CN206457992U - It is a kind of that there is the fast assembling wall slab and wall for presetting spool line box - Google Patents
It is a kind of that there is the fast assembling wall slab and wall for presetting spool line box Download PDFInfo
- Publication number
- CN206457992U CN206457992U CN201620941728.9U CN201620941728U CN206457992U CN 206457992 U CN206457992 U CN 206457992U CN 201620941728 U CN201620941728 U CN 201620941728U CN 206457992 U CN206457992 U CN 206457992U
- Authority
- CN
- China
- Prior art keywords
- line box
- wall
- spool
- fast assembling
- wall slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model is related to a kind of fast assembling wall slab for having and presetting spool and line box, including:Body, the body interior is provided with reinforcement, and the edge of the body surrounding is provided with fixed border, and the fixed border is connected with the reinforcement, and several mounting holes are uniformly provided with the fixed border.Further relate to a kind of wall combined by described fast assembling wall slab.The beneficial effects of the utility model are:In curing molding, the fixed border of several mounting holes is offered by being set in the surrounding of wallboard, the installation between wallboard can be quickly realized, and by setting multiple mounting holes, most can reasonably it be fixed according to the need for wall antidetonation rank, remaining mounting hole on wall to fix suspension member, in addition, presetting spool and line box on wall, using enhanced convenience and fast, by easy for installation to global design, using simple, operating efficiency can be greatly improved.
Description
Technical field
The utility model belongs to hospital ward technical field of buildings, and in particular to a kind of to have the fast-assembling for presetting spool line box
Wallboard and its wall.
Background technology
Assembled architecture refers to the building in assemble in site with prefabricated component.The advantage of this building is to build speed
Degree is fast, and climate conditionality is small, saves labour and can improve construction quality.Assembled architecture is national architectural industrialization hair
The emphasis direction of exhibition.State Council issues within 2 22nd, 2016《State Council of the Central Committee of the Communist Party of China is on further strengthening urban planning and construction
Some opinions of management work》Point out:" assembled architecture is widelyd popularize, building waste and dust pollution is reduced, shortens and builds work
Phase, lift construction quality.Formulate assembled architecture design, construction and acceptance specification.Component component standards are improved, building portion is realized
Product part factorial praluction.Encourage building enterprise's fabricated construction, assembled in situ.Building national level assembled architecture production base
Ground.Increasing policy supporting dynamics, strives, with 10 years or so time, making the ratio that assembled architecture accounts for new building reach 30% ".
Assembled architecture internal partition wall belongs to the important main into part of assembled architecture, and various types of Light trabses are assemblings
The main application product of formula internal partition wall at this stage, according to《Building light-weight batten partition wall technical regulation》(JGJ/T 157-2014) will
Ask, wallboard is after construction and installation, it is necessary to according to specific technique and require that fluting punches installation equipment installation, especially for doctor
The wall of institute's ward area, needs to carry out reinforcement solutions to opening fluting position with certain material after pipeline installation.In addition,
Subsequently made in people using the wall of assembling, it is necessary to when fixing some light fixtures, suspension member or decorative panel, it is necessary to separately punch solid
It is fixed, complex procedures, and there is the destruction of ambiguity to wall.
Utility model content
In order to solve the above mentioned problem of prior art presence, the utility model, which is provided, a kind of has default spool line box
Fast assembling wall slab and wall, in curing molding, the fixed border of several mounting holes is offered by being set in the surrounding of wallboard,
The installation between wallboard can be quickly realized, and by setting multiple mounting holes, can be according to the need of wall antidetonation rank
Most reasonably fixed, remaining mounting hole on wall to fix suspension member, in addition, spool and line box are preset on wall,
Using enhanced convenience and fast, by easy for installation to global design, using simple, operating efficiency can be greatly improved.
The technical scheme that the utility model is used for:A kind of fast assembling wall slab with default spool and line box, including:This
Body, the body interior is provided with reinforcement, and the edge of the body surrounding is provided with fixed border, the fixed border and institute
State reinforcement to be connected, and several mounting holes are uniformly provided with the fixed border.
Wire casing, the leading flank of the body are provided with the further optimization of technical solutions of the utility model, the body
Or and trailing flank on offer and line box, the wire casing is connected with the line box.
The further optimization of technical solutions of the utility model, the line box is arranged on the top of the body;The wire casing
For horizontal wire casing, and positioned at the top of the body.
The further optimization of technical solutions of the utility model, the line box includes top line box, middle part line box and bottom line
Box, and three line box are connected by vertical spool.
The further optimization of technical solutions of the utility model, the leading flank of the body or and trailing flank on be additionally provided with
Fixing hole.
The further optimization of technical solutions of the utility model, the material of the body is according to satisfaction《Building light-weight batten every
Wall technology code》The material of (JGJ/T 157-2014) defined makes.
Be additionally provided with the middle part of the further optimization of technical solutions of the utility model, the body puigging, fireprotection layer or
And heat-insulation layer.
Set in a kind of wall combined by above-mentioned fast assembling wall slab, including the body and connection sheet, the connection sheet
It is equipped with two fixing holes corresponding with the mounting hole.
The beneficial effects of the utility model are:The fixed border being connected with reinforcement is set by the surrounding in body,
The overall fastness of wallboard can be increased, uniformly mounting hole is offered on fixed border, the knot between wallboard can be facilitated
Close, in addition, the number of mounting hole is several, being fixedly connected between progress wallboard that can be selective is remaining to install
Hole, can install some suspension members as needed, or as the fixing hole installed, the design is reaching connection wallboard effect
While also have protect wallboard subsequently using not be destroyed purpose.
The wiring that spool and line box are set on body when can conveniently install wall, it is and existing using more hommization
Technology is compared, and can greatly shorten the engineering time, reduces the environmental disruption of job site.By setting line on the top of body
Pipe and line box, can walk main line, and can install top insert row seat as needed, and line box is set respectively at middle part and bottom,
On & off switch, socket or maintenance overhaul wound sky are installed during the characteristics of according in hospital can or live the need for people at middle part
Deng.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model fast assembling wall slab;
Fig. 2 is the structural representation for the wall that the utility model is made up of fast assembling wall slab.
In figure:1st, body;2nd, fixed border;21st, mounting hole;31st, top line box;32nd, middle part line box;33rd, bottom line box;
41st, horizontal wire casing;42nd, vertical spool;5th, connection sheet.
Embodiment
, below will be to technology of the present utility model to make the purpose of this utility model, technical scheme and advantage clearer
Scheme is described in detail.Obviously, described embodiment is only a part of embodiment of the utility model, rather than all
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made
Resulting all other embodiment is put, the scope that the utility model is protected is belonged to.
Embodiment 1
The utility model provides a kind of fast assembling wall slab for having and presetting spool and line box, including:In body, the body
Portion is provided with reinforcement, and the edge of the body surrounding is provided with fixed border, and the fixed border is connected with the reinforcement
Connect, and several mounting holes are uniformly provided with the fixed border.Fast assembling wall slab of the prior art is generally cavity wall
Using effect is short of after plate, installation, and connect up in hollow wall panel it is inconvenient, when being connected with each other in addition between hollow wall panel pair
The construction requirement of workmen is higher.Wallboard in the technical program has preset mounting hole, it is only necessary to which workmen enters
Luggage nail is fixed, and operating efficiency is improved, and using more simple.
Being directed to of the prior art load onto needs separately to open up the wire casing of cable tubing after wallboard, and sets the line of socket
Box, operation is sufficiently complex, and use environment has very big noise and dust.The technical program in the body by setting
Be equipped with spool, the leading flank of the body or and trailing flank on offer and line box.The spool is connected with the line box.
The line box is arranged on the top of the body;The spool is horizontal wire casing, and positioned at the top of the body.Can be in peace
Indoor spool is laid while dress wall and finished, without secondary construction, operating efficiency is improved.
Embodiment 2
On the basis of embodiment 1, as shown in figure 1, the line box includes top line box, middle part line box and bottom line box,
And three line box are connected by vertical spool, the line box of topmost between horizontal wire casing and other wallboards by realizing line
Walking for road is logical.This is designed to carry out multiple regions setting sockets according to the situation in ward, uses more hommization, construction
After finishing, people can mounting receptacle as needed, by without using line box, directly blocked with coating.
In addition, doing a little Art Designs on wallboard according to the daily middle needs of people, it usually needs perforate, this skill on wall
Art scheme when making wallboard, the body leading flank or and trailing flank on be additionally provided with fixing hole, people are in decoration
It need not punched again, it is only necessary to be fixed, convenient and swift, use is more comfortable.
It is preferred that, the body is made up of any middle material in ash concrete, foam concrete or gypsum, can also
Select suitable materials for wall as needed or according to the situation of local raw material cost.
Embodiment 3
It is a kind of as embodiment 1 or and embodiment 2 described in the wall that combines of fast assembling wall slab, including the body and
Two fixing holes corresponding with the mounting hole are provided with connection sheet, the connection sheet.According to bonding strength between wall
The need for can selectivity installation connection sheet number, on fixed border remaining mounting hole can as standby suspension member or
The fixation preformed hole of other decorations of person.
It is described above, embodiment only of the present utility model, but protection domain of the present utility model do not limit to
In this, any one skilled in the art can readily occur in change in the technical scope that the utility model is disclosed
Or replace, it should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be described with power
The protection domain that profit is required is defined.
Claims (7)
1. a kind of have default spool and the fast assembling wall slab of line box, it is characterised in that including:In body (1), the body (1)
Portion is provided with reinforcement, and the edge of body (1) surrounding is provided with fixed border (2), and the fixed border (2) adds with described
Strengthening tendons is connected, and several mounting holes (21) are uniformly provided with the fixed border (2).
2. according to claim 1 have the fast assembling wall slab for presetting spool line box, it is characterised in that:In the body (1)
Be provided with wire casing, the leading flank of the body (1) or and trailing flank on offer line box, and the wire casing and the line box phase
Connection.
3. according to claim 2 have default spool and the fast assembling wall slab of line box, it is characterised in that:The line box is set
Top in the body (1);The wire casing is horizontal wire casing (41), and positioned at the top of the body (1).
4. according to claim 2 have default spool and the fast assembling wall slab of line box, it is characterised in that:The line box includes
Top line box (31), middle part line box (32) and bottom line box (33), and three line box are connected by vertical spool (42).
5. according to claim 1 have default spool and the fast assembling wall slab of line box, it is characterised in that:The body (1)
Leading flank or and trailing flank on be additionally provided with fixing hole.
6. according to claim 1 have default spool and the fast assembling wall slab of line box, it is characterised in that:The body (1)
Middle part be additionally provided with puigging, fireprotection layer or and heat-insulation layer.
7. the wall that a kind of fast assembling wall slab as any one of claim 1-6 is combined, it is characterised in that:Including institute
State and be provided with two fixing holes corresponding with the mounting hole (21) on body (1) and connection sheet (5), the connection sheet (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620941728.9U CN206457992U (en) | 2016-08-25 | 2016-08-25 | It is a kind of that there is the fast assembling wall slab and wall for presetting spool line box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620941728.9U CN206457992U (en) | 2016-08-25 | 2016-08-25 | It is a kind of that there is the fast assembling wall slab and wall for presetting spool line box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206457992U true CN206457992U (en) | 2017-09-01 |
Family
ID=59692059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620941728.9U Expired - Fee Related CN206457992U (en) | 2016-08-25 | 2016-08-25 | It is a kind of that there is the fast assembling wall slab and wall for presetting spool line box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206457992U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106149971A (en) * | 2016-08-25 | 2016-11-23 | 邰仁记 | A kind of fast assembling wall slab with default line pipeline box and body of wall |
CN109339333A (en) * | 2018-11-26 | 2019-02-15 | 广东山众建筑科技有限公司 | Panel structure |
-
2016
- 2016-08-25 CN CN201620941728.9U patent/CN206457992U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106149971A (en) * | 2016-08-25 | 2016-11-23 | 邰仁记 | A kind of fast assembling wall slab with default line pipeline box and body of wall |
CN109339333A (en) * | 2018-11-26 | 2019-02-15 | 广东山众建筑科技有限公司 | Panel structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Gonzalo et al. | Energy-efficient architecture: basics for planning and construction | |
CN205444458U (en) | Integrated assembled steel construction building | |
CN106149971A (en) | A kind of fast assembling wall slab with default line pipeline box and body of wall | |
CN204282709U (en) | Diatom veneer rock wool composite wall | |
CN206457992U (en) | It is a kind of that there is the fast assembling wall slab and wall for presetting spool line box | |
CN203008189U (en) | Steel planting roof structure | |
CN104863392B (en) | A kind of Assembled type movable sentry box and its fast method for preparing | |
CN203684522U (en) | Lightweight composite prefabricated wall plate for house | |
WO2001066866A1 (en) | Multipurpose floor and beams thereof | |
CN205382727U (en) | Lightweight steel construction house | |
CN205171752U (en) | Prefabricated light steel partition wall and mounting structure thereof | |
CN101949202B (en) | Heat-preservation, sound-proof and fireproof floor structure and manufacturing method thereof | |
Arya et al. | The Concept of Energy-Efficient Residential Block Design | |
CN206554353U (en) | Sunk panel modeling structure on a kind of ceiling decoration | |
CN206917072U (en) | A kind of overall spinning bolt-type integrates inner partition plate | |
CN206554311U (en) | A kind of high efficiency environment-friendly type building facade Insulation | |
CN206144019U (en) | Frameless frame industrialization wall body can be built fast to light | |
CN206143963U (en) | Integral type wallboard of modularization installation | |
CN204492024U (en) | A kind of reinforcement type roof structure for steel work | |
CN110847515A (en) | Pitched roof structure and manufacturing method thereof | |
CN206157767U (en) | Utility tunnel | |
US20110283656A1 (en) | Hybrid core construction | |
CN215630612U (en) | Reinforced concrete assembled structural unit and assembled auxiliary house with same | |
Yuan et al. | From a Hive to a Place: The Fabricated Buildings with the Smart House | |
CN202416632U (en) | Adaption connecting device for telescopic adjustable settlement of finished glass partition |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||