CN204457048U - Self lift type head tower installation hanger device - Google Patents

Self lift type head tower installation hanger device Download PDF

Info

Publication number
CN204457048U
CN204457048U CN201520121058.1U CN201520121058U CN204457048U CN 204457048 U CN204457048 U CN 204457048U CN 201520121058 U CN201520121058 U CN 201520121058U CN 204457048 U CN204457048 U CN 204457048U
Authority
CN
China
Prior art keywords
suspension bracket
head tower
facility
crossbeam
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520121058.1U
Other languages
Chinese (zh)
Inventor
张光桥
荣杰
丁震
魏忠芹
王培光
慕长青
倪红珍
胡文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luqiao Group Co Ltd filed Critical Shandong Luqiao Group Co Ltd
Priority to CN201520121058.1U priority Critical patent/CN204457048U/en
Application granted granted Critical
Publication of CN204457048U publication Critical patent/CN204457048U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

The utility model there is provided simple, the easy to operate self lift type head tower installation hanger device of a kind of structure.It comprises: suspension bracket body, is arranged on mounted head tower, and have 4 suspension bracket columns vertically arranged, the top of suspension bracket column is provided with the crossbeam of horizontally set; Hoisting machine tool, arranges on crossbeam, for lifting the component of head tower; Vertically climb facility, and comprise four groups that structure is identical, correspondence is arranged on suspension bracket column respectively, and is connected with suspension bracket body, and suspension bracket body can be made to be mounted opposite the axial vertical lifting of middle head tower; Longitudinally adjust facility, comprise two groups that structure is identical, be separately positioned on crossbeam, and be connected with hoisting machine tool, can adjust by the component front and back position of the head tower lifted; Adjust facility with horizontal, comprise two groups that structure is identical, can adjust by the component right position of the head tower lifted.

Description

Self lift type head tower installation hanger device
Technical field
The utility model relates to a kind of self lift type head tower installation hanger device, belongs to traffic engineering technical applications.
Background technology
Domesticly at present usually adopt the lifting machine such as tower crane or crawler crane when the lifting component such as head tower or steel anchor box.Adopt tower crane install need to tower crane arrange firmly attachment device to guarantee tower crane stablize, adopt crawler crane installation that needing, enough counterweights are set and carry out balancing hoisting machine center of gravity, field operation labour intensity is larger, field operation danger coefficient is large, what adopt above technique all to adopt is hoister in large tonnage tool simultaneously, and mounting cost is high.
Utility model content
The utility model provides object and there is provided simple, the easy to operate self lift type head tower installation hanger device of a kind of structure.
The technical solution adopted in the utility model is as follows:
A kind of self lift type head tower installation hanger device, comprising:
Suspension bracket body, is arranged on mounted head tower, and have 4 suspension bracket columns vertically arranged, the top of suspension bracket column is provided with the crossbeam of horizontally set;
Hoisting machine tool, arranges on crossbeam, for lifting the component of head tower;
Vertically climb facility, and comprise four groups that structure is identical, correspondence is arranged on suspension bracket column respectively, and is connected with suspension bracket body, and suspension bracket body can be made to be mounted opposite the axial vertical lifting of middle head tower;
Longitudinally adjust facility, comprise two groups that structure is identical, be separately positioned on crossbeam, and be connected with hoisting machine tool, can adjust by the component front and back position of the head tower lifted; With
Laterally adjust facility, comprise two groups that structure is identical, can adjust by the component right position of the head tower lifted.
Above-mentioned self lift type head tower installation hanger device preferred version, often organize the facility that vertically climb and comprise balladeur train and vertical jack, balladeur train one end connects in an installation on head tower, the other end is connected to suspension bracket column, vertical jack one end is connected with balladeur train, the other end install in head tower connect, vertical jack and balladeur train junction and vertical jack are equipped with rotatable sour jujube block with head tower junction in installation.
Above-mentioned self lift type head tower installation hanger device preferred version, often group longitudinal adjustment facility comprise longitudinal jack and longitudinal sour jujube block, and longitudinal jack one end is connected with hoisting machine tool, and the other end is connected with longitudinal sour jujube block, and longitudinal sour jujube block can slide on crossbeam.
Above-mentioned self lift type head tower installation hanger device preferred version, often group horizontal adjustment facility comprise traversing jack and bearing beam, and bearing beam is fixed on crossbeam end face, and traversing jack two ends connect bearing beam and hoisting machine tool respectively.
Above-mentioned self lift type head tower installation hanger device preferred version, suspension bracket body adopts 4 vertically to arrange suspension bracket column, in length and breadth to the tower structure that is welded between suspension bracket column.
The beneficial effects of the utility model:
1, suspension bracket column has the facility that vertically climb, realize from climbing, can meet the lifting of head tower component under various operating mode, strong adaptability, increases work efficiency;
2, longitudinal direction crossbeam top arranged adjusts facility and laterally adjusts facility, realizes the quick position coupling of head tower.
3, compare traditional hoisting, do not need other attachment devices, have the advantages that structure is simple, easy to operate, efficiency of construction is high.
Accompanying drawing explanation
Fig. 1 is the utility model schematic front view.
Fig. 2 is that schematic diagram is looked on the utility model left side.
Fig. 3 is longitudinally adjustment facility and crossbeam and hoisting machine tool connection diagram.
Fig. 4 is the implement structure schematic diagram that vertically climbs.
Fig. 5 is laterally adjustment facility and crossbeam and hoisting machine tool connection diagram.
Fig. 6 is head tower preparation of construction schematic diagram.
Fig. 7 is the component schematic diagram that hoisting machine tool promotes head tower.
Fig. 8 is adjustment hoisting machine tool relative crossbeam front and back position schematic diagram.
Fig. 9 is adjustment hoisting machine tool relative crossbeam right position schematic diagram.
1. suspension bracket body, 2. crossbeam, 3. hoisting machine tools in figure, 4. longitudinal sour jujube block, 5. longitudinal jack, 6. vertical jack, 7. sour jujube block, 8. slide rail, 9. component, 10. head tower, 11. laterally adjust facility, 12. head tower bases, 13. suspension bracket columns.
Detailed description of the invention
In conjunction with the accompanying drawing in the utility model embodiment, do describe clearly and completely further the utility model, described embodiment is only the utility model part embodiment, instead of whole embodiments.
With reference to accompanying drawing 1, Fig. 2, a kind of self lift type head tower installations hanger device, comprises suspension bracket body, hoisting machine tool 3, vertically to climb facility, longitudinally adjustment facility and laterally adjust facility 11.Wherein suspension bracket body 1 has suspension bracket column 13, and suspension bracket column 13 is arranged on head tower base 12, and the top of suspension bracket column 13 is provided with the crossbeam 2 of horizontally set; Hoisting machine tool 3 arranges on crossbeam 2, for lifting the component 9 of head tower; The facility that vertically climb comprise identical four groups of structure, correspondence is arranged on suspension bracket column 13 respectively, and with and be connected with suspension bracket body, suspension bracket body can be made to be mounted opposite the axial vertical lifting of middle head tower; Longitudinally adjustment facility comprise identical two groups of structure, are separately positioned on crossbeam 2, and are connected with hoisting machine tool, can adjust by the component front and back position of the head tower lifted; Laterally adjustment facility comprise identical two groups of structure, can adjust by the component right position of the head tower lifted.
With reference to accompanying drawing 4, often organize the facility that vertically climb and comprise slide rail 8, vertical jack 6 and sour jujube block 7, slide rail 8 is fixed on head tower, vertical jack 6 one end is connected with slide rail 8, the other end is connected with suspension bracket body, and vertical jack 6 is equipped with sour jujube block 7 with slide rail 8 junction and vertical jack 6 with suspension bracket body junction.
Often organize longitudinally adjustment facility with reference to accompanying drawing 3 and comprise longitudinal jack 5 and longitudinal sour jujube block 4, longitudinal jack 5 one end is connected with hoisting machine tool 3, and the other end is connected with longitudinal sour jujube block 4, and longitudinal sour jujube block 4 can slide on crossbeam 2.
Often organize laterally adjustment facility with reference to accompanying drawing 5 and comprise traversing jack 14 and bearing beam 15, bearing beam 15 is fixed on crossbeam 2 end face, and traversing jack 14 two ends connect bearing beam 15 and hoisting machine tool 3 respectively.
In the present embodiment, suspension bracket body 1 adopts 4 vertically to arrange suspension bracket column, in length and breadth to the tower structure that is welded between suspension bracket column.
A construction method for head tower, is characterized in that comprising the following steps:
1) with reference to accompanying drawing 6, conveniently construction method construction steel tower base, self lift type head tower installation hanger device is installed, and the component 9 of head tower is transported to below self lift type head tower installation hanger device;
2) with reference to accompanying drawing 7, utilize hoisting machine tool 3 to hang the structure of head tower, 9, and slowly promote, until be promoted to design height position;
3) with reference to accompanying drawing 8, Fig. 9, utilize longitudinally adjustment facility and laterally the adjustment facility adjustment position of hoisting machine tool 3 on crossbeam 2, the component 9 of head tower is transported to design and installation position, and it is carried out coupling with the head tower sections of having constructed is connected, until complete this head tower segmental construction;
4) above-mentioned steps is repeated, until installed by the component 9 of whole head tower.
Above only describes general principle of the present utility model and preferred embodiment, those skilled in the art can make many changes and improvements according to foregoing description, and these changes and improvements should belong to protection domain of the present utility model.

Claims (5)

1. a self lift type head tower installation hanger device, is characterized in that, comprising:
Suspension bracket body, is arranged on mounted head tower, and have 4 suspension bracket columns vertically arranged, the top of suspension bracket column is provided with the crossbeam of horizontally set;
Hoisting machine tool, arranges on crossbeam, for lifting the component of head tower;
Vertically climb facility, and comprise four groups that structure is identical, correspondence is arranged on suspension bracket column respectively, and is connected with suspension bracket body, and suspension bracket body can be made to be mounted opposite the axial vertical lifting of middle head tower;
Longitudinally adjust facility, comprise two groups that structure is identical, be separately positioned on crossbeam, and be connected with hoisting machine tool, can adjust by the component front and back position of the head tower lifted; With
Laterally adjust facility, comprise two groups that structure is identical, can adjust by the component right position of the head tower lifted.
2. self lift type head tower installation hanger device according to claim 1, it is characterized in that: often organize the facility that vertically climb and comprise slide rail, vertical jack and sour jujube block, slide rail is fixed on head tower, vertical jack one end is connected with slide rail, the other end is connected with suspension bracket body, and vertical jack and slide rail junction and vertical jack and suspension bracket body junction are equipped with sour jujube block.
3. self lift type head tower installation hanger device according to claim 1, it is characterized in that: often group longitudinal adjustment facility comprise longitudinal jack and longitudinal sour jujube block, longitudinal jack one end is connected with hoisting machine tool, and the other end is connected with longitudinal sour jujube block, and longitudinal sour jujube block can slide on crossbeam.
4. self lift type head tower installation hanger device according to claim 1, is characterized in that: often group laterally adjustment facility comprise traversing jack and bearing beam, bearing beam is fixed on crossbeam end face, and traversing jack two ends connect bearing beam and hoisting machine tool respectively.
5. self lift type head tower installation hanger device according to any one of Claims 1-4, is characterized in that: suspension bracket body adopts 4 vertically to arrange suspension bracket column, in length and breadth to the tower structure that is welded between suspension bracket column.
CN201520121058.1U 2015-03-02 2015-03-02 Self lift type head tower installation hanger device Withdrawn - After Issue CN204457048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520121058.1U CN204457048U (en) 2015-03-02 2015-03-02 Self lift type head tower installation hanger device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520121058.1U CN204457048U (en) 2015-03-02 2015-03-02 Self lift type head tower installation hanger device

Publications (1)

Publication Number Publication Date
CN204457048U true CN204457048U (en) 2015-07-08

Family

ID=53663955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520121058.1U Withdrawn - After Issue CN204457048U (en) 2015-03-02 2015-03-02 Self lift type head tower installation hanger device

Country Status (1)

Country Link
CN (1) CN204457048U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675179A (en) * 2015-03-02 2015-06-03 山东省路桥集团有限公司 Self-elevating type hanging bracket device for mounting steel tower and construction method for steel tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675179A (en) * 2015-03-02 2015-06-03 山东省路桥集团有限公司 Self-elevating type hanging bracket device for mounting steel tower and construction method for steel tower
CN104675179B (en) * 2015-03-02 2016-11-16 山东省路桥集团有限公司 Jack up head tower installation hanger device and head tower construction method

Similar Documents

Publication Publication Date Title
CN104675179A (en) Self-elevating type hanging bracket device for mounting steel tower and construction method for steel tower
CN204875552U (en) Frame bridge crane vertical lift structure
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN203845689U (en) Indoor assembled large-scale equipment hoisting device
CN204661163U (en) A kind of Multifunction transformer sleeve pipe lifting support
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN204457048U (en) Self lift type head tower installation hanger device
CN204474182U (en) A kind of Combined tower crane
CN204038849U (en) A kind of cable drum lifting device
CN202864675U (en) Shaft-type part hoisting tool
CN204532376U (en) Split type lifting construction trolley
CN103318745A (en) Lightweight special-purposed spreader and mounting method thereof
CN103434933A (en) Large member hoisting in-position device and in-position method
CN205766057U (en) A kind of circular magnesium alloy die casting hitch
CN204752009U (en) Maintenance is with having rotated gallows
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN204040599U (en) A kind of pole upside-down mounting lift hydraulic lifting apparatus
CN203728491U (en) Jacking device for heavy type parts for machining automobiles
CN104340847B (en) The nut mounting device of rolling mill screwdown device and method
CN205820743U (en) A kind of power equipment Multifunctional carrying car
CN103723638B (en) Climbing frame of tower crane and tower crane
CN203307370U (en) Annular mounting bracket for hoisting smelting converter
CN206203760U (en) Height adjustable rubbish hangs support meanss
CN107288354B (en) Construction method for overall displacement of gantry crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150708

Effective date of abandoning: 20161116

C25 Abandonment of patent right or utility model to avoid double patenting