CN206502573U - A kind of hoistable platform for blast furnace building construction - Google Patents

A kind of hoistable platform for blast furnace building construction Download PDF

Info

Publication number
CN206502573U
CN206502573U CN201720010575.0U CN201720010575U CN206502573U CN 206502573 U CN206502573 U CN 206502573U CN 201720010575 U CN201720010575 U CN 201720010575U CN 206502573 U CN206502573 U CN 206502573U
Authority
CN
China
Prior art keywords
bracket
blast furnace
building construction
hoistable platform
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720010575.0U
Other languages
Chinese (zh)
Inventor
董保村
项小飞
赵建刚
高飞
张涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201720010575.0U priority Critical patent/CN206502573U/en
Application granted granted Critical
Publication of CN206502573U publication Critical patent/CN206502573U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of hoistable platform for blast furnace building construction, its structure includes the bracket that crossbeam and longeron are constituted being crossed-over by several, several hangers that the bracket is connected by connecting plate are uniformly arranged on the circumference of the bracket, it is provided with and is connected with described connecting plate and the first vertical reinforcement on described hanger, several support beams of circumference uniform distribution and four girders between the external diameter and blast-furnace bosh of the bracket, the second reinforcement is respectively arranged between two adjacent support beams or adjacent girder and support beam, the upper surface of the bracket is provided with supporting plate.The utility model has the advantages that:Workbench moving freely in blast-furnace bosh can be achieved; make the overhaul construction of blast furnace no longer cumbersome time-consuming; reduce the consuming of artificial machinery; and can be disposably by large scale prefabricated piece of handling in place and while carrying out multilayer operation more than furnace bottom and bosh protection canopy; so as to shorten construction period, fully ensure blast furnace builds efficiency by laying bricks or stones.

Description

A kind of hoistable platform for blast furnace building construction
Technical field
The utility model is related to a kind of blast furnace building construction equipment, and more specifically, the utility model is related to one kind and is used for The hoistable platform of blast furnace building construction.
Background technology
Those skilled in the art know that the overhaul of blast furnace has the characteristics of duration is tight, the amount of building by laying bricks or stones is big, when being built by laying bricks or stones due to blast furnace Brick amount is larger, and building construction is relatively difficult, iron mouthful when especially, air port size it is smaller, cause some prefabricated sections can not be from iron Enter stove at mouth, air port, therefore, material, which enters stove, turns into the problem of construction.
In order to solve this problem, existing conventional method is using bosh protection canopy build by laying bricks or stones and feed in stove, then To be hung to using hoist engine under prefabricated section more than masonry of well, bosh protects canopy to set up scaffold masonry heater in stove again after removing Abdomen is to furnace throat weatherable materials.
It is not only cumbersome, take but this traditional method is limited more, it is necessary to repeatedly lifting is had bad luck and scaffold is set up When, and labor intensive, machinery can not also ensure the in liberal supply of building materials in stove.
Utility model content
The purpose of this utility model is exactly to solve the problem of above prior art is present, and provides a kind of for blast furnace for this The hoistable platform of building construction.It is no longer cumbersome time-consuming that the application of the technology can make the overhaul of blast furnace construct, and reduces artificial, machinery Consuming, and multilayer operation can be carried out simultaneously, so as to shorten construction period, fully ensure blast furnace builds efficiency by laying bricks or stones.
Technical solutions of the utility model are:
A kind of hoistable platform for blast furnace building construction, including the crossbeam and longeron structure being crossed-over by several Into bracket, be uniformly arranged several hangers that the bracket is connected by connecting plate on the circumference of the bracket, described hangs It is provided with and is connected with described connecting plate and the first vertical reinforcement on ear, circle between the external diameter and blast-furnace bosh of the bracket Several support beams of Zhou Junbu and four girders, are set respectively between two adjacent support beams or adjacent girder and support beam There is the second reinforcement, the upper surface of the bracket is provided with supporting plate.
Crossbeam, longeron and support beam described in several make by channel-section steel.
The quantity of the support beam is at least 8.
Girder described in four constitutes stretching structure by channel-section steel and the channel bar being arranged in the channel-section steel.
The quantity of the hanger is at least 6.
The radius of lifting hole(eyelet) is 50mm on the hanger.
The beneficial effects of the utility model are:
(1) it is easy to draw materials, and makes simple, fund input is less.
(2) by the ingenious combination with lever hoist, achievable workbench moving freely in blast-furnace bosh, and by Four girders that channel-section steel and the channel bar being arranged in the channel-section steel are constituted can manually realize telescopic variation, so as to ensure freedom Mobile workbench diameter can change with the change in size of bosh internal diameter so that building work by laying bricks or stones becomes light, quick.
(3) position of supporting plate can be limited by the latticed bracket being welded of crossbeam and longeron, so as to ensure that work is put down Steady status of the platform in lifting process, it is ensured that the personal safety of workmen.
(4) rational deployment of hanger, it is ensured that steady, safety of the operating platform in lifting process, it is to avoid single The danger of platform rotation can occur for lifting rope lifting, play a part of escorting for safety in production.
(5) large scale prefabricated piece of handling disposably can be simultaneously subjected to furnace bottom simultaneously in place and bosh protects multilayer more than canopy to make Industry, so as to solve the problem that insoluble construction period always is tight, personnel's efficiency of construction is wasted.
Brief description of the drawings
Fig. 1 is planar structure schematic diagram of the present utility model.
Fig. 2 is the partial structural diagram at hanger in Fig. 1.
Reference:1-- brackets, 2-- hangers, 3-- support beams, 4-- supporting plates, the reinforcements of 5-- second, 6-- blast-furnace boshes, 7-- girders, 11- crossbeams, 12-- longerons, 21-- connecting plates, the reinforcements of 22-- first, 23-- lifting hole(eyelet)s.
Embodiment
In order that the utility model is easier to be understood, below in conjunction with the accompanying drawings with specific embodiment to the utility model Technical scheme be described in detail.
Reference picture 1, Fig. 2, the hoistable platform of the present utility model for blast furnace building construction, including mutually handed over by several Several, which are uniformly welded, on the bracket 1 that wrong crossbeam 11 and longeron 12 is welded, the circumference of the bracket 1 passes through connecting plate 21 Connect to be provided with the hanger 2 of the bracket 1, described hanger 2 and be connected with described connecting plate 21 and the first vertical reinforcement Muscle 22, is provided with several support beams 3 and four girders 7 of circumference uniform distribution between the external diameter and blast-furnace bosh 6 of the bracket 1, The second reinforcement 5, the bracket 1 are respectively welded between two adjacent support beams 3 or between adjacent girder 7 and support beam 3 Upper surface soldering pallet 4.
Support beam 3, crossbeam 11 and longeron 12 described in several and made by channel-section steel.
The quantity of the support beam 3 can at least should be 8 according to determining the need for structure setting.
Girder 7 described in four constitutes stretching structure by channel-section steel and the channel bar being arranged in the channel-section steel.
The quantity of the hanger 2 can at least should be 6 according to determining the need for structure setting.
The radius of lifting hole(eyelet) 23 is set to 50mm on the hanger 2.
Carrying out the construction method built by laying bricks or stones of blast furnace using the utility model is:
(1) protection canopy is built by laying bricks or stones below blast-furnace tuyere cupola well, after installation, the electricity set using top cone maintenance door Constituent material of the present utility model is transported on protection canopy and carries out assembly by dynamic cucurbit, and workmen is by climbing that burner maintenance door is set It can carry out building operation by laying bricks or stones above and below ladder, when cupola well is as follows;
(2) during assembly, the hole for hoist of lever hoist steel wire rope is opened up at 4 tedges of blast furnace, then will Lever hoist and steel wire rope are attached on the utility model;
(3) complete after installation of the present utility model, workmen stands on supporting plate of the present utility model, utilizes lever hoist Descending operation is carried out to the utility model, the lifting of workbench is realized;
(4) transport of the hoist engine set using burner maintenance door to progress refractory material in stove, workmen is in this reality With carrying out building operation by laying bricks or stones on new platform;
(5) refractory material is built by laying bricks or stones, carrying out FCL by blast furnace roof maintenance electric block lifts to inspection platform, then by overhauling The hoist engine that door is set is transported to mobile platform and built by laying bricks or stones;
(6) more than blast-furnace bosh build by laying bricks or stones after finishing, the utility model is down on cupola well protection canopy and removed, material is removed Material is removed to outside stove together with cupola well protection canopy removed material by air port, in case using again.
, it is necessary to quantity no more than total supporting power of the present utility model of each blanking be noted, to keep away in above method Exempt from occur accident, meanwhile, require that per tour personnel carry out coherence check to lever hoist and steel wire rope in work progress, find Damage and change in time.
Blast furnace is carried out using the utility model to build by laying bricks or stones, can be with levels operation simultaneously, so as to eliminate prior art in cupola well Protection canopy will also be set up scaffold by furnace bottom and carry out building trouble by laying bricks or stones after removing, greatly reduce fund and the input of manpower, also together When shorten the engineering time.
The technical solution of the utility model is schematically described above by reference to drawings and examples, the description does not have It is restricted.Those skilled in the art will be understood that in actual applications each technical characteristic in the utility model has can Can occur some changes, and other staff may also make similar Design under its enlightenment.In particular:As long as no Depart from design aim of the present utility model, all obvious variations in detail or similar Design are all contained in the utility model Protection domain within.

Claims (6)

1. a kind of hoistable platform for blast furnace building construction, including the crossbeam and longeron that are crossed-over by several are constituted Bracket, it is characterised in that:Several hangers that the bracket is connected by connecting plate are uniformly arranged on the circumference of the bracket, It is provided with and is connected with described connecting plate and the first vertical reinforcement on described hanger, the external diameter and State of Blast Furnace of the bracket Several support beams of circumference uniform distribution and four girders between abdomen, between two adjacent support beams or adjacent girder and support beam The second reinforcement is respectively arranged with, the upper surface of the bracket is provided with supporting plate.
2. the hoistable platform according to claim 1 for blast furnace building construction, it is characterised in that:Horizontal stroke described in several Beam, longeron and support beam make by channel-section steel.
3. the hoistable platform according to claim 1 for blast furnace building construction, it is characterised in that:The number of the support beam Amount is at least 8.
4. the hoistable platform according to claim 1 for blast furnace building construction, it is characterised in that:Girder described in four Stretching structure is constituted by channel-section steel and the channel bar being arranged in the channel-section steel.
5. the hoistable platform according to claim 1 for blast furnace building construction, it is characterised in that:The quantity of the hanger At least 6.
6. the hoistable platform according to claim 1 for blast furnace building construction, it is characterised in that:Lifting hole(eyelet) on the hanger Radius be 50mm.
CN201720010575.0U 2017-01-05 2017-01-05 A kind of hoistable platform for blast furnace building construction Active CN206502573U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720010575.0U CN206502573U (en) 2017-01-05 2017-01-05 A kind of hoistable platform for blast furnace building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720010575.0U CN206502573U (en) 2017-01-05 2017-01-05 A kind of hoistable platform for blast furnace building construction

Publications (1)

Publication Number Publication Date
CN206502573U true CN206502573U (en) 2017-09-19

Family

ID=59839785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720010575.0U Active CN206502573U (en) 2017-01-05 2017-01-05 A kind of hoistable platform for blast furnace building construction

Country Status (1)

Country Link
CN (1) CN206502573U (en)

Similar Documents

Publication Publication Date Title
CN201411900Y (en) Hydraulic die lifter for chimneys
CN105177202B (en) A kind of blast furnace overhaul method
CN106435087B (en) A kind of converter vaporization flue piecewise combination installation method
CN101509049A (en) Construction method for internal cooling wall and furnace liner of blast furnace
CN101225708A (en) Method for mounting up-sliding bottom-brick-building derrick-free hydraulic sliding formwork of chimney
CN109097516A (en) The construction method of blast furnace overhaul engineering replacement last furnace shell
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN101566005B (en) Chimney hydraulic mould lifting device
CN104003287A (en) Umbrella type variable diameter platform device for industry kiln
CN201214594Y (en) Loop crane hoisting disk device for blast furnace inner lining construction
CN112324231A (en) Construction method for ultrahigh chimney lining layer
CN203359745U (en) Hot blast stove refractory vertical transport device
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
CN107502690A (en) A kind of point of device and replacing options with integral replacing last furnace shell
CN102399925A (en) Method for replacing cooling wall of blast furnace
CN206502573U (en) A kind of hoistable platform for blast furnace building construction
CN110409803B (en) Hoisting method for disassembling central drum ring of hydraulic mold lifting device
CN107267165A (en) A kind of dry coke quenching body of heater is circular layout pre-embedded bolt fixed structure and installation method
CN207048281U (en) A kind of ore deposit Jiao groove feed hopper liner installation system
CN215626205U (en) Auxiliary crane device for ALC wallboard installation
CN106284997A (en) The big punching block construction method for lifting whole of reinforced concrete chimney
CN111121464A (en) Method for repairing damaged partition wall of internal combustion type hot blast stove
CN104652804A (en) Operating platform and construction method for going up and down freely in blast furnace
CN205556728U (en) Combination rack is built by laying to converter lining
RU2405897C1 (en) Method for construction of heat-resistant high-rise reinforced concrete pipes with low exit diametre with high thickness of heat insulation and lining of piece materials

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant