CN206494660U - Subway open-cut station is adjustable Span Beam gantry crane - Google Patents

Subway open-cut station is adjustable Span Beam gantry crane Download PDF

Info

Publication number
CN206494660U
CN206494660U CN201720086909.2U CN201720086909U CN206494660U CN 206494660 U CN206494660 U CN 206494660U CN 201720086909 U CN201720086909 U CN 201720086909U CN 206494660 U CN206494660 U CN 206494660U
Authority
CN
China
Prior art keywords
section
span
flange
gantry crane
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720086909.2U
Other languages
Chinese (zh)
Inventor
赵胜
王逢松
黄运生
樊建峰
谭云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Construction Co Ltd of China Railway Tunnel Group Co Ltd
Original Assignee
Fifth Construction Co Ltd of China Railway Tunnel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Co Ltd of China Railway Tunnel Group Co Ltd filed Critical Fifth Construction Co Ltd of China Railway Tunnel Group Co Ltd
Priority to CN201720086909.2U priority Critical patent/CN206494660U/en
Application granted granted Critical
Publication of CN206494660U publication Critical patent/CN206494660U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

The utility model proposes a kind of adjustable Span Beam gantry crane of subway open-cut station, supporting leg including girder and installed in girder two ends, the girder includes two standards with section, lower section of the standard with section is provided with beam flange, the top of the supporting leg is provided with post flange, the beam flange has multiple positions to coordinate with the post flange along along girder direction, and the supporting leg is fixed by the beam flange, post flange and the standard with section.When span change in station is little, only need to square column flange on adjustment supporting leg and be connected distance with beam flange, the span of gantry crane can just be changed, greatly reduce the overlapping investment of engineering machinery and the waste of resource, improve production efficiency and the adaptability of gantry crane, construction cost is reduced, with substantive distinguishing features and progress.

Description

Subway open-cut station is adjustable Span Beam gantry crane
Technical field
The utility model is related to technical field of building construction, and in particular to Span Beam gate-type lifting that subway open-cut station is adjustable Machine.
Background technology
The single girder used with a large amount of constructions of the big or middle city underground engineering in the whole nation, the vertical-lift of subway open-cut station Gate-type lifting(Electric block gate-type lifting)The application of the double girder portal cranes used with the vertical-lift of shield-tunneling construction dregs It is more and more frequent.As engineering is more and more, the usage amount of gantry crane is also increasing.Due to each city, every line Road, each station periphery boundary condition it is different, the span that each Station Design is built is also different, therefore causes every door The span of formula crane is different.Because the service life cycle of a gantry crane is longer, and manufacturing cost is higher, If the gantry crane of each station or new one different spans of processing and fabricating of shield-tunneling construction, it is clear that be uneconomical, not environmentally 's.Therefore, to use same gantry crane if station span is different, only to gantry crane using before all Carry out girder span transformation.But carry out girder span every time and transform spent higher, the time of transformation is long, therefore is Easily and fast, efficiently, economic, environmental protection completion gate-type lifting span regulation is using a kind of span, it is necessary to adjust more convenient Gantry crane.
Utility model content
The utility model proposes a kind of adjustable Span Beam gantry crane of subway open-cut station, door in the prior art is solved Formula crane girder span is unadjustable, for different construction span requirements, main beam of gantry crane can only be carried out secondary Processing or the technical problem of transformation.
What the technical solution of the utility model was realized in:A kind of adjustable Span Beam gate-type lifting of subway open-cut station Machine, including girder and the supporting leg installed in girder two ends, the girder include two standards with section, and two standards are with section Lower section is equipped with beam flange, and the top of the supporting leg is provided with post flange, and the beam flange has multiple positions can along along girder direction Coordinate with the post flange, the supporting leg is fixed by the beam flange, post flange and two standards with section.When station across When degree change is little, it is only necessary to adjust square column flange on supporting leg and be connected distance with beam flange, it is possible to change gantry crane Span.
The post FL flange length is suitable with the leg length.This structure design, mainly meet gantry crane across Bearing capacity and stability requirement after degree increase.
The girder also includes an adjustable span with section, and the adjustable span is arranged on two standards with section with section Between.When station, span is changed greatly, and is depended adjustment supporting leg alone and be connected with beam flange apart from when can not also meet span and requiring, can be with In two standards of girder with an adjustable span between section, is increased with section, so as to further increase the span of gantry crane.
Two standards with section between or the standard with section and adjustable span with section between be connected by screw bolts.Often Section girder splice plate diameter of bolt hole and pitch-row unified standard;Facilitate Rapid Combination and the span regulation of girder.
The utility model is according to different station spans, and the span to gantry crane carries out assembling regulation, be specifically divided into Lower three kinds:
1st, when span change in station is little, the post flange that need to only adjust supporting leg couples distance with beam flange of the standard with section, Achieve that gantry crane span is adjusted.
2nd, when station span increase it is more, depend merely on adjustment supporting leg be connected with beam flange apart from can not also meet span require When, can be between two standards of girder be with saving, piece adjustable span of increase is with section, so as to further increase gantry crane Span.
3rd, when span reduction in station is more, the adjustable span of girder can be removed with section, girder is not installed in assembling Then adjustable span is adjusted, so as to reach construction requirement with section according still further to first way.
The utility model adjusts the span of gantry crane by the way of flange connects and increased and decreased adjustable span with section, To adapt to the gauge construction needs of different station width, engineering machinery overlapping investment and the waste of resource are greatly reduced, is improved The adaptability of production efficiency and gantry crane, reduces construction cost, with substantive distinguishing features and progress.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment, the accompanying drawing used required in being described below to embodiment It is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present utility model, for ability For the those of ordinary skill of domain, on the premise of not paying creative work, it can also be obtained according to these accompanying drawings other attached Figure.
Fig. 1 is a kind of adjustable Span Beam gantry crane structural representation of subway open-cut station of the utility model;
Fig. 2 is the structural representation when gantry crane increases an adjustable span with section.
Marked in figure, 1, supporting leg;2nd, the first standard is with section;3rd, the second standard is with section;4th, post flange;5th, beam flange;6th, may be used Span is adjusted with section.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
It is a kind of adjustable Span Beam gantry crane structural representation of subway open-cut station shown in Fig. 1.The gate-type lifting Main beam includes two standards with section:First standard is with the standard of section 2 and second with section 3, and lower section of two standards with section is welded with Beam flange 5, the top of supporting leg 1 is welded with post flange 4, and beam flange 5 has multiple positions to coordinate with post flange 4 along along girder direction, Supporting leg 1 is fixed by the beam flange 5, post flange 4 and two standards with section.When span change in station is little, supporting leg 1 is adjusted The post flange 4 of top is connected distance with beam flange 5, it is possible to change the span of gantry crane.The length of post flange 4 and supporting leg 1 Length is suitable or identical, to meet bearing capacity and the stability requirement after the increase of gantry crane span.
Structural representation when increasing an adjustable span with section shown in Fig. 2 for the gantry crane.When station span Increase is more, depends adjustment supporting leg alone and is connected with beam flange apart from when can not also meet span requirement, can match somebody with somebody section 2 in the first standard And second standard between section 3, piece adjustable span of increase is with section 6, so as to further increase the span of gantry crane, adjustable Two ends of the span with section 6 are detachably connected with the first standard by connecting plate and bolt with the standard of section 2 and second with section 3 respectively.
The gantry crane is in new production, and it is design processing girder size to choose the size of most long span, first by whole Girder is processed by steel construction, it is ensured that the hardness of steel and camber of girder, then by whole girder sectional making into standard with section, Adjustable span is with section;Adjustable span makes uniform length, every section of girder splice plate diameter of bolt hole and pitch-row unified standard with section; Facilitate Rapid Combination and the span regulation of girder.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc. should be included in the utility model Protection domain within.

Claims (4)

1. a kind of adjustable Span Beam gantry crane of subway open-cut station, including girder and the supporting leg (1) installed in girder two ends, It is characterized in that:The girder includes two standards with section, and lower section of two standards with section is equipped with beam flange (5), institute The top for stating supporting leg (1) is provided with post flange (4), and the beam flange (5) has multiple positions can be with the post method along along girder direction Blue (4) coordinate, and the supporting leg (1) is fixed by the beam flange (5), post flange (4) and the standard with section.
2. gantry crane according to claim 1, it is characterised in that:Post flange (4) length and the supporting leg (1) Length is suitable.
3. gantry crane according to claim 2, it is characterised in that:The girder is also matched somebody with somebody including an adjustable span Section, the adjustable span is arranged on two standards between section with section.
4. any gantry crane according to claims 1 to 3, it is characterised in that:Two standards are between section Or the standard with section and adjustable span with section between be connected by screw bolts.
CN201720086909.2U 2017-01-23 2017-01-23 Subway open-cut station is adjustable Span Beam gantry crane Active CN206494660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720086909.2U CN206494660U (en) 2017-01-23 2017-01-23 Subway open-cut station is adjustable Span Beam gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720086909.2U CN206494660U (en) 2017-01-23 2017-01-23 Subway open-cut station is adjustable Span Beam gantry crane

Publications (1)

Publication Number Publication Date
CN206494660U true CN206494660U (en) 2017-09-15

Family

ID=59803649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720086909.2U Active CN206494660U (en) 2017-01-23 2017-01-23 Subway open-cut station is adjustable Span Beam gantry crane

Country Status (1)

Country Link
CN (1) CN206494660U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110723655A (en) * 2019-10-22 2020-01-24 海盐天奇标准件股份有限公司 Lifting device for bridge crane
CN110723643A (en) * 2019-12-05 2020-01-24 上海振华重工(集团)股份有限公司 Method for changing track gauge of in-service crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110723655A (en) * 2019-10-22 2020-01-24 海盐天奇标准件股份有限公司 Lifting device for bridge crane
CN110723643A (en) * 2019-12-05 2020-01-24 上海振华重工(集团)股份有限公司 Method for changing track gauge of in-service crane
CN110723643B (en) * 2019-12-05 2020-11-27 上海振华重工(集团)股份有限公司 Method for changing track gauge of in-service crane

Similar Documents

Publication Publication Date Title
CN206494660U (en) Subway open-cut station is adjustable Span Beam gantry crane
CN203254324U (en) Tool for manufacturing lower support of tower crane
CN210995904U (en) H shaped steel welding shaping device
CN202922126U (en) Wind electricity tower flange group tool
CN203791344U (en) Connection structure for connecting shaft bracket and rolling mill base in short stress path rolling mill
CN104444867A (en) Liftable column fixation type rotation cantilever crane
CN103362315B (en) Hanger for integral hoisting of pipeline and construction method thereof
CN202200243U (en) Heavy pin shaft mounting device
CN103754908A (en) Large-scale seed precipitation tank body mounting construction method
CN203161451U (en) Modular wind driven generator tower barrel
CN208844365U (en) A kind of track type intelligent inspection robot track turn structure
CN206219078U (en) A kind of novel modularized attaching frame of tower crane
CN204148303U (en) The main roller wheel transmission mechanism of arbor press
CN204276569U (en) The parts that are in transmission connection between arbor press main roller wheel and motor
CN202643187U (en) Crane and revolving supporting structure thereof
CN207200026U (en) JP cabinets lift new construction
CN204208933U (en) The pinch roller elevating mechanism of arbor press
CN204208938U (en) Arbor press main roller wheel supporting construction
CN206053967U (en) A kind of lining trolley
CN203557148U (en) Fixture for boring horn-shaped workpiece
CN214517165U (en) Horizontal moving device for three-roller plate bending machine
CN212050281U (en) High stability cantilever crane for building
CN210212114U (en) Tramcar contact net pillar rush-repair device
CN107737968A (en) A kind of valve flange of hydraulic control valve is to pushing up boring device
CN201313939Y (en) Configuration structure of overhaul workshop

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant