioned by measurement, fixed support is vertically and horizontally set at it
Ensure support system resistance to overturning, in work progress, implement in strict accordance with arrangement and method for construction and code requirement.It is equal using stress
The support system of the distinguishing features such as even, recycling, makes the construction of engineering more economically reasonable, and the city steel box-girder to being similar to is high
Summarized Account of Bridge Erection Construction has reference.
Finally illustrate, above example is only used to illustrate the technical solution of the utility model and unrestricted, although logical
Cross the utility model is described with reference to preferred embodiment of the present utility model, but one of ordinary skill in the art
It should be appreciated that various changes can be made to it in the form and details, without departing from appended claims institute
The spirit and scope of the present utility model for limiting.
Claims (10)
1. large-span steel box beam support system, it is characterised in that:Including some interior pedestals for being provided with pre-embedded steel slab, on each pedestal
A support frame is fixed with, support frame as described above is removably vertically connected with and formed successively by multiple standard knots, the standard knot bag
At least three vertical and equal length steel pipe columns are included, are connected by fixed mount between adjacent two steel pipe column in single standard knot,
Steel pipe column quantity on same support frame in all standard knots is identical and position is corresponding;Under steel pipe column in orlop standard knot
End is connected with the pre-embedded steel slab in pedestal, and the steel pipe column top in the superiors' standard knot is provided with the top for holding up steel box-girder
Plate.
2. large-span steel box beam support system according to claim 1, it is characterised in that:The top board and the superiors' standard
Be additionally provided with adjustable bracket between section, the adjustable bracket include steel pipe column quantity in correspondence standard knot by inner and outer tubes
The Collapsible structure of composition, inner tube is inserted in outer tube;The outer tube of adjustable bracket with corresponding steel pipe column in the superiors standard knots
End connection, inner tube upper end is connected with top board, and hydraulic jack is supported on top board lower surface and adjusts inner tube outside with by top board
Entrance depth in pipe, so as to adjust adjustable bracket highly.
3. large-span steel box beam support system according to claim 2, it is characterised in that:Steel pipe in different layers standard knot
Column length is not quite similar.
4. large-span steel box beam support system according to claim 1, it is characterised in that:The fixed mount includes some horizontal strokes
The brace of diagonal positions between bar and adjacent two cross bar of connection.
5. large-span steel box beam support system according to claim 4, it is characterised in that:The cross bar is square with brace
Steel pipe.
6. large-span steel box beam support system according to claim 1, it is characterised in that:In the orlop standard knot
Steel pipe column is connected by rearmounted chemical bolt with the pre-embedded steel slab in pedestal.
7. large-span steel box beam support system according to claim 1, it is characterised in that:The pedestal uses reinforced concrete
Soil is poured and formed, and its concrete grade is not less than C25.
8. according to any described large-span steel box beam support systems of claim 1-7, it is characterised in that:The steel pipe column is upper and lower
Two ends are equipped with horizontal connecting plate, and connecting plate is provided with for bolted connecting hole, the steel of adjacent modular section correspondence position
Fixed by connecting connecting plate by bolt between tubing string.
9. large-span steel box beam support system according to claim 8, it is characterised in that:Reinforcement is provided with the connecting plate
Muscle.
10. large-span steel box beam support system according to claim 9, it is characterised in that:The two ends of the fixed mount with
Reinforcement is connected.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621250024.3U CN206256384U (en) | 2016-11-22 | 2016-11-22 | Large-span steel box beam support system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621250024.3U CN206256384U (en) | 2016-11-22 | 2016-11-22 | Large-span steel box beam support system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206256384U true CN206256384U (en) | 2017-06-16 |
Family
ID=59024519
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621250024.3U Active CN206256384U (en) | 2016-11-22 | 2016-11-22 | Large-span steel box beam support system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206256384U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113463523A (en) * | 2021-08-13 | 2021-10-01 | 中建八局第二建设有限公司 | Stable support frame assembly for expressway steel box girder construction and construction method thereof |
| CN114150566A (en) * | 2022-01-07 | 2022-03-08 | 腾达建设集团股份有限公司 | A kind of support device and construction method for steel box girder |
| CN117328366A (en) * | 2023-11-16 | 2024-01-02 | 中国十七冶集团有限公司 | A BIM-based assembled steel box girder support frame component and its construction method |
| CN118257430A (en) * | 2024-03-25 | 2024-06-28 | 中国五冶集团有限公司 | A sliding adjustable support structure and use method |
-
2016
- 2016-11-22 CN CN201621250024.3U patent/CN206256384U/en active Active
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113463523A (en) * | 2021-08-13 | 2021-10-01 | 中建八局第二建设有限公司 | Stable support frame assembly for expressway steel box girder construction and construction method thereof |
| CN114150566A (en) * | 2022-01-07 | 2022-03-08 | 腾达建设集团股份有限公司 | A kind of support device and construction method for steel box girder |
| CN117328366A (en) * | 2023-11-16 | 2024-01-02 | 中国十七冶集团有限公司 | A BIM-based assembled steel box girder support frame component and its construction method |
| CN118257430A (en) * | 2024-03-25 | 2024-06-28 | 中国五冶集团有限公司 | A sliding adjustable support structure and use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
| CN206256384U (en) | Large-span steel box beam support system | |
| CN103184722B (en) | Large-span double-layer Bailey truss structure and construction method thereof | |
| CN203947771U (en) | A kind of Bailey beam pendent form support system | |
| CN201762663U (en) | Reinforced concrete superposed beam wing board support | |
| CN206887794U (en) | A kind of supporting apparatus system during the segmentation dismounting for Continuous Bridge | |
| CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
| CN103643800A (en) | Lifting installation system for buckling restrained supporting member and construction method thereof | |
| CN205662832U (en) | Under hold formula beiLei beam steel suspension bridge | |
| CN103147582A (en) | Overhead cantilever formwork construction method | |
| CN202176343U (en) | Self-propelled multifunctional template trolley combining device | |
| CN206873307U (en) | Movable type bridge justifies pier stud work high above the ground operating platform | |
| CN214993171U (en) | Bridge bent cap construction is with assembled sectional shelf-unit platform | |
| CN107881924A (en) | A kind of bent cap support | |
| CN212453690U (en) | Rectangular steel pipe concrete column mounting device | |
| CN205975376U (en) | Oblique web built -up plate of case roof beam | |
| CN205116025U (en) | Hanger device is pour to self -balancing concrete case roof beam and T beam bridge cantilever edge of a wing secondary | |
| CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
| CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
| CN222990595U (en) | Multifunctional portal for suspension bridge construction | |
| CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
| CN212866793U (en) | Assembled construction elevator stops layer platform | |
| CN201148726Y (en) | Independent climbing frame super large operating platform | |
| CN116025170B (en) | A device for tying and positioning steel bars of a horizontal beam on water in a wharf project and a construction method thereof | |
| CN113089499B (en) | Assembled combined support platform for bridge bent cap construction and mounting method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant |