CN202416632U - Adaption connecting device for telescopic adjustable settlement of finished glass partition - Google Patents

Adaption connecting device for telescopic adjustable settlement of finished glass partition Download PDF

Info

Publication number
CN202416632U
CN202416632U CN2011205099176U CN201120509917U CN202416632U CN 202416632 U CN202416632 U CN 202416632U CN 2011205099176 U CN2011205099176 U CN 2011205099176U CN 201120509917 U CN201120509917 U CN 201120509917U CN 202416632 U CN202416632 U CN 202416632U
Authority
CN
China
Prior art keywords
linkage
regulating
connecting device
regulating part
cuts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205099176U
Other languages
Chinese (zh)
Inventor
晏绪飞
郑宜坤
李道学
纪晓鹏
陈鹏
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Decoration Co Ltd
Original Assignee
China Construction Third Bureau Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Decoration Co Ltd filed Critical China Construction Third Bureau Decoration Co Ltd
Priority to CN2011205099176U priority Critical patent/CN202416632U/en
Application granted granted Critical
Publication of CN202416632U publication Critical patent/CN202416632U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to an adaption connecting device for the telescopic adjustable settlement of a finished glass partition. The adaption connecting device comprises a bottom connecting device and a top connecting device, wherein the bottom connecting device is hidden in an overhead ground formed by a floor and a ground foundation layer, and the top connecting device is hidden in an interlayer between a decoration panel and a hang ceiling foundation layer. According to the adaption connecting device, the partition can be conveniently moved in a large space. The adaption connecting device is convenient in disassembly and assembly, the using function is not influenced, the adaption connecting device can be greatly adjusted at any time and any place along with the change of the building space function. The adaption connecting device can be widely applied to partitions in large spaces, particularly in building spaces (such as office buildings) which need to change space layouts frequently.

Description

Finished glass cuts off the sedimentation of telescopic adjustment formula and adapts to linkage
Technical field
The utility model relates to the linkage that a kind of glass cuts off.
Background technology
At present, the increasing The building of China the design of big space room and special building body.Such as, the dwelling house of large-scale office premises and standard width of a room in an old-style house formula, this design is convenient to the owner and is carried out space layout according to actual needs voluntarily in the finishing stage in later stage, and at present, most space layout often adopts the finished glass partition to carry out space layout and separation.Present glass cuts off fixing often, carries out room functions if desired and changes, and perhaps increasing and decreasing department and clerical workforce etc. needs to change space layout; Then need remove again, produce, get the raw materials ready; Carry out secondary decoration, this is a very long and complicated process, influences the normal use in room.Simultaneously; The secondary decoration process will face a series of problems: because the variation of position; Existing shut-off member often can not be utilized again; Equipment (like smallpox, ground, electric pipeline, equipment end etc.) need be rethought dismounting, design, production, processing, install and coupling, and is time-consuming, causes the huge waste of resource.
The utility model content
The purpose of the utility model provides a kind of finished glass and cuts off telescopic adjustment formula sedimentation adaptation linkage, solve when layout need change in the existing room, and glass cuts off and can not recycle, and work progress is complicated, causes the technical problem of the wasting of resources.
For realizing above-mentioned purpose, the utility model adopts following technical scheme:
A kind of finished glass cuts off the sedimentation of telescopic adjustment formula and adapts to linkage; Comprise bottom linkage and top linkage; Both are installed in base and top margin that glass cuts off respectively; Said bottom linkage is hidden in the ground spacing of floor and ground layer formation, and said bottom linkage comprises bottom stressed member and bottom regulating part, and said bottom stressed member inserts in the regulating part of bottom; Is fixedly connected with set bolt A through regulating bolt A, and through regulating the bolt A highly adjusting of realization of in the regulating part of bottom, sliding; Said top linkage is hidden in the interlayer between decoration panel and furred ceiling basic unit; Said top linkage comprises top stressed member and top regulating part; Said top stressed member inserts in the regulating part of top; Is fixedly connected with set bolt B through regulating bolt B, and through regulating the bolt B highly adjusting of realization of in the regulating part of top, sliding.
Said bottom stressed member is rectangular steel pipe or U type shaped steel.
Said bottom regulating part is U type shaped steel or two U types that the leg of angle back of the body is combined into relatively, and correspondence has-regulating tank A on its perpendicular limb.
Said top stressed member is rectangular steel pipe or U type shaped steel.
Said top regulating part is U type shaped steel or two U types that the leg of angle back of the body is combined into relatively, and correspondence has-regulating tank B on its perpendicular limb.
Said regulating tank A and regulating tank B are U type groove or oval-shaped slot.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The described finished glass of the utility model cuts off the sedimentation of telescopic adjustment formula and adapts to linkage; Through adopting movable top and bottom linkage; When space requirement changed in the room, the glass that can decompose very easily, make up, be shifted cut off, and hid in floor of making somebody a mere figurehead and furred ceiling owing to top linkage and bottom linkage simultaneously; After displacement, do not stay the construction vestige, do not influence the integral body finishing effect in the room.
Simultaneously; The said finished glass of the utility model cuts off the sedimentation of telescopic adjustment formula and adapts to linkage; Can avoid the waste of material and reduce environment damage; Make full use of original partition and equipment, the cost minimum with the shortest time changes room layout, satisfies the needs of new various building functions.
In addition; The said finished glass of the utility model cuts off the sedimentation of telescopic adjustment formula and adapts to linkage, owing to be provided with the regulating part of top and bottom, can in altitude range, regulate the height that glass cuts off as required; When making full use of original glass partition, has the bigger scope of application.
Secondly; The said finished glass of the utility model cuts off the sedimentation of telescopic adjustment formula and adapts to linkage, installs and move easy construction, is prone to row; Need not special professional skill; The user can move according to the space change voluntarily, and simultaneously, it is time saving and energy saving that work progress does not influence inner normal use basically.
The utility model can be widely used in large space interior layout partition and change.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done further detailed explanation.
Fig. 1 is that the utility model and glass cut off the syndeton sketch map.
Fig. 2 is a bottom linkage sketch map.
Fig. 3 is a top linkage sketch map.
Fig. 4 is that glass partition above ground portion is removed sketch map.
Fig. 5 is that glass cuts off above ground portion aggregate erection sketch map.
Fig. 6 is that glass partition smallpox is partly removed sketch map.
Fig. 7 is that glass cuts off smallpox part aggregate erection sketch map.
Reference numeral: 1-bottom linkage, 1.1-bottom stressed member, 1.2-bottom regulating part, 1.3-regulating tank A, 1.4-adjusting bolt A, 1.5-set bolt A, 2-top linkage, 2.1-top stressed member, 2.2-top regulating part, 2.3-regulating tank B, 2.4-adjusting bolt B, 2.5-set bolt B, 3-glass partition, 4-ground layer, 5-floor, 6-furred ceiling basic unit, 7-decoration panel, 8-connect screw, 9-expansion bolt.
The specific embodiment
Embodiment is extremely shown in Figure 3 referring to Fig. 1; A kind of finished glass cuts off the sedimentation of telescopic adjustment formula and adapts to linkage; Comprise bottom linkage 1 and top linkage 2, both are installed in glass respectively and cut off 3 base and top margin, and said bottom linkage 1 is hidden in the ground spacing that forms with ground layer 4 in floor 5; Said bottom linkage 1 comprises bottom stressed member 1.1 and bottom regulating part 1.2; Said bottom stressed member 1.1 inserts in the regulating parts 1.2 of bottom, is fixedly connected with set bolt A1.5 through regulating bolt A1.4, and through regulating the bolt A1.4 highly adjusting of realization of in bottom regulating part 1.2, sliding; Said bottom stressed member 1.1 is rectangular steel pipe or U type shaped steel.Said bottom regulating part 1.2 is U type shaped steel or two U types that the leg of angle back of the body is combined into relatively, and correspondence has-regulating tank A1.3 on its perpendicular limb, referring to Fig. 2;
Said top linkage 2 is hidden in the interlayer between decoration panel 7 and furred ceiling basic unit 6; Said top linkage 2 comprises top stressed member 2.1 and top regulating part 2.2; In the said top stressed member 2.1 insertion top regulating parts 2.2; Is fixedly connected with set bolt B2.5 through regulating bolt B 2.4, and through regulating the bolt B 2.4 highly adjusting of realization of in top regulating part 2.2, sliding.Said top stressed member 2.1 is rectangular steel pipe or U type shaped steel.Said top regulating part 2.2 is U type shaped steel or two U types that the leg of angle back of the body is combined into relatively, and correspondence has-regulating tank B2.3 on its perpendicular limb, referring to Fig. 3.
Above-mentioned regulating tank A1.3 and regulating tank B2.3 are U type groove or oval-shaped slot.
The bottom surface of above-mentioned glass partition 3 is fixedly connected through expansion bolt 9 with bottom linkage 1, and its end face is fixedly connected through being connected screw 8 with top linkage 2, referring to Fig. 1.
Optimal way as the utility model; Can the mode of connection of auxiliary electromechanical equipment system associated therewith such as equipment band be designed again; The wiring connection device is set; Traditional electric wire fulgurite segmentation is connected, form a kind of movably device end, can realize that cutting off agent structure with finished glass moves.
Above-mentioned finished glass cuts off the mounting method that the sedimentation of telescopic adjustment formula adapts to linkage, referring to Fig. 5 and Fig. 7, comprises the steps:
Step 1, the bottom regulating part 1.2 and the ground spacing basic unit 4 of bottom linkage 1 is fixing through expansion bolt 9;
Step 2 is cut off bottom stressed member 1.1 and glass 3 underrun and is connected screw 8 connections;
Step 3 cuts off regulate glass in the regulating tank A1.3 that regulates bolt A1.4 insertion bottom regulating part 1.2 on 3 height, tightens adjusting bolt A1.4 after highly confirming, and through set bolt A1.5 solid bottom regulating part 1.2 and bottom stressed member 1.1;
Step 4 covers the floor 5 that matches with glass partition 3;
Step 5, the top regulating part 2.2 of top linkage 2 is fixing through being connected screw 8 with furred ceiling basic unit 6;
Step 6 is cut off top stressed member 2.1 and glass 3 end face through being connected screw 8 connections;
Step 7 cuts off regulate glass in the regulating tank B2.3 that regulates bolt B 2.4 insertion top regulating parts 2.2 on 3 position, and tighten after the position is confirmed and regulate bolt B 2.4, and through set bolt B2.5 that top stressed member 2.1 is fixing with top regulating part 2.2;
Step 8 covers the decoration panel 7 that adapts with glass partition 3.
Above-mentioned finished glass cuts off the moving method that the sedimentation of telescopic adjustment formula adapts to linkage, comprises dismounting and reinstalls the two large divisions, comprises the steps: that wherein step 1 to step 5 is cut off for removing existing glass, referring to Fig. 4 and Fig. 6.
Step 1 is raised the decoration panel 7 that glass cuts off 3 places;
Step 2 is turned on adjusting bolt B 2.4 and set bolt B2.5 between top regulating part 2.2 and the top stressed member 2.1, and top regulating part 2.2 is separated with top stressed member 2.1;
Step 3 is covered complete decoration panel 7 removing glass and is cut off 3 position, makes other position consistency of itself and furred ceiling;
Step 4 is removed the floor 5 that glass cuts off 3 positions, turns on adjusting bolt A1.4 and set bolt A1.5 between bottom regulating part 1.2 and the bottom stressed member 1.1, and bottom regulating part 1.2 is separated with bottom stressed member 1.1;
Step 5 is covered complete floor removing glass and is cut off 3 position, makes itself and other position consistency of ground;
Step 6 is cut off in new position glass being installed to step 12, referring to Fig. 5 and Fig. 7,
Step 6 moves to the position that new plan is installed glass partition 3 with glass partition 3, top stressed member 2.1 and bottom stressed member 1.1 integral body of removing;
Step 7 is removed new original floor of intending the position that glass partition 3 is installed, and the bottom regulating part 1.2 and the ground layer 4 of bottom linkage is fixing through expansion bolt 9;
Step 8 is fixed bottom regulating part 1.2 and bottom stressed member 1.1 through regulating bolt A1.4 and set bolt A1.5;
Step 9 covers the floor that is complementary with glass partition 3;
Step 10 is removed the new decoration panel of intending the original furred ceiling in position that glass partition 3 is installed, and top regulating part 2.2 is fixing through being connected screw 8 with the basic unit 4 of furred ceiling;
Step 11 is fixed through regulating bolt B 2.4 top regulating part 2.2 and top stressed member 2.1 with set bolt B2.5;
Step 12 covers the decoration panel 7 that is complementary with glass partition 3.

Claims (6)

1. a finished glass cuts off the sedimentation of telescopic adjustment formula and adapts to linkage; It is characterized in that: comprise bottom linkage (1) and top linkage (2); Both are installed in base and top margin that glass cuts off (3) respectively; Said bottom linkage (1) is hidden in the ground spacing that forms with ground layer (4) in floor (5); Said bottom linkage (1) comprises bottom stressed member (1.1) and bottom regulating part (1.2); Said bottom stressed member (1.1) inserts in the bottom regulating part (1.2), is fixedly connected with set bolt A (1.5) through regulating bolt A (1.4), and through regulating bolt A (1.4) the highly adjusting of realization of in bottom regulating part (1.2), sliding; Said top linkage (2) is hidden in the interlayer between decoration panel (7) and furred ceiling basic unit (6); Said top linkage (2) comprises top stressed member (2.1) and top regulating part (2.2); Said top stressed member (2.1) inserts in the top regulating part (2.2); Is fixedly connected with set bolt B (2.5) through regulating bolt B (2.4), and through regulating bolt B (2.4) the highly adjusting of realization of in top regulating part (2.2), sliding.
2. finished glass according to claim 1 cuts off the sedimentation of telescopic adjustment formula and adapts to linkage, and it is characterized in that: said bottom stressed member (1.1) is rectangular steel pipe or U type shaped steel.
3. finished glass according to claim 1 cuts off the sedimentation of telescopic adjustment formula and adapts to linkage; It is characterized in that: said bottom regulating part (1.2) is U type shaped steel or two U types that the leg of angle back of the body is combined into relatively, and correspondence has-regulating tank A (1.3) on its perpendicular limb.
4. finished glass according to claim 1 cuts off the sedimentation of telescopic adjustment formula and adapts to linkage, and it is characterized in that: said top stressed member (2.1) is rectangular steel pipe or U type shaped steel.
5. finished glass according to claim 1 cuts off the sedimentation of telescopic adjustment formula and adapts to linkage; It is characterized in that: said top regulating part (2.2) is U type shaped steel or two U types that the leg of angle back of the body is combined into relatively, and correspondence has-regulating tank B (2.3) on its perpendicular limb.
6. cut off telescopic adjustment formula sedimentation adaptation linkage according to claim 3 or 5 described finished glasses, it is characterized in that: said regulating tank A (1.3) and regulating tank B (2.3) are U type groove or oval-shaped slot.
CN2011205099176U 2011-12-09 2011-12-09 Adaption connecting device for telescopic adjustable settlement of finished glass partition Expired - Fee Related CN202416632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205099176U CN202416632U (en) 2011-12-09 2011-12-09 Adaption connecting device for telescopic adjustable settlement of finished glass partition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205099176U CN202416632U (en) 2011-12-09 2011-12-09 Adaption connecting device for telescopic adjustable settlement of finished glass partition

Publications (1)

Publication Number Publication Date
CN202416632U true CN202416632U (en) 2012-09-05

Family

ID=46741411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205099176U Expired - Fee Related CN202416632U (en) 2011-12-09 2011-12-09 Adaption connecting device for telescopic adjustable settlement of finished glass partition

Country Status (1)

Country Link
CN (1) CN202416632U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100294A (en) * 2017-07-03 2017-08-29 中建局集团装饰工程有限公司 A kind of system partitioning system and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100294A (en) * 2017-07-03 2017-08-29 中建局集团装饰工程有限公司 A kind of system partitioning system and its construction method
CN107100294B (en) * 2017-07-03 2023-04-11 中建一局集团装饰工程有限公司 System partition system and construction method thereof

Similar Documents

Publication Publication Date Title
CN104196239B (en) The mounting method of a kind of concealed distribution box on blockwork
CN110965727B (en) Side fluting shingle nail's assembled structure of hanging
CN206815646U (en) A kind of lightgage steel joist sub-assembly
CN202416632U (en) Adaption connecting device for telescopic adjustable settlement of finished glass partition
CN107100296A (en) A kind of integrated inner partition plate of framework spinning bolt-type and its installation method
CN201155196Y (en) Floor bracket
CN102493577B (en) Displacement separation type finished product glass partition system as well as mounting and moving method thereof
CN102535807A (en) Modular wall tile pre-bonding structure and construction method thereof
CN204252323U (en) House wall dry construction interior structure
CN214498157U (en) Wall body reentrant corner ceramic tile mounting structure
CN204001540U (en) A kind of novel heat insulation furring tile
CN104612358B (en) A kind of hanging method of wall decoration building materials
CN208916555U (en) A kind of elevator top ceiling structure
CN106149971A (en) A kind of fast assembling wall slab with default line pipeline box and body of wall
CN112160483A (en) Assembled furred ceiling with steel framed aerial layer locking structure
CN202467071U (en) Mounting structure of wooden decorative panel
CN206143963U (en) Integral type wallboard of modularization installation
CN205046814U (en) Compound top hangs wiring strip
CN205100477U (en) Formula wallboard installing the system gangs up with
CN205863837U (en) A kind of dark wire terminal box
CN204530401U (en) A kind of folded side mould
CN219863480U (en) Assembled wallboard
CN203583848U (en) Corner line for waterproof type external wall insulation decorative sheets
CN204510700U (en) The large keel of a kind of platform mould
CN218541323U (en) Overhead ground pipeline structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20131209