CN206503169U - A kind of integral basement tower crane and raft plate seam construction - Google Patents
A kind of integral basement tower crane and raft plate seam construction Download PDFInfo
- Publication number
- CN206503169U CN206503169U CN201720168783.3U CN201720168783U CN206503169U CN 206503169 U CN206503169 U CN 206503169U CN 201720168783 U CN201720168783 U CN 201720168783U CN 206503169 U CN206503169 U CN 206503169U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- raft
- seam construction
- bed course
- plate seam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of integral basement tower crane and raft plate seam construction, including sedimentation glide lamella, brick fetal membrane, screed-coat, flexible waterproof sheet, protective layer, steel plate for sealing water, its boarding wire mesh sheet, tower crane, foundation ditch, raft foundation.It can solve, because tower crane form and raft foundation are inconsistent, to cause post-cast strip reserved joint bar extremely complex and be inconvenient to connect using the utility model, post-cast strip pours the problem of rear differential settlement causes raft plate cracking, seepage.The utility model, which has the advantages that, is:(1) it is simple in construction, it is easy to operate;(2) it is safe and applicable, reliable in quality;(3) good integrity, waterproof effect is obvious;(4) it is small to raft foundation construction infection, save construction cost.
Description
Technical field
The utility model is related to building field, more particularly to integral basement tower crane and raft plate seam construction.
Background technology
In recent years, continuing to develop with Building Trade in China, each high-rise Group Buildings of big and medium-sized cities construction are increasing, whole
Body garage raft plate project is of common occurrence, it is contemplated that the factor, tower crane such as transportation range in reduction construction material rehandling and field
Often establish beside main building thing, this has resulted in tower crane and there is overlapping, seam with the construction of raft plate.Tower crane
Foundation construction and installation will be often carried out before earth excavation, so as to as soon as possible be Underground Construction service.Traditional does
Tower crane and raft plate are arranged on same absolute altitude by method, post-cast strip are set between tower crane and raft plate, due to tower crane form
(thickness, arrangement of reinforcement) is inconsistent with raft foundation, causes post-cast strip reserved joint bar extremely complex and inconvenient connection, after post-cast strip is poured
Differential settlement causes raft foundation cracking, seepage, and raft foundation construction quality is difficult to ensure that.
Utility model content
Problem to be solved in the utility model is to provide a kind of integral basement tower crane and raft plate seam construction, makes
It can solve the problem that tower crane causes seam difficulty of construction big with raft foundation seam conventional configurations with the utility model, quality is difficult to
Ensure, the shortcomings of operating inconvenience, larger cost, globality poor, seepage easy to crack.
A kind of integral basement tower crane of the utility model and raft plate seam construction, including sedimentation glide lamella, brick fetal membrane,
Screed-coat, flexible waterproof sheet, protective layer, steel plate for sealing water, its boarding wire mesh sheet, tower crane, foundation ditch, raft foundation.It is described
Bottom of foundation ditch has poured tower crane bed course;The tower crane top surface is flushed with raft foundation base surface, along tower crane
Outside surrounding has built tower crane brick fetal membrane by laying bricks or stones above tower crane bed course, and tower crane brick fetal membrane is built by laying bricks or stones to raft foundation pad
Layer bottom surface;The screed-coat that material is cement mortar is provided with the inside of the tower crane brick loose tool and above tower crane bed course,
Screed-coat is provided with external corner with raft foundation bed course intersection, and screed-coat is provided with inner corner trim with tower crane bed course intersection;It is described to look for
Flat bed which is provided with flexible waterproof sheet, and square brick fetal membrane is provided with raft foundation bed course intersection and gets rid of stubble on screed-coat;It is described
Pea gravel concreten protective layer is set above flexible waterproof sheet, and four the week side of boss walls of flexible waterproof sheet set matcoveredn, microlith
The concrete of tower crane part is poured above concrete cover, on the inside of protective layer;Joint bar is provided with the tower crane,
It is provided with along the thickness position of raft foundation 1/2 of tower crane peripheral regions above and below steel plate for sealing water, steel plate for sealing water and welds its boarding wire
Mesh sheet.
As further improvement of the utility model, the foundation ditch surrounding outer profile size it is wider than tower crane go out 500mm.
As further improvement of the utility model, the tower crane bed course outline goes out tower crane foreign steamer per hem width
Wide 340mm.
As further improvement of the utility model, the width of the tower crane brick fetal membrane is 240mm.
As further improvement of the utility model, the inner corner trim, external corner are radius 50mm circular arc.
As further improvement of the utility model, the thickness of the screed-coat is 20mm.
As further improvement of the utility model, the pea gravel concreten protective layer thickness is 50mm, the protective layer
For the thick extruded polystyrene boards of 20mm.
As further improvement of the utility model, batch length of getting rid of is 800mm.
As further improvement of the utility model, the steel plate for sealing water is that the wide 3mm of 400mm are thick.
As further improvement of the utility model, its boarding wire mesh sheet is made up of detailed catalogue steel wire, spiral,
A diameter of 12mm of spiral.
The beneficial effects of the utility model are:(1) it is simple in construction, it is easy to operate;(2) it is safe and applicable, reliable in quality;(3)
Good integrity, waterproof effect is obvious;(4) it is small to raft foundation construction infection, save construction cost.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the sectional view of integral basement tower crane and raft plate seam construction;
Fig. 2 is the sectional view at A-A;
Fig. 3 is the enlarged drawing at B;
Fig. 4 is the enlarged drawing at C;
In figure:1. settle the protective layer of 2. 4. flexible waterproof sheet of tower crane brick 3. screed-coat of fetal membrane of glide lamella 5.
6. the external corner 11. of 9. inner corner trim of steel plate for sealing water 7. its boarding wire mesh sheet, 8. tower crane bed course 10. gets rid of the detailed catalogue steel wire of stubble 12.
13. the pea gravel concreten of 17. raft foundation bed course of spiral 14. tower crane, 15. foundation ditch, 16. raft foundation 18. is protected
The layer tower crane of 19. joint bar 21.
Embodiment
It was found from Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of integral basement tower crane of the utility model and raft plate seam structure
Make, including it is sedimentation glide lamella 1, tower crane brick fetal membrane 2, screed-coat 3, flexible waterproof sheet 4, protective layer 5, steel plate for sealing water 6, fixed
Shaped steel silk netting 7, tower crane 14, foundation ditch 15, raft foundation 16.The bottom of foundation ditch 15 has poured tower crane bed course 8;Institute
State the top surface of tower crane 14 to flush with the bottom surface of raft foundation bed course 17, along the outside surrounding of tower crane 14 in tower crane bed course 8
Top has built tower crane brick fetal membrane 2 by laying bricks or stones, and tower crane brick fetal membrane 2 is built by laying bricks or stones to the bottom surface of raft foundation bed course 17;The tower crane base
The inner side of plinth brick fetal membrane 2 and the top of tower crane bed course 8 are provided with the screed-coat 3 that material is cement mortar, screed-coat 3 and raft plate base
The intersection of plinth bed course 17 is provided with external corner 10, and screed-coat 3 is provided with inner corner trim 9 with the intersection of tower crane bed course 8;The screed-coat 3
Self-adhering-type flexible waterproof sheet 4 is which is provided with, is had a common boundary in the top tower crane brick fetal membrane 2 of screed-coat 3 with raft foundation bed course 17
Place is provided with and gets rid of stubble 11;The top of flexible waterproof sheet 4 pours pea gravel concreten protective layer 18, the week side of boss of flexible waterproof sheet 4 four
Wall is provided with protective layer 5, and the top of pea gravel concreten protective layer 18, the inner side of protective layer 5 pour the concrete of the part of tower crane 14;Institute
State and joint bar is provided with tower crane 14, sealing is provided with along 1/2 thickness position of the raft foundation 16 of the peripheral regions of tower crane 14
Steel plate 6, steel plate for sealing water welds its boarding wire mesh sheet 7 about 6, after after the dismounting of tower crane 14, in the range of tower crane 14
The concrete that muscle connects after-pouring raft foundation 16 is wiped, is formed overall.
The surrounding of foundation ditch 15 described in the utility model outer profile size can be that hem width more every than tower crane 14 goes out 500mm.
The surrounding outer profile size of foundation ditch 15 goes out 500mm than tower crane 14 per hem width can have sufficient space to set sedimentation inside it
Glide lamella 1, tower crane bed course 8, tower crane brick fetal membrane 2, screed-coat 3, flexible waterproof sheet 4, protective layer 5, microlith coagulation
Soil layer 18, tower crane 14 etc. so that the tower crane is more consolidated with raft plate seam construction, and waterproof effect is higher, globality
More preferably, while construction is also easier.
The outline of tower crane bed course described in the utility model 8 can be that every hem width goes out the outline of tower crane 14
340mm.The outline of tower crane bed course 8, which goes out the outline 340mm of tower crane 14 per hem width, can make tower crane thereon in operation
More consolidate, the influence to tower crane 14 is smaller, after also being removed for later stage tower crane, the concrete poured in tower crane 14
Can be more firm with the faying face of raft foundation 16.
The width of the fetal membrane of tower crane brick described in the utility model 2 can be 240mm.The width of tower crane brick fetal membrane 2
Degree is set to 240mm, tower crane brick fetal membrane 2 can be made to more easily reach construction requirement, while also cost-effective.
Inner corner trim 9 described in the utility model, external corner 10 can be radius 50mm circular arc.Inner corner trim 9, external corner 10 are all provided with
Radius 50mm circular arc is set to, mainly sets self-adhering-type flexible waterproof sheet 4 to carry out waterproof, easy construction beneficial to thereon.
The thickness of screed-coat 3 described in the utility model can be 20mm.The thickness of screed-coat 3 is set to 20mm, can be with
Better meet construction requirement.
The thickness of pea gravel concreten protective layer described in the utility model 18 can be 50mm.Pea gravel concreten protective layer thickness
50mm is set to, the self-adhering-type flexible waterproof sheet 4 under it can be preferably protected, meet construction requirement.
Protective layer 5 described in the utility model can be the thick extruded polystyrene boards of 20mm.Protective layer 5 is set to 20mm thickness and squeezed
Mould styrofoam mainly using its high resistance to compression, low, moistureproof, airtight water absorption rate, light weight, it is corrosion-resistant, super it is anti-aging (be used for a long time it is several
Without aging), the low excellent properties of thermal conductivity factor so that tower crane is more firm, while also complying with the requirement of construction.
It can be 800mm that the length of stubble 11 is got rid of described in the utility model.The 800mm stubble that gets rid of is set to can effectively ensure that flexibility is anti-
Flexible waterproof sheet 4 on water layer is preferably connected with the flexible waterproof sheet on raft foundation 16, meet construction requirement.
Steel plate for sealing water 6 described in the utility model can be thick for the wide 3mm of 400mm.It is wide that steel plate for sealing water 6 is set to 400mm
3mm is thick, can play more preferable waterproof effect to the construction joint of later stage casting concrete formation.
Its boarding wire mesh sheet described in the utility model 7 can be made up of detailed catalogue steel wire 12, spiral 13, wherein spiral shell
The diameter of line reinforcing bar 13 can be 12mm.The setting steel wire for setting detailed catalogue steel wire 12, diameter 12mm spirals 13 to constitute
Piece 7 can connect its internal reinforcing bar and casting concrete formation raft plate be overall after the dismounting of tower crane 21, the entirety of its raft plate
Property is stronger, and waterproof effect is more preferable.
Preferred embodiment of the present utility model is these are only, but protection domain of the present utility model is not limited thereto, and is appointed
What those familiar with the art the change that can readily occur in or replaces in the technical scope that the utility model is disclosed
Change, should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be with claim
The protection domain defined is defined.
Claims (10)
1. a kind of integral basement tower crane and raft plate seam construction, including sedimentation glide lamella (1), tower crane brick fetal membrane
(2), screed-coat (3), flexible waterproof sheet (4), protective layer (5), steel plate for sealing water (6), its boarding wire mesh sheet (7), tower crane
(14), foundation ditch (15), raft foundation (16), it is characterised in that:Foundation ditch (15) bottom has poured tower crane bed course (8);
Tower crane (14) top surface is flushed with raft foundation bed course (17) bottom surface, along tower crane (14) outside surrounding in tower crane base
Tower crane brick fetal membrane (2) has been built by laying bricks or stones above plinth bed course (8), and tower crane brick fetal membrane (2) is built by laying bricks or stones to raft foundation bed course (17)
Bottom surface;It is the levelling of cement mortar that material is provided with the inside of the tower crane brick fetal membrane (2) and above tower crane bed course (8)
Layer (3), screed-coat (3) is provided with external corner (10), screed-coat (3) and tower crane bed course with raft foundation bed course (17) intersection
(8) intersection is provided with inner corner trim (9);The screed-coat (3) which is provided with flexible waterproof sheet (4), and the squarer on screed-coat (3)
Hang basic brick fetal membrane (2) and raft foundation bed course (17) intersection is provided with and gets rid of stubble (11);Set above the flexible waterproof sheet (4)
Pea gravel concreten protective layer (18) is put, four the week side of boss walls of flexible waterproof sheet (4) set matcoveredn (5), and pea gravel concreten is protected
The concrete of tower crane (14) part is poured above sheath (18), on the inside of protective layer (5);Set in the tower crane (14)
There is joint bar (19), be provided with steel plate for sealing water (6) along the thickness position of raft foundation (16) 1/2 of tower crane (14) peripheral regions, only
Water steel plate (6) welds its boarding wire mesh sheet (7) up and down.
2. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:Foundation ditch
(15) surrounding outer profile size goes out 500mm than tower crane (14) per each width in side.
3. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:The tower
Hang blinding layer (17) outline and go out tower crane (14) outline 340mm per hem width.
4. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:The tower
The width for hanging basic brick fetal membrane (2) is 240mm.
5. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:Described the moon
Angle (9), external corner (10) are radius 50mm circular arc.
6. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:It is described to look for
The thickness of flat bed (3) is 20mm.
7. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:It is described thin
Stone concrete protective layer (18) thickness is 50mm, and the protective layer (5) is the thick extruded polystyrene boards of 20mm.
8. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:It is described to get rid of
Stubble (11) length is 800mm.
9. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:It is described to stop
Water steel plate (6) is that the wide 3mm of 400mm are thick.
10. a kind of integral basement tower crane and raft plate seam construction according to claim 1, it is characterised in that:It is described
Its boarding wire mesh sheet (7) is made up of detailed catalogue steel wire (12), a diameter of 12mm spirals (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720168783.3U CN206503169U (en) | 2017-02-24 | 2017-02-24 | A kind of integral basement tower crane and raft plate seam construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720168783.3U CN206503169U (en) | 2017-02-24 | 2017-02-24 | A kind of integral basement tower crane and raft plate seam construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206503169U true CN206503169U (en) | 2017-09-19 |
Family
ID=59842011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720168783.3U Active CN206503169U (en) | 2017-02-24 | 2017-02-24 | A kind of integral basement tower crane and raft plate seam construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206503169U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331735A (en) * | 2019-07-18 | 2019-10-15 | 中建八局第四建设有限公司 | A kind of tower crane mounting structure for coastal region soft layer |
CN110565701A (en) * | 2019-08-23 | 2019-12-13 | 中国十七冶集团有限公司 | Deep foundation pit tower crane waterproof structure with weak permeability soil and construction method |
CN110725322A (en) * | 2019-10-29 | 2020-01-24 | 中建七局安装工程有限公司 | Foundation pit slope tower crane construction method |
CN111058473A (en) * | 2019-12-30 | 2020-04-24 | 朱夏武 | Anti-seepage structure for tower crane foundation in basement bottom plate of building and construction method |
CN113638436A (en) * | 2021-08-24 | 2021-11-12 | 无锡市钱桥建筑安装工程有限公司 | Basement tower crane foundation |
CN114150922A (en) * | 2021-11-26 | 2022-03-08 | 广州地铁设计研究院股份有限公司 | Full-period structure for high-inclusion reserved vehicle section property development and construction method |
CN115288181A (en) * | 2022-09-15 | 2022-11-04 | 中国十七冶集团有限公司 | Tower crane foundation waterproof and drainage structure embedded in basement and construction method thereof |
-
2017
- 2017-02-24 CN CN201720168783.3U patent/CN206503169U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331735A (en) * | 2019-07-18 | 2019-10-15 | 中建八局第四建设有限公司 | A kind of tower crane mounting structure for coastal region soft layer |
CN110565701A (en) * | 2019-08-23 | 2019-12-13 | 中国十七冶集团有限公司 | Deep foundation pit tower crane waterproof structure with weak permeability soil and construction method |
CN110725322A (en) * | 2019-10-29 | 2020-01-24 | 中建七局安装工程有限公司 | Foundation pit slope tower crane construction method |
CN111058473A (en) * | 2019-12-30 | 2020-04-24 | 朱夏武 | Anti-seepage structure for tower crane foundation in basement bottom plate of building and construction method |
CN111058473B (en) * | 2019-12-30 | 2021-05-07 | 朱夏武 | Anti-seepage structure for tower crane foundation in basement bottom plate of building and construction method |
CN113638436A (en) * | 2021-08-24 | 2021-11-12 | 无锡市钱桥建筑安装工程有限公司 | Basement tower crane foundation |
CN114150922A (en) * | 2021-11-26 | 2022-03-08 | 广州地铁设计研究院股份有限公司 | Full-period structure for high-inclusion reserved vehicle section property development and construction method |
CN115288181A (en) * | 2022-09-15 | 2022-11-04 | 中国十七冶集团有限公司 | Tower crane foundation waterproof and drainage structure embedded in basement and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206503169U (en) | A kind of integral basement tower crane and raft plate seam construction | |
CN206768880U (en) | A kind of waterproof construction for seashore pipe gallery | |
CN208933989U (en) | A kind of tower-crane foundation structure | |
CN201738479U (en) | Roof expansion joint integrated cover plate waterproof structure | |
CN102587416B (en) | Construction method of basement attached lane structure | |
CN104790436B (en) | Basement in high rise building top board pouring after settlement advance water stop construction method | |
CN104975607A (en) | Offshore area local deep foundation pit stanching pit construction method | |
CN201546313U (en) | Landscape pebble apron with water drainage ditch | |
CN204676607U (en) | Poured band of outer wall of basement plugging structure | |
CN207812509U (en) | Bottom plate post-poured strip waterproof structure | |
CN217679289U (en) | Underground structure induced seam system | |
CN102733512A (en) | Cast-in-place self-insulating external wall body | |
CN204626473U (en) | Basement roof waterproof construction | |
CN212405025U (en) | Rockfill dam with simplified construction partitions | |
CN206467697U (en) | Column foot and raft plate junction integrated water-proof structure | |
CN115961647A (en) | Basement roof post-cast strip advanced sealing structure, construction structure and construction method | |
CN212452807U (en) | Self-healing anti-floating anchor rod waterproof node | |
CN217267583U (en) | Integrated sump for prefabricating and constructing cushion layer and waterproof layer | |
CN206189916U (en) | Bathroom room | |
CN206189908U (en) | Bathroom room | |
CN104405046A (en) | Processing process for wall expansion joint structure | |
CN110159272A (en) | The construction method of large span city tunnel with box top board structure | |
CN210031923U (en) | Underground construction pours double-wall waterproof construction simultaneously | |
CN217325470U (en) | Basement outer wall post-cast strip department assembled retaining wall | |
CN216615983U (en) | Underground chamber roof post-cast strip is enclosed construction in advance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |