CN206514858U - Casing formula measurement mark pier - Google Patents

Casing formula measurement mark pier Download PDF

Info

Publication number
CN206514858U
CN206514858U CN201720139804.9U CN201720139804U CN206514858U CN 206514858 U CN206514858 U CN 206514858U CN 201720139804 U CN201720139804 U CN 201720139804U CN 206514858 U CN206514858 U CN 206514858U
Authority
CN
China
Prior art keywords
pier
protective cover
measurement mark
casing
pier shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720139804.9U
Other languages
Chinese (zh)
Inventor
王义兵
胡煌
万山雄
曹鹏亮
王小战
王润泽
黄家权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority to CN201720139804.9U priority Critical patent/CN206514858U/en
Application granted granted Critical
Publication of CN206514858U publication Critical patent/CN206514858U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of casing formula measurement mark pier, including pier shaft, and pier shaft is installed on pier base, bidding quotation or signal antenna is provided with the top of pier shaft, bidding quotation center is provided with the mark heart;Shielding cover is outside bidding quotation, and the bottom of protective cover is connected with pier shaft;Described protective cover includes a continuous side walls and a roof, and the bottom of protective cover is opened.Described pier shaft is concrete material, connecting rod is embedded with the top of pier shaft, the top of connecting rod is fixedly connected with bidding quotation.Compared with conventional mark pier, it is of the present utility model simple in construction, the process such as assembling reinforcement, erection and form removal can be saved during making, operating efficiency is significantly improved, construction cost is reduced, and is particularly suitable for the extremely inconvenient construction site of outlying mountain area's transport of materials and is used.The protective cover set in mark pier top portion, can prevent from marking the bidding quotation buried on pier(Or gps antenna etc.)It is not affected by the external environment, advantageously ensures that the service life of engineering survey precision and extension mark pier.

Description

Casing formula measurement mark pier
Technical field
The utility model is related to engineering measuring technology field, particularly a kind of casing formula measurement mark pier.
Background technology
Carry out precise engineering survey operation when, because its required precision is especially high, using plumb bob centering, optical centering or The error of centralization can produce significant impact in global error during laser alignment, thus using more than during precision instrument observation using strong The method of centering processed.The forced centering method commonly used in precise engineering survey has:
(1)In whole observation process, the position of instrument is remained stationary as, so almost without the error of centralization;This method Use indoors, but keep instrument motionless more difficult for a long time, be only applicable to short-term engineering.
(2)Observation mark pier is set up, observation pier nose buries center connection substantially as tripod head on observation mark pier platform Spiral, directly plugs instrument when using, its error of centralization<±0.2mm;Embedded center connects spiral preferably with antirust Copper material.
(3)The embedded instrument pedestal on observation mark pier, directly inserts instrument alidade or corresponding site when using, its is right Middle error < 0.05mm.
Therefore, in engineering survey operation, it is typically necessary construction measurement mark pier.At present, common mark pier is generally reinforcing bar Concrete structure pattern, i.e., first ground excavate foundation ditch in pour a pier base, after on pier base assembling reinforcement, erect template, Casting concrete simultaneously installs bidding quotation(Or gps antenna etc.), the form removal after concrete reaches some strength, i.e. completion mark pier Make.This to build the method that pier is marked in measurement, the major defect existed is:First, the manufacturing process process of mark pier is complex, ties up Wire-tie, formwork erection, the workload such as form removal it is larger, time-consuming, operating efficiency is not high, and economic benefit is low, especially for outlying The job site in mountain area, transport of materials is extremely inconvenient, and the construction cost for marking pier is higher;2nd, due to the bidding quotation buried on mark pier(Or Gps antenna etc.)There is no protector, be directly exposed to outer, exposed to the sun and rain for a long time and the external environment such as difference variation Influence, will produce physical deformation, the easy corrosion of the mark heart of bidding quotation and installation, so as to cause certain error occur during measurement, gently then Influence measurement accuracy, it is heavy then cause mark pier can not use.
Such as U of Chinese patent literature CN 203848836 are to describe a kind of pillar mark pier, including standard type, standard type lower end Pedestal is connected with, standard type upper end is provided with forced centering bidding quotation, and the outer surface of standard type is managed for PVC.But also lack under this structure Less for the protection of bidding quotation, bidding quotation and the mark easy corrosion of the heart or deformation also easily change position, or even easily lose because touch by mistake Lose.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of casing formula measurement mark pier, the letter of its manufacturing process process It is single, the workloads such as assembling reinforcement, erection and form removal can be saved, operating efficiency is high, and construction cost is low, can prevented on mark pier Embedded bidding quotation(Or gps antenna etc.)It is not affected by the external environment, advantageously ensures that making for pier is marked in engineering survey precision and extension Use the life-span.
In order to solve the above technical problems, the technical scheme that the utility model is used is:A kind of casing formula measurement mark pier, bag Pier shaft is included, pier shaft is installed on pier base, bidding quotation or signal antenna are provided with the top of pier shaft, bidding quotation center is provided with the mark heart;
Shielding cover is outside bidding quotation, and the bottom of protective cover is connected with pier shaft;
Described protective cover includes a continuous side walls and a roof, and the bottom of protective cover is opened.
Described pier shaft is concrete material, and connecting rod is embedded with the top of pier shaft, and top and the bidding quotation of connecting rod are consolidated Fixed connection.
It is preferred that scheme in, outer casing is socketed with outside pier shaft, the top of outer casing be provided with external screw thread, the bottom of protective cover Portion is provided with internal thread, is connected through a screw thread between protective cover and outer casing.
It is preferred that scheme in, outer casing is socketed with outside pier shaft, outer casing close to top outer wall provided with multiple along circle The positioning hole that week arranges;
It is provided with the bottom of protective cover on the inside of the protective cover extension corresponding with positioning hole, the termination of protective cover extension Provided with the pawl for catching on positioning hole.
It is preferred that scheme in, be additionally provided with anchor ear in the position of protective cover extension;
Described anchor ear is the annulus that band one is open, and the position of opening is provided with two parallel kinks, in kink Position is fixedly connected by bolt, or bolt with lock.
It is preferred that scheme in, described outer casing is pvc materials.
It is preferred that scheme in, pier shaft and or the outer wall of protective cover post reflective membrane.
It is preferred that scheme in, on protective cover be provided with protective cover handle.
It is preferred that scheme in, be provided with stage, the top contact of stage and outer casing in the inwall of protective cover.
It is preferred that scheme in,:Lug boss is provided with the bottom of pier base, boss is in foundation ditch.
A kind of casing formula measurement mark pier that the utility model is provided, compared with conventional mark pier, its is simple in construction, can during making The process such as assembling reinforcement, erection and form removal are saved, so as to save material and quantities, operating efficiency is obtained significantly Improve, reach the purpose of reduction construction cost, be particularly suitable for the extremely inconvenient construction site of outlying mountain area's transport of materials and use. The protective cover set in mark pier top portion, can prevent from marking the bidding quotation buried on pier(Or gps antenna etc.)It is not affected by the external environment, has Beneficial to the service life for ensureing engineering survey precision and extension mark pier.The protective cover pawl attachment structure and the knot of anchor ear of setting Structure, additionally it is possible to the valuable part in protection mark pier, such as High Value Unit pedestal or part made of copper.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is overall structure front view of the present utility model.
Fig. 2 is overall structure top view of the present utility model.
Fig. 3 is protective cover attachment structure exploded perspective view preferred in the utility model.
Fig. 4 is protective cover attachment structure schematic diagram preferred in the utility model.
In figure:Pier shaft 1, outer casing 2, positioning hole 21, reflective membrane 3, foundation ditch 4, pier base 5, connecting rod 6, threaded joints 7, Protective cover 8, protective cover extension 81, protective cover handle 82, bidding quotation 9 marks the heart 10, anchor ear 11.
Embodiment
As in Fig. 1~2, pier, including pier shaft 1 are marked in a kind of casing formula measurement, and pier shaft 1 is installed on pier base 5, scheme preferably In, lug boss is provided with the bottom of pier base 5, boss is in foundation ditch 4.Lug boss in this example uses back taper.
Bidding quotation 9 or signal antenna are provided with the top of pier shaft 1, the center of bidding quotation 9 is provided with the mark heart 10;
Protective cover 8 is enclosed on outside bidding quotation 9, and the bottom of protective cover 8 is connected with pier shaft 1;
Described protective cover 8 includes a continuous side walls and a roof, and the bottom of protective cover 8 is opened.Thus structure, to mark The equipment in pier top portion is protected, it is to avoid these equipment are extended the service life of bidding quotation 9 or signal antenna by wind and weather, It also ensure that measurement accuracy.
Described pier shaft 1 is concrete material, and connecting rod 6, the top of connecting rod 6 and mark are embedded with the top of pier shaft 1 Disk 9 is fixedly connected.Thus structure, is easy to bidding quotation 9 to fix.
It is preferred that scheme such as Fig. 1 in, outer casing 2 is socketed with outside pier shaft 1, the top of outer casing 2 be provided with external screw thread, prevent The bottom of shield 8 is provided with internal thread, is connected through a screw thread between protective cover 8 and outer casing 2.Thus structure, is easy to protective cover 8 Installation and removal.
It is preferred that scheme such as Fig. 3,4 in, outer casing 2 is socketed with outside pier shaft 1, is set in outer wall of the outer casing 2 close to top There are multiple positioning holes 21 circumferentially arranged;
The protective cover extension 81 corresponding with positioning hole 21 is provided with the bottom of protective cover 8, protective cover extension 81 The pawl for being used for catching on positioning hole 21 is provided with the inside of termination.Thus structure, is easy to protective cover 8 to be rapidly assembled and disassembled.Relative to Helicitic texture, processing of being also more convenient for.
It is preferred that scheme in, be additionally provided with anchor ear 11 in the position of protective cover extension 81;
Described anchor ear 11 is the annulus that band one is open, and the position of opening is provided with two parallel kinks, in kink Position be fixedly connected by bolt, or bolt with lock.Thus structure, protective cover extension 81 can be locked, do not unclamp Bolt and lock, are difficult to open.
For being worth higher equipment, such as instrument base can also set warning device, alarm dress in protective cover 8 The wire arranged along the inwall of protective cover 8 is provided with putting, wire is in connected state with control chip, when wire is truncated, then Control chip receives signal, and handles, and warning device is sent sound and light alarm signal, or sends information to constructor simultaneously Member.Thus structure, protects the High Value Unit positioned at field.
It is preferred that scheme in, described outer casing 2 is pvc materials.Protective cover 8 also uses PVC materials in this example.
It is preferred that scheme such as Fig. 1,3 in, pier shaft 1 and or the outer wall of protective cover 8 post reflective membrane 3.Thus structure, Night enables Construction traffic and personnel quickly to find to mark pier, it is to avoid collision.
It is preferred that scheme in, on protective cover 8 be provided with protective cover handle 82.Thus structure, is easy to protective cover 8 to open.
It is preferred that scheme in, stage, the top contact of stage and outer casing 2 are provided with the inwall bottom of protective cover 8.Thus Structure, is easy to control the socket depth of protective cover 8.Usual protective cover 8 is socketed to form using two pvc pipes, and internal pipe is shorter Form stage.Stage is also formed at the top of the inwall of protective cover 8 simultaneously, for carrying top plate.
The above embodiments are only optimal technical scheme of the present utility model, and are not construed as limit of the present utility model The technical scheme that system, the technical scheme that protection domain of the present utility model should be recorded with claim, including claim are recorded The equivalents of middle technical characteristic are protection domain.Equivalent substitution i.e. within this range is improved, also in the utility model Protection domain within.

Claims (10)

1. a kind of casing formula measurement mark pier, including pier shaft(1), it is characterized in that:Pier shaft(1)It is installed in pier base(5)On, in pier shaft (1)Top be provided with bidding quotation(9)Or signal antenna, bidding quotation(9)Center is provided with the mark heart(10);
Protective cover(8)It is enclosed on bidding quotation(9)Outside, protective cover(8)Bottom and pier shaft(1)Connection;
Described protective cover(8)Including a continuous side walls and a roof, protective cover(8)Bottom open.
2. a kind of casing formula measurement mark pier according to claim 1, it is characterized in that:Described pier shaft(1)For concrete material Matter, in pier shaft(1)Top be embedded with connecting rod(6), connecting rod(6)Top and bidding quotation(9)It is fixedly connected.
3. a kind of casing formula measurement mark pier according to claim 1, it is characterized in that:In pier shaft(1)Outer casing is socketed with outside (2), in outer casing(2)Top be provided with external screw thread, protective cover(8)Bottom be provided with internal thread, protective cover(8)With outer casing (2)Between be connected through a screw thread.
4. a kind of casing formula measurement mark pier according to claim 1, it is characterized in that:In pier shaft(1)Outer casing is socketed with outside (2), in outer casing(2)Outer wall close to top is provided with multiple positioning holes circumferentially arranged(21);
In protective cover(8)Bottom be provided with and positioning hole(21)Corresponding protective cover extension(81), protective cover extension (81)Termination on the inside of be provided be used for catch on positioning hole(21)Pawl.
5. a kind of casing formula measurement mark pier according to claim 4, it is characterized in that:In protective cover extension(81)Position It is additionally provided with anchor ear(11);
Described anchor ear(11)The annulus being open for band one, the position of opening is provided with two parallel kinks, in kink Position is fixedly connected by bolt, or bolt with lock.
6. a kind of casing formula measurement mark pier according to any one of claim 3~5, it is characterized in that:Described outer casing(2) For pvc materials.
7. a kind of casing formula measurement mark pier according to claim 1,3~5 any one, it is characterized in that:In pier shaft(1)With Or protective cover(8)Outer wall post reflective membrane(3).
8. a kind of casing formula measurement mark pier according to claim 1,3~5 any one, it is characterized in that:In protective cover(8)On Provided with protective cover handle(82).
9. a kind of casing formula measurement mark pier according to claim 4, it is characterized in that:In protective cover(8)Inwall be provided with rank Platform, stage and outer casing(2)Top contact.
10. a kind of casing formula measurement mark pier according to claim 1, it is characterized in that:In pier base(5)Bottom provided with projection Portion, boss is in foundation ditch(4)It is interior.
CN201720139804.9U 2017-02-16 2017-02-16 Casing formula measurement mark pier Expired - Fee Related CN206514858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720139804.9U CN206514858U (en) 2017-02-16 2017-02-16 Casing formula measurement mark pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720139804.9U CN206514858U (en) 2017-02-16 2017-02-16 Casing formula measurement mark pier

Publications (1)

Publication Number Publication Date
CN206514858U true CN206514858U (en) 2017-09-22

Family

ID=59866739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720139804.9U Expired - Fee Related CN206514858U (en) 2017-02-16 2017-02-16 Casing formula measurement mark pier

Country Status (1)

Country Link
CN (1) CN206514858U (en)

Similar Documents

Publication Publication Date Title
CN104328799B (en) A kind of sheltered reverse excavation subway station steel pipe column accurate positioning method
CN111795676A (en) Dam dangerous case emergency early warning system
CN103485549B (en) Based on the localization method to large-scale built-in fitting
CN101788292B (en) Measuring and centering device
WO2022000719A1 (en) Intelligent building sensor detection method
CN103711151A (en) Wave pressure sensor embedding device and method
CN204286435U (en) Verticality ACTIVE CONTROL warning device
CN208024341U (en) A kind of rotary digging stake locator
CN106895821B (en) A kind of settlement monitoring street lamp based on BEI-DOU position system
CN206514858U (en) Casing formula measurement mark pier
CN105318860B (en) Building subsidence observation method and structure
CN104897143A (en) Cylinder forced centering observation pillar and embedment method thereof
CN106759542A (en) The deformation monitoring of deep basal pit and the method for Deformation Prediction
CN103628511B (en) Setting-out plumbing method for pile foundation casing
CN105890579A (en) Rapid underground pipeline element measuring instrument and technical method
US11566882B2 (en) Magnetic tag sensor and method for manufacturing same, and riverbed scour detection device
CN110046363A (en) A kind of accurate pre-buried construction method of concrete structure interior conduit group
CN204059200U (en) Bridge High-pier construction verticality automatic control structure
CN108489455A (en) The aided measurement device and measurement method of sewage open caisson internal structure
JPH10111129A (en) Manhole
CN210395301U (en) Monitoring device for settlement of slopes on two sides of arch bridge
CN209495657U (en) A kind of surface cracks monitoring device based on laser ranging
CN209989805U (en) Bored concrete pile steel reinforcement cage centering device
CN217210899U (en) Ground mark for surveying and mapping engineering
CN217820879U (en) Beidou building deformation monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170922

Termination date: 20210216

CF01 Termination of patent right due to non-payment of annual fee