CN206486924U - A kind of construction site Water Sproading, generation comprehensive application system - Google Patents

A kind of construction site Water Sproading, generation comprehensive application system Download PDF

Info

Publication number
CN206486924U
CN206486924U CN201720087534.1U CN201720087534U CN206486924U CN 206486924 U CN206486924 U CN 206486924U CN 201720087534 U CN201720087534 U CN 201720087534U CN 206486924 U CN206486924 U CN 206486924U
Authority
CN
China
Prior art keywords
water
construction site
roofing
cistern
aqueduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720087534.1U
Other languages
Chinese (zh)
Inventor
徐健
段泳仲
张梦鸽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201720087534.1U priority Critical patent/CN206486924U/en
Application granted granted Critical
Publication of CN206486924U publication Critical patent/CN206486924U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/30Relating to industrial water supply, e.g. used for cooling

Abstract

The utility model discloses a kind of construction site Water Sproading, generation comprehensive application system, including the downpipe being arranged in construction site, municipal water supply main and municipal drainage main, downpipe, impeller is provided with municipal water supply main and municipal drainage main, all impellers are connected with generator, generator connects battery, battery connection building site production, office lighting equipment and the high-pressure pump for reclaiming water system, the present apparatus can also generate electricity while waste water is collected, electricity drives high-pressure pump to be powered to spray system, the unnecessary water resource produced using construction site that can do everything possible simultaneously is produced and stores new electric energy to save electric power resource, the present apparatus is simple in construction, environmental protection, waste resource can effectively be utilized.

Description

A kind of construction site Water Sproading, generation comprehensive application system
Technical field
The utility model belongs to building engineering field, and in particular to a kind of construction site Water Sproading, generation comprehensive application system System.
Background technology
Built according to Chinese Academy of Engineering's building water conservancy with architectural engineering department of the Chinese Academy of Sciences academician Zhou Fulin in the green that China Construction First Division sponsors Make with being represented in Platform for Sustainable Development, current China's building energy consumption has accounted for the 47% of national total energy consumption.In addition there are some researches show, The power consumption of construction production phase can account for building the 23% of life cycle management power consumption, wherein mainly hydroelectric resources disappears Consumption.
In the higher regional excavation pit construction of groundwater level, it is necessary to which groundwater abstraction reduces water level, just can ensure that Security of foundation ditch construction.These underground water overwhelming majority extracted have been directly discharged into city planting ductwork or natural river course, not by effective profit With.
According to measuring and calculating, the water that the newly-built real estate project of 80,000 square metres of construction area is discharged daily up to 400 cubic metres with On, equivalent to the 3000 city dwellers water consumption of 1 day.And often the duration is longer for such drainage procedure, waste frightened People.
Not only water resources consumption amount is huge, and electric power resource consumption is also very surprising.According to statistics, the municipal plumbing in construction site The usual water velocity of main is larger to can reach 2.5m/s, and branch pipe water velocity reaches 1.5m/s, and the daily supply and discharge water in building site It is huge, drive generator wind wheel synchronous axial system to produce at least millions of burnt kinetic energy, this part kinetic energy can be further converted to Electric energy is collected storage and utilized.Similarly, the potential energy that the draining in the area enriched in rainfall, downpipe has can pass through Conversion forms electric energy and is collected storage and utilizes.
In consideration of it, strengthen construction site municipal plumbing and rain water electricity generating, a variety of Water Sproading research on utilization in building site and should It is necessary with seeming.
Utility model content
The purpose of this utility model is to overcome that above-mentioned not enough there is provided a kind of construction site Water Sproading, generation comprehensive application System, the unnecessary water resource that can be produced using construction site is simultaneously produced and stores new electric energy to save electric power resource.
In order to achieve the above object, the utility model includes downpipe, the municipal water supply main being arranged in construction site With municipal drainage main, impeller is provided with downpipe, municipal water supply main and municipal drainage main, all impellers are connected with Generator, generator connection battery, battery connection building site production, office lighting equipment and the high-pressure pump for reclaiming water system;
The recovery water system includes roofing rain groove collection water purification installation, ground infiltration collection water purification installation and construction water Collection device, roofing rain groove collection water purification installation connects ground infiltration collection water purification installation by downpipe, and ground infiltration catchments Purifier and construction water collection device are all connected with sedimentation basin, sedimentation basin connection cistern, cistern connection spray system.
The spray system includes roofing spraying cooling system, road surface spray system and cleaning toilet system.
The roofing spraying cooling system includes setting on the roofing spray piping being arranged on roofing, roofing spray piping There are atomizer and temperature detect switch (TDS), temperature detect switch (TDS) is connected with temperature sensor, and spray piping connects cistern by high-pressure pump.
The road surface spray system includes being fixed on the aqueduct at municipal greenbelt and site road, aqueduct Time switch, hand switch and automatic nozzle are provided with, aqueduct connects cistern by high-pressure pump.
The cleaning toilet system includes the level sensor being arranged in water closet, and water tank is connected with aqueduct, water delivery Water level switch and hand switch are provided with pipeline, water level switch connection level sensor, aqueduct is connected by high-pressure pump Cistern.
The impeller is connected by wire with battery, and ground infiltration collection water purification installation connects retaining by collector pipe Pond, construction water collection device accesses the water inlet of sedimentation basin, the delivery port connection cistern of sedimentation basin by aqueduct.
The sedimentation basin is three-level sedimentation basin.
With prior art cenotype ratio, the utility model passes through the downpipe in construction site, municipal water supply main and city Impeller is set inside political affairs arterial drainage, impeller is driven electrical power generators, and collect roofing ground and construction water in cistern In, generator drive high-pressure pump makes the water in cistern enter spray system, and the present apparatus can also be sent out while waste water is collected Electricity, electricity drives high-pressure pump to be powered to spray system, and can do everything possible the unnecessary water resource produced using construction site And produce and store new electric energy to save electric power resource, the present apparatus is simple in construction, environmental protection, can effectively utilize discarded money Source.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Wherein, 1, municipal water supply main, 2, municipal drainage main, 3, impeller, 4, generator, 5, wire, 6, battery, 7, Building site production, office lighting equipment, 8, high-pressure pump, 9, downpipe, 10, roofing rain groove collection water purification installation, 11, ground infiltration collection Water purification installation, 12, cistern, 13, collector pipe, 14, sedimentation basin, 15, water inlet, 16, delivery port, 17, construction water collects Device, 18, aqueduct, 19, roofing spray piping, 20, atomizer, 21, temperature sensor, 22, temperature detect switch (TDS), 23, water delivery Pipeline, 24, time switch, 25, hand switch, 26, automatic nozzle, 27, municipal greenbelt, 28, site road, 29, water tank, 30th, level sensor, 31, water level switch.
Embodiment
The utility model is described further below in conjunction with the accompanying drawings.
Referring to Fig. 1, the utility model includes the downpipe 9, municipal water supply main 1 and municipal administration row being arranged in construction site Impeller 3 is provided with water conduit tube 2, downpipe 9, municipal water supply main 1 and municipal drainage main 2, all impellers 3 are connected with hair Motor 4, the connection battery 6 of generator 4, the connection of battery 6 building site production, office lighting equipment 7 and the high pressure for reclaiming water system Pump 8;
Reclaiming water system includes roofing rain groove collection water purification installation 10, ground infiltration collection water purification installation 11 and construction water Collection device 17, roofing rain groove collection water purification installation 10 connects ground infiltration collection water purification installation 11 by downpipe 9, and ground is oozed Collection water purification installation 11 and construction water collection device 17 are all connected with sedimentation basin 14, the connection cistern 12 of sedimentation basin 14, retaining thoroughly Pond 12 connects spray system.
Spray system includes roofing spraying cooling system, road surface spray system and cleaning toilet system.
Roofing spraying cooling system includes setting on the roofing spray piping 19 being arranged on roofing, roofing spray piping 19 There are atomizer 20 and temperature detect switch (TDS) 22, temperature detect switch (TDS) 22 is connected with temperature sensor 21, and spray piping 19 is connected by high-pressure pump 8 Connect cistern 12.
Road surface spray system includes being fixed on the aqueduct 23 at municipal greenbelt 27 and site road 28, aqueduct Time switch 24, hand switch 25 and automatic nozzle 26 are provided with 23, aqueduct 23 connects cistern by high-pressure pump 8 12。
Cleaning toilet system includes the level sensor 30 being arranged in water closet 29, and water tank 29 is connected with aqueduct 23, Water level switch 31 and hand switch 25, the connection level sensor 30 of water level switch 31, aqueduct are provided with aqueduct 23 23 connect cistern 12 by high-pressure pump 8.
The impeller 3 is connected by wire 5 with battery 6, and ground infiltration collection water purification installation 11 is connected by collector pipe 13 Connect cistern 12, construction water collection device 17 accesses the water inlet 15 of sedimentation basin 14 by aqueduct 18, sedimentation basin 14 goes out The mouth of a river 16 connects cistern 12.
It is preferred that, sedimentation basin 14 is three-level sedimentation basin.
Building site municipal administration discharge water generating system embodiment:When the municipal water supply main 1 and municipal drainage in construction site are done When pipe 2 carries out plumbing respectively, the water flowed through at a high speed flows through the out-of-date impeller 3 for driving arrangement in pipe and rotated at a high speed, so that impeller Drive the gear of the generator 4 outside pipe to carry out rotation to produce electric energy and be stored in battery 6 by wire 5 by rotating shaft Interior, electric energy is available for the high-pressure pump 8 of building site production, office lighting equipment 7 and recovery water system to use.Similarly, in each plumbing Same apparatus is respectively provided with branch pipe, collects and stores electric energy.
Building site rain water electricity generating system operation:The construction site production system huge as complicated, is internally provided with Many downpipes 9, impeller 3 is set under each downpipe, is driven when rainwater flows from high to lower along downpipe 9 at mouth Impeller 3 is rotated, and impeller 3 drives the gear of the generator 4 outside pipe to be rotated by rotating shaft, so that the potential energy conversion of rainwater is produced Electric energy is simultaneously stored in battery 6 by wire 5, and electric energy is available for building site production, office lighting equipment 7 and the height for reclaiming water system Press pump 8 is used.
Water reclamation system mainly includes system for reclaiming rainwater, base pit dewatering recovery system and construction water recovery system.Can For roofing spraying cooling, road surface spraying and dedusting, municipal greening irrigation, concrete curing and cleaning toilet.
Water reclamation system running:Rainwater is oozed by roofing rain groove collection water purification installation 10 and downpipe 9 and ground Rainwater is discharged into standby in cistern 12 by collection water purification installation 11 by collector pipe 13 thoroughly.The water flowed out from base pit dewatering well leads to Cross water inlet 15 to enter in three-level sedimentation basin 14, retaining is then flowed into by delivery port 16 and collector pipe 13 by precipitating and filtering In pond 12 (account for total precipitation 40%).Unnecessary construction water is received by construction water collection device 17 in building production process Collect and flowed into by aqueduct 18 and water inlet 15 in three-level sedimentation basin 14, the He of delivery port 16 is then passed through by precipitation and filtering It is standby that collector pipe 13 flows into (account for total water 30%) in cistern 12.
Equipment of whole electric energy for building site production, office lighting and recovery water system produced by of the present utility model makes With the water obtained by recovery is stored in cistern supports for roofing spraying cooling, road surface spraying and dedusting, municipal greening irrigation, concrete The various uses such as shield and cleaning toilet.
Roofing spraying cooling system embodiment:Roofing spray piping 19, atomizer 20 and temperature is set to pass in roofing Sensor 21, is provided with temperature detect switch (TDS) 22 on roofing spray piping, and when roofing temperature exceedes design temperature, temperature detect switch (TDS) 22 is automatic Open, cooled so that the water in cistern is delivered into roofing by high-pressure pump 8.
Road surface spraying and dedusting, municipal greening irrigation and concrete curing system embodiment:Water-supply-pipe is installed at each system Road 23, installs time switch 24, hand switch 25 and automatic nozzle 26 on aqueduct, sets timing to spray according to actual conditions Pouring time, the spray that the water that reaching the specified time can be conveyed in cistern by high-pressure pump 8 carries out municipal greenbelt 27 is poured With the spray dust of site road 28.
Cleaning toilet system embodiment:Level sensor 30 is installed, in aqueduct 23 in the water tank 29 in the lavatory of building site Upper setting water level switch 31 and hand switch 25, when water level is less than setting height, water level switch 31 is opened, defeated by high-pressure pump 8 Send in the water inlet water tank 29 of cistern, water level switch 31 is closed when water level is higher than setting height, stops water filling.

Claims (7)

1. a kind of construction site Water Sproading, generation comprehensive application system, it is characterised in that including being arranged on falling in construction site Water pipe (9), municipal water supply main (1) and municipal drainage main (2), downpipe (9), municipal water supply main (1) and municipal drainage Impeller (3) is provided with main (2), all impellers (3) are connected with generator (4), and generator (4) connection battery (6) stores Battery (6) connection building site production, office lighting equipment (7) and the high-pressure pump (8) for reclaiming water system;
The recovery water system includes roofing rain groove collection water purification installation (10), ground infiltration collection water purification installation (11) and construction With water collecting device (17), roofing rain groove collection water purification installation (10) connects ground infiltration collection Water warfare by downpipe (9) and filled Put (11), ground infiltration collection water purification installation (11) and construction water collection device (17) are all connected with sedimentation basin (14), sedimentation basin (14) connection cistern (12), cistern (12) connection spray system.
2. a kind of construction site Water Sproading according to claim 1, generation comprehensive application system, it is characterised in that described Spray system includes roofing spraying cooling system, road surface spray system and cleaning toilet system.
3. a kind of construction site Water Sproading according to claim 2, generation comprehensive application system, it is characterised in that described Roofing spraying cooling system includes the roofing spray piping (19) being arranged on roofing, and roofing spray piping is provided with mist on (19) Change nozzle (20) and temperature detect switch (TDS) (22), temperature detect switch (TDS) (22) is connected with temperature sensor (21), and spray piping (19) passes through height Press pump (8) connection cistern (12).
4. a kind of construction site Water Sproading according to claim 2, generation comprehensive application system, it is characterised in that described Road surface spray system includes being fixed on the aqueduct (23) at municipal greenbelt (27) and site road (28) place, aqueduct (23) time switch (24), hand switch (25) and automatic nozzle (26) are provided with, aqueduct (23) passes through high-pressure pump (8) Connect cistern (12).
5. a kind of construction site Water Sproading according to claim 2, generation comprehensive application system, it is characterised in that described Cleaning toilet system includes the level sensor (30) being arranged in water closet (29), and water tank (29) is connected with aqueduct (23), Water level switch (31) and hand switch (25), water level switch (31) connection level sensor are provided with aqueduct (23) (30), aqueduct (23) connects cistern (12) by high-pressure pump (8).
6. a kind of construction site Water Sproading according to claim 1, generation comprehensive application system, it is characterised in that described Impeller (3) is connected by wire (5) with battery (6), and ground infiltration collection water purification installation (11) is connected by collector pipe (13) Cistern (12), construction water collection device (17) accesses the water inlet (15) of sedimentation basin (14), precipitation by aqueduct (18) Delivery port (16) the connection cistern (12) in pond (14).
7. a kind of construction site Water Sproading according to claim 1, generation comprehensive application system, it is characterised in that described Sedimentation basin (14) is three-level sedimentation basin.
CN201720087534.1U 2017-01-23 2017-01-23 A kind of construction site Water Sproading, generation comprehensive application system Expired - Fee Related CN206486924U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720087534.1U CN206486924U (en) 2017-01-23 2017-01-23 A kind of construction site Water Sproading, generation comprehensive application system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720087534.1U CN206486924U (en) 2017-01-23 2017-01-23 A kind of construction site Water Sproading, generation comprehensive application system

Publications (1)

Publication Number Publication Date
CN206486924U true CN206486924U (en) 2017-09-12

Family

ID=59766915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720087534.1U Expired - Fee Related CN206486924U (en) 2017-01-23 2017-01-23 A kind of construction site Water Sproading, generation comprehensive application system

Country Status (1)

Country Link
CN (1) CN206486924U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108967134A (en) * 2018-07-25 2018-12-11 张�林 Novel garden landscape rain collector
CN115110590A (en) * 2022-06-29 2022-09-27 昆山市交通工程发展中心 Deep basal pit safety monitoring early warning device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108967134A (en) * 2018-07-25 2018-12-11 张�林 Novel garden landscape rain collector
CN115110590A (en) * 2022-06-29 2022-09-27 昆山市交通工程发展中心 Deep basal pit safety monitoring early warning device
CN115110590B (en) * 2022-06-29 2024-03-08 昆山市交通工程发展中心 Safety monitoring and early warning device for deep foundation pit

Similar Documents

Publication Publication Date Title
CN201276718Y (en) Rainwater collecting and recycling system on building roofing
CN107558533A (en) Mountainous areas rainwater energy electricity generation system and method
CN105625502A (en) System for collecting, purifying and utilizing rainwater by using solar energy
CN107130663A (en) Construction site water recycling system and method
CN205676965U (en) A kind of sponge urban rainwater collection reuse means
CN107387298A (en) The energy conserving system that a kind of rainwater-collecting generates electricity
CN111963357A (en) Roof rainwater recycling power generation system
CN206245384U (en) A kind of energy-conserving and environment-protective water conservancy irrigation device with rainwater-collecting and water filtration function
CN206941744U (en) sponge urban underground drainage system
CN206418685U (en) A kind of energy saving building rain water collecting system
CN207986847U (en) A kind of water resource suitable for construction site recycles spray dust's system
CN206486924U (en) A kind of construction site Water Sproading, generation comprehensive application system
CN103427711A (en) Roof power generation system with complementation between light and rain
CN102410132A (en) Open-channel rainwater generating system and method
CN209293097U (en) Sponge City Green residential rainwater Collection utilization system
CN205688484U (en) Building rainwater-collecting and high-altitude dedusting irrigation system
CN205935139U (en) Purification utilization system is collected to solar energy power generation's rainwater
CN207419583U (en) Mountainous areas rainwater energy electricity generation system
CN101289865A (en) Water resource recycling system for base pit engineering
CN113431137B (en) Green building rainwater collecting and discharging system
CN102146693A (en) Comprehensive utilization method for rainwater energy resource
CN205567081U (en) Pumping system is removed in complementary integration of wind light storage
CN206592148U (en) The outer blowdown wind controlling device of underground mine returnairshaft
CN206078391U (en) Drip irrigation system for apple planting
CN202157297U (en) Gate control type urban rain and flood regulation, control and utilization system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170912

Termination date: 20190123