CN205474878U - Outer hanging platform system of manpower - Google Patents

Outer hanging platform system of manpower Download PDF

Info

Publication number
CN205474878U
CN205474878U CN201620072921.3U CN201620072921U CN205474878U CN 205474878 U CN205474878 U CN 205474878U CN 201620072921 U CN201620072921 U CN 201620072921U CN 205474878 U CN205474878 U CN 205474878U
Authority
CN
China
Prior art keywords
basket
platform system
hang
manpower
guidance tape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620072921.3U
Other languages
Chinese (zh)
Inventor
赵文亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201620072921.3U priority Critical patent/CN205474878U/en
Application granted granted Critical
Publication of CN205474878U publication Critical patent/CN205474878U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to an outer hanging platform system of manpower walks guidance tape both ends fixed connection string basket respectively, hangs the basket upper end and is equipped with the couple, two it is connected with safety protective guard to hang between the basket. It is the welding system to hang the basket, dead weight 16.5Kg, size 10.81.5m, adopt 40302mm aluminium matter side pipe as main frame member, vertical bottom plate outside adopts 482.8mm's aluminum pipe and skeleton to weld, all the other adopt 203mm aluminum plate to connect, hang the basket through the aluminum pipe with walk the guidance tape and be connected, walk the guidance tape with 3 3000250250mm and adopt the simple and convenient connection of couple, walk the guidance tape and select the galvanized steel springboard for use, safety protective guard adopts hawser or the every 50cm of lightweight metal pipe to set up together, can add establishes the safety net. To hang earlier on the basket hangs the side wall, and walk the guidance tape again and hang and establish and set up safety protection after, form the scope of operation jointly. The utility model is suitable for an overpass side wall outer wall body routine maintenance and repair.

Description

Manpower external hanging type platform system
Technical field
This utility model relates to a kind of civil engineering platform, particularly to a kind of manpower external hanging type platform system.
Background technology
Along with the social development demand to traffic, urban viaduct application is more and more extensive, and for avoiding traffic above-ground to influence each other, overpass becomes the first-selection of city expressway, and subway overpass is also rapid transit common in city.Overpass is constructed based on concrete at present, by time, external environment condition combined influence, is in outdoor overpass side wall and bulge constantly occurs, come off and even leak the diseases such as muscle, threaten bottom pedestrian, vehicle.Side wall especially outside maintenance is become a kind of demand, but subject to conditions, also become a thorny difficult problem.
Owing to conventional construction uses ladder truck, scaffold, hanging basket etc. to arrange the scope of operation.Ladder truck and scaffold need to take ground, lower section, have a strong impact on traffic, also cannot construct in the place such as part greening, river.Hanging basket requires height, and the scope of operation is little, and risk is big, and cost is high.
Summary of the invention
For defect present in above-mentioned prior art, technical problem to be solved in the utility model is to provide the manpower external hanging type platform system that a kind of energy is convenient and practical.
In order to solve above-mentioned technical problem, the technical solution adopted in the utility model is: a kind of manpower external hanging type platform system, including Hanging Basket, walkway board, safety guide rail, described walkway board two ends are respectively fixedly connected with Hanging Basket, described Hanging Basket upper end is provided with hook, and connecting between two described Hanging Baskets has safety guide rail.
The walkway board that described Hanging Basket is made with general light zinc-plated steel by aluminum pipe is connected.Described Hanging Basket upper end is hung on side wall by hook.Described safety guide rail is made up of hawser or lightweight member.
Monomer deadweight=(deadweight of Hanging Basket deadweight+walkway board) * 1.2 of described manpower external hanging type platform system.
The beneficial effects of the utility model are:
This utility model is assembly form, carries out platform system by manpower and sets up, simple and convenient, and cost is low, can recycle.Selection combines the market quotation, and conventional aluminium is welded into Hanging Basket, and walkway board is market general light zinc-plated steel springboard, and material type is all in daily use.
Manpower external hanging type platform system passes through Hanging Basket and the ingenious connection of walkway board, convenient disassembly;Overall package, selection reasonable employment, easy to maintenance;Operation face length, connection and reasonable arrangement;Use manpower, light applicable.
The manpower external hanging type platform system that this utility model provides, maintain outside overpass side wall in engineering, utilize unique assembly platform system, conveniently assemble and remove, it is substantially reduced construction infection, also can significantly improve efficiency and cost is greatly lowered.
Accompanying drawing explanation
Fig. 1 is manpower external hanging type platform system schematic perspective view of the present utility model;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the base plate plane figure of Hanging Basket;
Fig. 4 is the front view of Hanging Basket;
Fig. 5 is the rearview of Hanging Basket.
Detailed description of the invention
Illustrate embodiment of the present utility model is described in further detail below in conjunction with accompanying drawing.
Such as Fig. 1, shown in 2, a kind of manpower external hanging type platform system, including Hanging Basket 1, walkway board 2, safety guide rail 3, link up with 4.
Walkway board 2 two ends are respectively fixedly connected with Hanging Basket 1, and described Hanging Basket 1 upper end is provided with hook 4, and connecting between two described Hanging Baskets 1 has safety guide rail 3, forms external hanging type job platform.The walkway board 2 that Hanging Basket 1 is made with general light zinc-plated steel by aluminum pipe 5 is connected.Hanging Basket 1 upper end is hung on side wall by hook 4.Safety guide rail uses hawser or lightweight member to arrange.
Hanging Basket 1 is welding system, deadweight 16.5Kg, size 1*0.8*1.5m, use 40*30*2mm aluminum matter square tube as main skeleton component, longitudinal plate outer side uses the aluminum pipe of 48*2.8mm to weld with skeleton, remaining uses 20*3mm aluminium sheet to connect, and top system is placed on side wall, utilizes crotch to avoid sidesway.Hanging Basket 1 is connected with walkway board 2 by aluminum pipe, and 3 pieces of 3000*250*250mm walkway boards 2 use the easy connection of hook 4, and walkway board selects the walkway board 2 of galvanized steel, 11Kg/ block of conducting oneself with dignity.Safety guide rail 5 uses hawser or the every 50cm of light-weight metal pipe to arrange together, can add safety net.First Hanging Basket 1 is suspended on side wall, then carries out walkway board 2 and hang, after safety guide rail 3 is set, be collectively forming the scope of operation.This utility model is applicable to body of wall regular maintenance and repair outside overpass side wall.
As shown in Figures 3 to 5, Hanging Basket 1 is made up of base plate 9, side's aluminum 6, aluminium sheet 7.Hanging Basket 1 AFH is 1.5m, and posterior facial height is 1.9m, and width is 1m, and the degree of depth is 0.8m.Base plate 9 is made up of side's aluminum 6, aluminium sheet 7, aluminum pipe 8, a width of 0.8m*1.0m of long * of base plate 9.The long * wide * thickness of side's aluminum 6 is 40 mm*30 mm*2 mm, and the wide * thickness of aluminium sheet 7 is 20 mm*3 mm, and the external diameter * wall thickness of aluminum pipe 8 is 48 mm*2.8 mm.
Mechanics Calculation: structural member bearing capacity=area of section * aluminium tensile strength=2*2*(2*40+2*26) mm * 15.7Kg/mm=8289.6Kg;
Deadweight=(deadweight of Hanging Basket deadweight+walkway board) * 1.2 of platform system monomer
=1.2*(16.5Kg+3*11 Kg)=58.2Kg.
Remarks: safety guide rail presses 20% value.
Hanging Basket deadweight table
Operation platform considers that 2 people construct, Some tools and material, construction loads value 1000Kg.
< structural member bearing capacity, meets force request for platform system deadweight and construction loads total.
The using method of this utility model embodiment is as follows:
1, by manpower, Hanging Basket is hung to overpass side wall.
2, in personnel enter Hanging Basket, together with the personnel of top, walkway board is suspended on Hanging Basket, suitably adjusts spacing.
3, safety prevention measure is set.
4, workmen's band safe to carry carries out maintenance activity.
5, remove by first filling the order torn open afterwards after having constructed.
Manpower external hanging type platform system ensures all there is positive meaning to minimizing social influence, raising effect, reduction cost, duration.

Claims (5)

1. a manpower external hanging type platform system, including Hanging Basket (1), walkway board (2), safety guide rail (3), it is characterized in that: described walkway board (2) two ends are respectively fixedly connected with Hanging Basket (1), described Hanging Basket (1) upper end is provided with hook (4), and connecting between two described Hanging Baskets (1) has safety guide rail (3).
Manpower external hanging type platform system the most according to claim 1, it is characterised in that: described Hanging Basket (1) is connected with the walkway board (2) being made up of general light zinc-plated steel by aluminum pipe (5).
Manpower external hanging type platform system the most according to claim 1, it is characterised in that: described Hanging Basket (1) upper end is hung on side wall by hook (4).
Manpower external hanging type platform system the most according to claim 1, it is characterised in that: described safety guide rail (3) is made up of hawser or lightweight member.
Manpower external hanging type platform system the most according to claim 2, it is characterised in that: monomer deadweight=(Hanging Basket (1) deadweight+walkway board (2) deadweight) * 1.2 of described manpower external hanging type platform system.
CN201620072921.3U 2016-01-26 2016-01-26 Outer hanging platform system of manpower Active CN205474878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620072921.3U CN205474878U (en) 2016-01-26 2016-01-26 Outer hanging platform system of manpower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620072921.3U CN205474878U (en) 2016-01-26 2016-01-26 Outer hanging platform system of manpower

Publications (1)

Publication Number Publication Date
CN205474878U true CN205474878U (en) 2016-08-17

Family

ID=56639905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620072921.3U Active CN205474878U (en) 2016-01-26 2016-01-26 Outer hanging platform system of manpower

Country Status (1)

Country Link
CN (1) CN205474878U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648258A (en) * 2020-06-08 2020-09-11 上海城建城市运营(集团)有限公司 Ultrahigh single-column pier reinforcing and maintaining method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648258A (en) * 2020-06-08 2020-09-11 上海城建城市运营(集团)有限公司 Ultrahigh single-column pier reinforcing and maintaining method
CN111648258B (en) * 2020-06-08 2021-10-22 上海城建城市运营(集团)有限公司 Ultrahigh single-column pier reinforcing and maintaining method

Similar Documents

Publication Publication Date Title
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN210236926U (en) Folding type tower crane pedestrian safety passage
CN104060541A (en) Sliding small hanging basket and construction technology for mounting interception pipe
CN205474878U (en) Outer hanging platform system of manpower
CN201762974U (en) System for simultaneous construction of upper horizontal structure and lower horizontal structure in core tube
CN203669328U (en) Quick-disassembly high-altitude working hanging basket
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN208701506U (en) Bridge Thin-wall Hollow Pier safety climbing ladder adheres to attachment device
CN208166361U (en) A kind of overlength light-weight metal roof boarding lifting attachment device
CN215564748U (en) Pavement for roof structure of swimming pool
CN205893930U (en) Self -propelled hanging flower basket device
CN213139095U (en) Adjustable cage hanging scaffold operation tool for ship construction
CN210767926U (en) Safety protection platform
CN209114330U (en) A kind of steel reinforced concrete girder cast-in-place concrete wing plate formwork jumbo
CN204803771U (en) High pier bridge disease of highway inspection punishment facility
CN204038917U (en) Dismountable external hanging service platform
CN210828282U (en) High-strength foot blocking plate
CN207646613U (en) Module assembling stent system
CN206308627U (en) A kind of portable beam body side operation frame
CN211472213U (en) Deck type railway steel truss bridge construction hanging basket
CN103758334A (en) Scaffold structure for constructing exterior wall of building
CN215052132U (en) Mounting bracket platform for cable-stayed bridge of arc steel tower
CN219951910U (en) Operation platform suitable for bored concrete pile well head detects operation
CN205839605U (en) A kind of totally-enclosed safeguard structure of Hanging basket on front support assembled
CN211338599U (en) Tower crane attaches wall mounting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant