CN206539016U - Constructional column pours device - Google Patents

Constructional column pours device Download PDF

Info

Publication number
CN206539016U
CN206539016U CN201720196730.2U CN201720196730U CN206539016U CN 206539016 U CN206539016 U CN 206539016U CN 201720196730 U CN201720196730 U CN 201720196730U CN 206539016 U CN206539016 U CN 206539016U
Authority
CN
China
Prior art keywords
lock
plate
constructional column
funnel
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720196730.2U
Other languages
Chinese (zh)
Inventor
杜君辉
邓小华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201720196730.2U priority Critical patent/CN206539016U/en
Application granted granted Critical
Publication of CN206539016U publication Critical patent/CN206539016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Device is poured the utility model discloses constructional column, including at least two templates, two or more than two templates are interconnected to constitute shaping mould body, expand outwardly to form funnel along the axis of constructional column in the middle part of the epimere of any one template, also include the disconnected plate of lock flushed with template, chute is provided with the disconnected plate two side of lock, provided with the projection matched with chute in template, when the disconnected plate of lock is displaced downwardly to extreme position, the disconnected plate of lock completely cuts off funnel and shaping mould body interior.Before concrete dry is solidifying, the mutual cooperation for the projection on plate end face of being broken using template upper hopper chute and lock, the disconnected plate of lock is moved vertically downwards, until lock breaks, the bottom of plate is contacted with the bottom of funnel, so that charging cavity and the inner space for being molded mould body are separate, be not in have any protrusion on the construction column outer wall of shaping after concrete is dry and hard, and then the artificial process for needing to reject construction column outer wall when tradition is poured is eliminated, reduce the labor intensity of workman.

Description

Constructional column pours device
Technical field
The utility model is related to one kind, and in particular to constructional column pours device.
Background technology
Constructional column is important concrete component in brick-and-concrete buildingses.To improve the anti-seismic performance of tier building masonry structure, Code requirement appropriate site should set reinforced column and be connected with collar tie beam in the masonry in house, common reinforcement building Stability.This reinforced column is generally thus referred to as constructional column.Constructional column, is primarily not to undertake vertical load, but Resist and shear, the lateral load such as antidetonation.Constructional column is generally arranged at the half space of staircase, longitudinal cross wall junction, wall Corner zhang at, wall length reaches that five meters of middle part will set constructional column.In recent years for improve masonry structure bearing capacity or Constructional column in stability and not increasing section size, wall is not only provided only on house wall corner, edge, and presses Need to be arranged on the middle part of wall, collar tie beam must necessarily be located closed.
In the prior art, constructional column is in pouring construction, particularly in constructional column roof beam Gao≤800 ㎜, shaping mould Full envelope can be realized, i.e., charging aperture is provided with the side of shaping mould, and needs to fill charging aperture when pouring post concrete, to ensure to tear open Gap is not present after mould at the top of constructional column between concrete and back timber, finally by manually chiseling out prominent concrete.Due in form removal Need to carry out the construction column outer wall that has been molded post-processing, and then be easily caused the outer wall of constructional column to damage when digging Wound, while the powder for being unfavorable for later stage exterior wall is applied.
Utility model content
The utility model purpose is that providing constructional column pours device, to solve drawbacks described above.
The utility model is achieved through the following technical solutions:
Constructional column pours device, including at least two templates, two or more than two templates be interconnected to constitute with Expand outwardly to be formed Lou along the axis of constructional column in the middle part of the shaping mould body of constructional column matching, the epimere of any one of template Bucket, in addition to the disconnected plate of the lock flushed with template, are provided with chute on the disconnected plate two side of the lock, are provided with and chute phase in template The projection of matching, when the disconnected plate of lock is displaced downwardly to extreme position, the disconnected plate of lock completely cuts off the funnel and shaping mould body interior.Use When, according to the constructional column that different construction speeds are in scene, the quantity of template is selected with this, so latter two or two with On template shaping mould body is interconnected to form by Screw arbor with nut at both-ends, then ensure constructional column when carrying out concrete placings without letting out Leakage;When pouring, concrete is injected into shaping mould body by the charging cavity of funnel so that concrete and rebar cage is cemented to One entirety, after the completion of pouring, before concrete dry is solidifying, the phase interworking for the projection broken using template upper hopper chute with lock on plate end face Close, move vertically downwards lock break plate, until lock break plate bottom contacted with the bottom of funnel so that charging cavity with into The inner space of pattern body is separate, after concrete is dry and hard, is not in have any prominent on the construction column outer wall of shaping Go out thing, and then eliminate the artificial process for needing to reject construction column outer wall when tradition is poured, reduce the work of workman Intensity, while the concrete block being molded in feed cavity body can carry out the secondary wastage for using, substantially reducing concrete, Reach the purpose for saving material.
The longitudinal cross-section of the funnel is triangle.Preferably, the longitudinal cross-section of funnel is triangle so that in funnel Feed cavity body in shaping concrete clout it is also triangular in shape, and the concrete segment of the triangle can be used for scene in step Filler when building by laying bricks or stones, that is, realize that the secondary recovery of concrete clout is utilized, while reducing consumptive material rate and the construction of job site Cost.
Along provided with spill plate on the funnel.When pouring, concrete impacts injection in funnel and easily spilt, Vibrating head is needed to use in casting process to carry out vibration tamp to the intrinsic concrete of shaping mould simultaneously, part concrete can be with Vibration and certain amplitude occur and freely beat, inventor increases the longitudinal direction height of funnel using spill plate, to avoid concrete Overflow.
The disconnected plate lower end of the lock is provided with the blade tip that thickness from top to bottom successively decreases.Because concrete is gathered materials glue by difference Tie the entirety formed, its it is not dry it is solidifying before, lock moving down for plate of breaking can be hindered by larger, and inventor is broken the lower end of plate in lock Blade tip is set, and the thickness of the blade tip from top to bottom successively decreases, that is, reduces the contact area of the disconnected plate lower end of lock and concrete, improve The shear stress of the disconnected plate of lock, so that the disconnected plate of lock is quickly moved to its extreme position, it is to avoid concrete and shaping in feed cavity body An entirety is formed after concrete connection inside mould body.
Also include the stressed plate for being fixed on the disconnected plate upper end of the lock, the stressed plate is in the horizontal direction towards away from shaping mould The direction extension of body.Because moving down for the disconnected plate of lock is obstructed effect substantially, therefore need to hammer it into shape when driving lock breaks plate Hit, and stressed plate is installed in the disconnected plate upper end of lock, and lock breaks plate generally using stainless steel, enables to lock to break plate when being impacted Area increase, while ensure lock break plate on each local pressure it is relatively uniform, with avoid lock break plate in folding process because of part Stress concentration and cause deformation or fracture.
The utility model compared with prior art, has the following advantages and advantages:
1st, the utility model constructional column pours device, before concrete dry is solidifying, utilizes template upper hopper chute and the disconnected plate end face of lock On projection mutual cooperation, move vertically downwards lock break plate, until lock break plate bottom contacted with the bottom of funnel, So that charging cavity and the inner space for being molded mould body are separate, after concrete is dry and hard, on the construction column outer wall of shaping Be not in have any protrusion, and then the artificial process for needing to reject construction column outer wall when eliminating traditional pour, Reduce the labor intensity of workman, at the same the concrete block being molded in feed cavity body can carry out it is secondary use, greatly reduce The wastage of concrete, reaches the purpose for saving material;
2nd, the utility model constructional column pours device, and the longitudinal cross-section of funnel is triangle so that in the feed cavity of funnel The concrete clout being molded in vivo is also triangular in shape, and the concrete segment of the triangle can be used for when step is built by laying bricks or stones in scene Filler, that is, realize that the secondary recovery of concrete clout is utilized, while reducing the consumptive material rate and construction cost of job site;
3rd, the utility model constructional column pours device, the lower end setting blade tip for the plate that breaks in lock, and the thickness of the blade tip Degree from top to bottom successively decreases, that is, reduces the contact area of the disconnected plate lower end of lock and concrete, the shear stress of the disconnected plate of lock is improved, so as to lock Disconnected plate is quickly moved to its extreme position, it is to avoid after the concrete in feed cavity body is connected with the concrete of shaping mould body interior Form an entirety.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the utility model embodiment, constitutes the one of the application Part, does not constitute the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the disconnected plate of lock and the cooperation figure of dustpan body.
Mark and corresponding parts title in accompanying drawing:
1- constructional columns, 2- locks break plate, 3- charging cavity, 4- spill plates, 5- funnels, 6- templates, 7- projections.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, with reference to embodiment and accompanying drawing, The utility model is described in further detail, and exemplary embodiment of the present utility model and its explanation are only used for explaining this Utility model, is not intended as limiting of the present utility model.
Embodiment 1
As depicted in figs. 1 and 2, the present embodiment include at least two templates 6, two or more than two templates 6 it is mutual Connect and compose the axis along constructional column 1 in the middle part of the shaping mould body matched with constructional column 1, the epimere of any one of template 6 Expand outwardly to form funnel 5, in addition to the disconnected plate 2 of the lock flushed with template 6, chute is provided with the disconnected two side of plate 2 of the lock, Template 6 is provided with the projection 7 that matches with chute, when lock break plate 2 be displaced downwardly to extreme position when, lock break plate 2 by the funnel 5 with Shaping mould body interior completely cuts off.
In use, according to the constructional column 1 that different construction speeds are in scene, the quantity of template 6 is selected with this, then Two or more than two templates 6 are interconnected to form shaping mould body by Screw arbor with nut at both-ends, then ensure that constructional column 1 is entering No leakage during row concrete placings;When pouring, concrete is injected into shaping mould body by the charging cavity 3 of funnel 5 so that coagulation Soil is cemented to an entirety with steel reinforcement cage, after the completion of pouring, before concrete dry is solidifying, utilizes the upper hopper chute of template 6 and the disconnected end of plate 2 of lock The mutual cooperation of projection 7 on face, moves the disconnected plate 2 of lock vertically downwards, the bottom of plate 2 and the bottom of funnel 5 until lock breaks Portion is contacted so that charging cavity 3 and the inner space for being molded mould body are separate, after concrete is dry and hard, the construction of shaping Be not in have any protrusion on the outer wall of post 1, and then eliminate and manually need to pick the outer wall of constructional column 1 when tradition is poured The process removed, reduces the labor intensity of workman, while the concrete block of shaping can be carried out secondary make in charging cavity 3 With, substantially reduce the wastage of concrete, reach save material purpose.
Along spill plate 4 is provided with the funnel 5, the lock breaks what the lower end of plate 2 was from top to bottom successively decreased provided with thickness Blade tip;Also include the stressed plate for being fixed on the disconnected upper end of plate 2 of the lock, the stressed plate is in the horizontal direction towards away from shaping calligraphy or painting model The direction extension of body.When pouring, concrete impact injection in funnel 5 is easily spilt, while being needed in casting process Vibration tamp is carried out to the intrinsic concrete of shaping mould using vibrating head, a tentering can occur with vibration in part concrete Degree is freely beated, and inventor increases the longitudinal direction height of funnel 5 using spill plate 4, to avoid concrete from overflowing.
Further, because concrete is gathered materials the cementing entirety formed by difference, its it is not dry it is solidifying before, lock breaks plate 2 Move down can by it is larger hinder, inventor lock break plate 2 lower end set blade tip, and the blade tip thickness from top to bottom Successively decrease, that is, reduce the contact area of the disconnected lower end of plate 2 of lock and concrete, improve the shear stress of the disconnected plate 2 of lock, so that the disconnected plate 2 of lock is fast Speed is moved to its extreme position, it is to avoid the concrete in charging cavity 3 is formed after being connected with the concrete of shaping mould body interior One entirety.
Further, because moving down for the disconnected plate 2 of lock is obstructed effect substantially, therefore needed when driving lock breaks plate 2 to it Hammered, and stressed plate is installed in the lock upper end of plate 2 of breaking, and the lock plate 2 that breaks generally uses stainless steel, enables to lock to break plate 2 Area increase when being impacted, while ensuring that each local pressure is relatively uniform on the disconnected plate 2 of lock, to avoid the disconnected plate 2 of lock from moving down During cause deformation or fracture because of stress raisers.
Preferably, the longitudinal cross-section of funnel 5 is triangle so that the concrete of shaping in the charging cavity 3 of funnel 5 Clout is also triangular in shape, and the concrete segment of the triangle can be used for filler when step is built by laying bricks or stones in scene, that is, realize coagulation The secondary recovery of native clout is utilized, while reducing the consumptive material rate and construction cost of job site.
Above-described embodiment, is entered to the purpose of this utility model, technical scheme and beneficial effect One step is described in detail, be should be understood that and be the foregoing is only embodiment of the present utility model, is not used to limit Fixed protection domain of the present utility model, all any modifications within spirit of the present utility model and principle, made, is equally replaced Change, improve, should be included within protection domain of the present utility model.

Claims (5)

1. constructional column pours device, including at least two templates (6), two or more than two templates (6) are connected with each other structure Into the shaping mould body matched with constructional column (1), it is characterised in that:Along construction in the middle part of the epimere of any one of template (6) The axis of post (1) expands outwardly to form funnel (5), in addition to the disconnected plate (2) of the lock flushed with template (6), in the disconnected plate (2) of the lock Two side is provided with chute, provided with the projection (7) matched with chute in template (6), when the disconnected plate (2) of lock is displaced downwardly to limit position When putting, the lock plate (2) that breaks completely cuts off the funnel (5) and shaping mould body interior.
2. constructional column according to claim 1 pours device, it is characterised in that:The longitudinal cross-section of the funnel (5) is three It is angular.
3. constructional column according to claim 2 pours device, it is characterised in that:Along provided with anti-overflow on the funnel (5) Plate (4).
4. constructional column according to claim 1 pours device, it is characterised in that:Lock plate (2) lower end of breaking is provided with The blade tip that thickness from top to bottom successively decreases.
5. the constructional column according to Claims 1 to 4 any one pours device, it is characterised in that:Also include being fixed on institute The stressed plate of disconnected plate (2) upper end of lock is stated, the stressed plate is in the horizontal direction towards the direction extension away from shaping mould body.
CN201720196730.2U 2017-03-02 2017-03-02 Constructional column pours device Active CN206539016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720196730.2U CN206539016U (en) 2017-03-02 2017-03-02 Constructional column pours device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720196730.2U CN206539016U (en) 2017-03-02 2017-03-02 Constructional column pours device

Publications (1)

Publication Number Publication Date
CN206539016U true CN206539016U (en) 2017-10-03

Family

ID=59940968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720196730.2U Active CN206539016U (en) 2017-03-02 2017-03-02 Constructional column pours device

Country Status (1)

Country Link
CN (1) CN206539016U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561157A (en) * 2020-04-30 2020-08-21 中国五冶集团有限公司 Structure and method for pouring concrete into grouting hole of high-altitude steel column
CN112376904A (en) * 2020-11-13 2021-02-19 罗奕舵 Feeding funnel of constructional column pouring mold and constructional column pouring method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561157A (en) * 2020-04-30 2020-08-21 中国五冶集团有限公司 Structure and method for pouring concrete into grouting hole of high-altitude steel column
CN112376904A (en) * 2020-11-13 2021-02-19 罗奕舵 Feeding funnel of constructional column pouring mold and constructional column pouring method

Similar Documents

Publication Publication Date Title
CN106088530A (en) Large area method for constructing terrace
CN106760503A (en) A kind of constructional column based on standard knot combination is poured uses template
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN107035148B (en) Method for simultaneously constructing building periphery constructional column and main body structure
CN206539016U (en) Constructional column pours device
CN102373713B (en) Construction method and device for preserved hole of equipment foundation bolt
CN205677249U (en) A kind of casting concrete constructional column hopper
CN107165411A (en) A kind of Constructional Col-umn Construction technique
CN114809029A (en) High cutting slope anchor rod frame beam coupling construction method
CN105064500B (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN103590599A (en) Self-compaction mode locking device and using method
CN103938610B (en) The construction pile pipe of the variable cross-section Reinforced Gravel Pile of a kind of strengthening soft foundation and technique
CN206144137U (en) Board formwork instrument falls
CN108222656A (en) The construction method of Prefabricated enclosure wall
CN208618661U (en) Pillar structure based on hollow masonry
CN102121313A (en) Rebar planting-free formwork erecting method for masonry construction and device thereof
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN102605763B (en) Construction method for bottomless formwork of concrete protecting wall of slide-resistant pile
CN105781103A (en) Capital inverted-triangular formwork erecting and pouring method
CN206319404U (en) A kind of building precast exterior sheathing
CN108981515A (en) A kind of sheath preventing Brick Chimney Demolition by Blasting back seat and construction method
CN107905222A (en) Pile foundation lining material and apply the lining material prefabricated band bellend prestressing pipe pile construction method
CN205777505U (en) Beam-ends sealing off and covering anchorage concrete construction typified form
CN209723299U (en) A kind of secondary structure constructional column exempts from erecting device
CN210439720U (en) Reinforced structure for increasing cross section of concrete beam side

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant