CN206467697U CN201621449535.8U CN201621449535U CN206467697U CN 206467697 U CN206467697 U CN 206467697U CN 201621449535 U CN201621449535 U CN 201621449535U CN 206467697 U CN206467697 U CN 206467697U
Authority
CN
China
Prior art keywords
column foot
bed
raft plate
coil layer
adhesive waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621449535.8U
Other languages
Chinese (zh)
Inventor
王丽梅
王安鑫
张振禹
郭建东
宫海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201621449535.8U priority Critical patent/CN206467697U/en
Application granted granted Critical
Publication of CN206467697U publication Critical patent/CN206467697U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses column foot and raft plate junction integrated water-proof structure, including the raft plate bed course being arranged at the top of column foot foundation ditch on surrounding ground and it is laid on close boulder bed in the bottom of hole, the inside sidewalls of foundation ditch at the top of close boulder bed have built brick wall by laying bricks or stones, in concrete cushion is provided with close boulder bed, outer cement sand bed is wiped with the inwall of brick wall, it is equipped with concrete cushion and outer cement sand bed on adhesive waterproof coil layer and adhesive waterproof coil layer extension laying to the raft plate bed course at the top of foundation ditch, pea gravel concreten protective layer is provided with the adhesive waterproof coil layer of hole bottom, interior cement sand bed is provided with adhesive waterproof coil layer at foundation pit side-wall, raft plate pea gravel concreten protective layer and raft board concrete are provided with the adhesive waterproof coil layer at the ground of hole top, column foot concrete has been poured in foundation ditch.Destruction using the stress that this structure can effectively resist base course crack, deformation is produced to waterproof system.

Description

Column foot and raft plate junction integrated water-proof structure
Technical field
The utility model is related to a kind of constructing structure of waterproof, more particularly to a kind of column foot joins structure with raft plate waterproof.
Background technology
The construction quality of waterproofing work directly influences the use of building, or even structure safety.With Building technology Development, construction quality, environmental requirement to building waterproof also more and more higher, it is necessary to from more excellent waterproof material, adopt Advanced construction technology is used, to ensure the waterproof effect and structure safety of building.The especially humidity of column foot and raft plate junction The waterproof construction construction quality in area is even more important, is the premise for ensureing the work of later stage safety of tower crane.
Application number:CN201410569644.2 Chinese patent discloses " a kind of construction method on wind tower basis ", method Including:Wind tower base position is formulated, earth excavation, blinding layer, brick loose tool is built by laying bricks or stones and plastered, basic waterproof, basic waterproofing protection Layer, basic unwrapping wire, reinforcing bar colligation under sole plate is pre-buried and install tower crane accessory, reinforcing bar on the basis of colligation, steel plate water stopper and Model sheetinstallat, the construction of wind tower foundation concrete, wind tower basis connects stranding face frosting treatment with structure raft plate and waterproof connects stranding processing.The patent It is the construction method on wind tower basis, is not suitable for humid area column foot self-adhesion waterproof construction structure integrated with raft plate junction.
The content of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art there is provided one kind is cost-effective, waterproof effect is reliable, The good column foot of easy construction, Forming Quality and raft plate junction integrated water-proof structure.
Column foot and raft plate junction integrated water-proof structure, including it is arranged on the raft plate at the top of column foot foundation ditch on surrounding ground Bed course and close boulder bed in column foot Foundation Pit bottom is laid on, in the side wall of the column foot foundation ditch in described at the top of close boulder bed Side has built brick wall by laying bricks or stones, is provided with concrete cushion on close boulder bed in described, is wiped with the inwall of described brick wall outer Cement sand bed, be equipped with described concrete cushion and outer cement sand bed adhesive waterproof coil layer and it is described from On viscous waterproof roll layer extension laying to the raft plate bed course at the top of column foot foundation ditch, prevent in the self-adhesion described in column foot Foundation Pit bottom Pea gravel concreten protective layer is provided with water coiled material layer, is set on the adhesive waterproof coil layer at described column foot foundation pit side-wall There is interior cement sand bed, be disposed with from bottom to up on the adhesive waterproof coil layer at described column foot Foundation Pit top ground Raft plate pea gravel concreten protective layer and raft board concrete, in the region that pea gravel concreten protective layer and interior cement sand bed are surrounded Column foot concrete is poured.
It is using the beneficial effect of this structure:Construction technology is perfect, easy, workable, and labor intensity is low.Column foot with The integrated construction of raft plate waterproof junction, it is ensured that the continuity and sealing of coiled material lapping seam.It is strong with higher tear Degree, can effectively resist the destruction of base course crack, the stress of deformation generation to waterproof system;With higher penetration, anti-impact Hit performance;Speed of application is fast, work efficiency is high, it can be ensured that the duration.
Brief description of the drawings
Fig. 1 is the elevational schematic view of column foot of the present utility model and raft plate junction integrated water-proof structure.
Embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Column foot as shown in Figure 1 and raft plate junction integrated water-proof structure, including it is arranged on surrounding at the top of column foot foundation ditch Raft plate bed course 10 on ground and close boulder bed 1 in column foot Foundation Pit bottom is laid on, the close top of boulder bed 1 in described The inside sidewalls of column foot foundation ditch have built brick wall 4 by laying bricks or stones, concrete cushion 2 are provided with close boulder bed 1 in described, described Outer cement sand bed 5 is wiped with the inwall of brick wall 4, self-adhesion is equipped with described concrete cushion 2 and outer cement sand bed 5 On waterproof roll layer 3 and described extension laying to the raft plate bed course 10 at the top of column foot foundation ditch of adhesive waterproof coil layer 3, in tower Pea gravel concreten protective layer 9 is provided with the described adhesive waterproof coil layer 3 of base Foundation Pit bottom, in described column foot foundation ditch Interior cement sand bed 7 is provided with the adhesive waterproof coil layer 3 of side-walls, the self-adhesion at described column foot Foundation Pit top ground Raft plate pea gravel concreten protective layer 11 and raft board concrete 6 are disposed with from bottom to up on waterproof roll layer 3, in microlith coagulation Column foot concrete eight has been poured in the region that protective soil layer 9 and interior cement sand bed 7 are surrounded.

Claims (1)

1. column foot and raft plate junction integrated water-proof structure, it is characterised in that:Including with being arranged on column foot foundation ditch top surrounding Raft plate bed course on face and close boulder bed in column foot Foundation Pit bottom is laid on, the column foot base in described at the top of close boulder bed The inside sidewalls in hole have built brick wall by laying bricks or stones, concrete cushion are provided with close boulder bed in described, in described brick wall Outer cement sand bed is wiped with wall, adhesive waterproof coil layer is equipped with described concrete cushion and outer cement sand bed simultaneously And on described adhesive waterproof coil layer extension laying to the raft plate bed course at the top of column foot foundation ditch, the institute in column foot Foundation Pit bottom Pea gravel concreten protective layer is provided with the adhesive waterproof coil layer stated, the self-adhesion waterproof volume at described column foot foundation pit side-wall Interior cement sand bed is provided with material layer, on the adhesive waterproof coil layer at described column foot Foundation Pit top ground from bottom to up Raft plate pea gravel concreten protective layer and raft board concrete are disposed with, is enclosed in pea gravel concreten protective layer and interior cement sand bed Into region in poured column foot concrete.
CN201621449535.8U 2016-12-27 2016-12-27 Column foot and raft plate junction integrated water-proof structure Active CN206467697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621449535.8U CN206467697U (en) 2016-12-27 2016-12-27 Column foot and raft plate junction integrated water-proof structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621449535.8U CN206467697U (en) 2016-12-27 2016-12-27 Column foot and raft plate junction integrated water-proof structure

Publications (1)

Publication Number Publication Date
CN206467697U true CN206467697U (en) 2017-09-05

Family

ID=59711315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621449535.8U Active CN206467697U (en) 2016-12-27 2016-12-27 Column foot and raft plate junction integrated water-proof structure

Country Status (1)

Country Link
CN (1) CN206467697U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468868A (en) * 2019-08-12 2019-11-19 武汉中合元创建筑设计股份有限公司 A kind of the earthquake isolation structure and method of large-scale experiment equipment
CN114658021A (en) * 2022-02-28 2022-06-24 中国五冶集团有限公司 Waterproof structure of pile raft bearing platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468868A (en) * 2019-08-12 2019-11-19 武汉中合元创建筑设计股份有限公司 A kind of the earthquake isolation structure and method of large-scale experiment equipment
CN114658021A (en) * 2022-02-28 2022-06-24 中国五冶集团有限公司 Waterproof structure of pile raft bearing platform

Similar Documents

Publication Publication Date Title
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN206503169U (en) A kind of integral basement tower crane and raft plate seam construction
CN201738479U (en) Roof expansion joint integrated cover plate waterproof structure
CN105201025B (en) Basement waterproofing construction and its construction method
CN105019404B (en) A kind of construction method of sealing rod and its water sealing structure and water sealing structure
CN107542115A (en) Underground project waterproof structure and its construction method
CN209457282U (en) Ground library top plate planted roof deformation joint structure
CN104790436B (en) Basement in high rise building top board pouring after settlement advance water stop construction method
CN103161176B (en) Tower crane foundation construction method in main building disjunctor garage
CN102704504A (en) Method for constructing tower crane foundation
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN208933989U (en) A kind of tower-crane foundation structure
CN105401571B (en) Prefabricated grouting behind shaft or drift lining abnormal shape root pile and its construction method
CN107119695A (en) A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN205617390U (en) A softer side of sears layer excavation supporting system for loess area
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN201162233Y (en) Rear irrigation zone structure with higher ground water level
CN107366303A (en) Construction method and retaining wall of the aluminum alloy mould plate as highway gravity retaining wall template
CN206467697U (en) Column foot and raft plate junction integrated water-proof structure
CN106884436A (en) A kind of construction method of the waterproof connecting structure of foundation ditch uplift pile and structure base slab
CN105332386B (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN112761158A (en) Green construction method for integral outer wall (three-in-one) of reverse construction underground engineering steel concrete key pin occlusive row pile
CN208455647U (en) Soft Rock Slope ecological safeguard structure
CN111535298A (en) Seepage-proofing construction method for underground diaphragm wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20180914

Granted publication date: 20170905

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20170905

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20210415

Granted publication date: 20170905

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20240415

Granted publication date: 20170905

PD01 Discharge of preservation of patent
DD01 Delivery of document by public notice

Addressee: Xie Yu