CN105318860B - Building subsidence observation method and structure - Google Patents
Building subsidence observation method and structure Download PDFInfo
- Publication number
- CN105318860B CN105318860B CN201410393266.7A CN201410393266A CN105318860B CN 105318860 B CN105318860 B CN 105318860B CN 201410393266 A CN201410393266 A CN 201410393266A CN 105318860 B CN105318860 B CN 105318860B
- Authority
- CN
- China
- Prior art keywords
- building
- auxiliary base
- base point
- steel
- observation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention relates to one kind to build detection structure, more particularly, to a kind of building subsidence observation method and structure.Some working base points are embedded with skin face, three datum marks and four auxiliary base points are embedded with surrounding's engineering foundation of building, auxiliary base point is observed by three datum marks, examines the relative stability of datum mark and auxiliary base point;Working base point is observed by four auxiliary base points, collection eccentricity determines Deposition Situation.The present invention has the features such as simple in construction, construction cost is relatively low, is not easy by Effects on Engineering, is not easy to be influenceed by Changes in weather, is not easy to be affected by thermal expansion and contraction, and measurement error is smaller.
Description
Technical field
The present invention relates to one kind to build detection structure, more particularly, to a kind of building subsidence observation method and structure.
Background technology
Whether the purpose of building subsidence observation is uniform by observing grasp building settlement, to judge design and construction
Whether situation is reasonable, if influences structure and provides data safely, true to reflect building settlement situation, this requires settlement observation
As a result must be accurately and reliably.Under normal circumstances, in order to observe sedimentation situation, observation datum mark is buried in the surrounding of engineering, is passed through
Observe datum mark and grasp sedimentation situation.It is easily heated but commonly observation datum mark is easily influenceed easily by Effects on Engineering by Changes in weather
Swollen shrinkage influences, and causes error of observation data bigger than normal, so as to can not accurately reflect building settlement situation.
The content of the invention
The present invention is easily influenceed by Changes in weather primarily directed to easy by Effects on Engineering present in prior art, easily heated
Swollen shrinkage influences, the technical problem of the larger grade of measurement error, there is provided a kind of simple in construction, construction cost is relatively low, is not easy by engineering
Influence, be not easy to be influenceed by Changes in weather, be not easy to be affected by thermal expansion and contraction, the less settlement observation method of measurement error and structure.
The above-mentioned technical problem of the present invention is mainly what is be addressed by following technical proposals:Buried in skin face
Provided with some working base points, three datum marks and four auxiliary base points, benchmark are embedded with surrounding's engineering foundation of building
Point is made up of concrete pier and round steel, and concrete pier is coated with sand protective layer, and concrete pier top portion is provided with a cavity, and round steel is extended by concrete pier bottom
To cavity, covered with reinforced mesh on cavity, concrete bed course has been poured outside reinforced mesh, in working base point is connected to by screw flight
Formed on threaded steel pipe, fixed angle steel is fixedly connected with skin face, inner thread steel pipe is welded with fixed angle steel, it is interior
It is cased with fixing steel box outside threaded steel pipe, screw rod outside weld is connected to a steel ball, and auxiliary base point is made up of concrete column, buried in concrete column
There is reinforcing bar, reinforcing bar head is exposed at outside concrete column, and steel loop is welded with reinforcing bar.
Working base point is in same level.The elevation of water is tried one's best the position for being maintained at nearer from the ground, optimal
Choosing height is 1 to 2 meter of height from the ground.
The distance of datum mark and building is 50 meters to 100 meters.The triangle formed between three datum marks is building
It is enclosed in the delta-shaped region.
Auxiliary base point is arranged on the corner of building, and the distance of auxiliary base point and building is 10 meters to 20 meters.Four
The quadrangle that individual auxiliary base point is connected into is in the delta-shaped region that three datum marks are connected into.
When detecting the sedimentation degree of building, the first step passes through three datum marks successively all auxiliary in observation visual angle
Datum mark, examine the relative stability of datum mark and auxiliary base point;Second step is observed and regarded successively by four auxiliary base points
All working basic point in angle, the eccentricity using special instrument through steel loop observation steel ball.When auxiliary base point or work base
When point is blocked by building, this group of eccentricity data can be excluded;When the stability of auxiliary base point is bad, the auxiliary base is excluded
The data gathered on schedule.
Under normal circumstances, special instrument is the high-precision level of in the market buying.
Therefore, the present invention has simple in construction, and construction cost is relatively low, is not easy by Effects on Engineering, is not easy by Changes in weather shadow
The features such as sound, is not easy to be affected by thermal expansion and contraction, and measurement error is smaller.
Brief description of the drawings
Accompanying drawing 1 is the overall structure diagram of the present invention;
Accompanying drawing 2 is the working base point structural representation of the present invention;
Accompanying drawing 3 is the datum mark structural representation of the present invention;
Accompanying drawing 4 is the auxiliary base point structural representation of the present invention.
Embodiment
Below by embodiment, and with reference to accompanying drawing, technical scheme is described in further detail.
Embodiment 1:Building subsidence observation structure is used for the sedimentation degree for observing building, is buried on the wall face of building 4
Provided with four working base points 1, working base point 1 is in same level, and three bases are embedded with surrounding's engineering foundation of building 4
On schedule 2 and four auxiliary base points 3, three datum marks 2 divide for A, B, C, and four auxiliary base points 3 minutes are E, F, G, H, four works
Make basic point 1 to divide for W, X, S, Z, the distance of datum mark 2 and building 4 is 70 meters, and auxiliary base point 3 is arranged on the four of building 4
Angle, the distance of auxiliary base point 3 and building 4 is 15 meters (as shown in Figure 1).
Working base point 1 is threaded on inner thread steel pipe 12 by screw rod 11 and formed, and is fixedly connected on the wall face of building 4
There is fixed angle steel 13, inner thread steel pipe 12 is welded with fixed angle steel 13, is cased with fixing steel box 14, screw rod outside inner thread steel pipe 12
11 outside welds are connected to a steel ball 15 (as shown in Figure 2).
Datum mark 2 is made up of concrete pier 21 and round steel 22, and concrete pier 21 is coated with sand protective layer 26, and the top of concrete pier 21 is provided with one
Individual cavity 23, round steel 22 extend to cavity 23 by the bottom of concrete pier 21, poured outside covered with reinforced mesh 24, reinforced mesh 24 on cavity 23
Concrete bed course 25 (as shown in Figure 3) is built.
Auxiliary base point 3 is made up of concrete column 31, and reinforcing bar 32 is embedded with concrete column 31, and the head of reinforcing bar 32 is exposed at concrete column
Outside 31, steel loop 33 (as shown in Figure 4) is welded with reinforcing bar 32.
When observing the sedimentation situation of building, first group of data acquisition:The first step is by datum mark A successively in observation visual angle
Auxiliary base point E and F, examine datum mark A and auxiliary base point E and F stability;Second step by auxiliary base point E successively
Working base point W and Z in observation visual angle and by auxiliary base point F successively the working base point W and X in observation visual angle, using special
Industry instrument records after the eccentricity of steel ball 15 is observed through steel loop 33.
Second group of data acquisition:The first step examines benchmark by datum mark B successively auxiliary base point F and G in observation visual angle
Point B and auxiliary base point F and G stability;Second step by the auxiliary base point F successively working base point W in observation visual angle and
X, by the auxiliary base point G successively working base point X in observation visual angle, steel ball 15 is observed through steel loop 33 using special instrument
Recorded after eccentricity.
3rd group of data acquisition:The first step examines benchmark by datum mark C successively auxiliary base point E and H in observation visual angle
Point C and auxiliary base point E and H stability;Second step by the auxiliary base point E successively working base point W in observation visual angle and
Z, by auxiliary base point H successively the working base point S and Z in observation visual angle, steel ball is observed through steel loop 33 using special instrument
Recorded after 15 eccentricity.
Claims (5)
- A kind of 1. building subsidence observation structure, for observing the sedimentation degree of building, it is characterised in that the building (4) some working base points (1) are embedded with wall face, three datum marks (2) are embedded with surrounding's engineering foundation of building (4) With four auxiliary base points (3), datum mark (2) is made up of concrete pier (21) and round steel (22), and concrete pier (21) is coated with sand protection Layer (26), concrete pier (21) top are provided with a cavity (23), and round steel (22) extends to cavity (23), cavity by concrete pier (21) bottom (23) concrete bed course (25) has been poured outside covered with reinforced mesh (24), reinforced mesh (24) on, working base point (1) is by screw rod (11) It is threaded on inner thread steel pipe (12) and forms, fixed angle steel (13), fixed angles is fixedly connected with building (4) wall face Inner thread steel pipe (12) is welded with steel (13), is cased with fixing steel box (14), screw rod (11) external welding outside inner thread steel pipe (12) There is a steel ball (15), auxiliary base point (3) is made up of concrete column (31), and reinforcing bar (32), reinforcing bar are embedded with concrete column (31) (32) head is exposed at concrete column (31) outside, and steel loop (33) is welded with reinforcing bar (32).
- 2. building subsidence observation structure according to claim 1, it is characterised in that the working base point (1) is in same On one horizontal plane.
- 3. building subsidence observation structure according to claim 1, it is characterised in that the datum mark (2) and building (4) distance is 50 meters to 100 meters.
- 4. building subsidence observation structure according to claim 1, it is characterised in that the auxiliary base point (3) is set In the corner of building (4), the distance of auxiliary base point (3) and building (4) is 10 meters to 20 meters.
- 5. a kind of observation procedure for being used for the building subsidence observation structure as described in claim any one of 1-4, its feature exist In, the first step by three datum marks (2) successively all auxiliary base points (3) in observation visual angle, examine datum mark (2) with it is auxiliary Help the relative stability of datum mark (3);Second step passes through four auxiliary base points (3) the successively all working base in observation visual angle Point (1), the eccentricity using special instrument through steel loop (33) observation steel ball (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410393266.7A CN105318860B (en) | 2014-08-04 | 2014-08-04 | Building subsidence observation method and structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410393266.7A CN105318860B (en) | 2014-08-04 | 2014-08-04 | Building subsidence observation method and structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105318860A CN105318860A (en) | 2016-02-10 |
CN105318860B true CN105318860B (en) | 2018-02-13 |
Family
ID=55246770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410393266.7A Active CN105318860B (en) | 2014-08-04 | 2014-08-04 | Building subsidence observation method and structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105318860B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108931231A (en) * | 2017-05-27 | 2018-12-04 | 中国二十冶集团有限公司 | The observation method of high-precision rolling mill foundation settlement |
CN111060070A (en) * | 2020-01-13 | 2020-04-24 | 中国水利水电第四工程局有限公司 | Method for observing uneven settlement of buildings around pipe gallery |
CN111336985B (en) * | 2020-02-27 | 2021-09-28 | 国网山西省电力公司晋城供电公司 | Monitoring method and device for goaf iron tower, storage medium and electronic equipment |
CN111609833B (en) * | 2020-05-26 | 2021-12-31 | 武汉弘泰建筑工程质量检测有限公司 | Settlement observation method for high-rise building |
CN113202152B (en) * | 2021-05-24 | 2022-02-22 | 浙江省第一水电建设集团股份有限公司 | Building settlement safety monitoring method based on wireless sensor data acquisition technology |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007212430A (en) * | 2006-08-07 | 2007-08-23 | Kurabo Ind Ltd | Photogrammetry device and system |
JP2010185801A (en) * | 2009-02-12 | 2010-08-26 | Tokyo Keisoku:Kk | State-change measurement system using imaging device |
CN201828266U (en) * | 2010-08-20 | 2011-05-11 | 许昌中原建设(集团)有限公司 | Denoter for sedimentation observation points of buildings |
CN201972063U (en) * | 2011-03-14 | 2011-09-14 | 西南交通大学 | Equipment for monitoring sedimentation of rapid transit railway works |
CN102322266A (en) * | 2011-06-17 | 2012-01-18 | 中铁十一局集团第五工程有限公司 | Tunnel excavating and constructing method |
CN203024760U (en) * | 2012-11-05 | 2013-06-26 | 山西潞安环保能源开发股份有限公司 | Similar material settlement monitoring device |
CN203857965U (en) * | 2014-05-15 | 2014-10-01 | 浙江乔兴建设集团有限公司 | Settlement observation reference point protection structure |
-
2014
- 2014-08-04 CN CN201410393266.7A patent/CN105318860B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007212430A (en) * | 2006-08-07 | 2007-08-23 | Kurabo Ind Ltd | Photogrammetry device and system |
JP2010185801A (en) * | 2009-02-12 | 2010-08-26 | Tokyo Keisoku:Kk | State-change measurement system using imaging device |
CN201828266U (en) * | 2010-08-20 | 2011-05-11 | 许昌中原建设(集团)有限公司 | Denoter for sedimentation observation points of buildings |
CN201972063U (en) * | 2011-03-14 | 2011-09-14 | 西南交通大学 | Equipment for monitoring sedimentation of rapid transit railway works |
CN102322266A (en) * | 2011-06-17 | 2012-01-18 | 中铁十一局集团第五工程有限公司 | Tunnel excavating and constructing method |
CN203024760U (en) * | 2012-11-05 | 2013-06-26 | 山西潞安环保能源开发股份有限公司 | Similar material settlement monitoring device |
CN203857965U (en) * | 2014-05-15 | 2014-10-01 | 浙江乔兴建设集团有限公司 | Settlement observation reference point protection structure |
Also Published As
Publication number | Publication date |
---|---|
CN105318860A (en) | 2016-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105318860B (en) | Building subsidence observation method and structure | |
CN204479060U (en) | A kind of subgrade stability recording geometry | |
CN103243747B (en) | Deviation rectifying method of prestressed concrete pipe pile foundation | |
CN107131862B (en) | Rock-fill dam panel deformation monitoring device and construction method | |
KR101162918B1 (en) | Method of measuring underground displacement using inclinometer | |
CN103913145A (en) | Crack opening two-direction deformation monitoring structure and measurement method | |
CN106813590A (en) | External floating roof tank deformation detection method | |
CN106759548A (en) | For the monitoring system and monitoring method of lattice suspension roof support cutting | |
CN110207655A (en) | Subgrade settlement monitoring settlement gauge and monitoring method | |
CN115387221A (en) | High pier line type control method for high altitude area | |
CN106759542A (en) | The deformation monitoring of deep basal pit and the method for Deformation Prediction | |
CN206457859U (en) | A kind of detachable apparatus for facilitating open caisson to observe skew and absolute altitude | |
CN103741726B (en) | A kind of open caisson settlement measurement metering method | |
CN106638535B (en) | Foundation pit construction local supervising and measuring equipment and monitoring method | |
CN102927944B (en) | Land movement measuring method and device in large-scale experiment | |
CN205502092U (en) | Testing arrangement of bored concrete pile burden frictional resistance neutral point in deep back filling | |
CN109811771A (en) | Make the simple and easy method not bent when anchor bar steel waist rail tensioning | |
CN103276755A (en) | Raft foundation bottom soil body void deformation monitoring device | |
CN107476327A (en) | Narrow base list column step foundation construction method | |
CN109113040B (en) | It is measured in observation platform and its construction method and water in water and measures observation system | |
CN206438544U (en) | Monitoring system for lattice suspension roof support cutting | |
CN203795884U (en) | Safe and reliable construction system for replacing columns by holding beams | |
CN106482621A (en) | A kind of device of Bridge Pier sinking deformation monitoring and its chucking device | |
CN105841592A (en) | Jacking axis offset measuring device and application method thereof | |
CN105862901B (en) | Docking formula bedrock survey mark and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |