CN206428979U - Face frontier defense protection unit - Google Patents

Face frontier defense protection unit Download PDF

Info

Publication number
CN206428979U
CN206428979U CN201621476868.XU CN201621476868U CN206428979U CN 206428979 U CN206428979 U CN 206428979U CN 201621476868 U CN201621476868 U CN 201621476868U CN 206428979 U CN206428979 U CN 206428979U
Authority
CN
China
Prior art keywords
frontier defense
protection unit
girder
defense protection
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621476868.XU
Other languages
Chinese (zh)
Inventor
程凯
周国
李文春
张强
赵飞胜
吴广勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201621476868.XU priority Critical patent/CN206428979U/en
Application granted granted Critical
Publication of CN206428979U publication Critical patent/CN206428979U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model is related to the technical field of construction safety equipment, frontier defense protection unit is faced in offer, including shielded frame and location structure, shielded frame is enclosed by upper girder, lower girder, left side beam and right side beam and formed, mesh sheet is provided between upper girder and lower girder, side frame is provided with upper slide cartridge and lower slide cartridge, and upper girder and lower girder are slidably matched with upper slide cartridge and lower slide cartridge respectively.Using it is above-mentioned face frontier defense protection unit when, during each overhanging unloading platform, only need to by simple push-and-pull shielded frame and positioning action, just the protection that overhanging unloading platform can be completed is set, compare prior art, which obviates the problem of there is potential safety hazard and lost labor's material caused by repetition is set up and frontier defense protection structure is faced in dismounting.

Description

Face frontier defense protection unit
Technical field
The utility model belongs to the technical field of construction safety equipment, more particularly to faces frontier defense protection unit.
Background technology
As shown in figures 1-4, Civil structure construct when, basis complete construction after, successively from the bottom up carry out wall column and Floor contignation 30 is constructed.Floor contignation 30 uses the circulation materials such as template, steel pipe, the layer beam slab knot per first floor Structure 30 is completed after construction, it is necessary to which the circulation material with tower crane by this layer for constructing is allocated and transported to upper strata and applied for a new Rotating fields Work.When being constructed because of building floor contignation 30, building periphery one is enclosed and sets up steel pipe outrigger 40, and tower crane lifting is transported Lifting overhead clear is must assure that during material, is vertical lifting mode, therefore needs overhanging unloading platform 20 being arranged on building The edge of layer contignation 30, the overhanging unloading platform 20 that end is set exceeds steel pipe outrigger 40, first carries circulation material Into overhanging unloading platform 20, then by tower crane by circulation material be hoisted to upper strata construction.Generally, overhanging unloading platform 20 is set up Afterwards, need to set up materials handling passage between the position of overhanging unloading platform 20 and the edge of floor contignation 30, material is removed Wan access both sides need to set up to face frontier defense protection structure 50.
At present, after the completion of overhanging unloading platform 20 is set up, workman sets up then at materials handling passage both sides faces frontier defense shield knot Structure 50, faces frontier defense after the circulation material of this floor layer is all hoisted to upper floors, then by the logical both sides of materials handling passage Protection structure 50 is removed, then, and overhanging unloading platform 20 is hoisted into upper floors, while again must be in overhanging unloading platform 20 Materials handling passage both sides, which are set up, faces frontier defense protection structure 50, so, when each overhanging unloading platform 20 is lifted, and is required to repeat to take If facing frontier defense protection structure 50 with dismounting.Therefore, it is existing to face the problem of frontier defense protection structure 50 still suffers from such:Due to discharging of encorbelmenting When platform 20 is lifted, it is required to repeat to set up and frontier defense protection structure 50 is faced in dismounting, so, if materials handling passage both sides are faced Frontier defense protection structure 50 is set up not in time, and workman is carrying circulation material into overhanging unloading platform 20 by materials handling passage When, there is the potential safety hazard that personnel or material fall;Repetition is set up and frontier defense protection structure 50 is faced in dismounting, can cause material and artificial Waste;Moreover, repeating to set up to face frontier defense protection structure 50, it is also difficult to ensure that the specification set up faces frontier defense shield with uniformly, have impact on The security of structure 50.
Utility model content
The purpose of this utility model is that frontier defense protection unit is faced in offer, it is intended to solve in the prior art due to repeat set up and The problem of there is potential safety hazard and lost labor's material caused by frontier defense protection structure is faced in dismounting.
In order to solve the above technical problems, the utility model, which is provided, faces frontier defense protection unit, applied on overhanging unloading platform, The overhanging unloading platform includes bottom plate, and the opposite sides of the bottom plate is respectively equipped with side frame, and the frontier defense protection unit that faces includes Shielded frame, the shielded frame is enclosed by upper girder, lower girder, left side beam and right side beam and formed, the upper girder with it is described Be provided with mesh sheet between lower girder, the side frame is provided with upper slide cartridge and lower slide cartridge, the upper girder and the lower girder respectively with The upper slide cartridge and the lower slide cartridge are slidably matched in order to which the shielded frame closes at the mesh sheet by horizontally slipping In the side frame or be exposed to outside the side frame, it is described face frontier defense protection unit and be also included in the mesh sheet close in the side frame or dew The location structure of the shielded frame is positioned when outside the side frame.
Further, the side frame is provided with upper clamping hook and lower snap fit, and the upper slide cartridge and the upper clamping hook are located at same On straight line and in being arranged at intervals in the glide direction of the shielded frame, the lower slide cartridge and the lower snap fit are located at same straight line Above and in being arranged at intervals in the glide direction of the shielded frame, the lower girder is supported on the lower snap fit, the upper master Beam is caught on by the upper clamping hook.
Further, the quantity of the upper clamping hook and the quantity of the lower snap fit are set at least two, at least described in two on Snap fit interval is uniformly arranged, and lower snap fit interval is uniformly arranged at least described in two.
Further, roller is arranged with the lower snap fit, the lower girder is supported on the roller.
Further, the location structure closes at the side including the latch on the right side beam, in the mesh sheet The first sleeve of cooperation is plugged for the latch and plugged when the mesh sheet is exposed to outside the side frame for the latch during inframe The second sleeve of cooperation, first sleeve and the second sleeve are arranged at intervals on the bottom plate.
Further, the right side beam is provided with fixed cover, and the latch is inserted in the fixed cover and the bending It is exposed to outside the fixed cover to prevent the latch from departing from.
Further, the latch includes shank, the upper end of the shank be bent to form with the shank into 90 degree the One bending, first bending is bent to form and the described first the second bending for being bent into 90 degree.
Further, the right side beam is provided with projection, and first bending or the second bending hook joint are in described convex On post.
Further, the inside casing of rectangular in cross-section, the top side side of the inside casing, bottom side are installed on the shielded frame And right edge is connected with the upper girder, the lower girder and the right side beam respectively, the mesh sheet is located in the inside casing.
Further, it is additionally provided with pedal between the bottom of the bottom side and the mesh sheet.
The beneficial effect for facing frontier defense protection unit that the utility model is provided:
When Civil structure is constructed, in set on overhanging unloading platform it is above-mentioned face frontier defense protection unit, faced due to above-mentioned Frontier defense protection unit employs shielded frame, mesh sheet, upper slide cartridge, lower slide cartridge and location structure, and upper girder and lower girder respectively with Upper slide cartridge and lower slide cartridge are slidably matched, so, after overhanging unloading platform is set up, and can make to prevent by left and right push-and-pull shielded frame The mesh sheet of shield framework is exposed to outside side frame and positioned at the both sides of materials handling passage, and positions fixation by location structure, in order to When circulation material is hoisted into upper floors, workman is protected, meanwhile, carry and finish in the circulation material of this floor layer When, the positioning of location structure is first released, then by left and right push-and-pull shielded frame, the mesh sheet of shielded frame is closed in side frame, this Sample, shielded frame can be hoisted to upper floors with overhanging unloading platform, set up and finish in the overhanging unloading platform of upper floors Afterwards, shielded frame can be released again.Therefore, during each overhanging unloading platform, it is only necessary to pass through simple push-and-pull shielded frame And positioning action, the protection setting of overhanging unloading platform just can be completed, compare prior art, which obviates due to repeating Set up and the problem of there is potential safety hazard and lost labor's material caused by frontier defense protection structure is faced in dismounting.
Brief description of the drawings
Fig. 1 is the structural representation for the overhanging unloading platform that prior art is provided;
Fig. 2 is structural representation of the overhanging unloading platform of prior art offer in construction;
Fig. 3 is the overhanging unloading platform that prior art is provided and faces another structural representation of the frontier defense protection structure in construction Figure;
Fig. 4 be prior art provide overhanging unloading platform and face frontier defense protection structure in construction by lower floor handling to Structural representation during upper floors;
Fig. 5 is the structural representation for facing frontier defense protection unit that the utility model is provided;
Fig. 6 is the upper slide cartridge, upper clamping hook, lower slide cartridge, lower snap fit, the first set that face frontier defense protection unit that the utility model is provided Cylinder and second sleeve are located at structural representation during overhanging unloading platform;
Fig. 7 be Fig. 5 provide face enlarged diagram of the frontier defense protection unit at circle A;
Fig. 8 is the structural representation faced when frontier defense protection unit is installed on overhanging unloading platform that the utility model is provided;
Fig. 9 is that Fig. 8 faces enlarged diagram of the frontier defense protection unit at circle B;
Figure 10 be the utility model provide face frontier defense protection unit construction when structural representation;
Figure 11 be the utility model provide face frontier defense protection unit in construction by lower floor handling to upper floors when Structural representation.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only to explain The utility model, is not used to limit the utility model.
As shown in Fig. 5~11, the preferred embodiment provided for the utility model.
It should be noted that when element is referred to as " being fixed on " or " being arranged at " another element, it can be directly another On one element or it is connected on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It should also be noted that, the orientation term such as left and right, upper and lower in the present embodiment, be only each other relative concept or Using the normal operating condition of product as reference, and it should not be regarded as restrictive.
As shown in Fig. 1, Fig. 5 and Fig. 6, what the present embodiment was provided faces frontier defense protection unit 10, applied to overhanging unloading platform 20 On, the overhanging unloading platform 20 includes bottom plate 21, and the opposite sides of bottom plate 21 is respectively equipped with side frame 22.
This, which faces frontier defense protection unit 10, includes shielded frame 11, and shielded frame 11 is by upper girder 111, lower girder 112, left side beam 113 and right side beam 114 enclose and form, between upper girder 111 and lower girder 112 be provided with mesh sheet 12, side frame 22 be provided with upper slide cartridge 13 and lower slide cartridge 14, upper girder 111 and lower girder 112 are slidably matched in order to protective frame with upper slide cartridge 13 and lower slide cartridge 14 respectively Frame 11 makes mesh sheet 12 close in side frame 22 or be exposed to outside side frame 22 by horizontally slipping, and faces frontier defense protection unit 10 and is also included in net Piece 12 close in side frame 22 or be exposed to side frame 22 it is outer when position the location structure 15 of shielded frame 11.
As shown in Fig. 1, Fig. 5 and Fig. 6, when Civil structure is constructed, in setting above-mentioned face on overhanging unloading platform 20 Frontier defense protection unit 10, because the above-mentioned frontier defense protection unit 10 that faces employs shielded frame 11, mesh sheet 12, upper slide cartridge 13, lower slide cartridge 14 With location structure 15, and upper girder 111 and lower girder 112 be slidably matched with upper slide cartridge 13 and lower slide cartridge 14 respectively, so, outstanding Choose after discharging platform 20 sets up, by left and right push-and-pull shielded frame 11 mesh sheet 12 of shielded frame 11 can be made to be exposed to outside side frame 22 And fixation is positioned positioned at the both sides of materials handling passage, and by location structure 15, in order to which circulation material is being hoisted to During floor layer, workman is protected, meanwhile, when the circulation material of this floor layer is carried and finished, first release location structure 15 Positioning, then by left and right push-and-pull shielded frame 11, the mesh sheet 12 of shielded frame 11 is closed in side frame 22, so, protective frame Frame 11 can be hoisted to upper floors with overhanging unloading platform 20, after the overhanging unloading platform 20 of upper floors is set up and finished, Shielded frame 11 can be released again.Therefore, during each overhanging unloading platform 20, it is only necessary to pass through simple push-and-pull shielded frame 11 and positioning action, the protection that just can complete overhanging unloading platform 20 is set, and compare prior art, which obviate due to Repetition is set up and the problem of there is potential safety hazard and lost labor's material caused by frontier defense protection structure is faced in dismounting.
You need to add is that, upper girder 111 and lower girder 112 are made up of steel pipe, certainly, upper girder 111 and lower girder 112 Material using being not limited to that;Left side beam 113 and right side beam 114 are made up, equally, left side beam 113 and right side beam of reinforcing bar 114 material is using being not limited to that.
As shown in Fig. 1, Fig. 5 to Fig. 9, in order to which shielded frame 11 is in horizontally slipping on overhanging unloading platform 20, side frame 22 Upper clamping hook 16 and lower snap fit 17 are provided with, upper slide cartridge 13 and upper clamping hook 16 are on same straight line and in the slip of shielded frame 11 It is arranged at intervals on direction, lower slide cartridge 14 and lower snap fit 17 are on same straight line and in interval in the glide direction of shielded frame 11 Set, lower girder 112 is supported on lower snap fit 17, and upper girder 111 is caught on by upper clamping hook 16.So, during push-and-pull shielded frame 11, Shielded frame 11 is by under the mating reaction of upper slide cartridge 13, lower slide cartridge 14, upper clamping hook 16 and lower snap fit 17, and swimmingly left and right is sliding It is dynamic.
Specifically, the cross sectional shape of upper clamping hook 16 and lower snap fit 17 is " L " shape.
Refinement ground, is more consolidated, upper clamping hook 16 in order that obtaining the support of upper clamping hook 16 and lower snap fit 17 to shielded frame 11 Quantity and the quantity of lower snap fit 17 be set at least two, at least two upper clamping hooks 16 interval is uniformly arranged, at least two times snap fits 17 Interval is uniformly arranged.
In order that roller 171 can be arranged with swimmingly in being slided on lower snap fit 17 on lower snap fit 17 by obtaining lower girder 112, Lower girder 112 is supported on roller 171.
Refinement ground, as shown in Fig. 1, Fig. 5 to Fig. 9, location structure 15 is including the latch 153 on right side beam 114, in net Piece 12 close at when in side frame 22 for latch 153 plug cooperation the first sleeve 151 and in mesh sheet 12 be exposed to side frame 22 it is outer when for insert Pin 153 plugs the second sleeve 152 of cooperation, and the first sleeve 151 and second sleeve 152 are arranged at intervals on bottom plate 21.So, exist After overhanging unloading platform 20 is set up, by left and right push-and-pull shielded frame 11 mesh sheet 12 of shielded frame 11 can be made to be exposed to side frame 22 Both sides that are outer and being located at materials handling passage, and latch 153 is inserted in second sleeve 152, make the positioning of shielded frame 11 solid It is fixed, in order to when circulation material is hoisted into upper floors, protect workman, meanwhile, in the turnover of this floor layer When material carrying is finished, latch 153 and the location fit of second sleeve 152 are first released, then by left and right push-and-pull shielded frame 11, make The mesh sheet 12 of shielded frame 11 is closed in side frame 22, then latch 153 is inserted in the first sleeve 151, in order to shielded frame 11 preferably as overhanging unloading platform 20 is hoisted to upper floors.
Specifically, latch 153 uses reinforcement fabrication, certainly, and the material of latch 153 is using being not limited to that.
As shown in Fig. 1, Fig. 5 to Fig. 9, in order to prevent latch 153 from being come off from shielded frame 11, right side beam 114 is provided with Fixed cover 18, latch 153 is inserted in fixed cover 18 and bending is exposed to outside fixed cover 18 to prevent latch 153 from departing from.
Refinement ground, latch 153 includes shank 1533, the upper end of shank 1533 be bent to form with shank 1533 into 90 degree the One bending 1531, the first bending 1531 is bent to form with the first bending 1531 into 90 degree of the second bending 1532.
In order to further prevent latch 153 from being come off from shielded frame 11, right side beam 114 is provided with projection 19, first Bending 1531 or the hook joint of the second bending 1532 are on projection 19.Specifically, projection 19 has bar dowel to be made.
As shown in Fig. 1, Fig. 5 to Fig. 9, in order to strengthen rigidity, the intensity of shielded frame 11, the safety of shielded frame 11 is improved The inside casing 115 of rectangular in cross-section, top side side, bottom side and the right edge difference of inside casing 115 are installed on performance, shielded frame 11 It is connected with upper girder 111, lower girder 112 and right side beam 114, mesh sheet 12 is located in inside casing 115.
Specifically, mesh sheet 12 is made up of reinforcing bar, and inside casing 115 is made up of angle steel, top side side, bottom side and the right side of inside casing 115 Side is welded with upper girder 111, lower girder 112 and right side beam 114 respectively, moreover, inside casing 115 and mesh sheet 12 are also by welding.
Refinement ground, as shown in figure 5, being additionally provided with pedal 116 between the bottom of bottom side and mesh sheet 12.
Preferred embodiment of the present utility model is these are only, it is all in this practicality not to limit the utility model Any modifications, equivalent substitutions and improvements made within new spirit and principle etc., should be included in guarantor of the present utility model Within the scope of shield.

Claims (10)

1. one kind faces frontier defense protection unit, applied on overhanging unloading platform, the overhanging unloading platform includes bottom plate, the bottom plate Opposite sides be respectively equipped with side frame, it is characterised in that the frontier defense protection unit that faces including shielded frame, the shielded frame by Upper girder, lower girder, left side beam and right side beam, which are enclosed, to be formed, and mesh sheet is provided between the upper girder and the lower girder, described Side frame is provided with upper slide cartridge and lower slide cartridge, and the upper girder and the lower girder are slided with the upper slide cartridge and the lower slide cartridge respectively It is dynamic to coordinate in order to which the shielded frame makes the mesh sheet close in the side frame or be exposed to the side frame by horizontally slipping Outside, it is described face frontier defense protection unit and be also included in the mesh sheet close in the side frame or positioned when being exposed to outside the side frame described anti- Protect the location structure of framework.
2. face frontier defense protection unit as claimed in claim 1, it is characterised in that the side frame is provided with upper clamping hook and lower snap fit, The upper slide cartridge and the upper clamping hook are described on same straight line and in being arranged at intervals in the glide direction of the shielded frame Lower slide cartridge and the lower snap fit are on same straight line and in interval setting, the lower master in the glide direction of the shielded frame Beam is supported on the lower snap fit, and the upper girder is caught on by the upper clamping hook.
3. face frontier defense protection unit as claimed in claim 2, it is characterised in that the quantity of the upper clamping hook and the lower snap fit Quantity is set at least two, and upper clamping hook interval is uniformly arranged at least described in two, and lower snap fit interval is uniformly arranged at least described in two.
4. face frontier defense protection unit as claimed in claim 2, it is characterised in that be arranged with roller on the lower snap fit, it is described under Girder is supported on the roller.
5. face frontier defense protection unit as described in any one of Claims 1 to 4, it is characterised in that the location structure includes being located at Latch on the right side beam, when the mesh sheet is closed in the side frame for the latch plug cooperation the first sleeve and in The mesh sheet is exposed to the second sleeve for plugging cooperation when outside the side frame for the latch, first sleeve and described second set Cylinder is arranged at intervals on the bottom plate.
6. face frontier defense protection unit as claimed in claim 5, it is characterised in that the right side beam is provided with fixed cover, described to insert Pin is inserted in the fixed cover and the latch is exposed to outside the fixed cover to prevent the latch from departing from.
7. face frontier defense protection unit as claimed in claim 6, it is characterised in that the latch includes shank, the shank it is upper End is bent to form with the shank into 90 degree of the first bending, and first bending is bent to form is bent into 90 degree with described first The second bending.
8. face frontier defense protection unit as claimed in claim 7, it is characterised in that the right side beam is provided with projection, described first Bending or the second bending hook joint are on the projection.
9. face frontier defense protection unit as described in any one of Claims 1 to 4, it is characterised in that be provided with the shielded frame The inside casing of rectangular in cross-section, top side side, bottom side and the right edge of the inside casing respectively with the upper girder, the lower girder and The right side beam connection, the mesh sheet is located in the inside casing.
10. face frontier defense protection unit as claimed in claim 9, it is characterised in that the bottom of the bottom side and the mesh sheet it Between be additionally provided with pedal.
CN201621476868.XU 2016-12-29 2016-12-29 Face frontier defense protection unit Expired - Fee Related CN206428979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621476868.XU CN206428979U (en) 2016-12-29 2016-12-29 Face frontier defense protection unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621476868.XU CN206428979U (en) 2016-12-29 2016-12-29 Face frontier defense protection unit

Publications (1)

Publication Number Publication Date
CN206428979U true CN206428979U (en) 2017-08-22

Family

ID=59584342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621476868.XU Expired - Fee Related CN206428979U (en) 2016-12-29 2016-12-29 Face frontier defense protection unit

Country Status (1)

Country Link
CN (1) CN206428979U (en)

Similar Documents

Publication Publication Date Title
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN206233102U (en) A kind of packaged type faces side operation work platform
CN103758045B (en) Box girder wet joint formwork construction method under space limitation condition
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
CN206428979U (en) Face frontier defense protection unit
CN209129147U (en) Regularization stair channel
CN204418229U (en) Poured band of outer wall of basement concrete draw-in groove
CN204663025U (en) A kind of reinforced concrete member horizontal hole safeguard structure
CN206267425U (en) A kind of device for being used in turn steel bar horse-shaped bench
CN203499262U (en) One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure
CN206000192U (en) A kind of large-scale horizontal opening protective device
CN205382718U (en) Sparse passway for escaping of steel platform die carrier system
CN104131635A (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN204850515U (en) Steel construction faces limit protector
CN108643925A (en) Intersect the cycle construction method of the tunneling section under mid-board engineering method
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN207974544U (en) Outer wall template steel pipe storing unit
CN205036098U (en) Interim escape way of high building construction
CN205857792U (en) Shear wall concrete replacement bottom provisions for grouting
CN205742561U (en) A kind of spigot-and-socket plate-jointing structure
CN205445132U (en) Curtain wall penel
CN205421978U (en) Elevartor shaft protection module
CN206128632U (en) Can have enough to meet need hard protector of formula elevator well regularization shaped steel
CN205936609U (en) Tunnel shaft mouth safety protection dish

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170822

Termination date: 20171229

CF01 Termination of patent right due to non-payment of annual fee