CN206554976U - Tunnel double-lining pours into a mould concrete autoalarm - Google Patents

Tunnel double-lining pours into a mould concrete autoalarm Download PDF

Info

Publication number
CN206554976U
CN206554976U CN201720145270.0U CN201720145270U CN206554976U CN 206554976 U CN206554976 U CN 206554976U CN 201720145270 U CN201720145270 U CN 201720145270U CN 206554976 U CN206554976 U CN 206554976U
Authority
CN
China
Prior art keywords
concrete
lining
touching switch
electric cabinet
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720145270.0U
Other languages
Chinese (zh)
Inventor
吴小峰
黄炬银
李恩惠
王红恩
唐志坚
周明升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201720145270.0U priority Critical patent/CN206554976U/en
Application granted granted Critical
Publication of CN206554976U publication Critical patent/CN206554976U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Tunnel double-lining pours into a mould concrete autoalarm.It is that electric cabinet and warning lamp are installed on two lining chassis, be connected plate on tunnel inner wall, installs touching switch and fixed slip bar in any one or both sides in fixed plate bottom, float plate is installed on fixed slip bar, touching switch connects electric cabinet by call wire.The utility model, which overcomes the construction trolley used at present, accurately to judge whether concrete fills this technological deficiency, float plate can contact touching switch automatically after concrete is filled, corresponding outside warning lamp is flashed to pipe, it can accurately determine whether concrete fills in time, even can trickle which position concrete of judgement more directly perceived be already filled with, prevent tunnel double-lining vault to come to nothing the generation of potential safety hazard, it is characterized in simple in construction, installation operation is convenient, cost is low, efficiency high, it is ensured that construction quality.

Description

Tunnel double-lining pours into a mould concrete autoalarm
Technical field
The utility model is related to warning device during tunnel double-lining cast concrete, specifically tunnel double-lining cast coagulation Native autoalarm, belongs to road and bridge construction field.
Background technology
With national road and bridge construction infrastructure grade constantly it is higher, the perfusion program for tunnel concrete is more advised Model, it is desirable to concrete must be filled to the vault in tunnel, strictly forbid vault to come to nothing, because the potential safety hazard after vault comes to nothing is non- Chang great, the substantial amounts of cement mortar of defuelling is accomplished by when finding that vault comes to nothing larger, i.e., time-consuming to take material schedule delays again. The main cause that formation vault comes to nothing in construction is not high to the monitor mode precision of vault when pouring into a mould concrete.General feelings It is to shine to sweep observation in stopper seal head end flashlight by workmen under condition, because two liner in pouring concrete trolleys is 12 meters long, Be divided into three cast to bear down on one pipe, each cast is beared down on one about 3 meters of spacing between pipe, be again from one end of previous cast concrete to Blocking plate one end is poured into a mould, and two cast are beared down on one between pipe and have a segment distance flashlight not see.Also a kind of situation It is that workmen judges that the concrete of vault fills degree by the sound and pressure of concrete pump, because concrete moisture contains Amount it is different can directly affect the sound and pressure of delivery pump, so can not by feel judge vault cast concrete when either with or without Come to nothing phenomenon.The need for the construction trolley generally used at present is obviously unable to adaptive norm construction.
Utility model content
The purpose of this utility model is that the vault for overcoming the construction trolley that uses at present to exist comes to nothing this technological deficiency, from And a kind of tunnel double-lining cast concrete autoalarm is disclosed.
The technical solution of the utility model is as follows:
Electric cabinet is installed on two lining chassis, warning lamp is installed on electric cabinet, be connected plate on tunnel inner wall, Touching switch is installed in any one or both sides in fixed plate bottom, and fixed slip bar is installed in fixed plate bottom, is installed on fixed slip bar Float plate, touching switch connects electric cabinet by call wire, and concrete is injected between tunnel inner wall and two lining chassis.
The utility model overcomes the construction trolley used at present and can not accurately sentenced in tunnel double-lining vault casting process Whether disconnected concrete fills this technological deficiency, and float plate can contact touching switch automatically after concrete is filled, and makes corresponding Outside warning lamp flicker pipes, and can accurately determine whether concrete fills in time, it might even be possible to more directly perceived trickle Judge which position concrete is already filled with, prevented tunnel double-lining vault and come to nothing the generation of potential safety hazard, be characterized in structure Simply, installation operation is convenient, and cost is low, efficiency high, it is ensured that construction quality.
Brief description of the drawings
Accompanying drawing 1 is main structure diagram of the present utility model.
Reference is as follows:Two lining chassis 1, concrete 2, electric cabinet 3, warning lamp 4, fixed plate 5, fixed slip bar 6 floats Plate 7, touching switch 8, call wire 9, tunnel inner wall 10.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing:
Electric cabinet 3 is installed on two lining chassis 1, warning lamp 4 is installed on electric cabinet 3, connects solid on tunnel inner wall 10 Fixed board 5, installs touching switch 8 on the right side of the bottom of fixed plate 5, and fixed slip bar 6 is installed in the bottom of fixed plate 5, pacifies on fixed slip bar 6 Float plate 7 is filled, touching switch 8 is connected by call wire 9 and injects concrete between electric cabinet 3, the lining chassis 1 of tunnel inner wall 10 and two 2。
The utility model first opens control cabinet in operation, starts layering point window cast concrete, when concrete is poured into During close to vault, concrete slows down speed of perfusion, elapses kickboard upwards as concrete constantly rises, when concrete is filled Float plate hits touching switch, and warning lamp starts flicker and piped, and concrete cast stops.

Claims (2)

1. tunnel double-lining pours into a mould concrete autoalarm, it is characterised in that:Chassis is served as a contrast two(1)Upper installation electric cabinet(3), In electric cabinet(3)Upper installation warning lamp(4), in tunnel inner wall(10)On be connected plate(5), in fixed plate(5)Bottom is any One or both sides are installed by touching switch(8), fixed plate(5)Bottom is installed by fixed slip bar(6), in fixed slip bar(6)It is upper to install floating Dynamic plate(7), touching switch(8)Pass through call wire(9)Connect electric cabinet(3), tunnel inner wall(10)With two lining chassis(1)Between note Penetrate concrete(2).
2. tunnel double-lining according to claim 1 pours into a mould concrete autoalarm, it is characterised in that:In fixed plate (5)Touching switch is installed on the right side of bottom(8).
CN201720145270.0U 2017-02-17 2017-02-17 Tunnel double-lining pours into a mould concrete autoalarm Expired - Fee Related CN206554976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720145270.0U CN206554976U (en) 2017-02-17 2017-02-17 Tunnel double-lining pours into a mould concrete autoalarm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720145270.0U CN206554976U (en) 2017-02-17 2017-02-17 Tunnel double-lining pours into a mould concrete autoalarm

Publications (1)

Publication Number Publication Date
CN206554976U true CN206554976U (en) 2017-10-13

Family

ID=60010836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720145270.0U Expired - Fee Related CN206554976U (en) 2017-02-17 2017-02-17 Tunnel double-lining pours into a mould concrete autoalarm

Country Status (1)

Country Link
CN (1) CN206554976U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837422A (en) * 2017-02-17 2017-06-13 中铁二十局集团第三工程有限公司 Tunnel double-lining pours into a mould concrete autoalarm
CN109944607A (en) * 2019-03-18 2019-06-28 中交一公局桥隧工程有限公司 Vault concrete pouring early warning device and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837422A (en) * 2017-02-17 2017-06-13 中铁二十局集团第三工程有限公司 Tunnel double-lining pours into a mould concrete autoalarm
CN109944607A (en) * 2019-03-18 2019-06-28 中交一公局桥隧工程有限公司 Vault concrete pouring early warning device and construction method thereof

Similar Documents

Publication Publication Date Title
CN106837422A (en) Tunnel double-lining pours into a mould concrete autoalarm
CN104314314B (en) A kind of grouting connection construction method
CN204098928U (en) Tunnel vault two serves as a contrast the location pre-embedded device of front Grouting Pipe
CN109707405A (en) Tunnel lining concrete casting quality control method and device
CN206554976U (en) Tunnel double-lining pours into a mould concrete autoalarm
CN106437767A (en) Tunnel pre-burying conduit installation structure and tunnel pre-burying conduit installation method
CN207619856U (en) A kind of replaceable combination girder segment for bridge construction
CN106284412A (en) A kind of prefabricated pipe gallery and construction method
CN107448234A (en) A kind of colliery pours closed wall construction method
CN106759485B (en) A kind of prefabricated piping lane of two-piece unit formula and installation method
CN204631008U (en) A kind of detection architecture of Grouted density of prefabricated components
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN206386125U (en) A kind of inside interstitital texture of built-in groove
CN110396982A (en) A kind of artificial dam attachment structure and construction method
CN205242407U (en) A cluster pipe, chute combination system for deep basal pit concrete placement
CN110700114B (en) Construction method of lower bearing platform structure of spherical flat hinge of large swivel bridge
CN104032742A (en) Underground concrete pouring construction technology based on double guide tubes and four hoppers
CN210482374U (en) Cable type utility tunnel
CN111156033B (en) Tunnel inverted arch structure repairing method
CN209400105U (en) A kind of tunnel double-lining concrete pressure monitoring system
CN109682503A (en) A kind of tunnel double-lining concrete pressure monitoring system and its application method
CN210686009U (en) Shield tunnel two-lining concrete structure
CN208202227U (en) A kind of precast concrete composite beam composite inner wall
CN208949729U (en) Concrete beam mould board device
CN207392239U (en) A kind of prefabricated piping lane of two-piece unit formula

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171013