CN206448178U - A kind of bridge construction anti-drop device - Google Patents
A kind of bridge construction anti-drop device Download PDFInfo
- Publication number
- CN206448178U CN206448178U CN201720121621.4U CN201720121621U CN206448178U CN 206448178 U CN206448178 U CN 206448178U CN 201720121621 U CN201720121621 U CN 201720121621U CN 206448178 U CN206448178 U CN 206448178U
- Authority
- CN
- China
- Prior art keywords
- fixed frame
- pedal
- sliding bar
- fixed
- transverse slat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of bridge construction anti-drop device, including fixed frame, transverse slat, sliding bar, steady pin and hoist engine, support base is welded with the fixed frame, and the first pedal is fixedly installed inside fixed frame, bar is installed on first pedal, the two ends of the transverse slat are welded on fixed frame, the sliding bar upper and lower ends are fixed on fixed frame, and sliding bar is passed through inside sliding shoe, the sliding shoe and sliding bar are provided with fixing hole, and safety belt is provided between sliding shoe, the steady pin is located on sliding bar, the hoist engine is fixed on fixed frame by fixed support, and hoist engine is connected with suspension hook.The bridge construction anti-drop device is provided with safety belt, and its safety belt two ends can be fixed on sliding bar by steady pin, so it is prevented that when people's hot work in progress, sole steps on the empty phenomenon fallen, and has effectively ensured the life security of workmen.
Description
Technical field
The utility model is related to bridge construction engineering device technique field, specially a kind of bridge construction anti-drop device.
Background technology
Bridge erection is in rivers,lakes and seas, the building for making traffic etc. smoothly to pass through, referred to as bridge.Bridge it is general by
Superstructure, substructure and attached structure composition, superstructure refer mainly to bridge span structure and support system;Substructure bag
Include abutment, bridge pier and basis;Attached structure then refers to transition slab at bridge head, truncated cone banking, shore protection, training works etc..
, it is necessary to climb up the work climbed down much among bridge construction process, such as painted etc. in the bottom of bridge pavement
During construction, safety prevention measure is needed to use in work progress, anti-drop device is exactly one kind therein, existing anti-fall dress
Put structure relatively simple, do not possess protector, once workmen's sole, which steps on sky, will cause falling accident, so as to construction
The personal safety of personnel causes threat, and practicality is not strong, in view of defect present in above prior art, it is necessary to entered
One step is improved, and is made it more for practicality, can just be met actual use situation.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction anti-drop device, to solve to propose in above-mentioned background technology
Existing anti-drop device structure is relatively simple, does not possess protector, once workmen's sole, which steps on sky, will cause thing of falling
Therefore, so that the personal safety to workmen causes threat, the problem of practicality is not strong.
To achieve the above object, the utility model provides following technical scheme:A kind of bridge construction anti-drop device, including it is solid
Determine to be welded with inside support base, and fixed frame on framework, transverse slat, sliding bar, steady pin and hoist engine, the fixed frame
It is fixedly installed on the first pedal, first pedal and bar is installed, the two ends of the transverse slat is welded in fixed frame
The second pedal is fixedly installed on body, and on transverse slat, the sliding bar upper and lower ends are fixed on fixed frame, and sliding bar
Passed through inside from sliding shoe, the sliding shoe and sliding bar, which are provided between fixing hole, and sliding shoe, is provided with safety belt, institute
Steady pin is stated on sliding bar, the hoist engine is fixed on fixed frame by fixed support, and hoist engine is connected with and hung
Hook.
It is preferred that, the support base number is four, and square structure, while its central point and fixed frame
The center of circle is same point.
It is preferred that, first pedal and transverse slat are distributed in array structure, and the fixed frame below the transverse slat of bottom
Offer square aperture.
It is preferred that, the transverse slat and the second pedal are arc shape, and the axis of the second pedal is stepped on the first pin
The axis of plate is on same vertical line.
It is preferred that, the sliding bar number is two, and symmetrical on fixed frame axis.
It is preferred that, it is formed with square through hole between the support bracket fastened lower end and fixed frame upper end.
Compared with prior art, the beneficial effects of the utility model are:The bridge construction anti-drop device is provided with safety belt,
Its safety belt two ends can be fixed on sliding bar by steady pin, so it is prevented that when people's hot work in progress, pin
The empty phenomenon fallen is stepped at bottom, has effectively ensured the life security of workmen, at the same the construction tool of workmen with
Material can be come up by hoist engine transport, be easy to people to climb up and climbed down, and workmen, can be by both feet point in work progress
Do not stand on the first pedal and the second pedal, can so improve stability, while being easy to construction, the new overall structure
It is compact, it is safe, it is practical.
Brief description of the drawings
Fig. 1 is the utility model structure schematic top plan view;
Fig. 2 is the utility model structure schematic elevation view;
Fig. 3 is the utility model structure sliding bar enlarged diagram;
Fig. 4 is the partial schematic diagram of the utility model structure chart 1.
In figure:1st, fixed frame, 2, support base, the 3, first pedal, 4, bar, 5, transverse slat, the 6, second pedal,
7th, sliding bar, 8, fixing hole, 9, sliding shoe, 10, safety belt, 11, steady pin, 12, hoist engine, 13, fixed support, 14, suspension hook.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of bridge construction anti-drop device, including fixation
Framework 1, support base 2, the first pedal 3, bar 4, transverse slat 5, the second pedal 6, sliding bar 7, fixing hole 8, sliding shoe
9th, support base 2 is welded with safety belt 10, steady pin 11, hoist engine 12, fixed support 13 and suspension hook 14, fixed frame 1, is propped up
It is four to support the number of base 2, and square structure, while the center of circle of its central point and fixed frame 1 is same point, it is overall steady
Solidity is high, and intensity is big, it is not easy to overturns, further improves security, rational in infrastructure, and inside above-mentioned fixed frame 1
The first pedal 3 is fixedly installed, the first pedal 3 and transverse slat 5 are distributed in array structure, and consolidating below bottom transverse slat 5
Determine framework 1 and offer square aperture, be easy to people to enter inside fixed frame 1, bar 4 is installed on the first pedal 3,
The two ends of transverse slat 5 are welded on fixed frame 1, and the second pedal 6, the pedal of transverse slat 5 and second are fixedly installed on transverse slat 5
6 be arc shape, and the axis of the second pedal 6 and the axis of the first pedal 3 are on same vertical line, slip
The upper and lower ends of bar 7 are fixed on fixed frame 1, and sliding bar 7 is passed through from the inside of sliding shoe 9, and the number of sliding bar 7 is two, and
Symmetrical on the axis of fixed frame 1, sliding shoe 9 and sliding bar 7 are provided between fixing hole 8, and sliding shoe 9 and are provided with peace
Full band 10, the steady pin 11 is located on sliding bar 7, and hoist engine 12 is fixed on fixed frame 1 by fixed support 13, fixed
Square through hole is formed between the lower end and the upper end of fixed frame 1 of support 13, is easy to people to take the construction tool on suspension hook 14
Under, using effect is good, and above-mentioned hoist engine 12 is connected with suspension hook 14.
Operation principle:When using the bridge construction anti-drop device, a simple structure is first carried out to the device and is understood,
Fixed frame 1 is moved to the position for needing to construct, switched on power, and makes that hoist engine 12 is in running order, people enter
Inside fixed frame 1, first safety belt 10 is tied up in loins, then climb along the first pedal 3, during climbing,
The two ends of safety belt 10, along the upward sliding of sliding bar 7, are climbed to behind suitable position by sliding shoe 9, by steady pin 11 from cunning
Removed in lever 7, and in the fixing hole 8 being inserted on sliding shoe 9 and sliding bar 7, thus sliding shoe 9 can be fixed on slip
On bar 7, while people can drive hoist engine 12 to work by extraneous button, hoist engine 12 pulls suspension hook 14 to rise, so that will
The construction tool of people is hung up, and people are in construction, and two feet station are on the first pedal 3 and the second pedal 6, a hand
Bar 4 can be buttressed to be constructed, here it is the operation principle of the device.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered
Row equivalent substitution, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc. all should
Within protection domain of the present utility model.
Claims (6)
1. a kind of bridge construction anti-drop device, including fixed frame (1), transverse slat (5), sliding bar (7), steady pin (11) and elevator
Machine (12), it is characterised in that:Fixation inside support base (2), and fixed frame (1) is welded with the fixed frame (1) to set
It is equipped with the first pedal (3), first pedal (3) and bar (4) is installed, the two ends of the transverse slat (5) is welded in
The second pedal (6) is fixedly installed on fixed frame (1), and on transverse slat (5), sliding bar (7) upper and lower ends are fixed on
On fixed frame (1), and sliding bar (7) is passed through inside sliding shoe (9), and the sliding shoe (9) and sliding bar (7) are provided with
Safety belt (10) is provided between fixing hole (8), and sliding shoe (9), the steady pin (11) is located on sliding bar (7), described
Hoist engine (12) is fixed on fixed frame (1) by fixed support (13), and hoist engine (12) is connected with suspension hook (14).
2. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:Support base (2) number
For four, and square structure, while the center of circle of its central point and fixed frame (1) is same point.
3. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:First pedal (3) and
Transverse slat (5) is distributed in array structure, and the fixed frame (1) below bottom transverse slat (5) offers square aperture.
4. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:The transverse slat (5) and crus secunda
Riding boogie board (6) is arc shape, and the axis of the second pedal (6) and the axis of the first pedal (3) are vertical in same
On straight line.
5. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:Sliding bar (7) number is
Two, and it is symmetrical on fixed frame (1) axis.
6. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:Under the fixed support (13)
Square through hole is formed between end and fixed frame (1) upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720121621.4U CN206448178U (en) | 2017-02-06 | 2017-02-06 | A kind of bridge construction anti-drop device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720121621.4U CN206448178U (en) | 2017-02-06 | 2017-02-06 | A kind of bridge construction anti-drop device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206448178U true CN206448178U (en) | 2017-08-29 |
Family
ID=59665716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720121621.4U Expired - Fee Related CN206448178U (en) | 2017-02-06 | 2017-02-06 | A kind of bridge construction anti-drop device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206448178U (en) |
-
2017
- 2017-02-06 CN CN201720121621.4U patent/CN206448178U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110374008A (en) | A method of the erection of cable-stayed bridge steel truss is carried out in marine environment | |
CN207144428U (en) | A kind of easy-to-dismount building scaffold | |
CN209210319U (en) | It drives a vehicle dedicated maintenance hanging basket | |
CN205975510U (en) | Pier fender maintenance platform | |
CN104276514A (en) | Flooring self-balance wrapping rod and mounting and use method thereof | |
CN206448178U (en) | A kind of bridge construction anti-drop device | |
CN211689948U (en) | Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge | |
CN208701506U (en) | Bridge Thin-wall Hollow Pier safety climbing ladder adheres to attachment device | |
Liu et al. | Safety control of hydraulic self-climbing formwork in south tower construction of Taizhou Bridge | |
CN206736698U (en) | A kind of leaning tower suspension bridge | |
CN207078935U (en) | A kind of portable full circle swinging mast loop wheel machine anchor | |
CN204150970U (en) | Seat ground self-balancing pole | |
CN207553565U (en) | A kind of crosshead of truss | |
CN106837163B (en) | Deep basal pit hook-hang type Emergency Ladder fabrication and installation construction method and Emergency Ladder | |
CN206144127U (en) | Simple and easy butt clamp integral type operation platform | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN209482687U (en) | A kind of Super High exterior frame column construction operation platform | |
CN106245531A (en) | Steel structural bridge installation method is hung under bilateral derrick type | |
CN211256690U (en) | Pier column high-altitude operation fixed net type safety protection system | |
CN205901172U (en) | Nearly pole of transmission line overhauls corridor hanger device | |
CN208456092U (en) | Skyscraper main body construction hoistway operation platform | |
CN106320525B (en) | Light shaft ceiling large span round steel tubular truss rotation-sliding construction method | |
CN205474878U (en) | Outer hanging platform system of manpower | |
CN218813226U (en) | Safe operation platform device for bridge superstructure construction | |
CN205557344U (en) | Bridge bent cap prestressing force stretch -draw operation panel system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20180206 |